Planned Order Component check and Scheduling.

Hi,
Current Process: MRP runs automatically over a finished product and creates a planned order. This planned order checks in-house prodcution time of the product and backward schedules the dates.
New Requirement: MRP runs automatically over finished product and creates a planned order. This planned order checks in-house production time and "component availability". If all components are available, then the planned order gets standard in-house production time. If a component is missing, then system checks the delivery date of the purchase requisition/ order and reschedules the planned order to acommadate for the late arrival of components.
How can this new requriement be achieved? Is it possible that when I check component availability of a planned order, system automaticall re-schedules the order?
Thanks in advance.

Hi Srao, the concept of MRP is to schedule requirement dates and qty's based on the delivery date of the finished product. If any component is not available according to this scheduling, the system generates a reschedule proposal of e.g. an existing purchase req. or creates a new purchase req. or planned order.
MRP considers planned GR's on sub-level only if they fit the schedule. What u want is simply not the concept - sorry

Similar Messages

  • What parameters determine Planned order production start and end dates?

    Greetings
    We are using the graphical planning table @ MF50 to firm Planned Orders (Basically checking off "Firm Order" field within the Planned Order). We are on ECC 6.0
    Whenever I backflush, the production start and end dates get overwritten (The Basic dates do not change).
    I would like to prevent this. Can someone advise me on what parameter controls how the production start and end dates getting changed?
    Thank you
    Hanarin

    Hi,
    Calculating production dates ( Lead time scheduling) are explained in detail in the SAP help URL as below:
    If "Automatci Scheduling indicator" is set in the customizing for scheduling parameters then after every change relevant to scheduling, the production order is also automatically rescheduled before saving.
    You need to check these settings.
    regards
    Datta

  • Planned order availability check

    Hi All,
    The planned order generated is checking for the availability of raw materials .,
    Im presently changing the planned order start date and finish date according to the commited date getting from availability check for components
    The issue is the committed date is displaying when the raw material will be available ., this is fine
    when there is stock for rm is available in rm stores it is not considering the stock, it is considering only the stock in wip store only(system showing a date according to the material planned delivery time , there is enough stock and no PR have been generated
    help me in sorting out the issue
    Regards
    Anand Srinivasan

    Hi anand
    During MRP run . The BOM gets exploded and it will be based on your Strategy only.
    If you use MTS 10 it will include stock, if it is 11 it will not include stock. If you use 20 it will not include stock during BOM explosion.
    Availability check also depends according to your strategy.
    That is why it not cosidering the stock and creating dependent requirement. On further conversion this will be converted to reservation.
    Hope this is clear
    Regards
    J . Saravan

  • How to view the planned orders in mass and how to delete in mass

    Hi gurus,
    How to view the planned orders in mass and how to delete in mass.
    Regards
    R.Rajakarthik

    Hi,
    Use the collective display of planned orders, transaction code MD16.
    You can select the data by different options and choose which ones or all that you need to delete.
    Click the Delete button to trash them.
    This will delete planned orders without deleting the planned independent requirements and sales orders.
    Hope it helps

  • Planned Order for stock and planned order for customer requirement

    Hello everybody
    I want to make a different, in MD04,   between the planned order for stock and the planned order created for a customer requirement
    Thank for your help

    Hi,
    True planned order are generated for both the cases but the planned order generated for sales order will have sales order number in the below column and for stock will show independent requirement. Mainly no sales order reference will be there for make to stock scenario.
    Hope it will help.
    Regards,
    Alok Tiwari

  • MRP run - misalignment for planned order between Date and Production Date

    Hi All,
    We've just integrated SAP for a new plant.
    The MRP runs based on Routing Lead Time for Make materials instead on Material Master Lead Time, for Capacity Assessment purpose.
    When requirements dates lay in the past, MRP performs forward scheduling starting from current date and properly defines Production End Date according to Routing.
    By checking MD04, for the proposed Planned Order, the basic date is same as Current Date (= same as Requirement Date) instead of being same as Production Date.
    It works as it if checks stil the MAterial MAster LEad time instead of Routing. In fact if I updated the LT of MM the MD04 provides the right Date.
    For future requirements, the MRP works properly, by having basic dates (both start and end date) aligned with Production Dates of Planned Order.
    How can I do the alignment w/o updating In House Production LT?
    Thanks,
    D

    Hi Caetano,
    we have already done this configuration in OPU5 but it doesn't provide any benefit.
    Below how we configured it:
    Scheduling level: Via detailed scheduling
    Adjust dates: adjust basic dates, adjust dep. reqmts to operation date
    For capacity scheduling: Always basic dates, dep. reqmts to operation dates
    Scheduling type: Backwards.
    Regards,
    D.

  • Conversion of Planned order to PR and Dependent Requirements

    Hello Everyone,
    I had two issues to be dealt with..
    1. When i run my MRP run for a specific plant i do not want the system to automatically convert planned orders to Purchase requisitions for specific material in specific plant. How do i Configure the same?
    2. I use planning strategy 40 for the header material. During MRP run dependent requirements are automatically  raised for lower level components. But how does the user know which planned order is generated for which higher level order?
    Moreover, since the same raw material is used in multiple  finished  materials, a single planned order is raised for the same raw material. This makes it all the more complex.
    I think Individual/ Collective requirement does not help in this case because i am using stategy group 40 which is a MTS strategy.
    Any help in both these cases would be greatly appreciated..
    Sincerely,
    Aji
    Edited by: Aji Kurian Mani on Nov 28, 2009 2:51 PM
    Edited by: Aji Kurian Mani on Nov 28, 2009 2:51 PM

    1) Select the indicator "3"- Planned Orders in the MRP Screen or in a Variant you use to schedule the MRP
    2) Under a make to stock scenario, requirements are summarized in a planned order (or many, according to the lot size key). But in general as the stock is generic and not customer-specific, there is no assignment of planned order to a given customer.
    Regards

  • Is it possible to get planned orders by checking the capacities

    Dear experts,
    Can u please help on the following case!
    when we do MRP run for any material, planned orders are getting generated on the particular date as per our PIR. once we got the planned order, we are converting to production orders to the defined date.
    Is it possible to get the production order dates by checking work centre capacities?
    even if capacity is full, production orders are getting generated on the particular day,we are not able to produce the item as defined on the day as capacity is full on the workcentre.ultimately customer is not happy as dispatch is not taking place in time.
    how will we configure this case in the system to enable timely dispatches or timely intimation to the customers for delay in dispatch?
    regards,
    murthy.

    for any mxml tag with an id attribute: <mx:Button
    id="foo">
    the child is available simply as the variable "foo":
    foo.label = "New Label"
    Other children can be accessed by walking the tree using
    getChildAt().
    quote:
    Originally posted by:
    LaCampanella
    If it is possible to get any child by the way like DOM's
    document.getElementById, it will be very useful to us controling
    child.
    Thanks.

  • Firmed planned order  in MS04 and MD04

    Dear EXPERT
    PLZ Could any one help me to found the reson of this issue:
    the  results in LTP simulation MS04 is not equal to MRP run MD04 .
    when we  search for  the reasons which cause that variance we found it as follow
    *In MD04 the Firmed planned order did not explode the BOM again which is standard SAP functionality, but in MS04 the system explode the BOM although may be some amendments occur in the BOM.:
    Best Regards,

    Hi,
    according of my previous question .... I found in SAP Help (performance assistant) the following
    Dependencies
    When the system copies firmed planned orders, it only copies the headers of the planned orders. That is, BOM items that were changed manually in the planned order are lost during the copying process.
    that means the LTP ONLY READING BOM IN MASTER DATA AND IGNORE BOM items that were changed in firmed planned order so its SAP function.
    that lead me to update my question:
    if  any existing tools or  Badi make LTP  read items were changed in planned order ????
    with regard

  • Scheduling in Planned order

    Dear All,
    When I am creating a planned order thro MD11 and scheduling it, it is picking only one operation from the routing of the material for which the plnd order is created. What could be the reason for this?
    Manisha

    Hi,
    Please check the below ...
    Proper relationship is maintained in the routing or not.
    Check that the other operation are alternate operations are not.
    Check the control key of the operation it is copying in the planned order.
    Hope thi can help.
    regards,
    kaushik

  • BAPI for Scheduling Planned Order

    Hi,
    Please tell me if there are any BAPIs for Scheduling a Pllaned Order and for Deleting a Planned Oredr.
    Thankes & Regards,
    Rahul

    BAPI_PLANNEDORDER_CHANGE       Change planned order
    BAPI_PLANNEDORDER_CREATE       Create planned order
    BAPI_PLANNEDORDER_DELETE       Delete planned order
    BAPI_PLANNEDORDER_EXIST_CHECK  Planned order existence check
    BAPI_PLANNEDORDER_GET_DETAIL   Get details for planned order
    BAPI_PLANNEDORDER_GET_DET_LIST Get detailed planned order list
    All bapi's related to planned order processing
    BR
    Manthan.

  • Not scheduling on manual creation of planned order

    Creating planned order through MD11 and noticed there scheduling not done and capacity planning not done and on doing scheduling manually dates altered and capacity planned which are appearing in CM01 for the respective week
    Planned order created through MRP are fine with scheduling an capacity planning .
    Please let us know what could be a reason for not updating on manual creation.

    Hi
    This is standard behavior of SAP as when you create the planned order through MD11 manually , you need to do the detailed scheduling manually by executing schedule in Edit>Schedule.
    Check this thread:
    Need Automatic Lead-time scheduling in Planned Order using MD11
    Regards,
    Anupam Sharma

  • Collective Planned orders Scheduling for lower level orders with reference to the Superior order

    Hi All,
    Collective planned order scheduling.
    I have been trying to reschedule the superior planned order and i was expecting the lower level planned orders to reschedule based on the superior planned order.
    My problem is
    when i try to reschedule the superior planned order the system is not rescheduling the lower level planned orders.
    For example if i change the basic finish date of superior planned order as 30/09/2014 and reschedule the planned order it is only scheduling the header planned order and the lower level planned order is not scheduling.
    Could some one tell me why this is not happenning at planned order level.
    As the rescheduling of collective order will work at production order level but for some reason it is not happening at planned order level(as there is no option available to do so).
    Please give your thoughts on this asap.
    Mahee.

    Hello Mahee
    Please observe that your system is working as designed. Planned orders are scheduled independently, even when they are part of a network/collective order. Note 152319 explains the planned order scheduling in detail and it provides the following information:
    * No scheduling of overall networks is executed although a directly manufactured component is assigned.
    Note that no scheduling of the overall network is executed for planned orders. For the components requirements dates are determined. In order to cover them, planned orders are created in the next MRP run. Since the requirements are not managed using the exact time, the results of the planned order scheduling and of a scheduling of the overall network of the converted collective order can differ.
    BR
    Caetano

  • Planned order scheduling in mrp

    hi
    iam trying to run MRP at my client place
    facing problem in planned order dates
    i choosen  tequirement type BSF and strategy group as 11
      in md 61 pir was given in a month of june2008(monthly)
    after mrp run at modo4 iam getting planned order with
    execption message 64 called order date in past
    means iam getting planned order START DATE AND END DATE IN THE MONTH OF JUNE
    where as i need to  my planned order satar date in MAY MONTH and
    end date must be 1st of june
    means i given PIR which is my start of my june month
    checked scheduling parameters which  says backword scheduling, and i choosed planning mode 3 and leddtime scheduling
    plz suggest which setting effects the planned order start and end dates??
    regards
    sasikanth

    hi
    i selected schedule margine key with 0 flots (key000)
    and chossed *LEED TIME SCHEDULING (in mrp controll parameters :-scheduling 2 at MD02 )
    how the reduction strategy helps in this case ,casue i am doing lead time scheduling system has to consider only routing time ??? right ??
    plz suggest how to  arrest message 64
    regards
    sasikanth 
    message 64 diagnosis enclosed
    64: Production finish after order finish                                                                  (P4)
    Message no. MD427
    Diagnosis
    The production finish date calculated using the routing lies after the order finish date that was calculated using the in-house processing time in the material master record.
    As the system uses the order finish date in the planning run, this situation may lead to material shortages if production is not finished until the production finish date calculated by the system.
    System Response
    This exception is displayed in the MRP list and in the current stock/requirements list.
    Procedure
    Check the times in the material master record and in the routing.
    Check whether the order has to be rescheduled in.

  • Plan order is considering saturday and sunday as working day.

    Hi All,
    I have a problem where saturday and sunday is being conidered as working day when a plan order is created (Either manually or Automatically). But in calender assigned to this plant, saturday and sunday is assigned as holiday.
    But when we convert the same plan order which has Saturday as Order start, the Basic start date of production order is moved to Firday.
    EG. Plan order - XXXXXX has order finish date as 22-Aug-2011. Inhouse lead time is 2 days. So system takes 20-Aug-2011 as order srat date in plan order.
    But when same Plan order is converted to Production order, then the Basic order start date is moved to 18-Aug-2011 and it says that 20-Aug-2011 and 21-Aug-2011 is maked as holiday in calender.
    Can some one please suggest why is plan order considering Saturday and Sunday as working day.

    Hi,
    Check the factory calendor assigned to plant which is referenced in plan order and teh factory calendor assigned to work center which is used in elad time scheduling in production order.. are they same? 
    Check how they ahve maintined..?

Maybe you are looking for

  • File downloads not working in Pepper-Flash beta 11.8.800.115 (chrome)

    Pepper-Flash Beta version 11.8.800.115 was auto-installed in latest Chrome update (29.0.1547.57 m).  This flash version does not display save/open dialog when clicking on a link that opens a file via flash.net.navigateToURL(request, "_self").  Reques

  • IWeb & .mpg movies HELPPPPPP!!!!

    We are creating an iWeb site. I've got nearly everything working. I'm from an IBM/MS world but loving Apple until the last two days. Have spent nearly 10 hours trying to figure out how to do this, including reading most posts and product help pages.

  • Duplicated Photos in Library

    Somehow each of my pictures in the library have been duplicated.  How do I easily delete all duplicates?

  • Using tcpdump...please help..

    Hi I want to use tcpdump to check a connection termination situation that occurs in my application. I read the documents and they say that the simplest way to use tcp dump is by typing tcpdump -i "interface name" But I am not able to find out what is

  • Steps to import OEL 5.7 ovf into amazon ec2

    Dear Legends, Forum Administrator: Sorry I was noticed the space name correctly. Thanks for reminding me. Can any one please let me know what should be required to install OEL 5.7 x64 in a local VM ware or VBox and then I need to move it to Amazon EC