Planned order for Collective requirement

I have parent material who is having child which is colloective material.
When I increases quantity for child item and do plant lavel Mrp then everytime new planned order is created . Iam expecting changes in existing planned order.
I had chosen planning mode in Mrp run screen as delete and recreate planning data.
Is there is any other config setting for this.
Also tell me how to creat to have default operation details in  production order which is created with material or without material. Is there is any other config setting for this.??

Hi,
You can use delete and recreate option or u can choose adapt planning in planning mode. There is no specific configuration is required.
Routing is always created with reference to plant and material specific, when u r creating the production order, the system will automatically pick up the routing, which contains the operation details.
Without material if you creating a production order, you need to attach the reference operation set. Reference operation set is created with reference to plant and without reference to material.
Regards,
V. Suresh

Similar Messages

  • Setting nedded for creation of Planned Order for Dependent Requirement.

    Hi PP Gurus,
    I have a one material for which I m running MRP which have three Components.
    I m using strategy 10 for FG and SFG also.
    When I m running MRP for FG the system is creation planned order for FG, but not for SFG even though no stock available for them.
    I m using lot size EX for all SFG.
    Please Help.
    Thanks in Advance.

    Dear ,
    You should maintain proper MRP related parameters for both FG and SFG.Check all the MMR parameters :
    1.MRP Type -PD for FG/SFG
    2.Procurement Type -E  for FG/SFG
    3.Planning Startegy -10  in FG
    4.BOM/Routing Explosion -Keep it Blank
    5.Indiviaul/Collective Indicator -not applicable as it is MTS  so keep it blank
    6.Validity of BOM /Routing should be corrcet before MRP run in MD02-NETCH , 2,1,3,3,2
    7.What is the Lot Sizing Set up-EX in OMI4-Scheduling Tab -Requirement date =Delievery Date and BOM Validity Date  .
    Ref .Re: MRP not plalned for dependent components
    8.Check in MRP4 -MRP Dept Requirement Parametre should be balnk for plalling the SFG  in MMR of FG -MM02
    I hope this issue may be with BOM explosion as per the validity and lot size -schedueling set up .
    Hope this will be useful
    Regards
    JH

  • Multiple planned orders for a requirement

    Hi,
           We have PPDS MRP with NEW shelflife w/ lot size profle run for product and produces multiple planned orders for the the requirements.
    I have a requirement of 4,750 and 14,976 in the system and available stock 86,966.
    The system creates two planned orders with 34,632 and 26,771 PCs.
    Why is the system creating two order instead of one??
    The min. lot size is 1876 and rounding is 936.
    can somebody tell me what factors the system is considering??
    Thanks.

    Hi Visu,
    Which lot size procedure you are using , please check in lot size tab in Product master, it should be lot for lot.
    if it is lot for lot , please change it to by period and weekly , is it change the planned order quantity ?
    Manish

  • Planned Order for stock and planned order for customer requirement

    Hello everybody
    I want to make a different, in MD04,   between the planned order for stock and the planned order created for a customer requirement
    Thank for your help

    Hi,
    True planned order are generated for both the cases but the planned order generated for sales order will have sales order number in the below column and for stock will show independent requirement. Mainly no sales order reference will be there for make to stock scenario.
    Hope it will help.
    Regards,
    Alok Tiwari

  • List of dependent requirements of planned order for a component

    Dear guru ,
    I search a list of dependent requirements of planned order for a component
    What do you suggest ?
    Thanks.

    Hi Cristano,
    Go to MD04 transaction, enter comopenet and plant. Then from the list select the Planned order and click on the Order Report from the bottom tool bar available below the list.
    You can see the componets details for that planned order.
    Thanks and regards
    Murugesan

  • Consolidate Planned Orders for Past demands

    Hi Experts,
    I have come across the following requirement. So, please follow the Screen shots.
    You can see that MRP Run has created 2 planned orders for the separate 2 demands (One is for 11.02.2014 and another one is for 15.04.2014). But when you look at the demands, you can see that these are old demands. How can we configure the system to have only 1 planned order for the qty 101 by having the date as latest finished date.
    So for an example.
    I want to have one planned order for 101 giving the date as 05.08.2014.
    I'm open to any valuable suggestions as I've a sand pit client to do some testing. Just want to show you the setting for parameters for determine the Basic Dates. ( I have a  clear idea what the following settings do)
    Thank you very much.
    Kind regards,
    Ishara

    Hi Ishara,
    Please check in MRP1 tab the lot size data (weekly, monthly,...). I think that your setting is monthly. For this reason you have two pl.orders created one for February (10 EA) and the other for April (91 EA). If you want to have just 1 pl.order choose min/max lot size equal with 101 EA.   
    Also check in MRP4 tab, section BOM explosion what is your individual/collective setting (should be collective).
    Thanks.
    Regards, Marius

  • MTO - how to prevent a second planned order for a sales order?

    Dear friends,
    We are working on Make to Order process (Planning strategy group 20).
    No Production/process order is used
    Shop floor uses a different system --> details from planned order is passed to the shop floor system; and finished product is delivered/posted into SAP Sales order stock - through interfaces
    No QM in place
    A typical day-to-day scenario –
    Sales order Qty = 100
    MRP Run à Planned order qty = 100
    Raw materials posted to ‘Sales order stock’
    Planned order is firmed
    For example if Produced qty = 90
    sales order stock of the finished product = 90
    Balance 10 cannot be produced / delivered for various reasons
    Planner posts the raw material to cost center / rejections / own stock etc., and ensures that the ‘sales order stock’ of the raw materials are zero.
    Planner deletes the planned order
    Next MRP run triggers a new planned order for the balance qty 10
    Now, the requirement is to prevent the new planned order getting generated for the balance quantity, during the subsequent MRP run (despite the shortage in the Sales order stock of the finished product).
    The following options have been evaluated –
    Once the final good receipt is done & before deleting the planned order,
    o       Change the Sales order quantity to match the total produced quantity
    o       (or) Change the schedule line category for the Sales order item from CP to CN
    §         Since the Sales order and planned order are handled by different teams, considering the frequency of correspondence/coordination needed between these two teams to get the sales order items corrected, this idea is not accepted
    §         Additional authorization for the planner to change the sales order item is not acceptable
    Include Under delivery / Unlimited tolerances
    o       at the customer (master) level
    o       (or) Sales order level…
    §         In this case, System seems to consider the tolerances only when the  delivery for the Sales order is posted; and not when the sales order stock is received within the tolerance limits;
    §         Considering the time gap between the GR and Delivery of the finished product, this option is not accepted
    Kindly suggest the other options / settings / processes, to meet this requirement
    Thank you for your time and efforts.
    With Best Regards,
    Senthil

    Closing this thread
    Thanks
    Senthil

  • MRP: how to segregate the planned orders by dependent requirements

    Hello SAP Guru's,
    I would like to know if this is possible to make the MRP work is this way:
    - generate global planned orders (by date) for several dependent requirements, for inhouse production;
    - AND generate individual planned orders for each dependent requirement, for external procurement;
    For the moment, it is grouping the quantities of all the dependent requirements to generate a unique planned order by date.
    But we would like to get separate planned orders for each dependent requirements that are externally procured.
    Do you think it is possible to do so? and if yes, how?
    Thanks in advance for your help on this subject.
    Regards,
    Rudy

    In MD04 the demand n supply that is seen is considered as plant segment. In some cases when you plan demand n supply for a given storage location separately it is called as SLoc segment, also if you're working with MRP areas then its called mrp area segment, likewise for project & sales order.
    In short it is just a way MRP would do its planning. In normal cases, the demand n supply is in plant segment, so in this segment the least resolution that you can work with is a day, so all demand on a given day is clubbed together and a supply proposal is made (depending on the lot size).
    If you want further split on a given day, then MRP needs some way to identify the difference & this is provided by the special stock segment such as project segment. To see how it works, if you're working with PS module, ask your PS colleague to create a demand for the material from different projects for a given day. Then in MD04 you will see each project demand show up in different segment & when you run MRP, you will see the results.
    I guess more than me writing quite a lot out here, a simple test at your end should help clarify... good luck

  • Planned order for Negative stock

    Hi All,
    Negative stock set up is active at storage location level. Due to this setting I got some  negative stock in storage location.
    MRP is creating additional planned order specific to negative stock qty other than planned order created for that day requirement.
    How to get only one planned order for entire day requirement including negative stock?
    we have daily lot size in mat master.
    Thanks.

    Negative stock "requirement date" is immediate (day of MRP run). The other daily requirement that you may have, may be for a date other than "today", and this is why you get 2 planning proposals.

  • Separate planned order for each sales order

    Hello experts,
    Here, on a given day when more than one sales order are created, only one planned order is generated by the system. My lot sizing procedure is ex. How can I create different planned orders for different sales order? My planning strategy for the header material is 40.
    Thanks in advance!
    Snigdho

    Dear,
    In lot size EX if requirement comes on single day system will create combine procurement proposal in MTS.
    Separate procurement proposals can only be achieved if you work with make-to-order production. Here, the requirements are managed in separate planning segments of the stock/requirements list.
    Please refer the OSS note 550568 question no 6 for details.
    Regards,
    R.Brahmankar

  • Can MRP only create planned orders for ROH, not for FERT?

    HI all,
    Is there any way to only generate planned orders for raw materials after MRP, forbid creating planned orders for FERT?
    We want create planned orders for FERTs manually.
    Thanks,
    Harvey

    Harvey,
    Yes, that was also my understanding of your scenario. Did you try X0 for Fert?  Run MRP against the entire plant, and MRP will not create any new planned orders for the X0 parts.  It will explode the BOM and create dependent requirements in the components.  In addition, you can create FERT planned orders manually, or using an external planning system, and these manually created orders will also create dependent demand on your components.
    If you are also using Sales orders to consume your PIR, you will also have to look at requirements determination for Sales orders.  This is configured based on MRP type.  If you change existing MRP types, you may have to add SD config so as to continue to pass requirements to MRP.  Your SD resource should be able to help you through this, or I can give you basic instructions if you decide that the PIR/demand/planned order/dependent requirements works to your satisfaction.
    Rgds,
    DB49

  • Planned Order for a Product not being shown

    Hi Experts!!
    I am an ABAPer and I am new to SAP APO. We are now working on /SAPAPO/PPT1. When clicked on some quantity, all the planned orders existing for that product are being shown with respective quantities. Now, I am trying to create a new planned order for a product through FM BAPI_MOSRVAPS_SAVEMULTI3 by splitting the quantity among the receipts. I have gone through several posts and have written the logic. But the newly created planned order is not being shown in /SAPAPO/PPT1. I can't find it anywhere. Am I doing something wrong here?
    Here I explain it with an example. I have an aggregated entry for the month of June with quantity 3000, which is already split under receipts 1234 and 1235 as 1000 and 2000 EA respectively. Now, I need to split it as 1000 EA for each planned order and hence am creating a new plord. I am using same FM for changing plords as well with quantities as 1000. So, now both the receipts are being shown with quantity 1000 and the aggregated value as 2000... and the newly created one is missing. But I need the new one to be displayed and the aggregated should be 3000. Why is this happening? Am I missing something?
    I already have posted a query that is related to this total requirement. Change Receipt Quantity for Planned Order in LiveCache . This has the first part of the total requirement. Just provided for extra info, but not related to this issue however.
    Please help me out. Your help is highly appreciated. Thanks a lot!!

    Hi Srinivas,
    With prior experience, i am sure that the BAPI SAVEMULTI3 can be used for Creation & Change.
    I dont think,the FM's which you are using, are recommended by SAP. So , try to use BAPI most of the time,as it ensure data consistency.
    As you told, order is not flown to ECC, but visible in APO, i would suggest you to check the importing parameters of the bapi, like EVENT CONTROL ( should be '1' ).
    and COMMIT_CONTROL(should be 'E').
    Also, check your queues after execution of bapi. you should find your change pointer in the inbound queue of R/3 System. Do let me know if you still stuck.
    Thanks,
    Santosh KB.

  • Unable to release planned order for single line from MRP workbench

    Hi
    We are unable to release planned order for single line from MRP Planner workbench,but Select All For Release is working for all the lines for the item
    User want to release a specific line but no new requisition is generated
    It is highly appreciable if anyone could help to resolve this issue
    Appreciate the Help
    Regards
    VKPK

    It sounds like the release goes through in the workbench but the requisition does not show up in source - is this correct? If so I would check item attributes / flags for purchasing and buy. also have found some items require a purchase price to be populated in master and org

  • Single planned order for different sales order of same material

    hi frnds
    my client want that if there is two  or more sales order of same material in a specific period than he require single planned order during mrp run for that material or when if he enter same material in two different line in single sales order than mrp doesnt considered it line item aand produce single planned order for both sales order
    please help me out its very urgent
    thanks

    Hi,
    In Mrp 3 view set the availability check as 01 and in Mrp 1 view
    Keep the lot size as periodic lot size and try the same.
    Thanks,
    S.Nandhakumar

  • What must i do with planned orders for closed item?

    Hi alls! My Customer closed some materials, but still there are planned orders for these materials.
    I am new in pp. What can I do for delete this orders?
    Than'S

    Hi Liza,
    If it is system generated planned orders i.e. if they are not firmed, then run MRP with planning mode - 3 it will delete all excess planned orders.
    But if they are firmed, then you can delete them individually in MD12, or collectively in MD16.
    Hope the above answers your query.
    If helpful award points
    Regards,
    Vivek

Maybe you are looking for

  • Enhancement-ABAP Code-Customized Field issue

    Hi Experts, Currently I am working on the BW3.5 version. We are using the standard SRM standard extractor 0BBP_TD_SC_1 and we enhance same extractor(populate the filed through CMOD - ABAP Code) with one customized field also. We are having issue on t

  • Location of com.sap.aii.mapping.api on PI 7.1.

    Hello, just tried to extract the above mentioned jar. file for development of java mappings on my local machine. I can find the jar on XI 3.0 in j2ee\cluster\server0\apps\sap.com\com.sap.xi.services (as also described in some tutorials) however in re

  • Widget Text Shifted Up

    Hello, The text of my widgets, the date in calendar for example, are now shifted up a bit. They can still be read, but they are too high. Other widgets are similarly affected. Anyone else see this or have a solution? Thanks, MIchael Morrison

  • Eloqua Wishlist/ Functionalities for Campaign Canvas

    Campaign Canvas wishlist: As eloqua already has most of this functionality in parts and components, it would be good to see this all on campaign canvas. This will deffinately help all users across all campaigns, minimizing time and effort to setup an

  • HT4113 how do you hard reset 2nd gen with out pass code?

    how do you hard reset a ipad with out the password