I have a requirement where the actual costs and planned costs for a production order have to be displayed. I got the actual cost details from the table COEP.
Please let me know if anyone knows the table which stores the Planned Costs / or any function modules which can be helpful.
Thanks in advance.
Neethu Mohan

Hi ,
Please refer the thread,
How To get Planned Cost for a Production Order
Best Regards.
*Reward if it is helpful.

Similar Messages

  • BAPI KPF6 POST PLAN COST FOR INTERNAL ORDER AND COST ELEMENT

    Hi all gurus,
    I would like to use in a custom report a BAPI/Function Module that help me to simulate KPF6 in order to post planning costs for internal order and cost element (layout 1-401).
    So the input should be:
    1) Version
    2) period from
    3) periodo to
    4) year
    5) internal order n.
    6) cost element n.
    7) value
    I found a lot of BAPI but don't know the correct one and how to use it (example how to fill the input value).
    Can anyone help me on that?
    Kind Regards

    In additio  to the previous I found the BAPI_COSTACTPLN_POSTPRIMCOST but don't know if it's the correct one and how to use it (some example fitting the my case will be very appreciated).
    If the quoted BAPI is correct.
    I tested it filling all fields as following:
    HEADERINFO:
    CO_AREA=FFCA
    FISC_YEAR=2008
    PERIOD_FROM=001
    PERIOD_TO=012
    DOC_HDR_TX='blank'
    INDEXSTRUCTURE:
    OBJECT_INDEX=000001
    VALUE_INDEX=000004 (hope this point at Interna Order)
    ATTRIB_INDEX=000000
    COOBJECT:
    OBJECT_INDEX=000001
    ORDERID=ZO53-08IMZ
    TOTVALUE:
    VALUE_INDEX=000004
    COST_ELEM=3224048
    FIX_VALUE= 200,0000
    DIST_KEY_FIX_VAL=2
    The Return table is set to 0. Nothing happens.....I suspect something related to indexstructure or index is wrong..
    Could anyone help me on that?
    Kind Regards

  • Sales order - show total plan costs (from production order) on sales order

    Hi all,
    I have the following question/scenario:
    We create prodction order to collect cost (hours) for a service. There exists also a material master for this service.
    The confirmed hours are posted on the production order and then setteld to the respective sales order (settlement rule SDI).
    What to I have to maintain/customize to show the total plan cost (for the service) on gthe sales order?
    If I check the sales order via VA03 --> environment --> cost report , I can see the planned sales revenue but no planned costs?
    (the actual value flows work so far, postings via settlement or billing document).
    I hope the topic is understandable. Any ideas?
    Thanks in advance.
    Edited by: Butch66 on Sep 27, 2010 7:07 PM
    Edited by: Butch66 on Sep 27, 2010 7:08 PM

    Hi
    Planned costs from prod order can not show on sale order.. Both are 2 separate entities in their own respects
    Unless you calculate sales order cost estimate on your sales order, you cant see planned costs on sale order...
    To calculate sale order cost estimate, make settings in your requirement class...
    1. Go to procurement tab of sale order
    2. See whats the requirement type
    3. Go to IMG > Controlling > Prod cost Contr > Cost Obj Contr > Prod Cost by Sales Order > Control of Requirements
    4. Here you can see mapping of req type to req class....
    5. If you want to have sales order costing and have sales order as CO object inorder to have sales order wise profitability, you should have following settings in Req class...
    >Acct Assignment Category should be E
    >Costing: Either Blank or X
    >Costing Id and Costing Method: As per your requirement
    Regards
    Ajay M

  • Actual Costs for Production Order

    Hi All
      I have a scenerio where they dont want any product costing methods say WIP,Variance calculation & Settlement.
      When the Goods receipt is done for production order the actual costs and the Activity costs to be valuated.
    Regards
    Jayshankar.A

    Hi,
    In our case the Standard price is updated in the material master. For this, you need to create a costing estimate using T-Code CK11N and update & release in CK24.
    When CK11N is executed the standard price is calculated for the material by taking Moving Avg Price of RM (Price indicator V) and the activity costs are calculated as per data given in KP26. These cost components are added and a final cost estimate is prepared, which is updated using T Code CK24.
    the pre-requisites are:
    1. BOM should be maintained.
    2. Routing should be made.
    For executing the same procedure for all the materials, you can use T Code CK40N.
    Hope this is what you were looking for.
    Revert for further details.
    Regards,
    Rohit.

  • Recognizing external production costs for production order

    Hi Experts,
    Our company is new to SAP and one issue we have not resolved is whether it is possible to attach costs to an Inspection Plan, and ultimately have these costs flow with the production order to Cost of Goods Sold (COGS).
    The objective is to enable us to analyze which specific customers/products require us to incur these additional costs.  Any advice you have to accomplice our objective would be appreciated.
    We are a Process Industry, and many materials are sent out for external testing. These costs are significant and some customers and/or products require more testing. We currently have Inspection Plans set up for each Material that requires testing, but have not found a way to burden the material with the appropriate COGS for the external testing.
    For example, if a product must be tested for the following characteristics, and each test cost is known, how do we get the test costs attached to the production order for the total of $200?
    Product 1 Inspection Plan
    Salmonella $70
    EColi $59
    Coliform $25
    Yeast/Mold $46
    Thank you!

    Richard,
    Are you able to advise which forum is the proper one for this question?
    Thank you,
    Esther

  • Settling of Cost for Production Order via WBS Element

    Hi Gurus,
    Just would like to briefly understand, how I can make use of the WBS Element in the Production Order (Assignment tab) to use as cost settling for a production order? How do i automate the WBS Element in the production Order for a set of given parameters? Is there a config I can use to set a profile?
    I have a scenario here as below:
    I have various types of production orders:
    PO 1 = Production A
    PO 2 = Production B
    PO 3 = Production C
    And for each of the above, I will individually have a WBS Element.
    PO1 - WBS Element A
    PO2 - WBS Element B
    PO3 - WBS Element C
    And WBS Element A, B and C is a Level 2 WBS Element which are tied to WBS Element Z (Level 1 WBS Element), which will be settled to a project.
    Appreciate your kind feedback on the above on how I can make it work in the PP Order.
    Thanks.
    Rgds.

    Hi Manoj,
    I need to understand your process in more detail.
    How do you procure?  Create a sales order with TAS item category to create a PReq and PO?
    Very simple explanation: Resource Related billing/DIP profiles are used to accumulate costs on WBS elements and then bill the client as needed.

  • Cost for Production Order

    Hi,
    How can I display the cost incurred for a production order?
    Regards,
    Prashant

    Hi
    In CO02 or CO03 you can view the order cost.
    In GOTO - COST you can go to the primary screen of the cost analysis.
    Go to change layout and select second option of cost trend.
    Depending upon the order status you shall see the costs.
    After the order confirmation and delivery you shall see the primary costs.
    After completion of CO cycle you shall see the settled costs.
    Narendra Lohokare.

  • Planned cost for process order

    Can we see the planned order cost of a process order before confirmation?If can how is it done?

    Hi,
    To see the planned cost of order before cofirmation,
    COR2-> Goto-> cost-> Itemization.
    Regards
    Pradeep

  • Function module for calculating planned and actual cost of production order

    Hi ,
    Do we have any standard function module for calculating planned and actual cost for production order?
    i need to implement this in a Z-report.
    Thanks
    Srini

    Hi,
    try below function module
    CRMCO_GET_PLAN_ACTUAL_COSTS
    CO_IH_GET_PLANNED_COSTS_TOTAL
    Regards,
    Sankaran

  • Abolish product cost collector for production order

    Dear Experts,
    we use for some production order types the product cost collector. Now we plan to abolish them and change the settlement for production order. Which things do we have to pay attention? Do we have to finish our running production orders first or is it possible to change customizing during running production process. Thanks for your hepl!
    Best regards
    Steffen

    Hi Ajay,
    thank you for your answer.
    We have tested two variants:
    1. new order type, so we can process two separate settlements, for orders with PCC and the new orders without PCC. After archiving of all prodorders with pcc, archiving of pcc it should be possible to switch back to old order type.
    2. change customizing without finishing existing orders, settlement for existing orders, all orders which already have been processed will be settled by pcc (status pcc usage in order header) We have not be seen any strange system behavior.
    We use the pcc collector for different order types in different plants and want to abolish plant by plant. In this time the pcc will still be customized/exists.
    Best regards
    Steffen

  • Material cost in production order plan cost

    Dear all,
    -we are in sales order cost object with non-valuated stock...
    -we have created two production orders from MRP run. First one is for semi finished material and second one is for finished material.
    Issue-1
    Both production orders not showing material cost in production order plan cost...
    Issue-2
    When i consumed raw material against semi-finished material production order (261-E), system not gnerated any document and material cost not updated either in production order or sales order...
    where should i do changes in configuration to get updated material cost in the production order...
    Best regards
    Kishore

    Hi
    Issue 1 : Check Whether Standard cost is present for header material of prod order, and under control tab of order costing variant for plan is present.
    Issue 2 : Use 261 instead 261E.
    Rajneesh

  • ADDDITIVE COST FOR PRODUCT COST BY SALES ORDER SCENARIO.

    Dear friends,
    We are using costing for sales order & we have maintained the costing variant under the path IMG> Controlling> Product Cost Controlling> cost object controlling> Product cost by sales order >premliminary costing & order based costing>product costing for sales order costing>Costing variant for Product costing >Check costing variant for product costing.
    Under this we have maintained the Costing variant, Now we need to have Additive cost. But didnt found the tab in the costing variant where as when we check in T.code OKKN which is a part of Product cost planning we can find the Additive cost tab.
    How to run addtive costing run for Product cost by sales order scenario & please guide me with one example.
    Or else is there any configuration where we can assign standard costing variant PPC1 instead of Costing variant SOC1 ( which is a costing variant of Product cost by sales order.
    Please guide me
    regards,
    Sandeep

    Hi Sandeep,
    You may please try using Unit Costing for Sale Order.
    It is over an above the sale order costing you have done. So in case you want to post any additional known cost, you may do the unit costing for the sale order after the sale order costing.
    Trust this helps

  • Costing the production order for the configured material

    We are trying to cost the production order for a configurable item.  But the system is not calculating any cost in the production order.  Sales order related to this configurable material is costed.  What additional setting I need to cost the production order for the configured material ?

    Hi Niki
    If your SO is costed, thats enough from a System's perspective... Planned cost will be the sales order cost estimate because SO saves the Chars required for the Configurable material
    Planned cost in Prod order depends on the Costing variant you have assigned in the order type... Check the error log if there is any error in cost calculation in prod order
    br, Ajay M

  • What are options for applying non-inventory costs to production orders?

    We have a non-inventory costs that need to be assigned to product produced on production orders.  There are two processes -make-to-order and make-to-stock.
    Currently we use activity rates to apply labor and burden costs to our production.  We use separate cost centers where needed to ensure that we have sufficient granularity to our activity rates applied.
    We have a few specific issues where we need to understand the options for applying costs -
    1) We have freight and duty costs related to inbound raw material that we want to assign to our final product.  The amount assigned may be either a specific amount (or a specific amount per model), or a % of the total cost on that production order.
    2) We have material on the production order bill of material that is called out by quantity and we are using discrete backflush, however we have found there are issues with the accuracy of the quantities.  We want to have this product ordered using KANBAN (bin ordering) and have the value relieved from inventory when the bin is issued to production.  The cost on the production order is envisioned to be an average amount for the product - or an average amount by model.
    3) We want to have a portion of cost for production scrap included in the cost of each product produced. (similar to freight and duty).
    In all cases- the amount can change depending on analysis from accounting regarding freight and duty costs (these fluctuate depending on the cost savings we achieve with combined loads and depending on the amount of out of country sourcing), the scrap amount may change periodically depending on the initiatives to reduce scrap on the production floor, etc.
    We currently use three activity types, labor, burden and tooling.  It is my understanding that there is a limitation in SAP that keeps us limited to 6 activity types.
    My questions are:
    Are we limited on activity types? these are an option to apply additional costs, but may not be the best option if we want to change the amount applied based on model or apply as a percentage.
    Are there other options for applying costs that we can explore? I want to be sure we take into account the various options available before we start down a specific path.
    Thank you in advance for your assistance.

    As clarification- we are using standard costing for our raw material.  We currently accumulate the incoming freight in a balance sheet account.  This is treated as part of our inventory.  We have considered using an activity type with a activity added to the BOM to apply the cost to the production order.  Then we could use the secondarly cost element data to book an entry to relieve the freight account on the balance sheet.
    Because we use standard costing- access to see production order variance is critical and must be maintained in any process we select. We also use COPA reporting- so the costing information must be able to flow to COPA for the specific orders/products/serial numbers.
    We are doing make to order (production order / sales order specific combination) but also looking at a make to stock process - so the method to apply costs must take both of these configurations into consideration.
    Rajneesh - you mentioned that I am limited to 6 activities in a work center- but does that mean I can have more than 6 activity types in SAP but only 6 activities in a work center/cost center combination?
    Thank you.

  • Cost center for Production Order

    Hi all,
         We are now not able to get a report of Material consumption cost, Cost center wise. It is Because cost center is not linked to Production order or not linked to material issued to production order. Can we get the cost of material cosumption for  production order cost center wise. Please give us a solution.
    With Regards,
    R.Mahendiran.

    Hi,
         Prod order is linked with controlling, for the direct costs like material cost linked with accounting view, costing view and secondary costs are linked with costing tab in work center and inturn workcenter is assigned to cost center, and for the prod order controlling part you will be assigned to the costing variant in transaction OPL8, if you remove this you can't get any reports.
    To understand the difference
    201 - Goods issue against cost center. Means you create reservation through MB21 and do posting of cost directly at cost center.
    261 - Goods issue to Production order. Means you create a reservation through Production order  and do posting of cost to Production order. When cost settlement of production order is done cost from production order will get transfered to cost center mentioned in settlement rule of production order.
    Hope this clarifies your doubt.

Maybe you are looking for

  • XE and Security Patches

    We have a group of SOA Suite developers uisng Oracle XE 10 locally on laptops. We are getting advised by IT security that securiy patches are needed. We are looking at following options - Apply security patches to XE 10 , upgrade to XE 11 or move to

  • Can't use Target Disc Mode with Imac Indigo? help

    So after holding off on buying a new imac for over 5 years I decide to pick one up. I restarted the intel imac in target disc mode. After doing that. My old imac gives me a message saying it can't read the contents of the hard disc connected through

  • Won't except email and password

    Won't except email address and password

  • PSE 11 Organizer user interface???

    About 6 months ago I upgrades to PSE 10.  Sortly after that I submitted a product update "request" asking for PSE to provide the ability to set preferences for how the user interface appears, something similar to what is done with Photoshop CS6 and o

  • Java problem after updating to mountain lion 10.8.2

    I have a macbook pro the java was working perfectly on mountain lion 10.8.1, but when I update to 10.8.2 it stoped working and just keep loading and the borwser just stuck either using safari or firefox. ( screen shots attached ) I will wait for any