Hi PP Guru
Can I change value in field "MRP controller" when i manual create planned order, MD11 ?
MRP controller is copied from the material master when the material number is checked, but can i change it to another ?
In Prod.Order field "MRP Controller" is editable
In Purch.Req. field "MRP Controller" is editable
In Planned Order field "MRP Controller" is NOT editable.
Thanks.

Hi,
It depends upon your authorisation profile. Normally MRP run, Planned order creation authorisation is given for the MRP controller only. Because MRP controller is the person responsible to plan that particular material. So with out his knowledge you cannot create the planned order.
Regards,
V. Suresh

Similar Messages

  • Changing MRP controller for planned order

    Hello experts,
    Is there any way the planner could change the MRP controller of a planned order within MD12 ? We are using ver 4.7 and this field is not enabled. Currently the planners are creating prod orders much in advance and are looking to move to a process where they firm planned order. We are using project stock planning structure so more that one planner may create orders for the same material. So when one planner review the material planning for one project he would firm the planned order and assign it to him for leater conversion.
    Note: I the config I didn't saw any field selection control for planned orders.
    Thank you in advance for sharing your wisdom.
    Francois Paquet BPA
    aeronautive industrie

    Francois,
    Very interesting question. However I never had to change those fields in either planned or prodcution orders.
    Both orders master data fileds are disabled.
    However since your are working with project orders ( or netwrok orders ) system would be giving you specific planner order hard tied to the project order ( similar to Made to order scenario).
    Planner could use MD51 ( project planning ) & MD4C ( option for Netwrok or WBS element ) for monitoring progress of his /her order.
    This way planners do not have to go by MRP controller data.
    Hope this provides some new thoughts.
    Thanks,
    Ram

  • Change MRP Controller Description

    Hi,
    We have maintained Same MRP Controller with Description for all 100 Plants.
    Now we want to change Description of these MRP Controller for all 100 Plants.
    Is there any way to change in One go or we need to manually change one by one?
    Thanks & Regards
    ND

    Hi Nitin Desai,     
    Well there is a way:
    GO TO OMD0 t-code select all the plants and then on the top of the screen you can see SELECTION click it select BY CONTENTS then select MRP CONTROLLER NAME OR MRP CONTROLLER.
    Then a pop window will appear give the data then bottom press CHOOSE then you can do it easily OK.
    I hope it helps you.
    Regards,
    Madhu.G

  • Change MRP Controller - MLFH

    Hello Experts,
    I want to change the mrp controller for recieving mail through output type MLFH  . .. current mrp controller is no longer with company so can anyone guide me the step by step process
    Will award full points
    Thank You
    Justin

    Hi
    for changing the MRP in MLHF go to T-Code NACE then select Application MEthen presscondition record on top. a pop up opens in that select your out out type double click on MLHF. it will ask for missing parts then Give X and execute it will open up a new screen then you can change your existing MRP controller to your new MRP controller.
    by doing this you will be able to send mails for missing parts to your new MRP controller.
    hope i made it clear
    Edited by: vikrama sharma on Dec 21, 2007 1:02 AM

  • MRP Controller changes in Planned order

    Hi Gurus,
    If anyway possible to change MRP controller in Planned order. I tried to change in MD12 but it's shows only display mode. Any answer?
    Thanks,
    B.Deethya

    Dear,
    I do not think so you can change the MRP controller any where other than material master and source list .Please check this threads which has approched similar kind of alternative solution :
    /thread/1611534 [original link is broken]
    Revert back for more information.
    Regards,
    Alok Tiwari

  • Mass update for production and planned order MRP controller

    Hi Gurus,
    It's anyway possible to mass update MRP controller for Production orders and  Planned orders. If any please provide me step by step process.
    Thanks,
    B.Deethya.

    I feel You have changed the MRP controller in Material master and want to incorporate same in production order & plan order.
    For Planned order Run MRP with delete and recreate mode, system will create a new plan order with MRP controller in Material master
    For production order, Mass change is not possible, create a simple BDC or LSMW, And change the MRP controller

  • MApping of MRP Controller in SCM

    Hi Friends,
       I am a bit unsure of integration of MRP Controller between ECC and APO.
    My understanding is that the MRP Controller field in automatically populated into the SNP or any other Planner field in APO when the material is integrated. We need the user exit EXIT_/SAPAPO/SAPLCIF_PROD_001 to populate the value into the Extras field .
    Is my understanding correct ? or do we need the user exit to populate the MRP controller into APO ?
    Thanks in advance for your replies !
    Regards,
    Ranjini.

    Hi Ranjini.
    There is something else you need to be careful of here.
    In ECC, MRP Controllers are configured at the plant level, whereas in APO planners are configured globally.
    This can lead to the situation where you are trying to map many to one.
    For example, MRP Controller '001' in Plant X = Traded Goods but MRP Controller '001' in Plant Y = Manufactured Goods. You would only be able to create 1 '001' planner in APO.
    This would mean that you have to create an APO planner for each MRP Controller/Location combination, meaning you couldn't use the same numbering convention as the MRP Controllers.
    Hope this helps.
    M

  • How can i display the MRP controller in transfer order print?

    Dear all:
       When i print the transfer order(Tcode: LT31) ,i want to display the MRP controller in the output form.
    How can i get that ?
    I found the user exit MWMD0001 and add the code in the include like this:
       select  single dispo from marc
         where matnr = ltap-matnr
               and werks = ltap-werks.
         zdispo = marc-dispo.
    But caz the "zdispo"  could not been brought to the "print form " of the report RLVSDR40 which control the print LT31.So ,i failed.
    Anyone advice?

    The problem is as zdispo is declared in your user exit it doesn't become available. Had it been declared variable in the include of the program for LT31 you would be able to use it directly in the script.
    Try doing this instead in your layout set.
    /: PERFORM MRP_CONTROLLER IN PROGRAM ZABCXYZ
    /: USING &LTAP-MATNR&
    /: USING &LTAP-WERKS&
    /: CHANGING &ZDISPO&
    /: ENDPERFORM
    in your program ZABCXYZ.
    FORM MRP_CONTROLLER tables in_par structure itcsy
                               out_par structure itcsy.
    tables: marc.
    data: matnr like marc-matnr.
    data: werks like marc-werks.
    READ TABLE IN_PAR WITH KEY ‘LTAP-MATNR’.
    CHECK SY-SUBRC = 0.
    MATNR = IN_PAR-VALUE.
    READ TABLE IN_PAR WITH KEY ‘LTAP-WERKS’.
    CHECK SY-SUBRC = 0.
    WERKS = IN_PAR-VALUE.
    select single dispo from marc
    where matnr = ltap-matnr
    and werks = ltap-werks.
    IF SY-SUBRC = 0.
    READ TABLE OUT_PAR WITH KEY ‘ZDISPO’.
    CHECK SY-SUBRC = 0.
    OUT_PAR-VALUE = MARC-DISPO.
    ELSE.
    CLEAR OUT_PAR-VALUE.
    ENDIF.
    MODIFY OUT_PAR INDEX SY-TABIX.
    ENDFORM.
    This should work.

  • MRP controller to APO product planner

    Hi,
    I want to use product planner as MRP controller to run PP heuristics.
    What I have done is as follows:
    1. I create planner in APO: Advanced Planning & Optimization->Supply Chain Planning->Specify Person Responsible(Planner)
    2. In ECC, I use exit CIFMAT01 to change CT_CIF_MATLOC-PLANNR_PPS according to IT_MARC-DISPO.
    But after CFM2, the product planner in /SAPAPO/MAT1 is still null.
    Is there anything wrong?
    Best Regards
    Rui

    Rui, This is what we did to accomplish this:
    In the R/3 User exit include ZXCIFUSERU08,
      Loop at IT_MATLOC where METHOD = ‘N’ (For each new product location),
      Read IT_MARC with key Material, Plant.
      If not IT_MARC-DISPO IS INITIAL.
      Set IT_MATLOC-PLANNR_PPS = IT_MARC-DISPO
    (Copy MRP Controller on to APO Production Planner)
      Update the change table (IT_MATLOCX)
      Endloop.

  • Change Mrp Element Data of Production Order in MD04

    Dear guru ,
    In the mrp element data of the stock/requirement list for the production order I see the
    Production order number , the order type , and the system add /RE if production order is released or
    /PD if production  order is partial delivered. No other information about others production order status.
    How can I change mrp element data using Customizing or ABAP in order to recognize in MD04 if production order is confirmed or partial confirmed ?
    Thanks.

    Dear Cris ,
    I am not sure if CNF/PCNF will show up in the MRP Element data in MD04.I have checked PO which are also CNF/PCNF and i looked the same order in md04.It is not showing .U may need some ABAP help .
    But if you really intersted to see the list PO status together , then go to COOIS and give plant , order type .It will give you all the order under that plant irrespective of material and also Status.U ave lot of option to filter the PO status under Status Profile or System status ok.
    Hope this will fullfill your requirement
    Reward point if useful
    Regars
    Jia

  • Creating Planned orders and Requisitions for a particular MRP controller and for all the others only Requisition is to be created.

    Hi Experts,
    Currently we run Program 'RMMRP000' as a batch job to create Planned orders and requisitions.
    The client wants that Planned orders and Requisitions should be created for a particular MRP controller and for all the others only Requisition is to be created.
    I implemented Exit 'EXIT_SAPMM61X_001' in the following manner by passing MRP controller to user_key.
      IF mt61d-dispo <> user_key.
        no_planning = 'X'.
      ENDIF.
    But as you can see that this will not meet my client requirement.
    If any of you has worked on similar requirement / if any one knows that this is achievable or not,
    please share your inputs.

    Moved from SAP ERP Sales and Distribution (SAP SD) to ABAP Development
    G. Lakshmipathi

  • MC.9 report is showing -ve value when MRP controller selected

    Hi Expert,
    I'm confuse about the -ve value in MC.9. If i run by using Plant as the selection parameter for month 02.2010, then sorted by valuatted stock value(ascending), it will not show me the -ve value for all materials. But if i run the report by using Plant and MRP controller as the selection parameters,then sorted by valuated stock value(ascending), it shows me the -ve value. why?
    Please explain.
    Thanks

    hi jurgen,
    i still not clear. I try to run the report for material A and mrp controller  001. I got the -ve value. But when i run the material without mrp controller, it shows 0. no -ve value. i check in MM03,changes history for the material. MRP controller has been changed few times but the latest is 160. What am i confusing is, what is the relation between MRP controller with the report? What is the function of the report actually? Isn't it suppose to give the same data either i put the MRP controller or not when running the report?
    Thanks

  • Creation of purchase order in MRP

    Hi All,
    Is it possible to create purchase order as an output of MRP? If yes, then how?
    regards,
    Mohit

    Hi Mohit,
    SAP has not provided such facility of directly creating the Purchase Order in MRP run, intentionally, so as to
    1. Provide an Authorization Level over the P.O. creation
    2. Provide a chance to change the Planned order or Purchase requizition before PO creation
    3. As this is a procurement proposal that is directly linked with the vendor, quantity and Price, it has to   be created very carefully.
    I hope you got it.
    with regards,
    gnk

  • Restrict transfer of requirments from Sales Order to MRP.

    Hi Friends,
    I have a requirement where in I have to stop/restrict transfer of requirements from Sales order line item to MRP.
    Generally, If the material in Sales order is for Internal production then the Planned order it triggered in MRP and If the material is Externally Procured then a Purchase Req is triggered in MRP. The MRP run is carried out using Transaction code - MD03
    Is there any technical enhancement where I can restrict the transfer of requirements to MRP from Sales order.
    I know I can control it functionally by changing the schedule line category, But We need a technical development to do this as the user would not every time go to Sales order change and then change the schedule line Category.
    Please Advise.
    Thanks & Regards
    Nayan Shah

    Hi Nayan,
    Please try user exits EXIT_SAPLMDR2_001/2/3 if it helps.
    Regards,
    Gaurav

  • Mail to MRP controller

    How I configure mail to MRP controller for the missing part list in the time of creating production order without work flow
    Regards
    Amitava

    Hi
    In CO01 > Click on Go to > Missing Parts > Missing Part list
    In Nxt Page Click on List > Send to > Mail recipient
    In the Recipient tab enter SAP user id of MRP Controller and Recipient type SAP Log on name and click on Send icon at Top left.
    SAP Mail will go to MRP Controller SAP Work place in box.
    Regards
    Brahmaji

Maybe you are looking for

  • DB need too many locks in single threaded application

    Hello, I`m new to BDB, and search for help of gurus. I try to create database importing data from csv files. Import procedure is already written and works fine, but sometimes it starts to need too many locks. Import process read csv file line by line

  • CFSEARCH Error

    Hey all, I am using cfindex and cfsearch to build a simple database searching tool. Most of the time it works, but more often than I'd like my search method fails stating "There was a problem executing the cfSearch tag with the following collections.

  • Whats the status of Two Step Verification in Canada?

    Has anyone heard what the status of Two Step Verification is in Canada. I have not been able to set it up since it was (supposedly) set up a few months ago. Thanks for your time.

  • Active vs. Passive FTP?

    Can someone explain in lay terms the difference?

  • TS3989 Unable to enable my photo stream on my pc win 7

    I installed the new iCloud Control Panel for Windows and signed in, but when I go to Photo Stream I see a message that says I'm not signed in. I have followed the steps to enable Photo Stream but I still get the message that I am not signed on. If I