From where the planned cost of material and activity types in cost itemizationafter creation flow ?From where the actual cost of a material and activity types in  cost analysis of process order after confirmation flow?

You may be knowing you give Costing Variants ( Both actual as well as Planned ) in Order type. These Costing variants contains Valuation variants which says which costs are to be taken while creation ( for Planned Cost ) and Actual cost ( while confirming and Moving Goods) to be calculate. These Variants decides mode of Cost Flows.
Now, Data in Planned costs are Standard Cost figures or Current prices for material or Planned Prices of Activities.
As far as Actual costs are considered it may be the price for the consumed quantity @ the moving average price of the day or activity price for the qty. consumed which include up planned consumption too.....
Reward if you find useful

Similar Messages

  • Function module for calculating planned and actual cost of production order

    Hi ,
    Do we have any standard function module for calculating planned and actual cost for production order?
    i need to implement this in a Z-report.
    Thanks
    Srini

    Hi,
    try below function module
    CRMCO_GET_PLAN_ACTUAL_COSTS
    CO_IH_GET_PLANNED_COSTS_TOTAL
    Regards,
    Sankaran

  • Table for Production order planned and Actual cost

    Hi Experts,
    Can anybody please tell me the name of table where Production order planned and Actual cost gets saved ?
    Thanks in advance.
    Regards,
    Bijay

    Table COEP
    don't forget the points

  • Planned and Actual costs at the Activity level

    Hi all,
          Can you tell me if there is a R/3 report which lists out the planned and actual costs for a project and displays it for each network and activity? I want these values at the activity level.
          I found a report which lists out these values for each network, but I cannot drilldown to the activity level. Please help.
    Thanks,
    Satyajit.

    Hi,
    There is setting in network type. Please go through transaction OPUV  i.e.
    Change view- Network type paramaeters : overview " Overview.
    Uner Network type parameters there is one radio button in front of ActvtyAcctAssgn. Just activate it.
    Hope this helps.
    Regards
    Tushar

  • Marketing Planning Planning and Actual Cost

    Hi
    We have a clinet requirement, where they want Marketing Planning functionality to be implemented. They want to use Budget Planning and Actual cost tracking functionality. Now as per my understanding we use SEM/BI for planning (Key Figure) and PS or COPA integration for Actual Cost Tracking.
    Is my understanding correct and what are the steps required for the two. Client has currently implemented SEM/BI and ECC, but PS is not in scope. So we will have to capture Actual Cost using COPA.
    Thanks & Regards
    Hits

    Hi Hitesh,
    The below link could answer your questions
    http://help.sap.com/saphelp_crm70/helpdata/EN/46/606830234f0db7e10000000a1553f6/frameset.htm
    Hope this helps,
    Regards,
    Naveen

  • Actual Cost Calculation in Process Order

    Hi All,
    I updated Standard cost of a raw material through a cost estimate and also ran cost estimate of the FIN that is using this raw material but when I am creating a Process order, it is taking the cost of this particular raw material from the previous estimate not the recent one to calculate the target cost. Can any body help me with this.
    Thanks
    MKR

    Hi Ashok,
    My Valuation variants for the Costing Variant of Cost Estimate and Production order (Actual/Plan) cost calculation are in Sync to get the prices according to the price indicator in material master. But when it calculates cost for a production order, it is picking up cost from the previous period for that particular raw material. I have updated the standard cost by running the cost estimate but still its not working.
    Any lead on this. This will be really appreciated.
    Thanks
    MKR

  • Tabale for Actual cost value for Process orders

    Hi Friends
    From which table can we retrive the actual values relates to process orderwise, like actual material consumption cost, activites cost, overhead cost and other costs.

    Hi
    You would find the actual for process orders in Table COEP with Object Number = OP*. Also Check if you would require COSS, COSP for Controlling Tables and to get the Object numbers you need to used AFPO with Order type of Process order PI01...
    Regards,
    Suraj

  • Actual cost for the Process Orders

    Hi Experts,
    I want to know the actual cost for total one month process orders.
    I can check actual cost for each order in COR2- by entering in to cost analysis.
    But, my request is, where to check actual cost for One perticular product for the total month (ex: 100 Orders) or certain period.
    can eny body give solution by sparing your precious time.
    adv. thanks and regards,
    Anand.M (Hyderabad)

    Hi,
    Try MCRI / MCRY or check the table entries of S027
    Regards,
    Srini

  • Planned and actual cost

    hi
    after doing cat5 the cost must transfer to the ps, in my case the plan/actual% is showing 100% at the activity level, deliberately I enter different time in the time sheet to see the difference in %, but when i enter time difference in wbs level in cat2 and after doing cat7 i can c the difference in actual and planed cost.
    my query is i want to see the difference in plan/actual at the activity level or u can say after doing cat5 so any one can help me on this and what setting to b changed.
    thanx in advance
    subhro

    hi
    while seeing act/plan/variance report using t code S_ALR_87013543
    subhro

  • In which table production order planned cost and actual cost i can see?

    Dear PP Guru,s,
    from which table i can see productuion order planned and actaul cost. i checked following tables AUFK, AFVC, AFVV, CAUFV, AFRU, AFKO, AFPO. but i did not found planned cost and actual cost field. is there any other way to get this data with respect production order?
    Regards,
    sree

    Dear,
    Planned and actual costs of prod order from COEP, COSS, COSP  S027 tables
    production order shows the planned cost based on the quantity structure.
    Please refer my reply in this thread for details,
    Re: Actual Halb Material Cost
    Regards,
    R.Brahmankar

  • Planned vs Actual Cost Report (with variance) for PM Orders

    Hi Experts,
    We are using the project system to collate order costs for annual shut work.  We have a requirement for a report to show 25% variance between planned and actual order costs (maintneance order).
    At this stage, we dont mind whether this is implemented in the the PM system, or the PS system.
    This is a fairly basic / common requirment.  Are there any standard transactions we could use to:
    1.  Select a list of orders using standard selection criteria.
    2.  Select a % for variance, e.g. 25%
    3.  Display a list of orders where the planned vs actual costs were greater than 25% and what the actual variance is for each order?
    Thanks,
    Maikel

    Hi Maikel,
                   I have never seen any such scenario, but the best thing that can come to me is for the shut down activities you muct have created a Revision, then based on that Revision you can take a dump of all the orders with Planned and Actual Cost, in the excel, and there by putting the formulae you can definitely have the Varience report.
    Hope it helps you.
    Regards,
    Yawar Khan

  • Std Costing and Actual costing at process Order

    Hello Friends,
    Followings are the client requirements, Please give me your ideas :-
    1 . Costing variant is same for all three - costing run, process order (plan and actual), means there is no prices variance on process order level. ( material at std price, Activity plan price, overhead fix%)
    2. Alongwith this above client also need to capture actual result (material at MAP, activity at monthly actual price, overhead fix %)
      In this case there is price and  usage variance can see.
    Now as I think that both scenarios are not possible on process order level.  According to me we can do by a customize actual costing cockpit.
    Need your openion that do we have any option thru standard funcations of sap to get this requirement.  If you need any other explanation , please do let me know.
    Thanks
    Ravi

    Thanks friends. I have done.

  • Target cost and actual cost not picking in production order

    Hello,
    The target cost and actual cost is not updating in production order when I display it in CO03 in cost analysis.
    Even though we have maintained planned price in KP26.
    Please suggest how it can be populated.
    Best Regards,
    Tapan

    Hi Tapan
    For Target cost
    1. Your std cost must be released before Goods Receipt
    2. There must be goods receipt posted on the prod order
    3. You must calculate variances in KKS1/2
    For Actual Cost
    1. Post Goods receipt and Goods issues
    2. See if any mat movements are pending in COGI
    3. Ensure that operation is confirmed in PP and no entry is lying in COFC
    Regards
    Ajay M

  • IW32  needed Plan Cost and Actual Cost table name

    Hello ,
    In IW32 transaction Plan Cost and Actual cost in cost tab ---Table Name.
    Req: needed  plan cost & actual cost table names  for particular order number.( For New Report )
    Can you please let me know where Plan cost & actual cost get stored in IW32 in Cost tab ( table name / function module name ) or how its get calcualted for particular order number.
    Thanks in advance !
    Regards
    Rahul

    hi ,
    i too had same issue , i wrote following FS for that :
    Actual and planned cost  from PMCO-WRT00 to WRT12(the sum of values should be considered for actual as well as planned ) for  PMCO-OBJNR taken from CAUFV -OBJNR for order number  AFIH-AUFNR  and also currency from CAUFV-WAERS .
    Actual cost will have valuation type PMCO-WRTTP = 4 and planned cost will have valuation type  PMCO-WRTTP = 1 , which will be placed in different column
    hope this helps
    regards
    satish

  • Function Module to find Planned Costs and Actual Costs against WBS element

    Dear All,
    We have a requirement where we need to find out the Planned Costs and Actual Costs booked against a WBS element, in a year. The costs can be against all the plan versions or on individual plan version.
    Are there any function modules to retrieve this value?
    Thanks for the help.
    Warm Regards,
    Judith

    Hi,
    The easiest way would be to get the OBJNR for all WBS elements from PRPS and look up RPSCO and summarize for Value type (RPSCO-WRTTP) 1 for planned cost and 4 for Actual cost.
    Please let me know if this helps.
    jibat

Maybe you are looking for

  • Mediasource won't display my music libr

    Here's the deal: When I open Mediasource Organizer, there are three folders displayed: PC Library, Nomad Jukebox Zen Xtra and My Computer. When I click on the Nomad folder to access the Music Library on my player, a box opens that looks as if it is t

  • Re: Update Duplicate Rows

    Oracle 11.2.0.2 Windows 2008 I have this table (case_file) with duplicate rows (case_number). I will like to make the case_number unique through out the table. For example, if I have two rows with the same case_number(225), I will like to change one

  • Movement type related question

    Hi, What is the difference between movement type 413 and 412 with special stock indicator E? An explanation with an example would help.

  • Trying to find expiration date of my GCU

    Hi mods, I read the post that explained it was lost as part of the web shake up for the holidays, but since it isn't back yet, can this be checked by you?  I was considering adding another 2 years with the promo on now, but didn't want to extend it t

  • Slowness in Loading Crystal Report

    Hi Experts, We are using Crystal Report 2008 with SAB B1 - 2007 B PL 13. The Loading of Crystal report viewer and criteria window is too slow. When we loads CR viewer for the first time it takes 30-40 secs to load. Criteria window takes another 20 se