Planned orders created with more than Maximum lot size??

Hi Gurus,
we have a lot size 'EX' with maximum lot size =480.
But, for the materail when we run MRP we found that aplanned order is created for 1000.
Please help me to find the root cause.
Thank you.
Naveen.

Hi
What is that material. If it fert and then yes system will create if you have mentioned max lot size.
Because the max lot size does not control prodcution, it only controls the procurement side
krishna

Similar Messages

  • Printing PDFs with more than one page size

    A large client sent me a PDF of mostly usLetter-sized pages, but with some in-line 11 x 17" pages he intended to Z-fold. I was able to vary the size of the bounding box within the Windows drivers by selecting "Choose Paper Source by PDF page size". That way I would eliminate the vast white spaces created by putting letter-sized images within an 11 x 17" bounding box, or alternatively, shrinking or masking 11 x 17" images to fit a letter-sized bounding box. With the advanced settings of our printer's drivers, I was able to program the two paper sizes into the print job.
    I can't seem to find a control like "Choose Paper Source by PDF page size" in my Mac OS X v. 10.4 (or 10.5) drivers. Are they absent or am I?

    Mike, it's a production run with lots of copies and lots of pages per copy, so it'd be too labor intensive to be cost effective if there's a high-tech way of doing it.
    That way is to put it on a Windows workstation to gain access to the "Choose Paper Source by PDF page size" control that the MS drivers offer. This sets the bounding box rather than the paper as the interface mistakenly indicates.
    Then use the PCL drivers because of the way Microsoft's PS drivers position the images.
    Make sure to set your letter-sized body pages to 2-sided and, if you can, your Ledger-sized pages to 2-sided, flip on short edge.
    Again, it's a shame that the Adobe/Apple interface doesn't offer the same ability that the Adobe/MS interface offers.

  • How can we create a table with more than 64 fields in the default DB?

    Dear sirs,
    I am taking part in the process of migrating a J2ee application from JBoss to SAP Server. I have imported the ejb project.
    I have an entity bean with 79 CMP fields. i have created the bean and created the table for the same also. but when i tried to build the dictionary, i am getting an error message as given below,
    "Dictionary Generation: DB2:checkNumberOfColumns (primary key of table IMP_MANDANT): number of columns (79) greater than allowed maximum (64) IMP_MANDANT.dtdbtable MyAtlasDictionary/src/packages"
    Is it mean that we can not create tables with fields more than 64?
    How can i create tables with more than 64 fields?
    Kindly help,
    Thankyou,
    Sudheesh...

    Hi,
      I found a link in the help site which says its 1024 (without key 1023).
    http://help.sap.com/saphelp_nw04s/helpdata/en/f6/069940ccd42a54e10000000a1550b0/content.htm
      Not sure about any limit of 64 columns.
    Regards,
    S.Divakar

  • Not able to create a table with more than 64 fields in dictionary

    Hi,
    I have created a java dictionary in Netweaver Developer studio. I have to create a table with more than 64 fields in it. I was able to create the table in dictionary, but when i tried to build it, I am getting an error message as "more than 64 fields are not allowed". If i create the table with 64 fields or below 64 fields, i can build the dictionary and deploy it.
    That is, when i create a table with more than 64 fieds, I am not able to compile the dictionary, But if i reduce the fields to 64 or below, i can compile the dictionary.
    Kindly help me to solve the problem.
    Regards,
    Sudheesh

    Hi,
    Sudheesh,as far as I am aware creating of fields in the table actually depends on the total width of table that can be used for various Vendors.
    So I actually tried out creating a table with too many fields,and I am reproducing the errors which I have obtained -
    <i>Error               Dictionary Generation: <b>DB2:checkWidth TMP_1: total width of table (198198 bytes) greater than allowed maximum (32696 bytes)</b>     TMP_1.dtdbtable     TestDictionary/src/packages     
    Error               Dictionary Generation: <b>DB4:Table TMP_1: fixed length: 198366 (32767).</b>     TMP_1.dtdbtable     TestDictionary/src/packages     
    Error               Dictionary Generation: <b>DB6:checkWidth TMP_1: total width of table (297200) including row overhead is greater than the allowed maximum for 16K tablespaces .</b>     TMP_1.dtdbtable     TestDictionary/src/packages     
    Error               Dictionary Generation: <b>MSSQL:checkWidth TMP_1: total width(198215) greater than allowed maximum (8060)</b>     TMP_1.dtdbtable     TestDictionary/src/packages     
    Error               Dictionary Generation: <b>SAPDB:checkWidth TMP_1: total width(198297) greater than allowed maximum (8088)</b>     TMP_1.dtdbtable     TestDictionary/src/packages     
    Error               Dictionary Generation: Table TMP_1 is not generated     TMP_1.dtdbtable     TestDictionary/src/packages     </i>
    I hope you can understand what the errors state.I am trying to create a table whose total width(sum of width all columns) is greater than the maximum allowed for various Vendors,such as DB2,MSSQL,SAPDB etc.
    I hope this answer helps you create your table suitably
    Regards,
    Harish
    (Please award points if this answer has been usefull)

  • Maximum lot size - create order manually

    Hi Experts,
    we are in the implementation phase of the project (PPDS) and need your help.
    For the products we have the data of Maximum Lot Size, that is a constrain for the process. But when we execute manual adjustments/creation of the planned orders, this maximum lot size is not respected, because for the manual orders is used the heuristic SAP_PP_001 Change Order Manually.
    We need to consider the maximum lot size even for manual adjustments/creation.
    Does anyone knows a way to consider the maximum lot size when create orders manually?
    Thanks in advance
    Thiago Cyrillo

    Hi Hans,
                  If as per the requirement you want the system to take into account the period of 63 days reqirement , then as my experience the lot size field should be changed from  the daily lot size .......or else the setting is quite redundant in nature........in accordance to your business requirement.
    Check for the period lot sizing for detail information..........incase you have any query then let me know ......
    Please reward points if it is helpful.........
    Thanks
    Kaushik

  • Essbase Variable with more than a value for use after in Planning forms.

    I want to now if it would be possible to create a variable with more than a value for use after in Planning forms.
    The variable that I want to use is created in Essbase.
    Example:
    &Years = FY08,FY09,FY10

    Hi.
    The only workaround I know for the problem is to create parent in the dimension.
    In your case, create member “planyears”.
    Then you define children that are shard (this are the multiple member for the variables FY08, FY09 etc..)
    Create Essbase sub variable that will have 1 member value “planyears”
    When you use the Sub Variable in form select function “Children” and in that case it will use the member FY08,FY09 etc on the form.
    Limitation: I’m working on version 9.2.0.3 so you can’t create hierarchy in the year dimension, but you can use it in other dimension.
    AE

  • Sales order with more than 9 items causing problem

    Hi,
    I have a situation here.
    A sales order is created in the system and since it is order related billing so its billing document is also generated. The billing document is not relevant for accounting. So, the only 2 documents are a sales order and its billing document.
    Due to some technical restrictions,if the number of lines is more than 9 the printout wont come.Henceforth,the user is unable to take a printout so I need to give him a solution.
    What shall I suggest him?

    Hi,
    >So, my question is that,should I ask the user to create a credit memo wrt the billing document and then split the sales order with 2 invoices(one with say 5 and the other invoice with the rest of the quantities)?
    So, if my undestanding is right then you want to create a credit memo after invoice ? If yes, then why are you splitting the sales order ? Also, this is something strange kind of ABAP logic which would not allow to print an invoice with more than 9 line items... Now, as you said if your sales order is having more than 9 line items then only print doesn't come.. right ? then in your case at this moment there are only 9 line items so ideally you'd be able to get a print.. right ?
    I think there is some confusion out here with your two posts.. kindly clarify...
    Hrishi

  • Anyone with more than one iPhone 6/6+ in same order getting there phones shipped if all your phones didn't have 9-19 when you ordered?

    Our Verizon account has 10 lines and I figure we're paying over $7,000 a year, when I think of how much money total we have payed to Verizon only to be jerked around and around and lied too over and over again really does make me sick.  6 of these contracts have ended and 3 will be up in next couple months and 1 has a year left so the cancelation fees would not be that bad. And with the other big carrier I've heard it might be cheaper on monthly service. All I wanted from Verizon was for them to do whats right.
    I Ordered
    iPhone 6 16gb  gray
    iPhone 6+ 16gb gray
    iPhone 6+ 64gb gray
    iPhone 6+ 64gb silver
    all on the same order. I finished at 3:19 am est and got a date of 10/14 even though all the phones except the 6+ 16 gb gray had 9/19. Got confirmation email at 4:56 will ship by 10/14 I got worried that all the phones would not ship till 10/14 and contacted verizon thru facebook messenger. They told me my phones would ship in the order received and not be held up by a phone that wasn't available in my order. And based on the time of my order she said 9/19 for the 6 and 6+ silver, 10/7 for the 6+ 64 gray , 10/14 for 6+ 16 gray. On Monday morning my status changed to 9/19:):) in the afternoon in changed to unknown. I called 611 and rep went thru all my phones with a time sheet she had and said i should get all but the 6+ 16 gray on 9/19, she said that one you had to order by 3:00 to get on 9/19. On Wednesday my status changed to 10/14 , called 611 again and this lady told me all my phones had 10/14 listed after them. She told me she didn't know  what to tell me that Apple ships the phones and its out of Verizon's hands because they don't have the phones. then she told me to call Apple (and gave me the phone # ) and see if they ship preorders with more than 1 in a order when their available or wait till all are. I called them ( they laughed that Verizon had me call them) and they don't hold up orders . Called customer service back and guy said at least 10 times ....I ASSURE YOU VERIZON WILL NOT HOLD YOUR PHONES!!!  i said of course they're not actually putting them in a box and waiting for all, they're sending them to other people who ordered after me. I asked him if my order could be separated/ rebuilt and do a (jump the line request)  so i could get my phones when i should. He said there is no such thing at verizon....he has worked there many years and if there was he would know. Someone posted # to Internet orders so i called them Thursday morning, spoke to a very nice guy he said my phones that i should get i would and i should get an e-mail later that day and if i didnt get anything by 8:00 pm to call back. Before we hung up i asked if I didn't  get anything did he know if they could cancel/separate/rebuild and do jump the line, he said they can do that and put me on hold while he spoke with a supervisor, he came back and said if nothing happened that day they would do that with my order. I got nothing, called Internet orders back at 8:30pm... went thru my history and asked them to do the rebuild. She transferred me to supervisor who REFUSED to rebuild my order, that is only for orders that have a technical error. She was also the first person from Verizon to tell me that they DO NOT  ship orders in multiple shipments, they will only send when everything is available. She then said your order was given a delivery date of before 10/14  and that's when you'll get all your phones. I let her know that there is nothing about that confirmation that tells me that the phones that I ordered that had 9/19 deliver by dates would not be delivered then, 9/19 is before 10/14.

    Same thing happened to me!!! They made a shady business move and they should be ashamed. Placed a pre-order for an Phone 6 and an iPhone 6 Plus at 2 AM on the 12th and got my pre-order in line just like everyone else did that morning. The 6 said delivery by 9/19 and the Plus was already back ordered to 10/7 but that's fine, I expected the Plus to be harder to get anyway. Being that both phones were eligible it made sense to just place one order given this hasn't been an issue in the past. However, Verizon moved my iPhone 6 pre-order delivery to coincide with the back ordered Plus so they don't have to ship each phone separately!!! I have to wait for something on backorder while the other is ready so they can save on shipping cost. I expected the one that I pre-ordered IN TIME FOR A 9/19 delivery and waited my turn "in (on)line" like everyone else I should get that when it told me that in the checkout, THEN send the Plus when it becomes available. I even have the confirmation email that says "Deliver by 9/19"!!!  Every company you order from sends you the backorder item when it becomes in stock, they don't wait and hold the entire order for it. WHAT A BUNCH OF CRAP!!!

  • HT1040 Is there a way to place an order with more than one item at a time? For example I am going to make a few books and have them all shipped to me.  Do I have to order and pay shipping for each one individually?

    Is there a way to place an order with more than one item at a time?  for example I am making a few books and having them all shipped to me.  Do I have to order each one separately and pay shipping each time?

    You have to order each book separately, if the books are different. Only multiple copies of the same book can be ordered in the same order, see here
    Regards
    Léonie

  • How to create a workbook in BI 7.0 with more than 15 Sheets?

    Hi Experts,
    i would like to know how to create a workbook with more than 15 Sheets.
    One Workbook should be based on one query  and the other on differents queries.
    How should be the authorization? If you have any documents please just send it to me.
    Cheers
    G

    HI
    Execute one report save it in the workbook, then you can goto the tools and click insert query, like that you can add how many queries you want. then right click on the reports goto properties there in the interface tab click the check button for refrsh all the queries. finally save it with the option save existing wrokbook(beacause you already save the first query in the workbook)
    Regards,
    chandra.

  • Hello. I have an iPad2, and iMovie software. My main problem, for the moment, is the length of the videos: I can´t create a video with more than 56 seconds. When I try, the app shuts off... Can anyone help me?

    Hello. I have an iPad2, and iMovie software. My main problem, for the moment, is the length of the videos: I can´t create a video with more than 56 seconds. When I try, the app shuts off... Can anyone help me?

    Sorry. We can't help you. It's no longer an iPhone. Apple won't touch it.
    Take it to whoever replaced the screen and see if they can help you.
    iPhones are not user servicable and Apple does not sell iPhone parts at all. I'd be surprised if you were actually able to back it up at this point. It sounds like it's completely borked.

  • Create a dynamic search in JSP with more than one datasource

    Hello,
    In the ViewCiteria tag you can specify the datasource in which you want to place the criteria. Is it also possible to work with more than one datasource ?
    In my project I want one query form for specifying criteria for more than one datasource. When I send the query form, I want the right view criteria will be coupled with the right datasource.
    Has someone more experience with that ???
    Thanks!!!

    Hi,
    I think I got the same problem! I tried to combine all the tables in a new view and create a query on this view.
    But when I search and my result has to be one record from the main table, I get this record more than once.
    I tried to use distinct but that does not work because each column has a different value, so the record is never the same.
    I hope someone can help us!

  • Creating Pages in PeopleSoft with more than one HTML Form

    Hi,
    We've a requirement to create a page in PIA with more than one HTML form.
    As per PBooks - "The page being developed cannot be built using PeopleSoft Application Designer.
    An example of this is a page that requires more than one HTML form.
    PeopleSoft Pure Internet Architecture places the entire page inside of a single form tag, so no other HTML form tags can be added.
    In this case the requirements of the page can't be met by pages created in PeopleSoft Application Designer, so use IScripts instead."
    If someone can share his/her experience, It Would be of great help to me.
    -Thanks!!

    Take a look at my IScript postings. Let me know if you still have questions after reading these blog posts.

  • Can I create a table with more than 40 columns ?

    Hello,
    I need to organize my work with a table and need about 66 columns. I am not very good with Numbers but I know a little bit of Pages. I cannot find a way to create a table with more than 40 columns... Is it hopeless ? (Pages '08 v. 3.0.3)
    Thank you all

    It's never too late to try to teach users that the Search feature is not only for helpers.
    The number of columns allowed in Numbers is not a relevant value when the question is about Pages '08 tables.
    I tried to copy a 256 columns Numbers table into a Pages '09 document.
    I didn't got a table but values separated by TABs.
    I tried to convert this text range in a table and got this clear message :
    If I remember well, in Pages '08, the limit is 40 columns.
    It seems that you are a specialist of inaccurate responses, but I'm not a moderator so I'm not allowed to urtge you to double check what you wrote before posting.
    Yvan KOENIG (VALLAURIS, France) vendredi 29 avril 2011 14:57:58
    Please :
    Search for questions similar to your own before submitting them to the community

  • Create a logical column with more than one data source

    I'm having a problem to create a logical column with more than one data source in Siebel 7.8.
    What I want to do is the union of 2 physical tables in one logical table.
    For example, I have a "local_clients" table and a "abroad_clients" table. What I want is to have a logical table "clients" with the client data from the 2 tables.
    What I've tried is dragging the datasources I need onto the logical column.
    However this isn't working because it only retrieves the data from the first data source.

    Hi!
    I think it is not possible to do this just by dragging the columns to the logical table. A logical table can have more than one source, but I think each column must have just one direct source column.
    I'm not sure, but maybe you should do the UNION SQL to get the data of the two tables. In the physical layer, when you create a new physical table, it's possible to set the "table type" as a "SELECT". I didn't try that, but it seems that it's possible to have the union table in the physical layer.
    Bye.
    Message was edited by:
    user578388

Maybe you are looking for

  • Problem with iTunes and low quality playback on headphones

    So I have an awesome pair of Phillips headphones that are awesome and recently i've been using my headphones and noticed that during playback the audio quality was not what it used to be. Crackily on the high notes and fuzzy on the bass notes plus ov

  • Translation for SAP Query

    Hi, Is it posible to change the texts for coulmn in the report (ALV Grid) created though SAP Query (SQVI)? Ex: if the Column has Number -> it should be changed to Nummer. This will be done based on some conditions. Thanks, Prashanth

  • Safari only partially loads certain web pages. The menu bar on a page is completely missing so I can't access any of the site

    where that white bar is above the login should be a menu bar. It never loads and I cannot access a number of pages on the site. Is there anyway to correct this?

  • Safari problem on iPAD

    I set up my MY3 modem then reverted back to my home wireless network and now safari is greyed out, the backwards and forwards arrows work and I can type in and visit URLs but the are also greyed out and hyperlinks won't work? Please can you provide a

  • Solaris TCP Tuning

    If you are running Weblogic on Solaris you'll need to change some of the default TCP configuration parameters. Sun's default TCP settings are not correct for a web server. We noticed the server was stalling during certain peak periods. netstat showed