Planned delivery time is not considering in SNP-PR date

Hi All,
I gave PDT 10days in product master.when i ran the heuristics system giving me PR on the same date.How to fix this issue?
Regards
venkadesh

- Check the Transportation Lane.  The Lane time supersedes the Product Master time.  The Product Master in APO & Lane need to be in Synch as well as with Lead time in R3 MRP view.
-  I could not understand from your problem, whether the PR Dates were wrong in APO Planning itself or where they wrong after having gone to R3.  Once PRs are sent to R3 the Lead Time in R3 needs to be in Synch, since PR dates (demand, supply, opening date) are recalculated based on Scheduling again in R3 ... which leads to discrepancies with dates in APO. There is a Consulting Note around Purchase Requisition Dates ... you must read it ... I don't remember the number offhand, search the OSS.
- Check the R3 Master Data as explained above. Check the LeadTime, Schedule Margin Key for Opening Period ... etc.
Hope you find this usefull.  Reward Points if you do.
Regards,
Ambrish Mathur

Similar Messages

  • System is not considering Planned Delivery time

    Dear Gurus,
    As iam planning for the month of January and running the MRP,schedulelines are getting generated but system is not condering Planned Delivery time maintained in the material master ie. 7days.Following is the example:
    I have a FERT-X with a component A-1PC in its BOM and its planned delvery time from vendor is 7 Days.If iam running the MRP on 13/12/2010 for FERT-X  100 PCS for January1,2011 then the schedule lines are getting generated for for component A is on 01/01/2011.But PDT is maintianed in material master is 7 days and same has been maintianed in vendor inforecord.But system is not considering it.
    Kindly help to resolve the issue.
    With Regards.

    I have one ROH which has two different vendors.
    Two scheduling Agreemnt with target qty 100000 kg each.
    Two different Vendor info record with Min. order qty maintained.V1-1000Kg,V2-6000Kg.
    One source list with two vendors and with respective scheduling agreement.
    Quota arrangement is there in which SOB is maintiained 50:50.
    I hv the requirement of 3084 kg of ROH.
    I run the MRP and two diiferent schedule lines are getting generated with 50:50 qty as mentioned in Quota arrangement.
    Not considering the minimum order qty maintiained in vendor info record.
    The above process is correct
    Only One doubt In Quota Arrangement?
    IS two schedule line is created after MRP run?
    Generally System will  select a vendor Whose Quota value is less
    quota rating   = quota base quantity + quota-allocated quantity/ quota
    Edited by: Sundaresan . E. V on Dec 14, 2010 3:26 PM

  • Planned Delivery time not considered after MRP run for scheduling

    Dear All,
    After running MRP, the planned delivery time maintained in Purchase info record is not taken into consideration for calculating start date of the schedule line of externally procured material generated by the system.
    Planned delivery time is 3 days & Requirement of parent material falls on 15/02/2010. With this, system should calculate the start date for schedule line as on 12/02/2010 considering 3 days Planned Delivery time.
    Any idea as to what might have gone wrong?
    thx for your help in advance.
    Rgds,
    Ranjeet

    Hi,
    Determination of PLD from the Purchase info record is maintained in transaction code:OMDT. Planned Delivery time is also maintained in Scheduling agreement. However, it is not calculating delivery date as well as release date.
    Rgds,
    Ranjeet

  • Creation of SNP PDS using planned delivery time

    Dear Experts,
    How do i control creation of PDS because of operaion generated from planned delivery time,although planed delivery ime is zero.
    the scenario is as follows:
    Material :XXXXX
    Planned Delivery time
    Procurement Type:E
    Plant:XXXX
    in transaction /sapapo/curto_simu: there are two PDS displayed with PDS usage as PDS for Supply Network Planning(SNP)
    the first one is because of operation generated fromm planned delivery time,output qty is the same a s that maintained as base qty in BOM and mode is blank,activity field is even blank.
    the other PDS is created because of the valid production version in R/3.
    Thanks in advance
    Amrish

    Hi Dutta,
    Thanx for a quick revert.
    Yes we are using reciepe and we have a valid PDS being generated because of Production Version.
    The problem lies with the creation of other PDS from planned delivery time whereinplanned delivery time is zero.I want a resolution so as the system doesnot create thses PDS which are invalid in nature.
    These invalid PDS are hamperring result out of SNp optimizer for the reason these are considered in the input log of optimizer.
    Regards,
    Amrish

  • How can consider Planned delivery time for subcontracting dependent of qty

    Dear guru ,
    How can mrp schedule delivery date of a subcontracting purchase requisition in order to consider planned delivery time and quantity to purchase.
    Thanks

    dear guru ,
    I want to create a self-defined info structure similar to S013.
    I want to add field purchasing group from EKKO-EKGRP. The other fields are similar to S013 with the same rules.
    What do you suggest i can do consider note 397864 :
    You are not permitted :a) to use info structure S013 as a template for self-defined info structures (This is prevented as of Release 4.5 due to a termination message).b) to create any update rules for S013 with a self-defined update group.c) to include the enhanced update rules that are used for S013 during the definition of key figure updating into the definition of the update of a self-defined info structure (compute...).
    Thanks

  • Is planned delivery time is considered in scheduling agreement ????

    Hi experts
    problem is that the schedule lines (for external procurement) generated from MRP are not taking the "" Planned delivery time into consideration"". System is only taking the G.R processing time.
    I have mentioned the Planned delivery time in .
    1) Scheduling agreement for 1 day.
    2) In material master for one day.
    3) In info record 1 day.
    e.g Suppose req date is 13.07.2008. MRP run date 4.07.2008.
    a) Planned delivery time = 1 day . B) G .R processing time = 3 days.
    Now when i run the MRP on 4.07.2008.
    Schedule line is generated on - 10.07.2008
    Please Guide . How i can take care of that time which is requiered at vendor ends.
    Regards
    Rahul Bhardwaj

    Go to OPPQ for that plant
    Click on "External Procurement " tab and check if you have maintained any planned delivery time?
    Tick indicator " Scheduling info record/agreement " (This will take Planned del time specified in scheduling info rec or agreement)

  • Value of planned delivery time in days not updating

    Hello Experts,
    i have created a material using BAPI_MATERIAL_SAVEDATA.
    IN Mrp2 VIEW
    PLANNED DELIVERY TIME IN DAys is not updating
    i have passed
    la_plantdata-plnd_delry =  P_PLND_DELRY.
    la_plantdatax-plnd_delry =  'x'.
    i have commited the work too but the field is not updated
    Please help.
    Thanks & Regards,
    Naresh

    Hi,
    This question is not related to APO, i would suggest you to post the thread in ABAP forum.
    However can you check
    can you check whether la_plantdatax-plnd_delry field is 3 charcter or one character field.
    Generally it will be like below.
    la_plantdata-plnd_delry = 100
    la_plantdatax-plnd_delry = 'X
    Regards,
    Srini

  • Planned delivery time Pickup from inforecord not material master data

    Hi,
    Currently the delivery dates of the orders are calculated with the delivery time which is marked in MM02. Since the purchasing integrates this information in the info record, we want the delivery date to be calculated with delivery time of the info record instead of calculating it with the data of MM02
    Please suggest any config.
    Thanks
    Shital D

    Hi,
    Try like this, ME21N, put the vendor, material , plant and other Org elements, hit enter, and check P.O what is the planned delivery time that you are seeing, also is the same PIR also appearing in the P.O when you scroll to the right?
    Also note.. that system might be picking 3, maybe saturday and sunday holiday is coming, check that too
    Regards
    Shailesh
    Edited by: Shailesh Rajan on Jul 7, 2011 7:00 PM

  • Consider planned delivery time field in MRP Areas

    Hi,
    I would like to know if the "Consider Planned Delivery Time" field in the MRP areas is taken into the scheduling of materials during MRP run? From the help documentation, it seems to be yes. Otherwise the system will take the Planned Delivery Time from the Plant level. May I ask how we can tick this field for all materials? We are currently in the process of activating the MRP areas in our system. Before, we didn't use the MRP areas but we think the need for it has arrived. Is there a mass maintenance tool to do this? Or do I have to use LSMW? Thanks!
    Regards,
    Chester

    Hello Chester
    If you flag the field "consider planned delivery time" the planned delivery time defined on the MRP area will be considered by MRP. You should tick it for all the materials if the value from the MRP area should be considered.
    Also, the report RMMDDIBE can be used for mass processing of MRP areas.
    BR
    Caetano

  • Planned delivery time not updating real time in apo

    Hi,
    I have a location product which is part of the active integration model.
    The location and product are both available in ECC and APO.
    When i change the value of Planned delivery time in ECC, the changes do not get transfered to APO even after RIMODINI.
    For e.g. the planned delivery time currently is 1 day and it is changed to 3 days, even after doing RIMODINI the changes are not reflected in APO.
    Kindly suggest if somebody has come across this issue earlier.
    Thanks & Regards.
    Santosh Joshi

    Hi Santosh,
    Please check by tcode CFM5 weather material is there in IM or not .
    Also check CFG1 log on R/3 and SLG1 or /SAPAPO/C3 or /SAPAPO/CQ in APO.
    Please confirm.
    Manish

  • How planned delivery time effects delivery creation?

    Dear All,
    Some time before, while placing order thro' CRM, we came across a typical error (hard error).
    "date (11/12/2011) lies afterthe end of validity calendar". 
    we could not place order in CRM but in SAP we could create save the order despite of same error but soft. However system didn't allow to create delivery for same order & same error message populated"
    Later it was found that it is because for material  " Planned Deliv. Time  maintained for say "X "days in material master MRP2 view" & was corrected.
    How planned delivery time effects delivery creation?
    For material even though planned delivery time was maintained as say for 500 days, sales order requested delivery date & delivery date in order schedule line got determined as order date (Considering avaliability of funds & material).
    i.e order date/req. delivery date/delivery date in schedule line are same as date on which order is placed.
    Regards
    Suhas W

    Hi,
    Extended your factory calender in SCA3.
    Regards,

  • Planned delivery time

    Hi,
    I have created a sale order on 1/7/2009 with a material which has planned delivery time of 4 days.
    Now when I go to the schedule lines screen I see that the delivery date corresponding to the confirmed quantity is 1/8/2009.
    Why is not SAP taking the 4 days into considerations while determining the delivery date?
    Please see below the screen shots:
    Scheduling configuration in material master:
    [http://i40.tinypic.com/14b2fyc.jpg]
    Schedule lines screen shot:
    [http://i44.tinypic.com/9pxkzc.jpg]
    Sincerely.
    Ketan

    Hi,
    You seems confused with planned delivery time in MRP 2 view of material master to Sales order delivery date.
    Material master Planned delivery time is for the material which is procured externally  through PR -- PO process.
    In Sales order the delivery date is with respect the ATP--Avalible to Promise.
    If the stock is avalible in the storage location on the date of Sales order creation, then system will consider the delivery date an the basis of confirmed qty in the sales order. You can check in CO09 for confirmed qty.
    rgds
    gsc

  • Planned Delivery Time and Transportation duration- Tlane and Means of Transportation

    Dear Experts ,
    I have question regarding lead time calculation my SNP
    I have
    Start Location : A
    Destination location: B
    I maintained Planned delivery time in ECC- material master as 10 days  and cifed to Tlane Product procurement as 10 days
    and leave empty in the transportation duration empty so the total lead time is 10 days from start location A to destination location  B
    now
    I maintain 24 hours in Means of transport as transportation duration by truck
    now the lead time is 11 days from start location A to destination location B
    Now
    i leave empty planned delivery time empty and maintain Means of transport duration as 48 hours
    so the lead time is 2 days from A to B
    does my understanding is correct or not advise please
    Regards
    Raj

    Hi Raj,
    Take a look of these notes. Specially SAP note 379006. This note explains how the system sets the times in ECC and APO. Basically, It recommends a BAdI in order to match the delivery date in ECC and APO (transit time). What I recommend is to set delivery time equal to 0 if this is possible in your company.. This is not an SAP recommendation, because the delivery date is a key master data in the purchasing process and making it equal to 0 could not be allowed.. Now, if its possible in your case, it is the easiest way to ensure consistency...
    These are the notes:
    379006
    - Transport duration and planned delivery time in APO and R/3
    441622
    - Supplying-plant-dependent planned del. time/trans. time
    624982
    - Incorrect dates for RBA controlled stock transfer
    Kind Regards,
    Mariano

  • Purchasing: Planned delivery time

    I have a material that are being purchased from 2 vendors.  one vendor delivers the material in 2 days.  the other takes 20 days.  In the material master, I have to maintain the planned delivery time.  As per the help info, I will need to maintain the average time here.  So, that would be 11 days.
    So, when I run MRP, 11 days will be taken as the planned delivery time.  My planning is not going to be accurate if I choose any of the vendors.
    Can anyone guide me how I can take care of this scenario?

    Raj,
    You maintain your planned delivery times for each vendor in your info records.
    You need to ensure you have flagged the <i>scheduling info record/agreem.</i> flag (Determine Planned Delivery Time) in transaction OPPQ.
    You also need to ensure that you have maintained source list entries for your vendors that are relevant for MRP.
    Now the MRP run will consider the planned delivery time in the info record and not the material master.
    Hope this helps.
    H Narayan

  • Planned Delivery Time is included Saturday. and Sunday?

    Dear Guru,
    Please kindly advice me about Planned Delivery Time in Days in the MRP View.
    Is it include Saturday and Sunday?
    If my calendar is not work on  Saturday and Sunday.
    Thank you very much.
    Saiya

    System calculates with help of factory calender. if you maintaned saturday and sun day as public holidays then system will not considered for planned delivery time.

Maybe you are looking for

  • Wont let me download apps in appstore

    Some apps I do not have option to download to ipod. Download Button not highlighted for me to click on in appstore. Using ios 6.1.6 on 4th gen ipod. Yes, these apps I am trying to download are compatible with ios6.1.6 as well so please help.

  • System Failure : FRONTEND_ ERROR raised While Calling RFC from R/3 to CRM

    Hi Experts, I'm Getting the Error System Failure Error "Error has occurred making remote call to method DISPLAY in system CRP_110". RFC function Module : CRM_FM_ACL_DISPLAY_FPO. I have Check the RFC Destination and other parameters passed is same. Pl

  • Dial-up connection disconnecting

    When importing a CD, my dial-up Internet connection disconnects after each song has finished importing. The importing doesn't seem to be affected, but I keep having to reconnect. Does anyone have any idea why this occurs?

  • Smartform output problem

    Hello all,      Now I met a problem about smartform output:      The default printer is LP01. When I execute the program which calls this smartform in background, I change the printer to LP03. Then I use the t-code:SP02 and find the printer is LP01 n

  • HT4236 how can i transfer my photo to iphone whith out removing old one?

    how can i transter my photo in iphone wuth out removing yhe old one?