Planned capacity Requirement of Past

Dear Experts
I Have selected the profile and displayed the report through CM02 for the past capacity planning Requiremnt.But the problem with report is that it is only showing the capacity of Released order and order status with TECO is not displaying in the report.Please guide me to get the same by selecting the suitable profile.
Actually i want to see the how much was the capacity planned in last month or week.Please tell me some suitable report to get the required output.
Thanks in advance for your valuable help.
AR
Edited by: Amit  Rana on Aug 26, 2009 12:45 PM
Edited by: Amit  Rana on Aug 26, 2009 12:53 PM

Hi Experts,
i Want to see the Planned capacity for workcentre.I mean to say what was the actual planned capacity of workcenter last week or Month.The system is only displaying order which is having released status system is not considering order status with TECO.This ineed to analyse my capacity requrement for this year Plan vs Actuall.
Please guide me
AR
Edited by: Amit  Rana on Aug 26, 2009 2:52 PM

Similar Messages

  • Remaining capacity requirements scheduled for operation in Planned Order

    Hi all,
    I'm workig with planned orders, and I need the "Remaining capacity requirements scheduled for operation" data to list it in a Z Report, but I don't know how to get it.
    You can see the info in the "Detail Scheduling" of the planned order in MD13.
    Anyone knows how to get the info? Any table or any FM to get it?
    Points will be given for helping
    Thanks in advance!

    Did you ever find out where the planned order capacity information lives?  I can find the production capacity information in table KBEZ, but it appears that there is no planned order info there.
    Thanks,
    Matthew Bruckner

  • MD02 - Capacity Requirement Plan for External Procurement Material

    Hi, I have the following requirements.
    MRP Scheduling is getting executed material level (material no, plant) with scheduling type 2 which means lead time scheduling using MD02 Transaction Code. This is works fine for the Inhouse Product. In order to achieve lead time the functional team has maintained the necessary routing/workcenter configs.
    The business needs the same functionality "Capacity requirements calculation" for the external procurement material. Business is willing to maintain routing/workcenter config.
    Currently standard program (MD02) is not considering the Capacity planning for the external Procurement material.
    Could you please suggest is it can be controlled through programming.
    Kindly suggest the function modules for Capacity Planning - materialwise, plantwise.
    Please suggest.
    Thanks
    Giri

    Hi Giri
        I think the requirement is not mentioned clearly. Capacity is required only if the material is assembled/produced in house.
    Anyway try this. Set the Procurement type to X in the MRP views in material master. You might have to define your custom material type so that it does not force the procurement type to F. Try the feature called "Quota arrangement". The idea is to define the material in such a way that it can be procured externally or produced in house. With quota arrangement you can say what % has to be bought and what % to be produced in house. If it is produced in house then you can have capacity requirements.
    Regards
    Pragnesh

  • Rough -cut plan with capacity requirment calculation

    Hi all,
    We checking SOP with rough-cut plan
    We created Rough-cut profile in mc35 for our bottle neck work center with base quantity -1 and time span - 1
    then we selected new work center (there is no existing cap req). and assigned base unit measure:min.
    and we assigned 1min for each day and saved the profile.
    Now we went to mc88 and checked the material's active version production plan. (period split- DAY)
    in View -> capacity situation -> rough cut planning -> show.
    System calculates some capacity requirement for our production plan.
    Say for tomorrow's date i given 1000 qty - production plan.
    but system showing capacity req
    Work center:  TESTWC3                  Plant: 0001         Capacity:  001
    Info structur  Material          Plant   Order qty     Unit     From              To          Capacity reqmts      Unit
    S076            TESTFERT14    0001  1000.000       EA    29.01.2010  11.02.2010   9000.000              MIN
    with 9000min and cap load more than 652% ( Actuallly  it has to show 1000min as per rough cut plan profile)
    Our available capacity of work center per day - 1380 min
    We cant understand the capacity requirement calculation in MC88..
    Help us out...
    Thanks in advance

    Hi,
    Rough cut planning is genrally done for the group of material say product group, group of workcentre rather than individual material or workcentre.
    As standard, in resource table whatever the value you enter that corresponds to no. of days. Each column represents one day.
    Pl. refer this link for clear understanding of the same.
    http://help.sap.com/saphelp_47x200/helpdata/en/a5/63212e43a211d189410000e829fbbd/frameset.htm
    Madhava

  • Planned Order Capacity Requirement CM29

    Hi All
    This may be a trivial question for you guys, but I am couldnt find the problem, need your help again please:
    In CM29 my planned order and process orders are visible, and I am using the standard overall profile: SAPSFCG013.
    Earlier I use to see a continous red bar for length of the planned order / process order in the graph, but somehow now it just show up as a single line, irrespective of the order quantity.
    Can you please let me know how to resolve this!
    Thanks in advance!
    -Rahul

    Hi Vivek
    Here is the link for attached screen shot for CM29 with weekly and daily split:
    CM29 with weekly split:
    [CM29 Screenshot|https://picasaweb.google.com/110467857304221340164/CM29?authkey=Gv1sRgCNLYw_uHj8-lUA#5626401198199374018]
    CM29 with daily split:
    [DailySplit|https://picasaweb.google.com/110467857304221340164/Jul72011?authkey=Gv1sRgCLKtzPPn5_SARQ#5626402521518801586]
    I have trie changing hte qty to 1000 and more, the capacity (detailed capacity and roughcut capacity requirement) changes as expected but the graph does not moves
    Thanks in advance
    Rahul

  • Capacity requirement for long term planning and make to order planning

    hello,
    anybody please guide me.
    my client using make to order scenarion and we are doing regulaly MRP run is MD50 with refernce to sales order.
    sales orders planning will follow for 2 to 3 months.
    at the same time my client wants to do long term planning also. to analize the capacity.
    for that he is creatind planning scenario and multi level planning with MS02 also.
    But the problem is when they are checking capacity requirement in cm38 it is showing only planning scenario load only. my client wants existing load and longterm planning load also. so they can plan the planning is sutibale in existing plan.
    so how can i get both plan in CM 38or is there any other T.code to get that data.
    please suggest me
    Thanks & Regards
    Bhakta

    Hi Pierre and Rajesh,
    When we create the simulation version, you have the possibility to choose the short-term planning. My point of view is, you can use the LTP fonction to do your scheduling for ex the next 3 months.
    I think it's what Pierre did. Am I right ?
    between to scheduling scenario to deliver my customer. With the simulation mode I can do my scheduling + use the MRP simulation to check if the raw material are available or not. Then use the MD04 to do the comparaison (or MS04 to compare between 2 scenario).
    But I found 2 problems :
    First : I don't find the parameters to show in the graphic MFS0, the planed fix order (I can only see the process order)
    Second : When my scheduling is finished, I want to update my operational planning with the simulation version. But I don't want to do article by article : when you have 400 references (raw mat, packaging, finish goods)  it's impossible (same issue like Pierre)
    Have you found a solution for this 2 points ?

  • Planned order capacity requirement load on holiday

    Hi ,
    We have some cases , the planned order capacity requirements be load at weekend (holiday), but we have no same issue for process order , that's means the resouce set up is correct.
    Is any customizing related with planned order capcaity requirment ?
    Thanks !

    Hi,
    If you select the Workday indicator  = 1 (Working days (overrides factory calendar) at "Interval of available Capacity Screen" of Workcenter screen system will schedule the  Order during the Holiday.(CA02)
    This is applicable for Both Planned Order and Process Order.
    Pradeep

  • How to calculate the Remaining capacity requirement in SAP Production Planning?

    Hi SAP Guru's,
    I would like to make report on Work center capacity with Remaining capacity requirement, available Capacity and Remaining available capacity requirements.
    Can please let me know the Transparent tables for below Fields?
    BEDAKT: Capacity Consumption Rest
    OUTPUTLEN: Capacity Consumption Offer
    SLIBELAS: Capacity load and
    SLIDELTA: Capacity Unused.
    Could you please help me accordingly
    Regards
    Bhupal

    Wrong space. Please move this to BW area.

  • Error in SAP APO Inbound: capacity requirement is invalid

    Hi Experts
    I am getting an error in APO Inbound in APO queue manager. The error text reads " Capacity requirement is invalid".
    I checked for all the resources whether they have validity and also checked for mismatching control key. But these fields are allright in both ECC and APO system.
    I checked note # 924562, but i am still not able to solve this issue.
    Can you please suggest how should i debug this error?
    Many Thanks!!
    Regards
    Mansi

    Hi Mansi,
    Were you able to replicate the issue on which activity triggers this CIF error?
    I remember a similar error which happened when converting planned order to production order where it was giving error"“Bucket capacity requirement has an invalid value” .
    SAP had suggested to implement note 1381483 to fix this.
    Thanks
    Ajay

  • Repetitive manufacturing - CM01 Capacity Requirement

    Hi All,
    I configured repetitive manufacturing process with lead time scheduling.
    Conf. at OPU5 is set as below
    Rate.plng horzn  - 999
    SelID:rate plng -  02
    Scheduling u2013 X (selected)
    Generate Capacity reqs. u2013 X (selected)
    Scheduling level  - Via Rate based scheduling
    Adjust dates u2013 Do not adjust basic dates, dep reqmt to operation dates 
    For capacity scheduling u2013 Always basic dates, dep. Reqmt to operation dates 
    I run MRP (MD02) with option - Lead Time Scheduling and Capacity Planning
    I could see required capacity is calculated at tab u201CProduction Ratesu201D & also in menu Planned order >> Goto >>Capacity leveling.
    we are unable to view Capacity requirement in CM01 transaction & in planning table MF50.
    Regards

    Hi,
    Select the correct profile in CM01.  Menu->Planning->Profiles
    Thanks

  • Capacity requirement and scheduling process

    Hi Experts,
      please explain me how capacity requirement and scheduling (please explain with configuration  settings)    will help in SAP PP.
    Regards,
    Bhaskar.
    Edited by: basi123 on Nov 7, 2011 1:12 PM

    Dear
    Capacity Requirement Are those Which is used  For Operation And Calculate the Time with help of Dervied Formulas
    for instance i take an Example To Describe so that u get clear Picture
    Ex: Suppose i have machine Drilling u assume that Drilling machine as a one capacity under capacity catergory
    here to operate this i need to make my machine set up first then machine time i need to arrange a labour
    so total i required Setup Machine Labour so Here in sap we define a standard value key with all these combination and there we will assign formula for HOW Much to Produce so on...... and in turn it is assigned to control key to perform all the Actions.....
    Scheduling : Scheduling is Nothing but to sechedule Right time at Right job This helps in shop floor to over come overload on machines.scheduling used in
    scheduling for Production orders
    scheduling for Planned Orders
    scheduling for Plant maintainence Order
    Configuration :
    1. Capacity Requirenemnt ;
    SPRO>>>production >>> capacity requirement >>>> Define capacity catergory
    2.Capcity planner
    3.Define parameters OP7B
    4.Assign this to OPCM
    Scehduling
    1. go to OPU3
    With regards
    Pushpalas

  • Capacity requirement showing up in previous month in RCCP

    Hi Experts,
                     I am doing RCCP through MC88. But when i am giving the sales quantity in January and generating a synchronous production quantity, the capacity requirement and load are shown in the month of December instead of in January.
                     How can i get the requirement and load in January, please suggest.
    Regards
    Sm.

    Hi Jiaul,
                I cannot find a provision to change the profile dynamically from MC88 screen. This is possible in my understanding in capacity levelling/planning screens like CM38/CM01, etc.
                But even in such screens the same problem remains. For example when i did LTP for this material with PIRs in Feb 2011, the capacity requirements in CM38 appeared from current period that is from 09.12.10, though my planning scenario was valid from 01.01.2011. I changed the period and evaluation period dynamically from  the CM 38 screen, but that did not solve the problem as the requirement and load which was wronly showing up in Jan instead of Feb 2011 ( just as it happened in RCCP) merely vanished from the output and now i have the available capacity in Feb 2011 showing up but without any capacity requirement or load in the month.
    Regards
    Sm.
    Edited by: Sm on Dec 9, 2010 1:02 PM

  • Capacity requirement in workcenter.

    Hi all
    Please explain about  setting for determining actual capacity requirements in workcenter.
    Also explain how it is useful?

    Hi,
    Capacity planning is divided into two components in SAP
    1. capacity leveling
    2.capacity Evaluation
    Capacity Leveling
      Following elements will create Capacity requirements,
      1. Planned order with Lead time scheduling
      2. production orders
    Following elements will be used to calculate  required capacity  and Capacity Percentage:( Actual capacity calculation)
    1. Work center formula
    2. Routing Base qty.,activity times
    3. Number of Individual capacity
    4. production order/ Planned order Order Qty
    Capacity Evaluation
    Capacity evaluation is fully controlled by setting maintained in IMG 'Overall profile'
    This is Just an overview about CRP.
    Regards,
    Velmurugan S

  • Table For Capacity requirements

    Hello Every one,
    Does any body know the table which contains details for capacity requirements raised for a planned order and production order raised for a specific tme period for multiple capacity categories.
    The table should contain or a logic should exist to link the following fields:
    1. Planned order, production order
    2. Capacity requirements
    3. Capacity category.
    4. Period
    This is because my current uses capacities of 2 capacity categories (machine and labor) to plan production.
    Sincerely,
    Aji

    Hello Aji,
    Please find the tables:
    KBKO    Header record for capacity requirements
    KAKO    Capacity Header Segment
    KAKT    Capacity Description
    KAZY    Intervals of Capacity
    KBKO     Header record for capacity requirements
    KBED     Capacity requirements records
    KBKO     Header record for capacity requirements
    KBED      Capacity requirements records
    KBEZ      Add. data for table KBED (for indiv. capacities/splits)
    TC26      Capacity category
    Regards,
    Alok Tiwari

  • Capacity requirements generation at phase level only

    Hi gurus,
    Is there any setting to get capacity requirements generation at phase level only?
    At present in my system iam getting for both operation and phase. Since we do confirmation at phase level only, practically system should not generate capacity requirement at both levels.
    Please throw some light on this.
    Regards
    Venkat V

    Dear ,
    I think you are working in a PP-PI system .There are operation control key which can be assinged in the master recipe which will not carry out Capcity Requirement Planning .Goto -spro-define operation control key -Check the PP-PI related Control key like PI01-select that -goto detail information -Check if the Capacity requirement check box  should not be marked .Assing that control key which will not allow to do the Capcity Requirement check .
    Or else , in master recipe you can choose the control key which does not have CRP activated -go details information befor assing the same
    Hope this is clear to u
    Regards
    JH

Maybe you are looking for

  • Error in bdc uploading for transaction F-02

    Hi all,        Iam uploading transactional data for the transaction F-02 using BDC call transaction. I  have recorded all the screens of F-02 and internal table with fields also declared. While running the program, it is showing the error saying -- "

  • Do I need a new airport or antennae or booster? advice please

    I have an old airport graphite base station in my house. I want to send the signal to an outbuilding with no phone socket, to be picked up by my old titanium powerbook with an airport card, a Mac G4, and a PC, both of which will also need wireless ca

  • What does "library missing" mean and how to recover it

    Whenever I try to access a program this flashes on the screen ** Library Missing" too quickly to read. and I am not able to access program

  • ZE4310EA CD Burner Problem

    Hi, Using different CD burning softwares (MS, DeepBurner, Burn4Free, RealPlayer, ...) I consistently end up with audio CDs that won't play correctly on my CD player (Onkyo DX-705/703). Schrieking noises, tracks corrupted or nor recognized at all. The

  • Arno's firewall - blocking ICMP?

    Hey all, I'm trying to block my computer from responding to ping requests. I've found what appears to be the relevant syntax for iptables, but I can't use it with Arno' firewall script, which obviously is what I'm using for the rest of the firewall.