PLANNED ORDER CREATION FROM SALES ORDER SAVING (REQUIREMENT CLASS 200)

Dear All,
By using requirement class 200, assembly type 4 (dinamic planned order) Iwould like that at sales order registration the planned order for the sales order material is created.
I have two problems.
The system doesn't schedule the planned order, even if the scheduling parametres are entered for planned order type (relation between routing id and planned order type).
So I have a planned order in which i have to manually schedule it.
The second problem is that the planned order is firmed at creation. I would like that it was not firmed to adjust by MPS procedure the components from BOM modification. Infact at the creation of the sales order The complete BOM is not defined, and I don't want to unfirm the planned order so run th mps procedure.
Can anyone answer to these questions?
Thank's in advance
Luca Pastura

Hi Luca Pastura,
For Scheduling
1. You need to Give the appropriate check mark ( 1 or 2 ) In the capccity check of the requirement class configuration (ovzg)
For Firming
1. Since youare using dyanamic processing ""During dynamic assembly processing, you can not change the quantities and deadlines"
2. kindly refer the F1 help for the assembly type inthe OVZG.
Check and confirm
Reg
Dsk
1.

Similar Messages

  • Blocking RdA creation from Sales Order Schedule Line

    Hi Gurus,
    please do you know if there is a way to block the RdA creation from Sales Order schedule line, for TAS item category? I tried with Header Delivery block without quantity confirmation but even if quantity on schedule lines are not confirmed, RdA is created anyway.
    Thank you very much
    Kind Regards
    Andrea

    thank you

  • Automatic PR Creation from Sales order

    Hi All,
              This is with respect to PR creation from Sales order for 3rd party items.
    I am able to create PR from standard sales order and i dont have any issues with that.  I have used schedule line categories which is configured with Order type Z2, Item rel for dlvy checked and Acct assigment group as E.
    Now my question is , I want to copy partners from sales order to Purchas req. Currently some partners are getting transferred from Sales order to P.Req, But not all there in sales order. Where do we control the data that can be copied from Sales order to P. Req
    Thank you
    Kris

    Hi,
    Genrating PR, Mostely depends on shedule line,see which shedule line u r determining for HIGH LEVEL ITEM ,for that shedule line maintain setting is VOV6.
    kapil

  • Planned order capacity requirement load on holiday

    Hi ,
    We have some cases , the planned order capacity requirements be load at weekend (holiday), but we have no same issue for process order , that's means the resouce set up is correct.
    Is any customizing related with planned order capcaity requirment ?
    Thanks !

    Hi,
    If you select the Workday indicator  = 1 (Working days (overrides factory calendar) at "Interval of available Capacity Screen" of Workcenter screen system will schedule the  Order during the Holiday.(CA02)
    This is applicable for Both Planned Order and Process Order.
    Pradeep

  • Auto Po creation from sales order.

    Hi ,
              I have a requirement to create a PO automatically from sales order.
    We will be creating a third party sales order, corresponding to which system creates an purchase requisition. Now the requirement is that this Purchase requisition should be converted in to PO automatically.
    For this in the item category config i have ticked the auto Po check box . Also the source of supply is unique so that  purchase requisition is automatically assigned with source of supply.
    But still the PO is not created automatically. What are all the configuration and workflow  needs to be done for this.?
    Kindly help me.
    ram.

    Hi
    From SD settings i dont think a purchase order can be directly created based on sales order thro standards
    You can trigger only purchase requestion
    In VOV6 if you mention order type NB for your schedule line category then a Purchase requestion is only created up on saving your sales order
    Item category in VOV6 should be 5 (third party)
    Account assignment category should be X
    This is third party sales settings
    In MM01 also in the purchasing tab of that material create automatic PO check box is there
    If you tick that also it generates purchase requestion only not purchase order
    In VOV7 create automatic PO check box is there
    If you tick that also it generates purchase requestion only not purchase order
    Involve your MM people also for this requirement
    In MM people can create automatically PO from PR and there are a lot of threads in MM forum regarding that
    For automatic PO creation from PR, follow the steps. taken from MM forum
    1) Material Master purchasing view tick automatic PO check box
    2) Vendor Master purchasing view tick automatic PO check box.
    3) Maintain Source list for Vendor & Material.(ME01)
    4) Maintain Purchase Info Record.(ME11)
    5) Create a Purchase Requisition.(ME51)
    6) Use T .Code: ME59 & execute for PR for vendor, you will be able to create automatic PO.
    7) Note-1:
    During creation of PR , select check box of Source Determination in the 1st screen of ME51
    Ensure that Purchase Info Record should be there.
    If you have more than one vendor then fixes only one vendor in source list.
    Regards
    Raja

  • PO creation from sales order

    Hi 
    we have a scenario where in we are creating a manufacturing order ( This is a sales order with no delivery relevance and billing relevance ), we use this to transfer requirement fo sales order to production( production is not in SAP) via interface .
    We need to create  PO when we get the confirmed dates from legacy system . We planned to create the PO from sales order directly . How can we do this ?
    Also my dubt is when we get the confirmed dates from  legacy system in to SAP , do we need to update the PO which in turn would need to update sales order schedule lines or can we directly update schedule lines in Sales order .
    IPlease let me know in detail if possible .
    Regards
    Ramanathan

    Hi
    You can use BAPI : BAPIPO_CREATE1_   for creating PO from sales order , you can pass the SALES ORDER no into the item level field : CRM_SALES_ORDER_NO---'' YOUR SALES ORDER '' . and fill the corresponding ITEMX for the field .
    Regards
    Swapnil

  • Automatic project creation from sales order

    Hi,
    I am creating project from the sales order. I have all necessary configuration and maintained master data.
    But during the creation of the project, I am getting 2 errors
    1. I have to maintain network start date (maintained forward scheduling in customization) and systems prompts for availability check
    2. After maintaining start date and confirming the ATP check, when I try to save the sales order, I get error like "Create Network: Project Allocation" where in I can see 2 standard projects, one SAP standard project and another which I created by copying this standard, against which there are 2 black fields for project definition. and below 3 options. COPY, ALLOCATE WBS ELEM and CREATE.
    If cancel this, system asks ' Copy project allocation in the network?' if i say yes then i cant leave the above window and if i say no then new window pops up asking me for WBS element acc assgn and billing WBS elem.
    Does anybody aware of this issue?
    Please help.
    Thanks

    Hi,
    If you want to have availability check on sales order then customize accordingly using OVZ9 & OVZ0. if you don't want availability check then you remove that customization with reference requirement class.
    If you don't want have availability check in project with reference to network type, which I hope has been maintained in the system right now, you can skip that.
    Secondly, your business requires where stock to be release (Sale order/ Project). For the same, kindly check in OVZG what has been maintained for special stock and for account assignment cat.
    If you want to have through sale order, kindly use sale order stock.
    Third, check in CN08, which all values has been defaulted with respect material number, generally if you want to run project through sale order and then header assigned network type is used.
    I hope it would be helpful in resolving the issue.
    Regards
    Avisek Bhardwaj

  • Service order creation from sale order

    Hi Friends,
       Could you please tell me where is the setting for the automatic creation of service order from sale order.
        Iam using LEIS , TAD and CD as the sales documents and SM01 as service order document.
        Am I missing something?
        Please let me know.
        Regards,
        satish

    Hi Satish,
    The setting for creation of a service order from sales order can be found in the Requirement class configuration.
    To know how to link, check the procurement tab in the sales order, note down the requirement type associated to the line item. Requirement type is linked to requirement class. In requirement class you find the configuration.
    Standard SAP creates SM03 (refurbishment) type of service order from sales order.
    Reward points if useful.
    Regards
    Ananth

  • Project Revenue Plan Not Update from Sales Order Item

    I am generating a network and project from the sales order item using Assembly processing. I am using milestone billing on the sales order item and the milestones attached to the project network activities are appearing as billing blocks on the sales order item billing plan. However, the project revenue is not getting updated from the sales order billing plan. Can someone please help?
    I have deleted the billing plan on the billing WBS element and activated revenue planning update from sales order in cusomization for PS. I am looking at CNS41 under the project revenue sched in version 0. Is there a different report I should be looking at?
    Regards,
    Venkat.

    HI Venkat,
    You are looking at the correct report & I believe you have also done the necessary customization. If you create a sales order and reference it to a quotation, the related plan values in the WBS element are refreshed automatically.
    When the payment data is recorded, the terms of payment and the customer payment history are taken into consideration. One of the probable causes could be the credit limit of the customer might have been exceeded. Take help of your SD consultant & increase the credit limit for that customer (from the sales document), t-code FD32 if it is permitted in the business.
    After the new credit limit is set execute the following steps:
    u2022     Go to the t-code Change billing request (VA02)
    u2022     Open the required billing request
    u2022     Remove the account assignment of WBS element from each line item
    u2022     Save the billing request
    u2022     Reopen the billing request in change mode
    u2022     Reassign the WBS elements to all line items
    u2022     Now the changed credit limit will take affect
    u2022     Check the Planned Revenue for the said project in CNS41, it should get updated.
    Rgds
    Deepak

  • Purchase order creation from sale order (Third party )

    Hii..
    I have a requirement where i create a sale order for third party, system automatically creates purchase requisition,
    my requirement is i dont want to  convert purchase requistion everytime into PO when ever sale order is created.
    can i automate the process where the moment i crete s sale order purchase order is created direclty.
    Suggestions will be worth rewarding..
    Regards
    SARFRAZ

    Hi
    first you need to do seeting for Automatic PO creation from PR
    1.You need to check the Auto POcheck box in Purchasing view of the material master
    2.You need check the Autoamic PO check box in Vendor master in Purchasing org data
    3.You need to maintai the source list with one of the vendor as fixed vendor
    4.Purchasing info record for Vendor and material
    Then you need to schedule the batch job for ME59N with the variant (Required input selection parameters) with the time intervals.
    One third party order created, PR will be generated automatically based on the item category defined in the sales order and source will be assigned in PR.Based o time interval schduled for batch job, the PRs will be automatically converted into PO.
    Regards
    Ramakrishna

  • MD03 / MD04 creation of separate planned orders per requirement

    Hello,
    I hope you can help me.
    Situation:
    - MD04: separate sales orders
    - MD03: Run MRP > based on requirements for sales orders >1 PR is created
    Material master:
    Lot size: EX / Availability check: 02 / Individual/coll.: 1
    How do I set the system in such a way that for each sales order, a separate PR (and later on a planned order) is created by running MD03?
    Current behaviour: 1 PR for all sales orders.
    PS: sales order stock is not possible due to situation and version (3.1i).
    BR,
    Dion

    Hi,
         MD03 - single item single level planning. So if you run by MD03, below only one level will be planned.
         MD02 - Single item multi level. If u run by this , it will plan upto the bottom level.
    Your requirement is separate PR for each sales order. What u have mention in the material master is correct, but in mrp 3 view use strategy 20.
        In this also if u are creating more than one sales order in the same date for the same material, system will create as a single PR only.
      MD50 - Multi level sales order.It plans only sales order item selected across the bom.
    Reward your points if it is useful.
    Regards,
    Dharma

  • PO Creation from Sales Order User Exit

    Hi,
    I have a business requirement where I need to  create a Stock Transport Order (STO) for a particular kind of sales order. I outlined different options for achieving this functionality.
    1. Trigger a workflow for creating STO.
    2. Configure it an EDI output for sales orders. Using the EDI document, create STO in the same system.
    3. Create STO using BAPI from the sales order exit 'USEREXIT_SAVE_DOCUMENT'.
    I am trying to understand the issues if I go with option of creating STO from sales order user-exit. I tested it and it is working fine. But what concerns is me transaction integrity. In other words I am trying to  execute another transaction within a transaction. Both Transactions (VA01 and ME21N/BAPI) may be trying to access same tables. Anyways I havent see any potential overlap.
    I would like to know anybody implemented such a solution?
    What could be the potential issues? Does it really affect transaction integrity?
    Thanks A Lot
    Anil

    I would also be concerned with the possibility of the order failing to update AFTER you call the BAPI.  You could create a custom output type that processes on order create for that order type.  You could add your BAPI call to the processing routine of the output type.

  • Production order creation from sales order

    Hi PP Gurus,
    I am creating a production order automatically from sales order by using strategy group exactly similar to 82. Once i create the sales order , its showing missing parts error in prouction order and if i check missing parts overview,it says over all confirmation date is not determine.We have stock in MMBE for that material and storage location combination.
    I have also chekced the requierement class and type and found ok.
    Please help me resolving this issue.
    Thanks in advance.!
    Regards,
    Sudheer

    Hi Mario,
    Yes, the availability check will check other stock types also. My concern is why the availability check is  failing and giving missing parts even if the components are there in stock after considering the reservations.
    I checked OPJJ setting, availability check is active and we did that.
    Can you please help me in this as we are stuck up at this point.
    Regards,
    sudheer

  • Planned Order - Original requirement

    Hi everyone,
    I would be very grateful if someone could tell me how to obtain (at tables level or using any function module) the original requirement from which a planned order has been generated (by executing MPS).
    I mean I have a PRqRel (Release order for a stock transfer requisition) and after executing MPS a Planned Order was generated. I need to find a link between those objects (PldOrd and PRqRel).
    Thanks in advance and best regards.
    Ben.

    Thanks Murugesan,
    In the assigment tab is not the information I need. The relation I need to find is shown when I push the button "Pegged requirements" on the planned order in MD04.
    Anyway I was talking about tables.
    Greetings.
    Ben.

  • Planned Order Capacity Requirement CM29

    Hi All
    This may be a trivial question for you guys, but I am couldnt find the problem, need your help again please:
    In CM29 my planned order and process orders are visible, and I am using the standard overall profile: SAPSFCG013.
    Earlier I use to see a continous red bar for length of the planned order / process order in the graph, but somehow now it just show up as a single line, irrespective of the order quantity.
    Can you please let me know how to resolve this!
    Thanks in advance!
    -Rahul

    Hi Vivek
    Here is the link for attached screen shot for CM29 with weekly and daily split:
    CM29 with weekly split:
    [CM29 Screenshot|https://picasaweb.google.com/110467857304221340164/CM29?authkey=Gv1sRgCNLYw_uHj8-lUA#5626401198199374018]
    CM29 with daily split:
    [DailySplit|https://picasaweb.google.com/110467857304221340164/Jul72011?authkey=Gv1sRgCLKtzPPn5_SARQ#5626402521518801586]
    I have trie changing hte qty to 1000 and more, the capacity (detailed capacity and roughcut capacity requirement) changes as expected but the graph does not moves
    Thanks in advance
    Rahul

Maybe you are looking for

  • Why can't I connect Mail on ports 25 and 110?

    Loaded the security update the other day, and two days later I can't download or receive email (access to the Internet is fine through our router). But it didn't happen immediately, and the ability to send mail disappeared after the receiving of emai

  • New Firmware for the mic

    I installed the new firmware into my micro, and now when i go into media source it doesnt come up. i cannot see my micro in it, I had to use windows explorer drag and drop. is there any way for me to get my mediasource to recognize my micro? thanks i

  • Using vriables in To field when using "Schedule For" option

    My Software: Crystal Reprts Server XI R2 My Scenario: I am using the "Schedule For" option when scheduling a report to a group of people.  The email address i want to use is based on the their user name.  That is SI_USERID(AT)domain.com So i tried se

  • Add disk  in ASM

    Hi, on 11g R2 , UNIX, RAC our ASM is in RAC, 4 instances. I want to add a disk. My questions are : -should I issu : alter diskgroup data add disk 'D:\asmdisk\disk3'; on each instance ? Then four times ? -should I restart : startup mount each instance

  • How many Photos do you Have/ Ram question

    Just finished setting up our new 20" Intel Core Duo. Still only have the stock 512mb ram with a gig stick on order. Just imported 37,000 photos into iphoto 6 and being a iphoto newbie was wondering if the performance lag is the intel core duo, the ra