Planned costs for investment program

I am having a problem configuring planned costs for inv program positions, which should reflect as the planned cost for the investment measure being created.
Appropriation request is being used in the scenario to create measures automatically. these measures will require to have the same plan values as the position to which they are assigned.
Please help.

The Measure is the cost collector through which spending will be controlled & measured, which is a key integration object with IM.
WBS Elements are the collectors associated with PS, whereas IO’s are cost collectors found in the CO module.
The Measure is always assigned to the lowest program position within IM. Program Position is found on Investment Program Hierarchy at its lowest level which may relate to a capital project or project component.
Hence accordingly the appropriation request serves as a tool to plan the spending and which is therefore upon approval becomes the Measure for the IO or WBS.

Similar Messages

  • Any FM to calculate planned costs for a Maintenance plan

    Hi all,
    Is there any FM to calculate planned costs for an Maintenance plan.
    I can use report RISTRA30(IP31). but i need to use for multiple multiple Mplans and different time frames. using SUBMIT to this report and getting data will lead to performance in my actual report.
    Please do provide any FM's or any other pointers for the same.
    warm regards,
    Sumanth

    Dear,
    In maintenance plan you can speciefy - order type,task list type,task list group & counter.
    when system automatically create service/maintenance order then system will determine plan cost, but for this you have to maintain planned price by t-code KP26.
    And then you can see report by IP31
    REGARDS,
    Kapil
    Edited by: Kapildev Farakte on Nov 17, 2009 10:38 AM

  • BAPI KPF6 POST PLAN COST FOR INTERNAL ORDER AND COST ELEMENT

    Hi all gurus,
    I would like to use in a custom report a BAPI/Function Module that help me to simulate KPF6 in order to post planning costs for internal order and cost element (layout 1-401).
    So the input should be:
    1) Version
    2) period from
    3) periodo to
    4) year
    5) internal order n.
    6) cost element n.
    7) value
    I found a lot of BAPI but don't know the correct one and how to use it (example how to fill the input value).
    Can anyone help me on that?
    Kind Regards

    In additio  to the previous I found the BAPI_COSTACTPLN_POSTPRIMCOST but don't know if it's the correct one and how to use it (some example fitting the my case will be very appreciated).
    If the quoted BAPI is correct.
    I tested it filling all fields as following:
    HEADERINFO:
    CO_AREA=FFCA
    FISC_YEAR=2008
    PERIOD_FROM=001
    PERIOD_TO=012
    DOC_HDR_TX='blank'
    INDEXSTRUCTURE:
    OBJECT_INDEX=000001
    VALUE_INDEX=000004 (hope this point at Interna Order)
    ATTRIB_INDEX=000000
    COOBJECT:
    OBJECT_INDEX=000001
    ORDERID=ZO53-08IMZ
    TOTVALUE:
    VALUE_INDEX=000004
    COST_ELEM=3224048
    FIX_VALUE= 200,0000
    DIST_KEY_FIX_VAL=2
    The Return table is set to 0. Nothing happens.....I suspect something related to indexstructure or index is wrong..
    Could anyone help me on that?
    Kind Regards

  • Planned cost for int labour and non stockable material not visible

    Hey gurus,
    While creating an order with a material, ext service, non stock material, I am able to see the planned cost for materials in stock and ext services procured. But i'm not able to see the planned cost for non stock material and int labour. However i'm able to see the actual cost for all the items. I think I have missed some config. Please help.
    Regards,
    Abhishek

    Hi,
    As said by Pithan there is a problem in costing variant for planned cost which you have assigned to prder type at plant level.
    Problem underlies within valuation variant assigned to costing variant.PM01 is your costing variant here.Check diiferent heads within valuation variant for this costing variant.There under activities tab what is calculation parameter you have selected.If it is blank you will not get any internal activity cost.You need to select at least one from dropdown like cost from previous period or avaerage cost etc.Then you will get planned cost for internal activities.SAmething applies to non stock material.
    Check in OKP6 for all these and make sure that you have selected at least one cost calculation schema there for activities and material and external.
    Regds,
    atul

  • Planned cost for MTO

    Dear,
    Here in the company have the following situation:
    The system appropriates the planned cost for the production order when the process is MTO.
    Anyone know any way to settle the planned cost of the stock of free stuff and not the planning of the Order of production?
    thank,
    Sergio Navarrete

    Ajay,
    Here's an example:
    This material is the planned cost for the stock free: Process MTS.
    Standard Price 12,96
    In the same material (special stock) planned cost came with the Production Order Sales Order. MTO process.
    Standard Price 100,96
    Order 20232271
    So we can see that the cost calculated by the planned production order is very different from the planned cost of the same material for free stock.
    Question:
    You can make the system use the same cost of the planned free stock for stock of the particular process, such as material inventory value free, 12.96?
    thank,
    Sergio Navarrete

  • Planned cost for Results Analysis

    Dear Friends,
    SAP reads line items from COSS and COSP to determine the planned cost for result analysis.  What line items does it consider while summing up the planned cost.  I wish to reconcile the planned cost as considered in result analysis.
    I am considering the line items from COSS and COSP where
    Value type = 1 or 11
    Beltyp = 1
    Version = 0
    Business Transaction ????
    What values should I put for business transation ?    Or is there a SAP standard report which matches with the planned cost value of result analysis.
    Standard report S_ALR**** does not always match with the planned cost value in result analysis.  These reports read values from RPSCO table which is a summary table.  
    Regards
    Jayesh.

    After releasing production order all primary and secondary costs get attached to the order.
    You can see planned cost in Tcode:CO02>>>>Goto>>>>>>>Costs>>>Analysis>>>under cost trend layput.
    Yogesh Thorat

  • Planned cost for processing the component

    Hi All,
    How to see the planned cost for processing any component or finished product in SAP.
      I don't want actual cost for processing the component.
    Regards,
    Shailendra

    After releasing production order all primary and secondary costs get attached to the order.
    You can see planned cost in Tcode:CO02>>>>Goto>>>>>>>Costs>>>Analysis>>>under cost trend layput.
    Yogesh Thorat

  • Planned costs for production order

    Hi,
    I have a requirement where the actual costs and planned costs for a production order have to be displayed. I got the actual cost details from the table COEP.
    Please let me know if anyone knows the table which stores the Planned Costs / or any function modules which can be helpful.
    Thanks in advance.
    Neethu Mohan

    Hi ,
    Please refer the thread,
    How To get Planned Cost for a Production Order
    Best Regards.
    *Reward if it is helpful.

  • Function modules or BAPI for posting plan costs for WBS Element

    Hi all,
    Does anyone know, whether there exists a function module or BAPI for posting plan costs to a WBS Element? K_COSTS_PLAN_PS does not work, because RKP1 is not allowed.
    Greetings

    check
    BAPI_COSTACTPLN_POSTACTINPUT   Activity Input Planning: Posting                
    BAPI_COSTACTPLN_POSTACTOUTPUT  Activity/Price Planning: Posting                
    BAPI_COSTACTPLN_POSTKEYFIGURE  Stat. Key Figure Planning: Postings             
    BAPI_COSTACTPLN_POSTPRIMCOST   Primary Cost Planning: Postings                 
    BAPI_PDTRANSCO_POSTPRIMCOST    Transfer of Planning Data: Post Primary Costs   
    K40C                           CO Actual Postings, Manual                      
    BAPI_ACC_PRIMARY_COSTS_POST    Accounting: Post Primary Costs                  
    BAPI_COPAACTUALS_POSTCOSTDATA  BAPI Operating Concern: Post Costing-Based Actua
    BAPI_PRIM_COST_CHECK_AND_POST  Primary Costs: Formal Parameter Check           
    S@meer

  • Tables & Table relationship to find ACTUAL & PLANNED COST for ACTIVITY ELEM

    Hi Guys,
    I have to create a report for Project, WBS, Network, Activity and Activity Element to show :
    Reporting period: March 1,2007 to March 25, 2007
    Planned cost   ( (from March 1, 2007 to March 26, 2007)
    Current reporting period   (from March 1, 2007 to March 26, 2007)
    YTD Actual Cost   (from Jan 1, 2007 to March 26, 2007)
    Kindly let me know the table to get the ACTUAL COSTS and PLANNED COST with relationships.

    Hi,
    Refer to the BLOG
    SAP Project System - A ready Reference ( Part 2 )
    Hope it will help full
    Regards,

  • Plan cost for activity element

    My internal activity can calculate plan cost from a workcenter properly , but while I append a activity element(internal) and add the same worcenter and data the activity element does not calculate plan cost , but if I confirm the activity element it gives actual cost.
    What possibly be the problem could any one tell me? is there any setting seperately for activity element?

    Hi
    Thanks. I am using CJ20N and then selecting the activity element I am following the path edit>cost>Plan/actual
    When I try to recaulutate the cost by edit>cost>update cost then I get generic error :
    "Object was not costed
    Message no. CK060
    Diagnosis
    The system could not find any entries that are relevant to costing.
    System Response
    The system did not cost the object.
    Procedure
    Check whether the following objects should be flagged as relevant to costing:
    Items in the BOM
    Display BOM
    Operations in the routing
    Control key in the routing
    1. Look at the message log.
    2. Check whether a quantity was specified in the confirmation."
    But while calculate cost for an internal activity it is calculating cost.

  • Calcualtion of Material cost  for custom  program

    Hello all
    For a particular cost estimate we need to calacualte only the material cost in that particular material
    and thi swe required for all the material
    i had checked all the costing related table but not able to do tha
    kindly help
    anil

    Hello
    For get the only material cost for a standard cost estimate run material
    you hav eto use a standard BAPI and no need to write a full program to calcualte the cost.
    BY this badi you will get all the data only you have to get the report in required foramt.
    The BAPI is BAPI_COSTESTIMATE_GETEXPLOSION
    thanks
    alok

  • Lock a Plan cost for a period

    Dear Experts !
    I want to lock Cost Planning for a perticular period ...for this i am doing setting in OKP1 with controlling area wise ...But this is not working ....
    Please Clear me where I am wrong.
    Regards
    SMITH

    hi
    OKP1 locks the plan data for the controlling area, fiscal year, Version and business transaction combinations.
    If you want to lock the planning for the particular WBS, you can do the same in Project Builder under the menu path Edit-> Status-> Lock -> Planning.
    Just see this serves your purpose.
    Regards
    Ramesh

  • Not able to see plan cost for labour

    Hi,
    I had created an PM order (IW31) and assigned some operation to it, after saving plan cost should be available in cost tab.
    But nothing is there.
    but if i do the confirmation of the operation cost'll appear in actual cost.
    Kindly reply with path.
    Thanks
    Warm regards
    Rajat

    Rajat,
      The costing log is emptied once you leave the transaction.Please do cost determination by choosing the same in the application toolbar of the header screen.After this check the costing log Goto > Logs > cost determination.That might give you a  clue. 
    If this still doesn't resolve the issue, make sure that the following has been maintained for the wrk center . "Other formulae" for capacity category "002" as SAP008. "Other formula" for scheduling as SAP004. Check the version assigned to plan cost in the valuation variant assigned to the costing variant using transaction OKP8.Double click on the valuation variant and choose the Activity type /process subtab.Generally this version is set to 0.If its set otherwise check to make sure that "plan cost" has been selected for the version and also whether cost has been maintained in KP26 for this version and cost center /activity type combination.
    Regards
    Narasimhan

  • Planned cost for process order

    Can we see the planned order cost of a process order before confirmation?If can how is it done?

    Hi,
    To see the planned cost of order before cofirmation,
    COR2-> Goto-> cost-> Itemization.
    Regards
    Pradeep

Maybe you are looking for

  • Report Navigation / Drill Down

    I am anticipating building an OBI report based on the following scenario: I have a database table with 15 columns. Column 1 is a product number. Column 2 is a unique lot number. Column 3 is a period name. Columns 4 - 15 are months JAN - DEC. This wil

  • Decode the values without ETL (Re-group Dimension Values)

    Hello guys, i have a question which is partly triggered by me not wanting to modify the default ETLs. I have values in a dimension table coming as: Region A Region B Region C Region D Region E However, i am hoping to re-org the hierarchy as below: Re

  • Modifying Connectors for Receiving Internet Mail - Anonymous setting?

    I have a mail reflector for my domain to deliver mail on an alternate port, other than 25 because my ISP blocks port 25. I have the following default receive connectors: Default Client Font End Transport (FrontEnd Transport) - TLS, Basic, Integrated,

  • Instant crash problem solved - here's how

    I've just had two weeks of iphoto 6.0.2 crashing instantly every time I opened it and have faithfully followed all the advice on this forum to no avail. It's now working again and this is what I did. You will lose your albums but keep your photos & r

  • Data from R/3 to MDM

    Hello, Our requirement is to transfer the data load in R/3 tables  to MDM for data management etc.. Please suggest me about the ways to achieve this. Please help its urgent!! Brad