Planning data changes through CJR2  transcation

Dear all,
Kinldy let me know how to track changes made in my financial planning through CJR2 . because f these changes , my project planned datas are changed and gross margin reduced.
I wish to know, is it possible to track the changes made using CJR2 transcation ?  like , when , what and which WBS changed .
i tried CJI4 but no result .
Appericiated your help as usual,

Thanks for your reply  , But my concern is not to get the old value there , I have a hardcopy to serve that purpose, but I really want to know who did it ?  Like user name , time , which WBS got changed . I have tried CJI4 to capture this changes , but I am not getting any values under CJI4.  Is there any other transaction available  to track this changes ?
Eg. For sales order , any time will get a change report on line by line , I am looking something similar to that .

Similar Messages

  • To track which line item the billing plan date changed.

    Hi All.
    I have a requirment of tracking changes done for the billing plan date and whenever i change the billing plan date it will be reflected in the FPLA table. But i was not able to track to which line item of the subscription/order the billing plan date changed.
    In the FPLA table there is a relation to the VBELN(subscription/order) only not POSRN(line item) is there.How can i track to which line item it got changed.
    Thanks for your help.
    Thanks,
    Neslin.

    Hi,
    There should be entries in FPLTC for FPLNR found in table FPLA. Try from SE16, enter FPLNR preceded by zeros so that the total length is 10 and execute.For example,  FPLNR is 10, enter 0000000010.
    Hope it helps.
    Regards,
    Nupur

  • To track the line item to which the billing plan date changed.

    Hi All.
    I have a requirment of tracking changes done for the billing plan date and whenever i change the billing plan date it will be reflected in the FPLA table. But i was not able to track to which line item of the subscription/order the billing plan date changed.
    In the FPLA table there is a relation to the VBELN(subscription/order) only not POSRN(line item) is there.How can i track to which line item it got changed.
    Thanks for your help.
    Thanks,
    Neslin.

    Hi,
    There should be entries in FPLTC for FPLNR found in table FPLA. Try from SE16, enter FPLNR preceded by zeros so that the total length is 10 and execute.For example,  FPLNR is 10, enter 0000000010.
    Hope it helps.
    Regards,
    Nupur

  • IDOC - Master data changes( through MM41 & MM42) to XI

    Hi Experts,
    My requirement is:
    Any updates/ changes to the article master through SAP transaction MM42 or any article creation through SAP transaction MM41 will trigger an update for the interface which will be picked up during the nightly batch job. For all updates/changes made throughout the day only the latest change will be interfaced to other non-sap system during the nightly batch.
    An IDOC will be generated for the changes made throughout the day by picking the latest one. IDOC name is WBBDLD03.
    Actually i am working on IDOC first time. I think i need to track changes in master data table through ABAP statements only and then a internal table ( with required data) need to be sent through IDOC. Please suggest if my approach is correct?
    Also, tell me the method to be followed for sending IDOC?
    Some examples implementing the similar scenario would be highly appreciated.
    Hoping for a useful response:-)
    Regards
    Gaurav K

    Hi,
    This is a change pointer scenario.
    IDOC:WBBDLD03
    Messge type:WBBDLD
    You need to write any code. You have to just make some ALE settings, this itself will meet ur requirement.
    First activate change pointer through BD61.
    Also activate change pointers for ur message type using txn BD50.
    Create LS for both sender and receiver (Use txn SALE)
    Assign the LS created to the respective clients .
    Create a rfc dest for ur receiving system using SM59.
    Later create a distribution model using txn BD64 (Here u mention ur receiver sender and message type )
    Create partner profile for ur logical system with this message type using txn WE20.
    Now you can trigger sending of the idocs through job schedule prg.
    But i dont know what is the prg name for ur scenario.
    I hope it helps you.
    Reward points.
    Thanks,
    Prasanna

  • Monitoring user msater data change through CCMS

    Hello Experts,
    I have a requirement where I need to set up a system in which a mail should be triggered to SAP mailbox or internet mail (of one particular person or more than one person) when a SAP_ALL or SAP_NEW profile is assigned to users through SU01 transaction.
    I was trying to implement this by using CCMS (under MTE Security)
    Can anyone please guide me if this can be achieved by CCMS or is there any other method?
    Any detailed document to implement this would be of great help.
    Thanks in Advance.

    Hi Yoganand,
    thanks a lot for your helpful answer!
    I did not know that CEN first calls the sapccm4x agent and only in case of inactivity it uses the RFC based data collection method.
    I never could find that info anywhere in the SAP help.
    From time to time I have the following situations with a system, who's built-in RFC account has been locked out:
    When I open the monitor in RZ20, the login account shows up. I cancel and finally the monitor comes up and the data of this system is included!!
    That could be something like a timeout effect: after a certain number of seconds, CEN tries to get data over the RFC in addition to still trying the agent ... and then the agents finally answers and delivers the MTE data (the RFC cannot authenticate and therefore will never deliver anything ... )
    Rigas

  • Material Classification Data changes

    Hello,
    I need to track the changes done to material classification data.
    I can not see changes through MM04 transcation. Is there any way i can see the table where changes are stored or way changes are tracked?
    Best Regards
    Himanshu

    Hi,
    Generally CDPOS & CDHDR are the history tables but cannot see the classification related changes. As i mentioned above tables can see the changes of classification, but make sure that for the  related field  "Log data changes" indicator checkbox need to select in SE11. If you are not able to check this box please refer  the OSS Note 943559 . Thanking you.
    Edited by: Padmasri Garapati on Nov 17, 2011 11:11 AM

  • BAPI to upload Plan Cost Thru CJR2 Transcation...

    Hi all,
    I am uploading all plan cost thru CJR2 transcation.I want to know there is any BAPI avail to upload this.points will be rewarded.
    Thanks
    Dinesh

    Hi Sreenivas,
    Thank you very much for the guidelines.I have tried the same & got the result.
    I have one small change in the requirement, we need to enter plan values against Periods.(1 -12).Different Plan values to different Periods.
    I am trying to add period columns from 1 to 12 in the Layout in Report Painter.I couldn't get it.
    Could you please guide me how to get it?
    Thanls a lot
    Suresh Kumar.

  • User Exit/Badi to change the billing plan date when create sale order

    Experts,
    Please advise which user exit/badi can be used to change the billing plan date wen create sale order.
    My requriement is based on some rules to dynamically change the line item billing plan start date and end date when create sales order.
    I tried some user eixt in MV45AFZZ, but the date got revert to the orginal date from billing plan.

    Hi,
      check the include MV45AFZB.
    Thanks & Regards,
    Sateesh.

  • Function module / BAPI for changing planning date (FDTAG)

    Hi everyone,
    Let's go for a problem.
    Many FI documents have been created in our system, with a wrong planning date, these documents have to be changed and I have been trying to develop a report.
    I am having a big trouble finding a function module or a BAPI which allows me to change the planning date (FDTAG field). I have been trying these function modules:
    FI_ITEMS_CHANGE
    FI_DOCUMENT_CHANGE
    The first one works for changind data in the FI documents but it seems like it can't change the planning date, it returns an error message that informs that the FDTAG field can not be changed.
    The second one is confusing, I have been unable to feed the function module with the data it needs to determine a single document.
    I am trying to use BAPI_ACC_DOCUMENT_POST right now, it doesn't seems promising but you never know.
    Has anyone had the same problem? I have been looking for an answer in both google and here but I can't find one, just some people with the same problem.
    I will keep trying to find the solution, if I find it I will post it here.
    Thanks in advance,

    Hi again Max,
    This worked perfectly, even better because we where already using the FDTAG field for mass changes (don't remember right now which note we implemented) so I have just used FI_ITEMS_MASS_CHANGE with no changes at all.
    Thank you very much for the help.

  • CANNOT CHANGE PLANNING DATE

    HI GURUS,
    We posted a SD document 180000XXXX Base line date 16.12.2008 and Payt terms C003 (30 days) thE planning date must be 15.01.2009 but the Planning date is 12.01.2008. We intented change the base line date, the Payment terms and the Planning date doesn´t change. Can someone knows how can we fix the date line??

    We have  the OBB8 terms OK. but in this document in particular when we use FB03 the planning date is not correct, the Net Due Date is correct(15.01.2009), but for Treassury the Planning date is not correct
    Payment Terms: C003 (30 days)
    Bline Date:    16.12.2008
    The planning date (claculated by SAP): 12.01.2008  (This day is not correct, SAP is not taken 16.12.2008 + 30 days)
    I tried changing the bline date and the Payment Terms but it doesn´t work for this particular document? Anybody knows WHY?

  • How to- Log Changes in Plan Data Using Datastore Object

    Hi,
    I followed the u201CHow tou2026 Log Changes in Plan Data Using Datastore Objectu201D  in order to trace the changes made in Planning.
    Although it is working fine, Iu2019m only being able to write the changes made by users that have SAP_ALL.
    Do you know what kind of authorization is missing on other users?
    Best regards,
    João Arvanas

    Hello João
    I would recommend you to use the authorization logn on RSECADMIN to
    trace what is the authorization missing for the user who you are using.
    Also you can try to set break-points on the introduced code and check
    where the issue is raised and check that is the authorization system is
    looking for.
    Let me know if this helps, otherwise I will give you other updates.
    Also you may post here what is the error that you are getting. That can
    help us to giving more specific answers.
    Best regards
    Lucimar

  • Maintenance plan package change resulting in incorrect call dates

    When we change a maintenance package on an existing maintenance plan to a package whose frequency is not an exact multiple of the previous package (for example, changing from a 6M 180-day package to a 1Y 365-day package) and then restart the plan, the call horizon of the plan seems to be ignored and the new call dates are always a day or so before the plan date regardles
    Why is the call horizon being ignored in this situation?

    Hello
    Please check the Option Start in Cycle while scheduling the Plan.
    Also refer the below thread too
    http://scn.sap.com/thread/1788240
    Br
    Rakesh
    Message was edited by: RAKESH MANE

  • CJR2-The plan data transfer is locked

    Hi,
    I am planning costs by CJR2 on a WBS element for a certain period and version by cost element.When I execute CJR2,it allows me to enter the values against periods but when I try to save ,system gives error message-The plan data transfer is locked for fiscal year 2009 and version F06 in controlling area 1000.
    I have checked in OKP1 and also in CO versions,this version is not locked for any transactions and Fiscal year 2009.Has anyone come accross similar situation and how was it resolved.
    Its matter of urgency,any help will be highly appreciated.
    Regards,
    MTH

    Hi Ravi,
    Thanks for your answer.I have checked the statuses and there are no status hampering the Plan primary cost or Periodic reposting Plan data.I guess its more related to the version used.Any other thoughts?Anyone.....
    Regards,
    MTH

  • Function for changing planned dates of activity

    How can I change planned dates of activity in code ?
    Is anyone familar with a bapi/function for this ?
    Thanks,
    Nitzan

    Hi Nitzan,
    Actually When you want to change planned date of the activity?
    If it is during the processing of the activity, you can do it by  two methods
    1)Either by using a call back function module configured in CRMV_EVENT transaction. In this function module read the date using CRM_order_READ FM to read ET_APPOINTMENT table.
    Then use CRM_ORDER_MAINTAIN to change to change the date.
    2) use the BADI order_save and implement the method  CHANGE_BEFORE_UPDATE and put the same logic.
    OR
    if you want to do it externally, use the BAPI BAPI_ACTIVITYCRM_CHANGEMULTI to change the activity dates.
    Regards,
    Annu Cyriac

  • Unable to copy plan data through KP97

    Hi,
    we are trying to copy plan data from budget to forecast c01 for current fiscal year.We could not copy the plan data. On our investigation we found that if we copy cost centres individually planning data for all but two cost centres are copied.  Thus we cannot copy data for two cost centres and system issues no errors either in test run or in actual run.
    What could be wrong ? any ideas?
    Thank you 
    Umang

    Check the validity of the cost centers. Also check the block indicators in cost center master data.
    Regards
    Rakesh Pawaskar

Maybe you are looking for

  • IPhone 4s: upgrade from ios 5.1 to ios 6 failed and phone stuck in recovery mode

    I am on a Macbook OS 10.7.5.  iTuens 10.7. This afternoon I plugged in my iPhone 4S and started the upgrade process from iOS 5.1 to iOS 6. The update process failed at some point and now I am stuck with only the "Restore" option in iTunes. The fright

  • Striped + Mirrored software RAID no longer mounting

    I have a MacPro 4,1 using the 4 internal bays each with a 1.5GB drive. Drives 1&2 are mirrored, drives 3&4 are mirrored. Those 2 mirrored drives are then striped together for a volume called 'Titanic.' Been working great for years, but just recently

  • File to IDoc : XML parsing in ABAP mapping

    Hi, In ABAP mapping I want to parse all of the incoming XML strings to internal table.Later I add few more fields to this table and transfer them to IDOC adapter in IDOC-XML format.In thsi case how do i get all of the input file data(converted from X

  • Sender JDBC Adapter in a synchronous szenario

    Hi, i am trying to set up following szenario: A JDBC Sender Adapter is polling data from a database, this data is beeing mapped to a synchronous RFC-Call to the R/3 backend. The result from the RFC-Call contains an order-number, which should be store

  • WBS in Sales Order

    Hi All, When ever we enter WBS element at the Sales order item level profit centre will be auto determined from it and gives pop-up message (Information message: Profit center was set to XXXXX). WBS element is not mandatory for the text Item. So i ne