Planned order MD11/Planned order MD02 for sale order

hi
How to identify a planned order ref to sale order created manually MD11 or created by MRP run MD02.
is there any table entries plaaned order and transaction codes?
i got two planned orders qty1 and qty5  from a client for same sale order item.
what could be possibilites.
-ashok

Dear,
Couple of check,
1) Check  Lotsize ?
2)Planning strategy?
3)Individual /collective requirements indicator in MRP4 view?
For MTO, you will get one Planned Orders per one requirement element.
So, you are getting number of Planned Orders for FG?
For MTS Scenarion, the Lot Size EX will work just like the Daily lotsize (TB).
So, system will club all the requiremnts per day and propose the Planned Orders for 1 day requirements.
You will get separate planned orders for the Next day.
Hope clear to you.
Regards,
R.Brahmankar

Similar Messages

  • No planned order created when run MRP for Sale Order

    As I have told on the subject. My problem is system does not generate planned order for components in BOM
    Some more information is: requirement class in SO is 043
    I have choose "2" in tab MRP 4 for individual/collective and all component and finish product have MRP type is PD and Strategy is 20 - make to order
    Please help me to solve this
    Thanks

    Hi Hoai Vu,
    Please check in OPPQ plant parameters in SPRO weather you maintained for the plant conversions of planned order to production order.
    SPRO-> Production> material requirement planning> plant parameters--> carry out plant parameters or over all maintenance of plant parameters (OPPQ)
    Then check the for the material did you maintained the work scheduling view or not.
    I hope helps you any queries please revert me back.
    Regards,
    Madhu.G

  • Down Payment processing for Sales orders using Milestone Billing Plan

    Hi,
    The business scenario is as follows.
    The delivery for the sales orders are to be created only after the pre payment( a percentage of the total sales order value) is made by the customer.
    Hence the sales orders while creation are blocked for delivery creation using credit block by means of a userexit.
    The credit manager checks the blocked sales orders using VKM1 transaction and verify if there are any payments made by the customer to cover this pre payment to be made.
    If it is enough to cover then he releases the sales order manually for delivery creation.This is a complex process since there are too many sales orders and the payments made by the customer may not match the amount to be paid(it can be greater or lesser).The customer just pays a huge amount which is to be distributed among the sales orders for pre payments.
    Later, when the invoice is created, the customer account is cleared manually using F-32 transaction for the oldest open invoices.
    Here again there is a huge manual effort involved since he need to distribute the amount against the invoices using oldest open item principle.
    As a solution we are planning to implement "Down Payment processing for Sales orders using Milestone Billing Plan".
    Is this the right solution?
    Can you please give the steps in detail to implement this functionality for above scenario?
    We are using SAP 4.7 version without Project Systems.
    Thanks in advance.
    Regards,
    Ragesh

    Hi Ragesh
    Check the links where you will get the entire down-payment configuration
    [https://forums.sdn.sap.com/post!replydownpayments ]
    Regards
    Srinath

  • PO for Sales Order

    Hi Experts...
    We tried to create a PO against the sales order with acc assignment " C " (for Sales Order), mentioning the Sales Order number at the item detail. When we posted the GRN, there were no acounting entries nor the material quantities were updated in the sales order for delivery. Then we reversed the GR and amended the PO against the requisition created after the sales order. Here also, after GRN no accounting entries exist and no quantities available for delivery in the sales order. Is the process wrong? what happens when we create PO for a sales order or a requisition ?
    Thanks in advance
    Suraj

    Hi
    Are you using third party scenario ?
    Process for PO against sales order as follows
    Sales Order
    Purchase Requestion
    Purchase Order
    GRN
    MiRO
    Delivery
    Billing
    In this pl.check material type for the material sales order

  • Release strategy for Sales Order

    Hi all,
    Is it possible to assign release strategy to Sales Order document in SAP?
    Thanks
    SAP-MM.

    Please check this answered link:
    Re: Release strategy for a Sales order
    what is release strtegy for sales order
    Edited by: Afshad Irani on Jun 30, 2010 12:27 PM

  • Planned material price in case of production order for sales order (MTO)

    Hi,
    In case of production orders created for sales order, the planned price for a component (BOM) material gets picked as per following:-
    1. If there is no entry in EBEW for the component (that is, there is no previous GR for the component) for that sales order, then plan price is picked up on the basis of planned costing variant.
    2. In case there is an entry for the component in EBEW (there has been a previous GR for the component with reference to the sale order) then the plan price for the component is taken from the EBEW table (first GR price) and system ignores the costing variant.
    The above is as per my observation. Please validate if this is correct or not.
    The requirement is that even if there has been a previous GR for the component (there is an existing entry in EBEW) the system should take the plan price on the basis of costing variant and not from the EBEW table.
    How can this be achieved? Is there a user exit that can force the system to read the costing variant before looking into the EBEW table?
    BR
    Abhi

    Hi Ajay,
    Yes i had considered it but I'm not sure If it will help.
    Because the main problem here is that system is ignoring the costing variant itself and instead picking the price from EBEW table. So changing the costing variant (validation variant) may not help.
    Moreover i don't want to valuate with my own strategy. I want the plan price to be equal to standard price of material from material master. Basically MBEW instead of EBEW.
    Any clues?
    BR
    Abhi

  • Transaction to maintina Billing Plan for Sales order item

    Hi All,
    Is there any transaction other than VA01/VA02 to maintian Billing plan for Sales order item.
    Thanks & Regards,
    Rajanidhi Rajasekeran.

    It is possible to maintain Billing Plan in Sales Document Type (VOV8), as well as Item Category level (VOV7). As you want it at Item level, maintain the same in Item Category Configuration at Item level & it will by default be captured in Sales Order at Item level.
    Step 1: Sales Document Type
    IMG > Sales and Distribution > Sales > Sales Documents >
    Sales Document Header:
    1. Sales Document Type:The sales document types represent the different business transactions, such as Inquiry, Quotation, Sales Order, etc. To create new sales order type, always copy as with reference to similar sales order. If possible use standard sales order.
    2. Define Number Ranges For Sales Documents: Maintain number range with discussion with core team.
    3. Assign Sales Area To Sales Document Types:
    A. Combine sales organizations / Combine distribution channels / Combine divisions: Ensure to maintain these, else Sales Order creation will give error.
    B. Assign sales order types permitted for sales areas: Assign only required Sales Order Types to required Sales Area. This will minimize selection of Sales Order Type as per sales area.
    Sales Document Item:
    1. Define Item Categories: If possible use Standard Item Category. Incase if required to create new, copy as from standard & maintain New.
    2. Assign Item Categories: If possible, use standard. Formula for deriving item category: Sales Document Type + Item Category Group + Usage + Higher Level Item Category = Item Category
    Regards,
    Rajesh Banka

  • Plan costs calculation during results analysis of sales order

    Hi Experts,
    I am in process of implementing sales order costing. I am facing a problem during result analysis with plan costs data.
    We have a sales order for which production order is generated. Cost object is sales order.
    Say, sales order cost estimate which is the plan costs --> is $ 1000 (which includes prod order COGM of $ 600) (So remaining sales and admin costs are $ 400)
    Plan cost of production order is $ 550 (as per production order cost analysis report)
    While calculating the result analysis for sales order, system is calculating the plan costs data as $ 1000 + $ 550 = $ 1550
    As a result, I feel plan costs data during result analysis is over calculated.
    I feel either plan costs should be $ 1000 (as it already includes COGM part)
    or
    $ 950 which is (plan cost of production order $ 550 + sales and admin costs of $ 400)
    Could some one explain me why result analysis shows plan costs data as $ 1500 and if I need to rectify how can I do so.
    Thanks,
    GAN

    Any suggestions please.
    Edited by: DSK on Feb 9, 2012 6:16 AM
    Edited by: DSK on Feb 13, 2012 4:39 AM

  • Plan value(break up) not appearing in sales order cost report

    hi
    I have done sales order bom in cs61,operation in ca01,in va02 for sales order costing in itemization showing like
    material 100
    actity      10
    total 110
    saved and if I see in cost report it show only revenue , cogs(110),but it is not show raw materials and operations.
    please advise me what to do?
    Thanks and Regards,
    Nagesh

    Dear Nagesh,
    Probably, you need to check the status of the BOM and the Routing in the Header. It should be active/released.
    Kind Regards
    Umapathi G
    Edited by: Umapathi Naidu G on Aug 11, 2011 3:26 PM

  • MRP-Delivery Schedule for Sales order is not updating in Production order

    Dear Experts,
    I have created Sales order and maintained delivery scheduling, Then Run MRP through MD50,
    We received Planned order then through this we have converted to Prodcution order.
    When we observe the delivery schedule for sales order under assignment Tab in Produciton order which is showing zero instead showing line item of Delivery schedule.
    I am able to see Sales order and Line item but i am not abel to get any delivery schedule line item.
    Please suggest where settings are missing.
    Thanks in advance
    Regards
    Don

    Dear Experts,
    Please provide me solution.
    after Running MD50 transaction against Sales order.
    If I maintained different Scheduling Line Item for First Line item of Sales order.
    The Respective Scheduling Lines should update against Each Production order which has converted from Planned order.
    Thanks in advance.
    Regards
    DON

  • Goods Receipt for sales order stock

    Hi everybody,
    I want to receive materials for sales order stock. what I did:
    1- Created a Purchase order,
    2- Account Assignment = C
    3- went to MIGO
    4- selected PO number
    5- set movement type 101 / E
    the SAP give error message that you have not planned 101 / E !!!!
    I searched alot but couldn\t find the solution.

    Hi Dear,
    When you use C account assignment category, System will consume those materials/services for the respective sales order at the time goods receipt/service confirmation. There is no inventory possible when we use, account assignment C as a standard, If you want to make inventorize, we have to choose account assignment category M against sales order.
    When we are procuring material against project, Account assignment Q-will be inventoried and P-will be consumed for respective cost object
    Like the same M-will be inventoried and C--will be consumed for respective cost object
    R,
    Amala Srinivasa Rao

  • Using MD50 to run MRP for Sale Order

    Dear all,
    I have some problem when using MD50 with Mill Product Industry.
    When SAP system not activate Mill Product yet. I used transaction code MD50 to run MRP for Sale Order, the system have generated planned order for multilevel. But when SAP system have activated Mill Product, I used transaction code MD50 to run MRP for Sale Order, the system only generate planned order for single level. I think that we have to configure something based on Mill Product Industry. So can you help me for this
    Thanks, Regards

    Hi,
    Check with following links which may help you resolve your issue :
    http://www.sap.com/sme/whysap/industries/millproducts/index.epx
    http://help.sap.com/saphelp_di471/helpdata/en/4e/1796374b088e5ce10000009b38f8cf/frameset.htm
    http://help.sap.com/content/documentation/industry/docu_is_mill.htm
    Regards,
    Tejas

  • How to configure rescheduling for sale order quantities

    kindly explain how to configure rescheduling for sale order quantities that are created last month. kindly explain. i am in urgent.
    regards,
    g.v.shivakkumar

    Hi,
    Short text
    Rescheduling sales and stock transfer documents: by material
    Description
    The 'Rescheduling' program (SDV03V02) processes sales document items that are contained in the item directory for the material. It takes into consideration open items and schedule lines from stock transfer items, stock transfer scheduling agreements and purchase order requests (items only), referred to hereafter as stock transfer documents, for the materials.
    All sales documents for the material that are still open are selected. This means that the material index must be activated for at least all sales document types, whose items may have requirements. All stock transfer documents or items for the material that are still open are also selected. Open in this case means for example, that there is no deletion indicator, that the item from a stock transfer purchase order request cannot be labeled as completed or that the quantity delivered and posted to goods issue for the item in a stock transfer purchase order is the same as the amount ordered. An availability check can only be carried out if a checking rule is assigned to the document type - if this is not the case, the document or document item is not checked.
    Checking rule 'A' is used as a basis for rescheduling sales orders (exceptions to this are rush orders  they use checking rule B, and orders with individual customer stock; they use checking rule AE). Stock transfer documents use the checking rule that is assigned in Customizing for Purchasing. It is important that the scope of checks is consistent for both the stock transfer documents and the sales documents and that they do not exclude each other, as this can lead to incorrect test results. An example of an incorrect setting would be: The scope of check for checking rule 'A' checks delivery schedules for stock transfer purchase orders and stock transfer purchase requests, however the scope of check for the checking rule for the stock transport scheduling agreement does not.
    The items and schedule lines found in the selection are sorted according to 'Priorities' - document category, delivery priority, creation date of the item or schedule line (for stock transfer purchase orders and delivery plans) entered on the selection screen or according to the schedule line date of the earliest schedule line with order quantity, document number and item number and then transferred to the availability check. Priority 1 is highest priority and priority 5 the lowest. Stock transfer purchase order requests are sorted after stock transfer purchase orders and scheduling agreements, as they are less binding. This means that when you have identical sort criteria such as delivery dates, the stock transfer purchase order item is checked first and then the item from the stock transfer purchase order request.
    The preset option 'Unconfirmed documents required' only carries out rescheduling for materials for which there is at least one unconfirmed transaction.
    You can use the parameters 'Sorting criteria delivery date' to define whether sorting is carried out with the order quantity after the creation date of the item or the delivery date of the earliest schedule line.
    If you mark the 'Simulation' field, the checked documents are not saved. Instead a results list is generated and saved. However, the availability check for the corresponding documents continues as if saving has taken place already, that is, that the simulated list corresponds to the actual one.
    Under 'Options' on the selection screen, specify whether sales documents and/or stock transfer documents should be processed. For stock transfer documents you can enter whether stock transfer purchase orders and scheduling agreements should be processed at item or schedule line level:
    Processing at item level:
    All open schedule lines for the item are read and collected, then transferred to the availability check. To sort and prioritize documents, you do not need each individual schedule line. It is sufficient to have the item or data from the first schedule line. All open schedule lines for the item are processed and checked.
    Example of processing at item level:
    Sorting: Date (Delivery date first schedule line) - Document number - Document item
    Doc. cat. Doc. number  Doc. item  Doc. schedule line  Delivery date PO        4500000012      10               0001              26.01. PO        4500000012      10               0002              26.02. PO        4500000025      20               0001              28.01. PO        4500000025      20               0002              02.02.
    You can see that the second schedule line for document 4500000025/20 from 02.02 was processed after the second schedule line for document 4500000012/10 from 26.02. This is because all open schedule lines for an item are read and processed. The first schedule line from 4500000012/10 has the earliest delivery date, therefore it has priority.
    Processing at schedule line level:
    Each open schedule line for an item is entered in document sorting in accordance with the values entered under 'Priorities'. The availability check is carried out for each individual schedule line.
    Example for processing at schedule line level:
    Sorting: Date (delivery date first schedule line) - document number -document item
    Doc. cat.    Doc. number  Doc. item  Doc. sched. line  Del. date PO           4500000012    10             0001           26.01. PO           4500000025    20             0001           28.01. PO           4500000025    20             0002           02.02. PO           4500000012    10             0002           26.02.
    Here you can see that each schedule line was sorted according to its delivery date. Note that this type of processing requires more runtime due to the individual checks and more frequent saving.
    The results of rescheduling are saved, as long as the program was not started in simulation mode. When calling up from the 'Sales' area menu or when directly starting via the development environment, the iniator is informed via a dialog box that he has just started a process that changes data. He can then decide whether or not he wants to continue.
    Checking procedure for stock transfer documents:
    An availability check of stock transfer documents in rescheduling is carried out in accordance with the check carried out when manually creating a document. If, however, the required quantity for a schedule line is not available on a particular date and will not be ready until later, new schedule lines are created for the stock transfer purchase orders and scheduling agreements, containing the relevant data. New items are created in this case for stock transfer purchase order requirements. The total sum of schedule line quantities for a processed schedule line corresponds to the schedule line quantity of the original schedule line.
    First example: Using a stock transfer purchase order item with a schedule line:
    a) Status of item before rescheduling run:
    Del. date  PO quantity   Confirmed quant  Confirmed del. date 23.07.      50 items       0 items              -
    ==> This now affects the stock/requirement situation:
        - Goods issue is posted for the material in the delivering plant on the 23.07.
        - A purchase order of 10 items was created for the material in the delivering plant. Delivery is expected on the 29.07.
    b) Status of stock transfer purchase order item after rescheduling run:
    Del. date PO quantity   Confirmed quant   Confirmed del. date 23.07.     40 items      40 items            23.07. 29.07.     10 items      10 items            29.07.
    ==> The first schedule line was changed in accordance with the results of the rescheduling availability check. Only 40 of the 50 original items could be delivered on the 23.07. Therefore, a new schedule line is created for the rest on the 29.07. for 10 confirmed items.
    Second example: Same output situation as the above example.
    ==> There is now a change in the requirement/stock situation:
    A purchase order for 10 items is created for the material in the delivering plant. Delivery is expected on the 29.07. A further purchase shows another 40 planned items on the 30.07.
       Status of stock transfer purchase order item after rescheduling run:
    Del. date PO quantity  Confirmed quant  Confirmed del. date 29.07.     10 items       10 items          29.07. 30.07.     40 items       40 items          30.07.
    ==> The first schedule line was changed in accordance with the result of the availability check for rescheduling. The original delivery date is set to the date confirmed in the ATP check. A new schedule line is created for the remaining 40 items, that are available on the 30.07.
    Note:
    Any set fixed delivery date and quantity indicators and creation indicators for schedule lines or items are 'inherited' by newly created schedule lines. Assuming that the original schedule line was fixed in the above example (since it is created manually), this indicator is also set for the newly created schedule line.
    If shipping scheduling is activated for a stock transfer document type, this is also implemented for newly created schedule lines, with the exception of route schedule determination. This means that in the current version of the program no route schedule has been determined for a schedule line containing a route schedule for which new schedule lines may need to be created.
    The results of the run are issued in the form of a list, which is also saved, so that the results can be controlled at a later date. This is done using the function 'Evaluate rescheduling', but it is only a good idea to do this after the first rescheduling has taken place. You can restrict selection requirements but these can however affect the runtime. You can use this function to analyze the saved list until the next rescheduling run, which writes over the result. If you start rescheduling in the background, a spool file with the result list referred to will be created in the corresponding setting. You can see this in spool management.
    Output
    A list of changed documents, a list of documents in which an error occurred during processing and as a result were not changed, can be called up via the menu 'Edit - Error log'. If in a subsequent evaluation a restricted selection is carried out, a note appears at the end of the list to say that not all document items are displayed.
    You can set the scope of the list under the menu option 'List' in the list display. You can view improvements, deteriorations and the whole list. Before the documents can be included in one or either of the restricted lists, the date or quantity has to have changed so that the item can be contained in both the list of improved or deteriorated documents.
    You can use the interface for changing transactions and the order list to navigate. Use 'Back' to exit the list and 'New selection' to return to the selection screen.
    Recommendation
    You should only start this program occasionally and use very restricted selectin criteria during working hours as it requires enormous system resources.
    Note
    The columns for 'New date' and 'New confirmed qty' only contain entries if the dates or quantities have changed.
    As the system only runs the change check (dates/quantities) per line in the original list, an item whose backlog has increased in the list of improvements. This occurs, for example, if the whole quantity can be delivered at once but at a later date. In this situation, the system determines an increase for the line when it compares quantities.
    Regards,
    Amrish Purohit

  • Table name for sales order with Customer info

    Hi Gurus,
    Could you please provide me table name for  sales order with customer no and customer name.
    I have list of sales order number (more than 1000 no's ) i need to identify customer number and customer name (ship to party and sold to party information). I am running this report every week. so i plan to create sqvi for this report.
    Thanks and regards,
    B.Deethya.

    Hello,
    Access Tables VBAK & VBAP.
    From the above tables you will get Solt to Party & Ship to Party Codes.
    For Customer names you have to pass the Customer Codes to Table - KNA1
    Hope this clarifies.
    Thanks,
    Jignesh Mehta

  • DTW Template for SALES ORDERS

    Hi All,
                Can anybody give me the name of the DTW template used for Sales Orders Updation.
                 I am Using SAP Business One 2005B version.
    Thanks and Regards,
    Sree.

    Sree,
    This is the key
    1. Fill the DocEntry and LineNum columns in your template to reference the Order and the exact lines you plan to update
    Suda