In a BOM of FERT material, one HALB material is present at different BOM levels. When we run sale order MRP (MD50), system will create one planned order for complete quantity (total qty of HALB material at all  levels put together). Is there any way, so that system will create different planned orders for the same material present at different levels ?

Hi,
MD50 is T code for running MRP w.r.t sales sales, During MRP run system will explode the BOM and plan the requirements for all the levels( i.e, multiple levels)
with regards,
P.P.Anand

Similar Messages

  • TCODE for Process order creation against Sales order

    Hi gurus,
    Pls tell me what is the TCODE for Process order creation against Sales order
    Eg. CO07 is for production order from sales orde

    Typically, in MTO scenario after the sales order is created you run MRP which will create planned order and then you convert that into production order using MD04.
    Or if you have SD settings correctly directly from the release of Sales Order it will create planned order or production order.
    please check and revert back.

  • PLANNED ORDER CREATION FROM SALES ORDER SAVING (REQUIREMENT CLASS 200)

    Dear All,
    By using requirement class 200, assembly type 4 (dinamic planned order) Iwould like that at sales order registration the planned order for the sales order material is created.
    I have two problems.
    The system doesn't schedule the planned order, even if the scheduling parametres are entered for planned order type (relation between routing id and planned order type).
    So I have a planned order in which i have to manually schedule it.
    The second problem is that the planned order is firmed at creation. I would like that it was not firmed to adjust by MPS procedure the components from BOM modification. Infact at the creation of the sales order The complete BOM is not defined, and I don't want to unfirm the planned order so run th mps procedure.
    Can anyone answer to these questions?
    Thank's in advance
    Luca Pastura

    Hi Luca Pastura,
    For Scheduling
    1. You need to Give the appropriate check mark ( 1 or 2 ) In the capccity check of the requirement class configuration (ovzg)
    For Firming
    1. Since youare using dyanamic processing ""During dynamic assembly processing, you can not change the quantities and deadlines"
    2. kindly refer the F1 help for the assembly type inthe OVZG.
    Check and confirm
    Reg
    Dsk
    1.

  • Planned Order creation for Sales Order and Purchase Order

    Hi
    We have a following requirement.
    In normal scenario when we have demand for material  which was created by MD61 and in addition to that if there is Sales Order the 1st planned order gets revised.To better expalin this consider possible scenario
    You create plan via MD61 for 200 qty .The system creates Planned Order for 200.
    Now there is Sales Order for 150 peices.Then what happens is original  Planed Order of 200 is changed to 50 and another planned order is created for 150 peices.The requirement is not summed.
    Now in new scenario instead of Sales Order there is Intercompany Purchase Order of 150 peices.
    Now the system is not changing original Planned Order of 200,but it created another planned order of 150.So now there are 2 Planned Orders of 150 and 200.
    What I want to know is there any way wherein the system will reduce the original planned order (similar to Sales Order scenario)
    Regards

    Hi,
    Use Strategy 52 in urs case.
    PIR witll be created .
    None convertable planned order will be created.
    Once you get sales order for that material.
    New planned order will be created which will consume PIR( planned order ).
    Eg.
    PIR 10.
    Planned order 10 qty.
    Sales oder 6
    Planned order for SO 6 qty
    Planned order through pir will become 4 qty.
    Regards,
    Vishal

  • Production order creation from sales order

    Hi PP Gurus,
    I am creating a production order automatically from sales order by using strategy group exactly similar to 82. Once i create the sales order , its showing missing parts error in prouction order and if i check missing parts overview,it says over all confirmation date is not determine.We have stock in MMBE for that material and storage location combination.
    I have also chekced the requierement class and type and found ok.
    Please help me resolving this issue.
    Thanks in advance.!
    Regards,
    Sudheer

    Hi Mario,
    Yes, the availability check will check other stock types also. My concern is why the availability check is  failing and giving missing parts even if the components are there in stock after considering the reservations.
    I checked OPJJ setting, availability check is active and we did that.
    Can you please help me in this as we are stuck up at this point.
    Regards,
    sudheer

  • Planned order creation with sale order assingment at the run time of MRP

    some material item not planed with sale order stock in MRP run time. all setting in material master are corrected as i knowing.having some mistake in setting other configuration.

    Planning strategy is Make to order individual collective as individual but still come as make to stock plan orders
    Incase of Header material- Plan order is creating in MTS
    Check the sale order procurement tab, Is The requiremnt type is relevant to your Stratergy?, if not chnage it to correct requiremnt type and rerun MRP again
    Incase of component material- Plan order is creating in MTS
    Check for the component material MRP 4 View, individual/Coll.req- as 1. If not set as 1 and rerun the MRP again

  • Automatic Plan Order Creation on Sales Order save

    Hi friends,
    We are having an requirement where Automatic Plan Order should be created on Sales Order saving.
    We have Material A in Plant 1000 & Plant 5000.
    Plant 5000 in plant where Manufacturing is carried out & Plant 1000 is service Plant.
    We are using Special Procurement key for Material A in 1000 Plant which triggers procurement from Plant 5000.
    When Sales Order is entered in Service Plant 1000, after saving Order Plan Order should be created in both Service Plant 1000 & Manufacturing Plant 5000 along with Sales order reference.
    I have tried using Strategy Type 81 but Plan Order is created while saving Order only in Service plant (1000), but with Procurement Type (E - In-house Production) & No Plan Order created in Plant 5000.
    Can you please guide me how to meet requirement?
    Thanks in advance.

    Hi Jiaul,
    Thanx for reply.
    I have already assigned the Special Procurement Key to Material A in Plant 1000.
    In Plant 1000 procurement type is F (External procurement)
    But when Plan Order is created after saving Sales Order it is created with Procurement type E (In house production).
    If I delete Firm Plan Order generated & run MRP for Sales Order / Item. It gives me required output generating Plan Order in both Plants.
    Regards,
    Rameshvar

  • Production Order creation wrt Sales order

    Hi,
    I am having one doubt please clarify, In MTO scenario.
    Creating Production Order wrt sales order in co08 and also we can run mrp in md50.
    what is the use instead of going to md50 can we create directly from co08?
    Please clarify this.
    Thanks & Regards
    Venkat

    Dear Venkat
    You scenario is make-to-order i.e., you procure raw materails only on receipt of sales order.
    For the requirements calculation specific to the sales order you run MRP w.r.t. sales order in transaction MD50. This will create the relevant PR and planned orders for the shortage requirements.
    The PR  can be converted into PO for procurement activities. Once you receive the required raw mateirals you need to produce the product in inhouse for that you can convert the planned order to production order or you may create production orders manually in transaction CO08
    So MD50 is to calculate the requirements and raise PR and Planned orders i.e., procuremetns elements
    CO08 is to create production order manually w.r.t. sales order for producing the materail in inhouse.
    Regards
    Soundar

  • Service order creation from sale order

    Hi Friends,
       Could you please tell me where is the setting for the automatic creation of service order from sale order.
        Iam using LEIS , TAD and CD as the sales documents and SM01 as service order document.
        Am I missing something?
        Please let me know.
        Regards,
        satish

    Hi Satish,
    The setting for creation of a service order from sales order can be found in the Requirement class configuration.
    To know how to link, check the procurement tab in the sales order, note down the requirement type associated to the line item. Requirement type is linked to requirement class. In requirement class you find the configuration.
    Standard SAP creates SM03 (refurbishment) type of service order from sales order.
    Reward points if useful.
    Regards
    Ananth

  • Purchase order creation from sale order (Third party )

    Hii..
    I have a requirement where i create a sale order for third party, system automatically creates purchase requisition,
    my requirement is i dont want to  convert purchase requistion everytime into PO when ever sale order is created.
    can i automate the process where the moment i crete s sale order purchase order is created direclty.
    Suggestions will be worth rewarding..
    Regards
    SARFRAZ

    Hi
    first you need to do seeting for Automatic PO creation from PR
    1.You need to check the Auto POcheck box in Purchasing view of the material master
    2.You need check the Autoamic PO check box in Vendor master in Purchasing org data
    3.You need to maintai the source list with one of the vendor as fixed vendor
    4.Purchasing info record for Vendor and material
    Then you need to schedule the batch job for ME59N with the variant (Required input selection parameters) with the time intervals.
    One third party order created, PR will be generated automatically based on the item category defined in the sales order and source will be assigned in PR.Based o time interval schduled for batch job, the PRs will be automatically converted into PO.
    Regards
    Ramakrishna

  • Service Order Creation through Sales Order...

    Hello,
    I got one requirement it is , we need to copy the account assignment (WBS element ) from sales order line item to service order line item . Morever same wbs element should be used to create automatic settlement rule in service order.
    This should also work even if user changes the WBS element later. i.e, updated WBS element should again update service order and settlement rule automatically.
    I tried to use Exit MV45AFZB and routine USEREXIT_MOVE_FIELD_TO_COBL, but still i am not able to see the data in service order Location tab, Object tab.
    I checked the table ILOA, its not getting updated when creating Service order via sales order.
    I am not able to see any fields value coming on Service order screen when creating through sales order.
    Regards,
    Sujeet Mishra

    Hi ARC,
    Here the issue is that, Sales Order is getting created but while sending the Order num. to Webpage through web service then rasing below Exception.
    Runtime Error UNCAUGHT_EXCEPTION
    Except. CX_SOAP_CORE
    Date and Time 07.05.2008 20:13:24
    ShrtText
    An exception that could not be caught occurred.
    What happened?
    The exception 'CX_SOAP_CORE' was raised but was not caught at any stage in the
    call hierarchy.
    Since exceptions represent error situations, and since the system could
    not react adequately to this error, the current program,
    'CL_SOAP_TRANSPORT_EXTENSN_ROOTCP', had to
    be terminated

  • Plant maintanance service order creation using Sales order

    Hi,
    We have created plant maintanance service orders  using requiremnt class in sales . so in sales order schedule line the service order is created. but in some sales orders it will show the service order number and when we double click on that shows an error service order does not exist. please let us know what would be the problem.
    Thanks & regards,
    Rohit

    Hi ROHIT,
    First check do you have authorization for (IW32 , IW33) and Check your number ranges in OION and check is there any status is blocking  that number.
    Regards
    Nishad

  • Auto Creation of Delivery with PGI and Billing after creation of Sale Order

    Dear Experts,
    I am having one Req. like...After creation of sales order ..automatic Delivery and Billing should be done.
    Right now i m able to create automatic Delivery but PGI is not happening for that delivery.
    Is there any configuration I have to do ... or by any user exit we can get the solution.
    Can u please provide me solution for this.
    Regards,
    Sanket.

    Hello,
    yes, you can create the PGI Atomatically by BATCH JOB using the program nder the VL23 transaction code.
    Goto the Transaction code SM36 to create a job for the program  SAPMSSY0 which is the program for the AUTO PGI
    create a variant for the Delivery document types and sales organisation combinatioans and add this variant to the bath job created in SM36.
    Set the time of the Job to run after every 5 minutes, so once the job exected it will pcik all the Deliveries which are pending for the PGI.
    After the PGI done you can run SDBILLDL program to create the Billing for all the document which were cleared and due for Billing.
    Hope it is clear for yo, please revert if you need frther clarification .
    santosh

  • Va01 creation of sales order

    Hi
    can i create sub screen  in creation of sales order item
    in user exit mv45afzz
    my requirement is when user click on any line item than than i need to call subscreen with some information
    pls guide me on this

    HI
    <b>
    Sales realated exits</b>
    SDTRM001 Reschedule schedule lines without a new ATP check
    V45A0001 Determine alternative materials for product selection
    V45A0002 Predefine sold-to party in sales document
    V45A0003 Collector for customer function modulpool MV45A
    V45A0004 Copy packing proposal
    V45E0001 Update the purchase order from the sales order
    V45E0002 Data transfer in procurement elements (PRreq., assembly)
    V45L0001 SD component supplier processing (customer enhancements)
    V45P0001 SD customer function for cross-company code sales
    V45S0001 Update sales document from configuration
    V45S0003 MRP-relevance for incomplete configuration
    V45S0004 Effectivity type in sales order
    V45W0001 SD Service Management: Forward Contract Data to Item
    V46H0001 SD Customer functions for resource-related billing
    V60F0001 SD Billing plan (customer enhancement) diff. to billing plan
    V46H0001 SD Customer functions for resource-related billing
    V45W0001 SD Service Management: Forward Contract Data to Item
    V45S0004 Effectivity type in sales order
    V45S0003 MRP-relevance for incomplete configuration
    V45S0001 Update sales document from configuration
    V45P0001 SD customer function for cross-company code sales
    V45L0001 SD component supplier processing (customer enhancements)
    V45E0002 Data transfer in procurement elements (PRreq., assembly)
    V45E0001 Update the purchase order from the sales order
    V45A0004 Copy packing proposal
    V45A0003 Collector for customer function modulpool MV45A
    V45A0002 Predefine sold-to party in sales document
    V45A0001 Determine alternative materials for product selection
    SDTRM001 Reschedule schedule lines without a new ATP check
    SDAPO001 Activating Sourcing Subitem Quantity Propagation
    https://www.sdn.sap.com/irj/sdn/wiki
    Check this link
    Sail

  • Reducing PIR-Planned Independet Requirements by sales order

    Hi;
    I use 40 as strategy group (MM03 > MRP3). In this strategy group sales order consumes PIR and when MM documentis created via delivery PIR is reduced.
    I want to reduce PIR when a sales order is created. Is possible?
    I am waiting foru your kind answers.
    Regard.
    Emre OZDURSUN

    Why do you want to do so? 
    In terms of planning, the Ind.Req. shown is already taken to account of the sales order consumption so there is no issue there.  If you think about it, it does make sense that it will be reduced only when sales order is delivered.  Here my example to explain why.
    PIR 1000
    Sales Order 50
    Shown in MD04 and in MRP run:
    Ind.Req       950
    Sales order  50
    If the sales order is cancelled, then PIR will be set to 1000
    Shown in MD04 and in MRP run (after sales order rejected)
    Ind.Req.  1000
    Therefore, if you reduce PIR at sales order, it will be gone for goods.  You cannot change the PIR back to the way it was. If your sales order rejected or partially rejected, you loss all the info for your demand plan (even though you have in PIR history but no good for planning purpose).
    If you want to delete and reorg old PIR that already have sales order in the past (back order per se), use MD74 (adjust PIR to sales order qty), MD75 (delete PIR without consumption) , and MD76 (delete history).
    Hope it helps,
    Edited by: ayethebing on Mar 3, 2011 10:51 AM

Maybe you are looking for

  • Multi-Camera-Link Vision Acquisition using .avi

    So I'm trying to use two Camera-Link Cameras (JAI CM-200-MCL) with the NI PCIe 1430 frame grabber in order to obtain video of a y-axis tensile testing project, and I'm relatively new to the whole LabVIEW experience. Essentially, I want to be able to

  • IOS Widgets and Edge Animate CC 2014.1.1

    Hi ! I just noticed that when exporting my animation using iBooks .wdgt files, when I expand this widget to see its contents, I cannot find the necessary info.plist file in order to this Widget to work inside iBooks Author or elsewhere. Is that norma

  • DV6500 Physical Memory Limitation to 3gb

    Hi All, My DV6500 Entertainment PC came with Windows Vista 32-bit preinstalled which limited my usable memory from 4gb to 3gb. I recently upgraded to Windows Home Premium 32-bit which I believe has a physical memory limitation of 4gb (http://msdn.mic

  • Total number of Pages in Keynote

    Is it possible to include a place holder in a Keynote file that reports the total number of pages in a presentation? Alternately, is it possible to create a progress bar that shows the position of the current slide? One problem with beamed presentati

  • Filemaker Pro Developer 7 - Does it Work?

    As anyone tried using Filemaker Pro 7? What if any problems have been encountered? Thanks in Advance