Planned Order, with first Prod Version.

Dear All,
I am Trying to use Production version for diffrent style of Production Req for same product.
When i Gave PV in MD61, for diff days, diff PVs,
Is is not reflecting in PLanned ORders.
Planned Order have only one PV. for all RIRs.
Kindly let me know the,
Where cud i miss .
In MRP 4 Selection is 3,
Ind/Coll : 1
Stratgy :40
Regards
Raghu

Raghu,
1)check material master selection/explosion  of BOM is always by by production.
2) lots size should not have oevrlapping.
3) and you cant create PIR in same period with differnt versions.
4)You might want to check whether the In-house Prod Time in Material Master has been maintained. I would think that this is the cause of the inconsistencies.
By right, if you run MRP by lead time scheduling, you don't need to enter the In-house Prod Time in MRP 2 view, because MRP will calculate the prod time by using your routing data.
5)Message no. MD425 ,
Please check the routing for all level in CA02 and do the consistance check through CA02ExtraConsistance check.
6)The error is talking about the Scheduling Master data.
What was the scheduling type selected during the MRP run
Basci scheduling: make sure the In house production data in material master is maintained.
Lead time scheduling: make sure the Scheduling data in routing is maintained properly.
7)Check the setting of *OPU5 *check the selection ID and also check setting in OPJH. And also check routing selction id COR4 . Also check the status usage and validity date of routings
another thing is , please describe what exact results you are expecting.
Regards
Ritesh

Similar Messages

  • Planned order to prod order----order type and prod version/ routing

    Hi,
    My client produces a material in three different locations. The process at all the locations is same. Each location has the set of same work centers. We have differentiated the workcenters at the three different locations by naming conventions. I am mainting three counters in the routing with different set of work centers.
    We want different order types for the production orders processed at these three locations. Also I should be in a position to select the routing/ production version manually for the production orders processed at the three different locations. When I am creating a production order manually, I can select the order type and even the routing or production version.
    But here I am converting the planned order to production order. The system is picking the order type as maintained in OPPE. In OPL8 I maintained manual  selection of prod version. But version 1 is selected default by the system. Can I have any control over the selection of order type and prod version/ routing?
    Thanks and Regards,
    Raghu

    Dear,
    Selection of production version is only possible at manual creation of production order, but not when converting planned order to production order. you can manually change the production version if u want to in the planned order.When you have a planned order it would default contain a valid production version. So system would just take the Production version in the planned order to use the same in Production order. If you want to change the production version in production order then go to CO02-FunctionRead PP Master data and change it.
    (Goto OPL8 and select Manual Selection of Production Order in Production Version field
    And in MRP4 view of material master select - Selection only by production version as the option for the Selection method field )
    Hope clear to you.
    Regards,
    R.Brahmankar

  • Planned order with exception message 52

    Hello ,
    I created a planned order and when i look at MD04 transaction for the material i can see the planned order but there is an exception 52 indicating No BOM selected , what can be the reason for this exception.
    I have created a bom , routing and and production version for the material.
    Regards,
    Sureshbabu G.

    Dear,
    Couple of check,
    1. Check the material having valid date BOM, ie BOM should be available on planned order basic start.
    2. Check the BOM usage
    3. check the BOM status ( Active or inactive)
    4. Check material assigned with any prod version.
    5. In MRP4 view check the BOM selection method. Lot size means check the lot size in BOM header.
    You can check in these T.codes,
    1) BOM status must be active in the BOM header data.(CS01)
    2) BOM usage must be relevent for production. (OS20)
    3) BOM explosion indicator must be enabled for MRP (OS23).
    4) Selection of BON ID must have BOM usage indicator assign (OS31).
    Hope it will solve your problem.
    Regards,
    R.Brahmankar

  • How to generate SNP planned order with different category

    Our SNP system receives Forecast and Salse Order from DP system.
    and we'd like to generate SNP planned order with different category..for example, 'AI' for Forecast Demand and 'AL' for Sales Order..
    currently, If we run CTM, system generate SNP planned order with the
    same category 'AI'..
    another system(APS) in Our company receives planned order from SNP
    and they want to receive planned order for forecast and planned order for sales order seperately..

    It is not directly achievable however can be done through BADIs and two CTM profile. I am assuming that sales orders are planned ahead of Forecast demands. So have two CTM profiles - one for Sales Orders (regenerative mode) and the other for Forecast Demands (net change mode). You may have to invoke two BADIs in the first run for Sales Orders - one that changes master data by putting a temperory Forecast Horizon in SNP2 tab (BADI /sapapo/ctm_matloc). The other BADI (BADI /sapapo/ctm_orders) changes the ATP category just before saving. in the second run though you just need to run the latter BADI by saving it in the ATP category required. BADIs can be invoked based on CTM profiles used.

  • Report for PO's/Pr's/Planned orders with exception code

    Hi all,
    Is there any report which lists out Purchase Orders/Purchase requisitions/Planned orders for a specific exception message number?
    For example when MRP is run some times the finish date for a planned order may be in past (exception message number 07). I would like to get a list of all the planned orders with exception message number 07. Similarly i would like to get PO's/PR's for a specific exception code.
    Any help is highly appreciated.
    Thanks,
    Avani.

    Hi Neetha,
    You can use the Collective access tab on the MD06 T-Code, don't enter a material number, only the plant number and MRP Controller number.  Then click on the tab marked Exception Groups, check box  number 7 and execute the report.  This will give you a list of all materials with exception group 7.  If you need it as a report. Once the report comes up you can click on MRP List on the tool bar at the top of the page and then click print.  This will format it so you can download it into excel by clicking on the Local File Button.  When the box comes up click on spreadsheet and save it to your hard drive as an excel spreadsheet.
    Hope this is of some help to you.
    Debbie

  • Creating a planned order with error "Material requires configuration"

    Dear All,
    I am facing a problem for creation of a planned order with error "Material requires configuration".
    To follow the note 180317, I change Account Assignment Category to "U" (Unknown).
    However, the system still does display the same error.
    Could you please help provide possible solution for this?
    Regards,
    Phong

    See also the following blog post:
    Configurable planned order for material variants: Exception "53: No BOM explosion due to missing configuration"
    BR
    Caetano

  • Problem when creating planned order with MRP run

    Hello,
    I create a material with a fix reorder point, MRP type VB. When I run MRP with MD03 on this material I have several problems :
    - planned order is created with an opening date in the past, so I have error 'Opening date in the past' in MD04. How can I generate a planned order with opening date not in the past
    - when changing manually opening date, after running again MD03, I have error 'No BOM selected'. Material is configurable, has a text BOM, a routing and a configuration profile. What is the problem? When modifying planned order, I have message :
    Material requires configuration
    Message no. 61259
    Diagnosis
    Orders and requirements for a configurable material must have characteristic values.
    Usually, you should create a variation for configurable materials managed in inventory management which has the default variant configuration.
    System Response
    MRP: Requirements without characteristic values for a material cannot be planned in MRP.
    Procedure
    Check requirements or orders.
    Create a configuration evaluation for the material in the material master record if necessary.
    Thanks in advance.

    Hi
    I am facing the problem. Could you please tell me if you have resolved the above problem? If yes, Could you please provide me as how you resolved? Thanks in advance.
    Thanks
    Nagesh.

  • Creating planned orders with BAPI_MOSRVAPS_SAVEMULTI3

    Dear all,
    I have to create planned orders in our APO-system ... This works fine with function BAPI_MOSRVAPS_SAVEMULTI3, until I try to create a planned order with a configurable material ... I added values to the following tables: cfg_headers, cfg_instances and cfg_values but still I am not able to create a planned order ... Maybe I don't fill the correct fields in the mentioned tables ? Can anyone tell me which fields they fill to create planned orders with configurable materials ? I used the fields that are required according to the SAP-help, but it seems that my values are possibly wrong ... Maybe an example can help me too ?
    Thanks in advance !!!
    Greetz,
    Kurt.

    Hello Babu,
    I am facing the same error in BAPI_PIRSRVAPS_DELMULTI. Could you revert with the solution if you have got one.
    Thanks,
    Ankit

  • Planned orders with excesseption messages

    Hello All,
    I want to creates a customised report for the planned orders with exception messages. In which table I get the required information?  User want the selection criteria as WBS, meterial codes  and material groups. Thats why I can not use the MD04,MD05 etc.
    Please suggest the tables.
    Regards,
    Mayur

    Hello Ramagiri,
    Thanks for the quick reply.
    Table MDKP shows X tick in exception group but does not show the message number. In which table I will get these message number?
    Mayur

  • Where/ how do I set SNP to create Planned orders with multiple line items?

    Hi
    Currently our SNP is generating planned orders on a daily basis, it creates a single order with a single line item per location.
    Where/ how do set SNP to create planned orders on a daily basis to generate a single order with multiple line items per location, so therefore one planned order with multiple line items for a single location.
    Thanx
    Keegan

    Hi Keegan,
                   In SNP (APO) it is not possible to create order with multiple line items.
    But you can do some settings so that while planning system can do aggregation and disaggregation.
    But your requirment should be set on Aggregation/Dis-aggregation logic.
    Please follow the follwing links:
    http://help.sap.com/saphelp_scm2007/helpdata/en/2c/c557e9e330cc46b8e440fb3999ca51/content.htm
    Aggregation:
    http://help.sap.com/saphelp_scm2007/helpdata/en/42/f731d078e73ee4e10000000a1553f6/content.htm
    Disaggregation:
    http://help.sap.com/saphelp_scm2007/helpdata/en/a6/ebefaf32e22e468355da304cc59387/content.htm
    Please be sure that the setting of this logic will be at planning area level.
    You can't change aggregation/disaggregation logic further.
    Regards,
    Santosh

  • How to delete planned orders with partial quantities -reg.

    Dear Friends,
    the issue is
    we are not able to delete the old planned orders in MD16 for which partial quantities are existing.
    we require to delete these planned orders which are partially serviced to avoid creation of schedule lines  for excess quantities.
    Is there any way to delete the planned orders for which partial quantities are existing ?
    is there need to change any strategy to make MRP not to consider these planned orders with partial quantities for MRP run ?
    thanks
    Madhu Kiran.

    Hi Madhu,
    Are you getting any error message from MD16? if yes then please send us the messsage number with class. if you do not want that MRP to consider the planned orders then change the startegy 11 for these parts with mixed MRP indicator 1.
    try this deletion from MD12 also..planned order change mode. Let us know the fresh update.
    Regards
    TAJUDDIN

  • Offset in planned order with weekly lot sizing.

    Hi,
    After i run MRP with a weekly lot sizing procedure, avaiability date = start of the period, the MRP groups all planned orders of the week at the first requirements date of that week.
    But what i need is to put that group of the planned orders in the last working day of the week before.
    For example:
    Week
    Friday Week n
    Week n+1
    Ind. Requirements
    0
    1
    1
    1
    1
    1
    Planned order
    5
    Can you please help me how to solve this issue.
    Thanks in advance.
    Mike

    Hi,
    It is possible by configuring a version of the standart weekly lot sizing procedure. In customization for lot sizing procedures (tr. OMI4), copy the lot sizing procedure WB and name it. In the detail settings of the procedure set the scheduling field to 1. This makes the delivery date of the procurement proposal the period start (you requirement is the last day of the previous period, however this is the best next option). You may press F1 after clicking on this field and learn about other options. Please assign this new procedure to the material and test it.
    Regards.

  • Sales Order Costing using prod version

    Hi Guru,
    My client use MTO and have prod version 1000 & 2000.  When I create SO and choose prod.version 1000,  prod.order created using BOM/Routing in prod.version 1000, so the prod order cost plan.
    But in costing SO, prod version 2000 is use as base in qty structure, it's mean SO plan cost is based on prod version 2000, not 1000.
    How the logic of SO costing ? where config to be set in order to get SO costing based on prod version choosen.
    Reward will given to any input.
    Thanks

    You may want to have a look at OKK5 - Quantity structure determination.(QSD)
    Choose the Quantity Structure control and double click. Then click on the BOM application. In there, there is section for override alternative selection from material master. There is a check box for production version. whose help reads as
    This indicator shows that, when alternatives are selected automatically according to application, the production versions maintained in the material master record are used as selection criteria.
    Dependencies
    <b>In the MRP view of the material master, in the requirements explosion data, the indicator for selecting alternative BOMs is maintained.
    When you explode the  BOM, only the alternatives for which selection by production version (2) is defined are taken into account for selection.</b>

  • REM- Planned order with Movement type 311

    Hi,
    I want to use movement type 311 along with planned order in MFBF but system is not allowing me.
    Do I need to mention movement type 311 somewhere in configuration of planned order.
    Regards,
    Samir Wadajkar

    Dear
    Basically Movement 311 will be used for Material Staging.Material Staging can done with reference to the Material or with reference to the Planned Order etc...
    You can do the following with MF60:
    1. Direct stock transfer : You must select Staging type (Storage location level)
    To use direct stock transfer, you must maintain an issue storage location for each component in the BOM (or in the material master record or the production version). The system only displays those requirements for which you have defined an issue storage location
    2. Stock transfer reservation : You must select Staging type ‘1’ (Storage location level)
    The system then automatically displays the storage location view of the pull list. The system also only selects the corresponding requirements.
    In Global Settings, you must adopt the default settings and you must also select Stock transfer reservation.
    I hope you must have maintained the Customization Setting for Stock Determination Strategy with reference to your plant with 311 movement.
    Further details refer below link:
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/8a/a5a8d04adc11d189740000e8322d00/content.htm
    Hope this is clear to you
    Regards
    JH

  • Error when creating planned orders with BAPI_POSRVAPS_SAVEMULTI3

    Hello,
    I am working on a program which duplicates planned orders from one planning version to another. To do this, I am using the BAPI BAPI_POSRVAPS_SAVEMULTI3.
    When I run the program, I get this error messae from the BAPI: A different planning version is being used.
    The flow of my program is the following:
    - Reading target planning version
    - Deleting orders with the same selection criteria than the orders to be duplicated
    - Reading source planning version
    - Creating read orders to target planning version (where it goes wrong)
    I worked before on another program which does the same but with manufacturing orders, and I did not encounter such a problem.
    Can someone help ?
    Thanks in advance.

    Hello Babu,
    I am facing the same error in BAPI_PIRSRVAPS_DELMULTI. Could you revert with the solution if you have got one.
    Thanks,
    Ankit

Maybe you are looking for