Planned orders not needed.

Dear Gurus,
             As per my client requirement.SAY BOM 1fert-1halb-1roh.If i give demand of 100for FERT.After running MRP i should get PR(100nos) for ROH alone.I should not get Planned order for FERT and HALB.I have tried via user exit.But since dependant requirements are generated from planned order of fert and halb,I am not able to get the desired output.
      Please help me in this regard.
                                                  -Guna

Hi,
Then you can create it manually htrough MD11.
Or in MD61 do the planning at ROH and then run MRP for ROH
then you will get PR for ROH alone.
Please try and come back.
Regards,
R.Brahmankar

Similar Messages

  • Planned order not getting generated for FG

    Dear Experts,
    Planned orders not getting generated for the Finished Goods - X which is having MRP Type M0 - MPS fixing type strategy group 20 which is copied fron another FG - Y , its a new product and production plan has been updated through MC88 - Rough cut planning but the planned orders are not getting generated.
    And for the material valid production version exists with selection method 3 and individullcollective as 1.
    Please let me know what might be the possibalities and what all the key fields i need to check.
    Thanks & Regards,
    Sampath
    Edited by: sampath s on Jul 13, 2011 11:31 AM

    Dear,
    In general MPS is run for High value items ( if you use like Gold , Platimum or A class items. ).
    Always only single level is used for Explosion and planning. then only you can analyse the requirements at each stage before procurement.
    Otherwise if you run MPS to multi level, Bottom most high value will be procured without any notice to authorities. Even you may cancel the process in mid way. At that time what will happen to the procured high value material.
    So for that purpose only single item single level MPS concept is evolved.
    Fo that you run MPS at single level so that only for the first level MPS will be carried out.
    Check and revert back.\
    Regards,
    Alok Tiwari

  • SNP Planned order not following resource bucket capacity/factory calendar

    Hi gurus,
    SCM 5.0
    I am running SNP heuristics for a product and expecting planned orders for it.  It has corresponding production data structure and multimixed resource.  The resource has an assignd factory calendar and SNP bucket capacity.  The bucket capactiy availablity dates of the resouce is consistent with the factory calendar workdays/holidays.  Using simple lot for lot strategy, I am expecting heuristics to schedule the planned orders on the dates of the demand in compliance with teh SNP bucket capacity availability of the resource.  APO does not schedule on holidays consistent with bucket capactiy.  This is true until...
    We have a public holiday in factory calendar that needs to become a workday. To remedy this, we put a special rule for the factory calendar and explicitly made that holiday into a workday.  The changes were synchronized with APO, and this is also reflected in the bucket capacity of the resourc: former holiday now has bucket capacity after the calendar change.  However, when running heuristics, it still does not create SNP planned order on that former holiday that has been changed into workday.  Even if it is a public holiday, there is already a special rule for the factory calendar and the resource bucket capacity reflects this correctly. But SNP heuristics seems not to follow this change.
    Any ideas on this? looks like a bug.

    Hi Edgar,
    Yes, when your resource reflects the addional capacity of the holiday turned working day, then it is expected to be considered for the SNP planned order.
    Instead of SNP heuristics, you may try to check interactively in SNP planning book, if manual order creation in the bucket works out.
    Since this is a mutlimix  resource , it can also be checked if in PPDS planned order can be created on the day.
    The above checking may not solve your problem , but will get to know if at least manully the bucket is being considered or not.
    regards
    Datta

  • Planned order not selecting BOM and Routing.

    Dear All,
    I am runing LTP, but for all simulative Planned order system is not selecting Routing and BOM.When i change it manually its selecting the correct BOM and Routing.
    Please let me know what needed ....
    Regards
    Sathish

    Dear,
    First check the OPU5 setting for routing selection ID for your pant and order type?
    Check setting of OPJM fo the selection ID linked application?
    OS32 setting for alternative selection.
    BOM is selected by the system based on the setting in MRP plant parameters(OPPQ) and in material master MRP view BOM explosion type. I. e based on the validity date, lot size. so on
    Regards,
    R.Brahmankar
    Edited by: R Brahmankar on Apr 3, 2010 11:11 AM

  • MD06  Issue - Planned orders not getting displayed

    Hello,
    Planned order with the exception "Newly created order proposal" does not get displayed in MD06 with the option "Only Unprocessed MRP Lists" in the processing indicator.
    I am running MD06 report with the following parameters:
    Plant
    MRP Controller
    Exeception Group - All exception selected except 8-Terminations
    Processing indicator - Only unprocessed MRP LIsts, Only with new exceptions
    My material which has a newly created planned order thorugh MRP run with exception "1 - Newly created order proposal" does not get displayed.
    Only when I specify Only processed MRP lists or All MRP LIst in the processing indicator, this material gets displayed. The planned order is for a Stock Transfer order to this plant (receiving plant). How is the MRP LIst processed?
    Please help me out with this issue.
    Sincerely,
    Ketan

    Hi Ketan,
    When you execute the MD06 report, you would find a column with the heading CI, if am right it would be just after the MRP cntlr, here you would find a Pencil & a tick mark. If you find them both, it means the row is unprocessed, but if you find only a tick mark it means that the row is processed.
    So now check for the planned order, it would be just a tick mark & hence would be showing only for the processed MRP list or all MRP lists.
    To process a row or unprocess, just click on the icon & it changes.
    Check & revert if it answers your query.
    Regards,
    Vivek

  • Planned orders not getting generated

    Hi friends,
    we are running material level MRP  MD02 (make to `order scenario).
    when we run MRP instead of generating planned orders, it is generating Purchase requisition . i can see purchase requisition generated instead of planned orders in MD04 screen.(we are facing problem with only one material).BOM of FERT Contains 3 HALB.all the mrp parameters have been maintained.
    thanks in advance.

    Hi
    1. Since you are telling it is MTO scenario you need to use the MD50
    2. Also in the MRP screen check the Create Purchase Reqn try the setting   "" 3     Planned orders"""
    3. As you have mentioned only for that particular material - kindly check if any scheduling margin key has been maintained. ??
    check and revert back
    Reg
    dsk

  • Planned order not getting generated at plant level

    Hi experts,
          When i run MRP for a particular plant in T- code (MD01) Planned order is not getting generated but when MRP is done against a material in T - code (MD02) in the same plant planned order gets generated... Is there any customizing  to generate planned order in plant level.....
    Regards,
    Joseph.
    Edited by: joseph5885 on Aug 12, 2010 9:23 AM

    Dear Joseph,
    No it is not recommended. only in emergance cases this will be done
    Usually in MDRE and MDAB will be scheduled before MRP run at background for inconistancies in planning file enries
    So the above said t-codes will take care of the same
    Added
    Refer this link
    [Planning file entry;
    Regards
    Madhu
    Edited by: K.Madhu Kumar on Aug 12, 2010 6:53 AM

  • Availability check - Planned order not considered

    Hi Experts,
    I am facing an issue in Make to Order scenario.
    My sale order is of quantity 10.
    when i save the sale order, i get confirmed quantity as Zero.
    But in my controls setting of availability check i have selected consider all firmed planned order.
    Now  i have a firmed planned order for this sale order.
    but still system shows confirm quantity as Zero.
    Let me know what is the correct procedure and whether planned orders are considered for availabilty check for MTO scenario or not.
    Regards,
    Birendra

    Hi Venu,
    Please find answers of your query:
    1.    First have you maintained any safety stock in mm01:
    No
    2. Tcode: Md04
    3.> Tcode : Co09
    4> If that stock related to batch Please check in MSC2N Because if batch is restricted you cant get stock
    Not related to batch
    5.> schedule lines
    Let me know if any more information required.
    Regards,
    Birendra

  • VA02: Production order/ plan order not processed when credit limit exceeds

    Hi,
    In VA02, when I try to process a Production order/ plan order from sales document , i get an information message saying that  ' Subsequent function not possible due to credit block.'  It is going into the incomplete logs. But as per my client's requirement, the order should be processed even if the credit limit exceeds though the message pops up. the message number is V1849. Can you please tell me how to do that?
    Regards,
    Lohitha

    hello.
    stop the credit check for particular order type.
    VOV8-order typeCheck credit limit--choose option
       No credit limit check
    A  Run simple credit limit check and warning message
    B  Rund simple redit limit check and error message
    C  Run simple credit limit check and delivery block
    D  Credit management: Automatic credit control
    for particular item category
    choose item category : uncheck credit check active check box
    for particular condition
    OVA8----assign routine for that..
    write coding
    let me know anything requires
    regards,
    Rushikesh

  • Production and planned order not scheduling

    Dear Experts,
    Created new plant ,scheduling parameters,order type parameters ,confirmation parameters.
    Scheduling parameters: Detailed Scheduling ,Forward etc.
    created BOM, Routing,WC.
    Maintained Work center Scheduling Tab formulas entered,Routing Machine,setup time entered.
    System showing at the of creating production order Scheduling Start time and end time is same.
    scheduling not done in production order.
    Anyone explain process for scheduling
    Regards,
    Naresh Reddy.

    Hi Naresh,
               The problem is mainly due to the work center scheduling formulas only. Maintain the scheduling formulas as SAP001 for setup and SAP002 for machine. In OPU3 check the automatic scheduling check box, adjust dates as 'adjust basic dates , adjust basic requirements to operation date' and recreate the production order.
    Let me know if u are still facing the same problem after doing these settings.
    Regards,
    Krishna Chandra

  • Open Planned Order Quantity

    Hi Experts,
    for a particluar material I need the Open quantity of Planned orders for displaying in a custom report.
    Please suggest from which table or by logic can i fetch this quantity .
    Note: Not from any std report - i need table lable detail

    Hi
    Will this give the Open quantity of the Planned Order ( not converted ) ???
    in PLAF table only existing plan orders info will be there
    no productions orders
    Regards
    kumar

  • Mapping issue in planned Order

    Hi Experts,
    I am working on a planned order interface(File -> RFC -> File). There is a mapping provided like below in the request,
    In the request mapping, i am mapping the source structure to the BAPI request. based on the creation/change/cancel request from the source structure for planned order, i need to populate the corresponding target structure in BAPI Request.
    i need to do the mapping based on the creation/change/cancel like below,
    Source Field                            Target Field
    action(add,change,cancel)         Add strcuture
       Work Id----
    >EXTAUFNR(0..1)
                                                           Field(0..1)
      SupplierProductCode----
    >Value(0..1)
      Quantity----
    > "
      PlannedStartDate----
    > "
      PlannedEnddate----
    >"
                                                       Change structure
                                                                                    Cancel structure
    The above structure is given for 'add' planned order.
    based on the source, target 'field' need to map as constant as below at runtime,
    for 'value'  in target 'SupplierProductCode' the 'Field' need to given as 'MATNR'
    for 'value' in target 'Quantity' the 'Field' need to be given as 'BDMNG'
    for 'value' in target 'PlannedStartDate' the 'Field' need to be given as GSTRP'
    for 'value' in target 'PlannedEnddate' the 'Field' need to be given as 'GLTRP'
    Kindly help me to get the values to 'value' and insert manually to the 'field' at runtime.
    Regards,
    Maha.

    Hi,
    Please check below link it may helps you
    Re: Why the basic finish date is not adjusted in planned orders
    Regards,
    Ram

  • Planned Order convert to PR

    Hi
    When I do conversion of planned order to PR, the defaulted PR type is NB, but I would like to change it to ZNB (customised), now I need to change it manually during the PR screen, how can I defaulted the PR type to ZNB. I look at the IMG, in the planned order conversion to PR, the NB there is for planned order not for PR, I cannot find the relationship of the planned order type to PR type..look at PR IMG, cannot find anything as well..
    anyone done this before please share, this should be something common as of many company do change the standard PR type of NB to ZNB..
    thanks
    dannnysao

    Hi,
    The system determines the document type from the stettings u are making in "planned order Profile" in Customising for MRP. There u define the order type, the procurement key and the special procurement key and also the account assignment category. So based on the procurement key and the special procurement key maintained in the Marterial master, the document type is selected.
    Production > Materials Requirement Planning > Procurement Proposals > Planned Order > Define order profile
    Choose the planned order type - NB1 Within this you specify the P req doc type to be used.
    Through MRP group and the different PR document type for MRP generated PR is possible only if you assign the document type to MRP group in the MRP configuration.
    You need to perform some modifications in  as per OSS Note : 46919 .
    Please try and come back.
    Regards,
    R.Brahmankar

  • Scrap qty in planned order in COOISPI

    Hi
    When using COOISPI for planned orders the result does not show the field SCRAP.
    The field SCRAP can be choosen in the result screen, but for planned orders it is alway zero (0).
    When running COOISPI for process orders the scrap field is filled correctly.
    Field in Planned order: PLAF-AVMNG
    thanks
    Vijay

    Hi vijay.anukonti,
    to see the quantity SCRAP in the COOIPI for planned order you need to set this value in the planned order (view Hdr - field Scrap Quantity). Otherwise it will came with no value.
    Make sure you check the type of planned order and if it allows to have this info (for example type LA Stock Order).
    Regards,
    Felipe Tavares

  • Combined Planned order

    Hi gurus,
    i am working for steel industry, i am using MILL_OC functionlaity.
    i want to combine 10-12 planned orders into single planned order ( not production order) and that planned order should be get
    converted into one single prod order.so that at the time of GRN, only one prod order will be there.
    ( coz in MILL_OC  system converts all planned order into different prod orders)
    is this possible to do this??
    thanks & regards
    sandeep

    Dear,
    Yes you can do this in MILL_OC,
    First, you need to select the original orders planned order we want to combine.  We need to define one of the selected orders as a reference order. As soon as we have selected the orders, a newplanned order is created using the master data of the reference order. This new order is the combined order. In order to create the original orders as items in the combined order.
    Please refer this link,
    [Combination order|https://www.sdn.sap.com/irj/scn/weblogs?blog=/cs/junior/view/wlg/15188]
    Regards,
    R.Brahmankar

Maybe you are looking for

  • Multiple iPhones to a single iTunes Account - doable?

    Hi all, heres one - Is it possible to have 2 iphones authorised to 2 personal machines (windows) AND my mac which has all my centralised iTunes music? Currently, my music collection is dottted around various machines and drives. I am in the process o

  • Windows 2003 Server Fax and Scan to WIndows 8.1

    I have a server with Windows Server 2003 on. We have computers running WIndows 2007 and Windows Fax and Server. All was great, could see the faxes inbox on the computer etc. Now I have a machine with 8.1 Pro and connected great to the Windows Server,

  • Apple TV starts, and then TV loses HDMI signal

    I moved my ATV 2 from a newer 1080 HDTV to an older 720 tv, and now the ATV starts and displays apple logo and after 30-45 secs I get a message on the tv that the hdmi signal is not detected. I suspect that the ATV is sending a 1080 signal that the t

  • I want to change my open item management is it possible?

    Hi I already posted some documents last 2 months... suddenly i want change my openitem management...is it possible after posting the documents... how to i change the status of openitem management... Thank you. Ashok kumar Email: [email protected]

  • I've been getting a error message stating that I can't download any apps to my ipad 3 ?

    I recently went to update my Kindle app to the newest version, my ipad has been running great until now. After I went to install the latest version I noticed that I received an error message stating that I couldn't install at this time. I have tryed