Planned order date on requirement date
Hi ,
My indepenedt req is maintained for monday .By backward scheduling it gets planned on friday(i.e production endson friday)
How i can schedule the production to take place in current week . That is for PIR entered on monday , the production should be planned in the current week.
Are there any settings in lot size ?
Regards
ShankarR
Hi,
PIR date is the requirement date.
When you run MRP with this date, the system checks for Avaialble Stock and receipts and does the Net requirement calcualtion.procurement selection, BOM explosion and scheduling.
When it comes to scheduling, it looks for the requirement date and schedules it based on the scheduling parameters maintained for the Planned orders.OPU3
You can set the scheduling type as it forward or Current date scheduling .
If you set the Current date scheduling, the system will consider the start date as today and does the scheduling, if after the scheduling the availability date is past the requirement date anexception message is raised.
Hope this clarifies , please revert if you need any details.
regards
Ratan
Similar Messages
-
Basic Start/Finish Date and Requirment Date in Maintenance Order
Sir,
We want to know the link between Order Start/finish date and requirement date in Maintenance Order.
As we are facing problem during change in dates.
When we change either start date or finish date in the order, the system automatically change the requirment date as of ondate of all the materials which has been earlier issued and also consider the today date.
Like in Maintenance Order
Basic Start Date - 01.04.2009
Basic End Date - 31.05.2009
We have issued materials on the order at different date by putting offset value for the requirement date.
Now if we increase the Basic End Date of order to n30.062.009 or whatelse, the system automatically changes the requirement dates of all the materials issue based on current date. Suppose we changed the Basic End date on 10.11.2009, the system changes all the requirement dates by calulating offset value from 10.11.2009. However these materials has been issued earlier.
I want to know if there is any remedy to stop to change the requirement dates automatically.
With Regards
Mudit GuptaHI
In general the requirement date will get changed only when the IMG settings in OPU7 permits the requirments dates should be adjusted towards the order basic start and end dates
kinldy check and adjust as per the requirement
regards
thyagarajan -
SNP Planned order start and end dates are not calculated correctly
Hello SNP Guru's
The SNP planned orders generated after the Heuristics run, have a start and end date based on the Activity Duration (Fixed), while the resource consumption is based on the Bucket Consumption (Variable), which is correct.
The Activity Duration (Fixed) is based on the BOM Base Quantity. So if the Activity Duration = 1 day, and if the order quantity is more than a day, the start and end dates, still shows as 1 day. So no matter what is the order quantity, the start and end dates is always = 1 day.
Does anyone have any experience in implementing any code to change the start and end dates on SNP Planned Order?
Seems like it should work as standard.
Am i missing something?
Thanks,
MangeshDear Mangesh,
SNP is a infinite planning tool. If you have defined fixed duration to be 1 DAY in the activity, no matter how many quantity you input for your planned order, the order will last for one day. If the resourced is overloaded, you then run capacity levelling to
banlance the capacity. What your expected beahavior happens in PPDS planning.
Claire -
BAPI to create SNP planned order based on start date
Hi,
I am looking for a BAPI to create SNP planned order based on the order start date. There is BAPI BAPI_MOSRVAPS_CREATESNPORDER which can be used to create SNP planned order based on the end date but not based on the start date.
Also would be great if some one can share how do they create SNP Planned orders using BAPI BAPI_MOSRVAPS_CREATESNPORDER in case if GR processing time is defined in the product master and workdays for GR to be respected according to the calendar.
Regards,
VenkatHello Mr.Venkat,
Hope you recognize me.
Please check out the BAdi below.
BAdi - APO_BAPI_BUS10503 (this is the BAdi for ManufactOrderAPS BAPI which contains the SNPorder BAPI)
Method - CHANGE_SAVEMULTIPLE2
In this method parameter IT_ORDER_HEAD contains Order start date input option.
For GR time please check this (not sure if it will help).
Same BAdi/ same method
Parameter IV_PLANNING_MODE_USAGE contains field PLANNING_MODE.
Value 1 for PLANNING_MODE corresponds to "Observance of parameters from the product master".
This may make it respect the GR time in product master
Good luck with the above
Regards,
Ashok -
Setting nedded for creation of Planned Order for Dependent Requirement.
Hi PP Gurus,
I have a one material for which I m running MRP which have three Components.
I m using strategy 10 for FG and SFG also.
When I m running MRP for FG the system is creation planned order for FG, but not for SFG even though no stock available for them.
I m using lot size EX for all SFG.
Please Help.
Thanks in Advance.Dear ,
You should maintain proper MRP related parameters for both FG and SFG.Check all the MMR parameters :
1.MRP Type -PD for FG/SFG
2.Procurement Type -E for FG/SFG
3.Planning Startegy -10 in FG
4.BOM/Routing Explosion -Keep it Blank
5.Indiviaul/Collective Indicator -not applicable as it is MTS so keep it blank
6.Validity of BOM /Routing should be corrcet before MRP run in MD02-NETCH , 2,1,3,3,2
7.What is the Lot Sizing Set up-EX in OMI4-Scheduling Tab -Requirement date =Delievery Date and BOM Validity Date .
Ref .Re: MRP not plalned for dependent components
8.Check in MRP4 -MRP Dept Requirement Parametre should be balnk for plalling the SFG in MMR of FG -MM02
I hope this issue may be with BOM explosion as per the validity and lot size -schedueling set up .
Hope this will be useful
Regards
JH -
MRP: how to segregate the planned orders by dependent requirements
Hello SAP Guru's,
I would like to know if this is possible to make the MRP work is this way:
- generate global planned orders (by date) for several dependent requirements, for inhouse production;
- AND generate individual planned orders for each dependent requirement, for external procurement;
For the moment, it is grouping the quantities of all the dependent requirements to generate a unique planned order by date.
But we would like to get separate planned orders for each dependent requirements that are externally procured.
Do you think it is possible to do so? and if yes, how?
Thanks in advance for your help on this subject.
Regards,
RudyIn MD04 the demand n supply that is seen is considered as plant segment. In some cases when you plan demand n supply for a given storage location separately it is called as SLoc segment, also if you're working with MRP areas then its called mrp area segment, likewise for project & sales order.
In short it is just a way MRP would do its planning. In normal cases, the demand n supply is in plant segment, so in this segment the least resolution that you can work with is a day, so all demand on a given day is clubbed together and a supply proposal is made (depending on the lot size).
If you want further split on a given day, then MRP needs some way to identify the difference & this is provided by the special stock segment such as project segment. To see how it works, if you're working with PS module, ask your PS colleague to create a demand for the material from different projects for a given day. Then in MD04 you will see each project demand show up in different segment & when you run MRP, you will see the results.
I guess more than me writing quite a lot out here, a simple test at your end should help clarify... good luck -
Planned order for Collective requirement
I have parent material who is having child which is colloective material.
When I increases quantity for child item and do plant lavel Mrp then everytime new planned order is created . Iam expecting changes in existing planned order.
I had chosen planning mode in Mrp run screen as delete and recreate planning data.
Is there is any other config setting for this.
Also tell me how to creat to have default operation details in production order which is created with material or without material. Is there is any other config setting for this.??Hi,
You can use delete and recreate option or u can choose adapt planning in planning mode. There is no specific configuration is required.
Routing is always created with reference to plant and material specific, when u r creating the production order, the system will automatically pick up the routing, which contains the operation details.
Without material if you creating a production order, you need to attach the reference operation set. Reference operation set is created with reference to plant and without reference to material.
Regards,
V. Suresh -
Multiple planned orders for a requirement
Hi,
We have PPDS MRP with NEW shelflife w/ lot size profle run for product and produces multiple planned orders for the the requirements.
I have a requirement of 4,750 and 14,976 in the system and available stock 86,966.
The system creates two planned orders with 34,632 and 26,771 PCs.
Why is the system creating two order instead of one??
The min. lot size is 1876 and rounding is 936.
can somebody tell me what factors the system is considering??
Thanks.Hi Visu,
Which lot size procedure you are using , please check in lot size tab in Product master, it should be lot for lot.
if it is lot for lot , please change it to by period and weekly , is it change the planned order quantity ?
Manish -
Planned Order for stock and planned order for customer requirement
Hello everybody
I want to make a different, in MD04, between the planned order for stock and the planned order created for a customer requirement
Thank for your helpHi,
True planned order are generated for both the cases but the planned order generated for sales order will have sales order number in the below column and for stock will show independent requirement. Mainly no sales order reference will be there for make to stock scenario.
Hope it will help.
Regards,
Alok Tiwari -
PLanned order and PO item for a same material in MD04
A material with Procurement key as F.
In MD04, There is a planned order for 8657 nos. for a material..
below that there is a Dep Req XXXX
Below that there is a purchase order for 8657 Nos.again.
My question is if there is a open PO for the material,then why is the planned order created for the material.
The PO reads as
04/05/2012-POitem--- 4500016092/00050 04/09/2012 15----
8657
THe Planned order reads as PLdOrd----0000478483/stpo--
8657
Please help me out..In MD04,planned order and dependent requirement dates are 2/4/2012
whereas the PO date is 5/4/2012.
Inside the planned order the order finish date is 30/3/2012
and inside the PO the delivery date is 2/4/2012..
Its bit confusing..can you help in this..
ANd for your information,the Planned order is now not found in MD04,it was there yesterday.. -
Why the basic finish date is not adjusted in planned orders
Hi, all.
Can anybody help me to understand:
"Why the basic finish date is not adjusted in planned orders during
forward scheduling, but in production order basic finish date is adjusted?
It is look like non-coordination between groups of developers.
And lead to situation, when planner don't see in MD04 when he can really wait material receipt. He must go to planed order and check production data there, it's unusable."
Am I right, or SAP have it's own logic.Hi,
Production orders are different story. Since production order is a constant element, they are not created in the course of MRP, basic dates can be adjusted. In production order basic finish date is adjusted, but you won't see for the upper level materials', basic dates of the planned orders adjusted according to the prodcution order you create. Production order is consistent within itself in terms of date and is not dependent to other elements of MRP, but planned orders are not like that.
MRP creates planned orders whose basic finish dates are calculated by subtracting goods receipt time from production start date of the source of requirement. MRP works backwards without changing directions. Meanwhile if any production finish date is calculated different than the basic finish date due to forward scheduling, in order not to violate the alignment between the basic finish date and source of requirement's start date, basic finish date is not adjusted. If it was, dates of all the planned orders calculated so far at the upper levels of the BOMs had to be recalculated, otherwise all the consistency of all the dates is violated. This cannot be done because changes in any level affects all lower levels. -
Desired date in planned orders
Hi all!
I used heuristics SAP_PP_002 for creation planned order (AI) from sales order (BM).
APO show message Order &1 with source &2 created late on &3; desired date &4
That I need to do, that desired date planned order (AI) - Requested Delivery date it was identical with Requested Delivery date sales order (BM)?
Thanks!Hi,
It works with following logic
1. Net requirement calculation to calculate uncovered requirement
2. Procurement quantity calculation (Lot formation)
3. Source determination (PDS/PPM/TLANE determination)
4.Then Scheduling of order with backward+reverse scheduling strategy. Here system will first set desired date as finish data and according to duration of activities from PPM or PDS tries to find out start date. If start date goes into past system will reverse the direction to forward and set start date as todays date and calculats finish date according to activity times in PDS/PPM.
Regards,
Santosh -
Hi,
Please let me know where can we find out the date the planned order was created. In which table and which table it is tored. I have tried in table PLAF. Unable to find out this.
Regards,
V. Sureshhi
Please try
PLAF and Field PEDTR
Order start date is Basis start Date in the planned order.
If you go to Det Scheduling tab of planned order in a Planned order there option Basic Dates , there are two dates Start and Finish ... these are the dates required by you......opt for Help Window it Shows you a Description : "Order finish date in the planned order
Date, according to the planned order, that you should expect either the completion or the delivery of the planned order quantity."
BV -
SNP planned order availability date difference between APO and ECC
Hi,
I have observed that SNP Planned order availability date is not matching between APO and ECC. Details are as follows.
I ran SNP Optimizer with bucket offset of 0.5. After publishing the optimizer created planned orders to ECC, only start date is matching.
Example:
I am using PDS as a source of supply.
Fixed production activity in SNP PDS is 1 day.
GR processing time: 3 day
After running optimizer planned order is created with dates explained below.
Start date/time: 09.05.2011 00:00:00
End date/time: 12.05.2011 23:59:59
Availability date: 16.05.2011 00:00:00
Because of bucket offset defined as 0.5 optimizer planned order availability is start of next monday.
After publishing this planned order to ECC dates on the planned order is as follows.
Start date: 09.05.2011
End date: 09.05.2011
Availability date: 12.05.2011
I have not maintained any scheduling margin key in ECC. Also if I dont define the GR processing time, planned dates between APO and ECC always match. Can anyone explain the impact of GR time on the availability date.
Regards,
VenkatHi Venkadesh,
What's "state stamp"? Do you mean different time zone?
note : 645597 mentioned by Nandha is very helpful:
In standard, CCR will use duedate - "the available date of the output product".
Nandha's words "In SAP APO, if the receipt date of the primary product deviates from the
end date of the last activity of the order, the receipt date
always identifies this as inconsistent. You cannot rectify
inconsistencies of this type by using CCR."
I guess in your PDS or PPM, the output product is not assigned to the End of the last activity. Someone changed it?
Please CIF the PDS or PPM again.
If you really want to apply a note, please use note 815509 as you're using planned order,
and system will use order end date in CCR instead.
GR time is always considered. BR/Tiemin -
Forward scheduling from date of requirement
DearExpert,
Please In need your advise regarding to this issue :
My Requirment date in 13.02.2012
Planned order created in earlier date 06.02.2012
i want to start the planned order from the date of the requirement , please let me know how i can do that ?
Your help very appreciated
Regards
RamiHi,
Do you want the the requirement date and start/end date of planned order on the same date ?
Planned order start date is calculated backwards depending on the replenishment time calculated using PPM activities.
Please check your PPM activities.
You can also check it by clicking on the planned order.On left hand side,click on activities.This will show the details of planned order duration and relevant dates depending on PPM activities.
Thanks
Amit
Maybe you are looking for
-
Binding to Active Directory - strongauthrequired
I am trying to bind a 10.4.3 machine to a Windows 2000 Active Directory, but experiencing problems. The Active Directory plugin hits step 5 then displays "Unable to access domain controller: This computer is unable to access the domain controller for
-
My Macbook Pro 2010 model is hanging constantly. Please Help
Well, i have Macbook pro 2010 model. Since yesterday it is hanging and has becoming frealing slow. I have cleared the memory, deleted unnecessary apps & files. Still no improvement. Please help!!
-
Replace a character/string
hi all, i have string like c:\data\product, i wanted to get c:\\data\\product as output( "\" is replaced as "\\").how to do this.i tried replace string function but iam not the required output. thanks ravi
-
Is ColdFusion 8 compatible with Windows 7 64-bit?
I saw in the Systems support matrix that ColdFusion 8 is compatible with Windows Vista 64 bit, however I want to install it on Windows 7 64-bit Enterprise Service Pack 1. Is ColdFusion 8 compatible with Windows 7? Thanks in advance.
-
Editing and exporting videos from youtube
I downloaded a justin bieber video from Youtube.com.I edited this video using adobe premiere pro cs5. I tried exporting the file and it seems that I am not able to play the exported file. Is there something wrong with my file selection? Adobe Premier