PLANNING BOOK SNP

DEAR ALL,
I AM NEW TO SAP APO.
HOW TO CREATE COPY OF SNP STANDARD PLANNING BOOKS ( WITH REFERANCE TO SNP94(1) AND SNP94(2).
WHEN I "CREATE" MY OWN PLANNING BOOKS WITH REF TO SNP94(1) and
SNP94(2).IT IS NOT COPIED SAME AS "9ASNP94" WITH REFERANCE TO SNP94(1) AND SNP94(2).IN THIS CASE MACROBUILDER IS NOT SHOWING MACROS IN
MACRO DEPOT SAME AS STANDARD "9ASNP94" WITH REFARANCE TO DATA VIEW SNP94(1 ) AND SNP94 (2).
YOU ONLY CAN COPY 9ASNP94 WITH REF SNP94(1) AND SNP94(2) TO YOUR
OWN CREATED PLANNING BOOK.THAN ONLY MACROBUILDER WILL SHOW ALL MACROS IN MACRO DEPOT BUT HOW TO COPY IT.
PLS HELP ME TO SOLVE THIS PROBLEM.I AM ON APO VERSION 3.1
MANT THANKS IN ADVANCED
BEST REGARDS,
VISHWESH RAJGURU

Creation of Planning Book with Reference to Standard Data View:
Path: Administration of Demand Planning and Supply Network Planning --> Supply Network Planning -->Environment --> Current Settings  --> Define Planning Book
Step1: Create Planning book "PB_XYZ" Data View "DV_XYZ" by copying with reference to standard book 9ASNP94, Data view SNP94(1). this also copies all macros but leaves them inactive.
Step2: Specify newly created planning book and press Edit button.
Step3: Select "Planning Book" tab and rename Planning Book Description (if reqd)
Step4: Change TB Profile ID if want to display result in ur time stream.
Step5: Select "Data View" tab rename as per ur naming convention.
Step6: Proceed to last tab and Press Complete; confirm the save query.
Activate Macros
Path: Administration of Demand Planning and Supply Network Planning --> Supply Network Planning -->Environment --> Current Settings  --> Macro Work bench
Step1: select ur planning book with data view under SNP APO application. Double click on it.
Step2: Press Generate Macro Push Button.
Step3: Exit the Transaction

Similar Messages

  • Key figure Explaination in SNP planning books 9ASNP94

    Dear Experts ,
    I am curious to know regarding SNP planning books key figures
    when i am exploring sap standard  Planning book
    9ASNP94
    Data view : SNP94(1)
    I can able to see many KEY FIGURES  Please refer below
    I AM NOT SURE how they are used in planning , i mean  what is clear definition of those key figures and i see some key figures are grey out and some or open for entry
    how to find those detail information
    when i go  to T code SDP84 - define planning book
    i can able to see those descrption and infocubes but not sure how to understand clearly , would be more thankful if some give me a clear explaination of it
    Forecast     TXT                                                                                                                   
    Sales Order     TXT                                                                                                                   
    Distribution Demand (Planned)     TXT                                                                                                                   
    Distribution Demand (Confirmed)     TXT                                                                                                                   
    DistrDemand (TLB-Confirmed)     TXT                                                                                                                   
    Dependent Demand     TXT                                                                                                                   
    Total Demand     TXT                                                                                                                   
    Distribution Receipt (Planned)     TXT                                                                                                                   
    Distribution Receipt (Confirmed)     TXT                                                                                                                   
    Distribution Receipt (TLB-Confirmed)     TXT                                                                                                                   
    In Transit     TXT                                                                                                                   
    Production (Planned)     TXT                                                                                                                   
    Production (Confirmed)     TXT                                                                                                                   
    Manufacture of Co-Products     TXT                                                                                                                   
    Total Receipts     TXT                                                                                                                   
    Stock on Hand     TXT                                                                                                                   
    Supply Shortage     TXT                                                                                                                   
    Safety Stock     TXT                                                                                                                   
    Reorder Point     TXT                                                                                                                   
    Target Days´ Supply     D                                                                                                                   
    Target Stock Level     TXT                                                                                                                   
    Days´ Supply     D                                                                                                                   
    ATD Receipts     TXT                                                                                                                   
    ATD Issues     TXT                                                                                                    
    Many thanks & Regards
    Raj

    Hi
    Please find below the short summary of each key figures.
    Forecast TXT  :- FCST which has been released from APO DP to APO SNP
    Sales Order TXT :- Sales order transferred from ECC to APO via CIF.
    Distribution Demand (Planned) TXT :- Dependent demand coming from other location to this location for same product. Network planning
    Distribution Demand (Confirmed) TXT :- In case deployment , we confirm the Distribution Demand (Planned) will appear her.
    DistrDemand (TLB-Confirmed) TXT :- Mainly used in case of TLB.
    Dependent Demand TXT :- Dependent demand coming from parent product in case of BOM
    Total Demand TXT :- The sum of all above demands is called as Total Demand.
    Distribution Receipt (Planned) TXT :- SNP created Purchase req will appear in this key figure.
    Distribution Receipt (Confirmed) TXT :- In case of deployment Distribution Receipt (Planned) will be get confirmed in the Distribution Receipt (Confirmed) key figure.
    Distribution Receipt (TLB-Confirmed) TXT :- Mainly used in case of TLB.
    In Transit TXT :- In will contain the in transit stock which will transfer for ECC via CIF.
    Production (Planned) TXT :- Planned order will get created via SNP in case of domestic mfg.
    Production (Confirmed) TXT :- In case of SNP deployment Production (Planned) will be get confirmed in the Production (Confirmed)) key figure.
    Total Receipts TXT  :- Total of all the receipt elements as been used.
    Stock on Hand TXT :- Stock has transferred from ECC or R3 via CIF.
    Supply Shortage TXT :- This will be calculated with macro based on total demand and total receipt.
    Safety Stock TXT :- Based on SNP master data, safety stock will get calculated during planning run.
    Reorder Point TXT :- Based on SNP master data, Reorder Point will get calculated during planning run. . There are different methods of calculating safety stock.
    Target Days´ Supply D :- The safety stock defined in number of days appears based on SNP master data in APO.
    Target Stock Level TXT :- Get calculated by macro  based on Target Days´ Supply D and total demand in future.
    ATD Receipts TXT :- Mainly used for Deployment.
    ATD Issues TXT :- Mainly used for Deployment
    If you require any specific information for any key figure please do let me know.
    I hope this will be useful for you.
    Thanks
    Amol

  • Meaning of CONDET key figure in standard 9ASNP94 APO SNP planning book

    I am trying to clarify the use and meaning of the CONDET (capacity consumption details) key figure in the SAP standard SNP planning book 9ASNP94.
    Any advice appreciated...

    Hi  Frank,
    This indeed is practical requirement wih no simple solution ( at least we  did not find).
    We created a background job for deletion of the stocks ( which were updated through IDOCs like your situation) at specific periodicity. The jobs were made as per planners with specific variants and when planner would like to delete the stocks, the job will be run.
    Another option could to be copy the standard program /SAPAPO/RLCDELETE to a module program and check validation at the input screen, before calling the deletion program.
    Regards
    Datta

  • SNP - Planning Book/Data View not showing up in /SAPAPO/SNP94

    Hi All:
    I created a planning Book out of a custom SNP planning area. While I could see the Planning Book in the list of Planning Book in the /SAPAPO/SDP94 - Interactive Supply Network Planning (all Books)   I could not see the custom planning book in /SAPAPO/SDP94 - Interactive Supply Network Planning (all Books) .  I could ony see the SAP supplied PB there.  Will SDP94 transaction display only the standard SNP Planning book?  How can I make sure that the custom PB is displaed in /SAPAPO/SDP94?
    pl. help
    Thanks
    Ryan

    Hi Narayanan,
    a couple of simple checks..
    can you please check that you have not set a filter critera in the shuffler in planning book/data view?
    you can also check if by mistake only a limited number of users are assigned to this planning book and data view ?
    else you may want to check note : , 327371
    Let me if this helps.
    Rgds, Sandeep

  • How to create a custom Button in a SNP planning book

    Hi Experts,
    I created my own Planning Book and Dataview in SNP with 3 Key Figures: KF1, KF2, KF3. Now I want to create one my own button with Macro so that when I press that button, the Macro will run to calculate: KF3 = KF1 + KF2.
    I know that I can drag this Macro to one of default events like: Default, Level Change, Start. But actually, I want to create my own button so that I can handle the event as I want.
    My question are:
    1. How to create a custom button on the toolbar of SNP Planning book and writing macro for the button?
    2. Please give me any document, material teaching about writing macro and relating to my above scenario.
    Thanks very much!
    Duyennx
    Edited by: xuanduyen on Sep 6, 2011 9:20 AM

    Hi,
    Access the transaction "/n/sapapo/advm". In the list select your planning book/ data view and click 'Start Macro Builder' button.
    In the Macro builder screen, drag and drop your macro from Macro depot to the work area.
    Right click on your macro name and select 'properties'. In the pop up, next to the Assigned Push button field, there is a button 'Choose'. Click that. It will display all the available icons. In standard system, it displays more than 1000 icon. Choose any one icon which is suitable for your macro function. Close the pop up and save the macro. This will assign a push button to your macro.
    In the Planning book tool bar, you can see the selected icon in the header tool bar. Just by clicking that icon, you can execute the macro interactively.
    And I don't know whether we can include/design our own icon. But there are already 1000+ standard icons to choose.
    Regards,
    Manimaran M.

  • How can you block production for a specific product in SNP planning book

    Hi All,
    Looking for a way to manually indicate a decision to prevent production in a specific cell for a product in the SNP planning book utilizing the supply planning and capacity leveling heuristics.  For this requirement the resource would have available capacity during that time period.  It also could plan other products in that time period.  The requirement is for a planner to manually go into the planning book to somehow indicate that the heuristic should not consider that time period as available for a specific product, while still leaving the resource available for other products.
    Has anyone run into this before?  Any experience on how to stop a heurisitc from considering a specific time bucket  for a specific product as available for orders?
    Thanks
    -Mike

    Hello Mike,
    I haven't tried it yet myself but I kow that there is the option in the Planning Book to manually fix several periods for a specific location product. This will prevent the heuristic from planning these periods for the specified product. For details please have a look in the Online Help for SNP under key word "Order Fixing".
    regards
    Christian

  • Show Sales orders, STOs, & Deliveires in SNP planning book by Shipping Poin

    We are using ECC 6.0 and SCM 7.0.
    We have a requirement to model the Shipping point as a location in SNP. By this functionality we want to show Sales orders, STOs, & Deliveires in SNP planning book by Shipping Point in addition to Delivering Plant which is default now.
    When I create Sales Orders in ECC system always perform shipping point determination and passon to APO per schedule line via CIF. These Sales Orders always show up in SNP under delivering plant/location. We also want to show them under Shipping Point location.
    Here is what I have done so far:
    1. I have created a CIF integration model for all required shipping points and CIFed over to APO. These locations are showing up in SNP planning book.
    2. I have created Sales Orders and verified the shipping points are determined correctly and sent Sales Orders to APO successfully.
    3. I see all the Sales Orders in SNP planning book at delivering plant/location.
    4. But I don't see any sales orders under shipping point. They also don't show in RRP3 screen.
    5. If I create a forecast in RRP3 at Shipping Point location they show-up in SNP planning book at Shipping point location.
    Any idea how to model shipping points in SNP for planning?

    check what the ATP order type is of these orders are (from RRP3)
    then check what ATP group these order types are assigned to (from SPRO)
    then in the SNP Planning are make sure the Keyfigure you want to see them in refers to the ATP group from above
    Which planning book are you using? Is it a standard book/ copy of a standard book? What KF are you expecting to see it under... the standard book has KF for planned production that will be same as your PPDS planned orders

  • Demand on VC material not visible in SNP planning book

    Hi Experts,
    Is there any way to plan VC (Variant Configuration ) materials in SNP at the group level ?
    I will explain the scenario more in details below
    I have an VC material say X. Material X has end product Y attached to it (material variant). When material X is cifed to APO, it appears as configurable product in APO & is a top level product. Now when I create a demand on material X through DP, the demand appears in product view (RRP3). However the demand does not appear in the SNP planning book nor it gets selected during background planning run. The system is configured as Variant Configuration & not CDP.
    Is it possible to plan material X in SNP ? If possible how can the demand be read in SNP ?
    Thanks in advance
    Regards
    Sandeep

    Hi Sandeep,
    One of the limitations of Characteristics Based Forecasting is, CBF results can only be used in PPDS and not in SNP, hence it is not possible to plan that material X in SNP. Even though you use MC90 transaction which is release DP to SNP, but the data will not be available in SNP
    That material X will be planned only in PPDS, there are two ways to plan, those are
    1. one way is by releasing CBF results to active version using MC90 transaction, during this release, you should maintain consumption group in release settings and in product master, in this case you have to use Forecast Check/Allocation check as a part of ATP/GATP, here you can not use CTP or MATP
    2.the other way is by releasing CBF results to inactive version using MC90 transaction, during this release you should not define consumption groups,  generate the dependent requirements in inactive verison using heuristics in PPDS , and convert dependent requirements from inactive version to Forecast - active version using /SAPAPO/DMP2 transaction, in this case you can use MATP/CTP as a part of GATP
    -Deepak

  • Process orders not reflecting in SNP planning book

    Hi,
    I am facing a problem here that the SNP planned orders once converted into process orders in ECC are not reflecting in the SNP planning book.
    However if i check the /sapapo/rrp3 product view, the process orders are visible here.
    Kindly help me understand if i am missing out something here.
    Thanks,
    Nalin

    Hi,
    Please Check whether the ATP category is assigned to the Category group which is assigned to KF in the planning.
    If that is assigned rightly then run TS cons check.
    Regards,
    Kishore Reddy.

  • How to manually enter forcast/demand in SNP Planning Book

    Hi experts,
    Kindly help me there are two questions on my mind. First
    1. How to create manually forecast in SNP planning book? and also in RRP3? (if the product is in house it automatically creates planned order, if externally procured PREQ but how about forecast using product view?
    2. If the forecast is in the past but I want to upload that in the SNP Planning book?
    Even if I change the period structure date it does not reflect the past dates in the planning book.  Since the planning book of SNP is standard how am I be able to change the planning book time bucket start date.
    Thanks and Best Regards!!!!

    Hi,
    in /SAPAPO/SJKTST04 you set the type of order FCST, then you planning area and version, keyfigure to populate (your forecast keyfigure, probably 9ADFCST), the order type (usually FA)
    In the details you set product, date to start, in horizon - the number of orders to create, if you set 10, you'll get 10 orders starting from your start date).
    Unfortunately through here, you gan create orders with fixed quantity only and also for only one product/location combination.
    If you already have DP available, even for testing I find it more easy to release forecast from there.
    For your second question - at least for 4.1 (I don't have a 5.0 system to check) you cannot have past dates in a column other than "Initial"
    Hope that helps,
    br,
    Mikhail

  • User are getting kicked out of SNP planning book

    Hello Experts
    I hope you can help me out here!
    From time to time we are experiencing strange issue for SNP user's .. User are getting kicked out from SNP planning book
    Please help us.
    Thanks
    Ramesh

    Hi Ramesh,
    As far as I know, users should not get kicked out unless someone terminates their session.
    Even if they lock some data and the same data is needed by some job, it's the job that would fail showing data lock. Similarly, if some other uses tries to access the locked data, the user who is accessing later would face the issue of not being able to go to edit mode.
    It's possible to write programs that could specifically do this work of kicking out users before we run batch jobs, but let me assume that this is not the case with you.
    One possibility is that there is issue in livecache and so users are not able to access livecache or get kicked out from their active session (e.g. your log area gets full, then users would soon get kicked out after seeing the system hanging initially). This you would need to check at the time when users face issue. This would also mean that other processes that need livecache should also fail e.g. GATP, or SNP planning or PPDS planning related jobs would fail at the same time.
    If you could share exactly what error message the users are seeing, that could be helpful in resolving the issue.
    Thanks - Pawan

  • Whether can we enhance screen of planning book/dataview in snp?

    Dear SAP Expert,
    we wonder whether can we enhance screen of planning book/dataview in snp?
    please tell us.
    thanks so much

    Hello, what kind of enhancement do you want?
    You cannot make changes to standard SNP planning area or planning books/data views, but you can create your own ones by copying the standard ones, and make changes to your own created SNP planning area or planning books/data views, like adding new key figures, change key figure settings or modifying macros ...

  • APO-SNP Planning book BAPI_PBSRVAPS_CHANGEKEYFIGVAL2

    Hello experts,
    In the BAPI "BAPI_PBSRVAPS_CHANGEKEYFIGVAL" for locking and unlocking the planning area there is an error message "Locking planning area for planning book & has failed" .
    This is urgent ,can anybody please help me out why this error message appears.
    Thanks in advance.
    Sandhya

    Hi Srinivas,
    Thank you very much for reply
    This error is getting in APO SNP. In the BAPI
    The FM /sapapo/ts_dm_lock  is calling FM Enque_report and if this function module is filling the table "enq" then the locking is failing .
    Can you please tell me what this table contains.is this table is filling with the both the users who are trying to edit the keyfigure values.
    Thanks and Regards,
    Sandhya

  • Production during resource downtime in SNP Distribution Planning Book

    Hi Guys,
    We are in SCM7.0. Have got PPDS along with SNP and DP. SNP Planned orders are converted to Production orders and are capacity planned in the PPDS planning board.
    When a production order gets its partial confirmation in ECC then the Production (Confirmed) KeyFigure in the SNP Distribution planning book doesnot considers the resource downtimes / weekends. This results in receipts during downtime/weekends in day bucket in the SNP planning book.
    Before partial confirmation, the scheduled production orders (in PPDS) is reflected correctly in the day bucket considering the downtimes / weekends.
    Any suggestion on relevant Notes / Settings.
    Thanks
    Srini

    Hi,
    Ok, I understand the issue completely now.
    But did you right click on the bucket with downtime in SNP planning book, choose diaply details and see the order details?.
    After doing this you can check in product view and MD04 to check if the order is actually open in this period.
    If it not open in the period corresponding to the bucket in which it is displayed in planning book and product view and MD04 are fine, Please check this and update, maybe other experts could help.
    If you have a really good abapper, you could also debug the planning book load or raise an OSS to be safe.
    Regards,
    Ashok

  • Capacity Consumption in SNP Capacity Planning Book

    Hi,
    Can someone let me know how the Capacity Consumption KF(9ACACON)  is calculated in the SNP Capacity Planning Book.
    No macor is associated with the KF. But when i load the data in specific to a resource it gives me some value in the Capacity Consumption KF.
    Is there any option to identify the calculation logic of this KF ?
    Regards
    BVN

    Hi
    There is no formula as such, it depends on the master data settings in your resource. In transaction /sapapo/res01 you can display the Capacity but how exactly depends on what type of resource you are using and how the capacity is calculated, basically you can have:
    Time-Continuous capacity
    PP/DS Bucket Capacity
    SNP Bucket Capacity
    And they can also have different values!
    For the SNP View it should be using the SNP Bucket Capacity, so if you click on this tab in your resource master data it should have a field "Bucket Definition" which can either be from Continuos Capacity or be maintained separately. If you click the button "Bucket Capacity" it should show you the current values you have.
    If it is from Cont Capacity then click that tab and see the start, end and break times there.
    To add a little confusion, you may also have several variants of capacity, the active variant is on the General Data tab, this is the capacity variant that should show up as standard capacity in your planning book.
    There is more to it all than this but hopefully that should help answer your qeustion.
    Regards
    Ian

Maybe you are looking for

  • Controlfile corrupted when creating a database - ORA-00202

    Hi Oracle experts, I have two virtual machines, the clusterware installed fine and is accessing shared disks, also ASM is running fine. When I created the database using dbca everything went fine until the very last end, I saw a window indicating tha

  • Write to Text File - unflatten channel string

    Hi all, This is my first post on the forums!  It's been very helpful for me but I have not been able to find a solution to my (simple) problem. Operating system: Windows 7 (64-bit) Labview 2012 Full Development I'm using the DAQmx unflatten channel s

  • How to sync iTunes to iPhone

    Hi there, I'm having trouble syncing my iPhone 3G onto my iTunes. How do I copy ringtones, music and podcasts which are on my iPhone into iTunes??? I download podcasts directly onto my iPhone so there's always new podcasts on my iPhone which aren't o

  • Need Help with PHP please!!!

    I'm trying to create a contact us page and my web host needs it in php and I have no clue how to do it. I am using Dreamweaver Cs3 I have flash but am new to it. Thank You LB 

  • HDD to SSD Offloading

    I have a netbook with all partitions on a HDD, but I am thinking of offloading some mount points (I'm thinking of /usr/bin, firefox cache, and /home/ebooks) to a 8GB uSD card (using ext4 and LVM) so that the HDD will spinup less frequently and for gr