Planning drill through with EPMA members
I have a webform and it displays a field 'Asset Desc' which is member of Accounts Dim. This member is only at EPMA and not in Essbase.
Once the Data is entered through webform, I should be able to drill-thru with 'Asset Desc' along with other details.
984167 wrote:
I have a webform and it displays a field 'Asset Desc' which is member of Accounts Dim. This member is only at EPMA and not in Essbase.
Once the Data is entered through webform, I should be able to drill-thru with 'Asset Desc' along with other details.
What do you mean by it is not there in Essbase? If it is showing up in webform and you can enter data it'll be there in Essbase.
If you perform a search for Planning drill through you'll get lots of article.
More to life than this...: Planning V11 Drill back
Regards
Celvin
http://www.orahyplabs.com
Similar Messages
-
Hyperion Planning Drill through
Hello All,
Please suggest Essbase Studio if works for the below scenario of our environment.
We have a Planning cube and Drill through defined in planning cube using EIS in the planning cube. We want to use Essbase studio 11.2.1. instead of EIS and define drill through on the same planning cube.
I did some research on Essbase studio and did not find a way to just specify drill through on planning cube without building the outline from Studio. Can any one suggest if it is possible to define drill through on planning cube from studio or we have to stay with EIS with the current architecture.
Thanks and appreciate your response.As far as I am aware there is no direct integration so the outline still needs to be built from studio.
Cheers
John
http://john-goodwin.blogspot.com/ -
OLAP Universe and drill through with Essbase
Hi all
Has anyone created an OLAP universe on top of Essbase that allows the user to drill through back to an Oracle database?
If anyone has can you please let me know how you did this.
Thank you and kind regards,
DeanHi,
There is no way to activate drill-through from Essbase to any other database within OLAP universes.
If you are using Web Intelligence you have 2 alternatives:
<li> The first one is to create 2 data providers (1 on Essbase and 1 on Oracle) and synchronize them.
This is not really a drill thorugh operation but you have both data sources in sync in the same document.
<li> The second option is to create 2 Web Intelligence documents (1 on Essbase and 1 on Oracle) and then parameterize the Essbase document to use Opendoc capabilities (hyperlink) to dril-through on the Oracle document.
Didier -
Drill through with OLAP Universe on Essbase cube
Hi all
How can I achieve drill through from an Essbase cube to an Oracle database?
Is there an option in OLAP universes to achieve this?
If not do I have alternative options?
Thank you for your help and kind regards,
DeanHi,
There is no way to activate drill-through from Essbase to any other database within OLAP universes.
If you are using Web Intelligence you have 2 alternatives:
<li> The first one is to create 2 data providers (1 on Essbase and 1 on Oracle) and synchronize them.
This is not really a drill thorugh operation but you have both data sources in sync in the same document.
<li> The second option is to create 2 Web Intelligence documents (1 on Essbase and 1 on Oracle) and then parameterize the Essbase document to use Opendoc capabilities (hyperlink) to dril-through on the Oracle document.
Didier -
Hyperion Planning Drill through to FDM
From Hyperion Planning , when trying to do DrillThrough to FDM a blank Internet explorer page opens. Any setting which needs to be modified to make it work.
you need to import adapter for drill thru capability from FDM. I guess Essbase adapter ES11xG4D.exe is used for both Planning and Essbase
-
Issue with Drill Through Reports in Essbase Studio.
Hi,
we are using essbase studio to drill through to the source table in Oracle.In drill through definition the query is like , select * from source where (Project IN ($$PROJECTS-VALUE$$)). Project column is located in source table and PROJECTS-VALUES are located in Essbase under project dimension and we will select the values in smart view. we are using smart view to check drill through reports.In smart view, If i select one member at gen-2 level which contains 1450 level-0 members,It is saying as error in executing the report in line 1972. Is there any limitation with IN condition , such that oracle takes only limited values like count of 999.we are facing issue only at gen-2 of project and it is working good from gen-3.
Please let me know is there any kind of certain limitation.It is possible you are overloading the parser. If the projects table/view is a recursive join, when Studio creates the $$Project-value$$ is actaully returns all the level zero members under the member selected(at least in 11.1.2.X. If the list is huge, it might have problems. I would open an SR to see if there is a limit. It might be number of characters or values
-
Drill through from Planning to FDM 11.1.2 Not working
Hi,
I have FDM with Essbase adapter installed, version 11.1.2.0.0.
And i have FDM application configured to load data from files to essbase. When in Planning form i am clicking 'drill through' icon on cell with loaded data it opens new window with error:
Error: No locations were found matching the passed intersection values. Please verify:
1) that the target system (originating the drill through) is properly configured;
2) that FDM POVs have not been retroactively modified or compromised.
In the FDM error log the following record:
ERROR:
Code............................................. 7123
Description...................................... INSERSECTION SQL DEBUG
Procedure........................................ SELECT vDataFact.PartitionKey, PartName, CatName, CatTarget, PeriodKey, PeriodDesc, DataView, AccountX, EntityX, ICPX, UD1X, UD2X, UD3X, UD4X, UD5X, UD6X, UD7X, UD8X, UD9X, UD10X, UD11X, UD12X, UD13X, UD14X, UD15X, UD16X, UD17X, UD18X, UD19X, UD20X, SUM(DECODE(ChangeSign, 0, (Amount), 1, (Amount *-1), (Amount))) AS Amt From vDataFact Where (((CatTarget) = N'EXP.011201PDV.BDRS.BUDGET') And ((PeriodTargetM) = N'Jan') And ((YearTarget) = N'FY10') And ((CalcAcctType) > 0) And ((AccountX) = N'EXP.011201') And ((EntityX) = N'EXP.011201PDV.BDRS.BUDGETV.FACTEXT.KNT.NAAC.3200EN.GD') And ((ICPX IS NULL) or (ICPX = N'') or (upper(ICPX) = N'[ICP NONE]')) And ((upper(UD1X)) = N'EXP.011201PDV.BDRS.BUDGETV.FACTEXT.KNT.NA') And ((upper(UD2X)) = N'EXP.011201PDV.BDRS.BUDGETV.FACTEXT.KNT.NAAC.3200') And ((upper(UD3X)) = N'EXP.011201PDV.BDR') And ((upper(UD4X)) = N'EXP.011201PDV.BDRS.BUDGETV.FACT') (and so on...)
And we can see that (CatTarget) = N'EXP.011201PDV.BDRS.BUDGET' consist of three joined together elements from three different dimension EXP.011201(account) and PDV.BDR(custom3) and S.BUDGET(scenario).
With other custom dimensions in this select statement - the same error, in front of correct element - string with other joined elements.
Can anybody help me to understand why i have this error in drill through?
FDM error or Oracle RDBMS errors or Planning with Essbase? Something wrong with locale setting may be, with "," or "." delimiter somewhere in the settings?Hi there
Are you using member aliases or names? I had problems with aliases in excel not allowing drill through. not sure if this is fixed in 11.1.2
Are you trying to drill through from a level 0 intersection?
Simon -
How to prefix member names in Planning with EPMA load?
Hi
I use Planning 11.1.2.1 and load the metadata with EPMA.
I would like to add a prefix for all my members (P_TEST instead of the TEST I have in my source file).
I don't find how to do that :-(
thanks in advance for your help
FannyHi
You can export the dimensions using EPMA file generator to a text file. You can then edit the file (i.e. add prefixes) preferably using Excel and load it back into EPMA again.
http://download.oracle.com/docs/cd/E17236_01/epm.1112/epma_file_gen_user/frameset.htm?launch.html
Cheers,
Alp -
EPM 11.1.1.3 Drill back with Hyperion Planning and Financial Reporting
Hi,
I'm trying to drill back data with Planning thanks to FDM but it doesn't work.
In fact Planning server and FDM server are not installed on the same machine. My user is both admin on Planning application and FDM one.
When I drill back my data the url provided is the planning one and not FDM server one. I've set up application properties on Planning Application such as FDM_BASE_URL with
"http://servername/HyperionFDM/AuthorizedPages/IntersectionSummaryByLocation.aspx", and the restated my webserver, but it doesn't work.
I've the following errors :
Server Error in '/' Application.
The resource cannot be found.
Description: HTTP 404. The resource you are looking for (or one of its dependencies) could have been removed, had its name changed, or is temporarily unavailable. Please review the following URL and make sure that it is spelled correctly.
Requested URL: /HyperionFDM/AuthorizedPages/IntersectionSummaryByLocation.aspx
Best Regards
EricWhen you say drill back, are you saying you want to drill through to the source database or whatever it was you loaded the data from?
If so, my question is was this data loaded using FDM ?
Also I would run the validation tool in EPM Diagnostics and make sure everything is ok on the web end.
Not knowing exactly what your setup looks like, this is all I can suggest for now. -
Problem with EIS drill through reporting
Hello,<BR><BR>Please help me with this.<BR><BR>We are using Drill Through reports with EIS 7.1 and Essbase 7.1 in AIX environment. (These are the IBMDB2 Olap versions, not directly from Hyperion.) For some reports when retrieved on a member with more number of children, the Integration server gets killed and we get the following error<BR><BR>ESSDTU<BR>{ESSNET MESSAGE} Network error [10054]: Cannot Send Data<BR><BR>Following is the information in the server log file:<BR><BR>[Thu Jul 13 4:39:04 PM 2006] /IS/Listener/0/Informational/1051001/Build-EIS71B168<BR>Received client request Login<BR><BR>[Thu Jul 13 4:39:04 PM 2006] /IS/Coordinator/0/Informational/0/Build-EIS71B168<BR>Executed client request 'Login' in 0 seconds<BR><BR>[Thu Jul 13 4:39:04 PM 2006] /IS/Worker/1152826749/Informational/0/Build-EIS71B168<BR>Initialization completed, 'Worker' service is online.<BR><BR>[Thu Jul 13 4:39:04 PM 2006] /IS/Worker/1152826749/Informational/0/Build-EIS71B168<BR>Received client request Get Drill-Through report<BR><BR>[Thu Jul 13 4:39:04 PM 2006] /IS//0x0/1152826749/Informational/0/Build-EIS71B168<BR>Successfully loaded the OLAP Model 'OM1'<BR><BR>[Thu Jul 13 4:39:05 PM 2006] /IS//0x0/0/Informational/1051034/Build-EIS71B168<BR>EssbaseAPI: Logging in user [User1]<BR><BR>[Thu Jul 13 4:39:05 PM 2006] /IS//0x0/0/Informational/1051035/Build-EIS71B168<BR>EssbaseAPI: Last login on Thursday, July 13, 2006 4:24:33 PM<BR><BR>[Thu Jul 13 4:39:06 PM 2006] /IS/Worker/1152826749/Informational/0/Build-EIS71B168<BR>Executed client request 'Get Drill-Through report' in 2 seconds<BR><BR>[Thu Jul 13 4:39:07 PM 2006] /IS/Worker/1152826749/Informational/0/Build-EIS71B168<BR>Received client request Get Drill-Through report attributes<BR><BR>[Thu Jul 13 4:39:07 PM 2006] /IS/Worker/1152826749/Informational/0/Build-EIS71B168<BR>Executed client request 'Get Drill-Through report attributes' in 0 seconds<BR><BR>[Thu Jul 13 4:39:07 PM 2006] /IS/Worker/1152826749/Informational/0/Build-EIS71B168<BR>Received client request Get Drill-Through report data<BR><BR>[Thu Jul 13 4:39:07 PM 2006] /IS/Worker/1152826749/Informational/0/Build-EIS71B168<BR>Drill Through Report for Essbase Server:Server1.corp.com Application<img src="i/expressions/face-icon-small-happy.gif" border="0">T1 DB<img src="i/expressions/face-icon-small-happy.gif" border="0">B1 User:User1<BR><BR>[Thu Jul 13 16:39:16 2006] /IS/Server///Informational/0<BR>Unknown flag [JDBC DSN] found, ignoring it/Build-EIS71B168<BR><BR>[Thu Jul 13 16:39:16 2006] /IS/Server///Informational/0<BR>Found Q command line parameter and a value of 128 is set to it/Build-EIS71B168<BR><BR>[Thu Jul 13 16:39:16 2006] /IS/Server///Informational/0<BR>Setting configuration variable, server home, to 'c:\ibm\db2olap\is'/Build-EIS71B168<BR><BR>[Thu Jul 13 16:39:16 2006] /IS/Server///Informational/0<BR>Setting configuration variable, temporary directory, to 'C:\DOCUME~1\malkar\LOCALS~1\Temp'/Build-EIS71B168<BR><BR>[Thu Jul 13 16:39:16 2006] /IS/Server///Informational/0<BR>Setting configuration variable, log file name, to 'c:\ibm\db2olap\is\log\olapisvr.log'/Build-EIS71B168<BR><BR>[Thu Jul 13 16:39:16 2006] /IS/Server///Informational/0<BR>Setting configuration variable, Essbase message database, to 'C:\ibm\db2olap\bin\essbase.mdb'/Build-EIS71B168<BR><BR>[Thu Jul 13 16:39:17 2006] /IS/Coordinator/0/Critical/2002003/Build-EIS71B168<BR>Invalid session identifier, please log in to Essbase Integration Services Server again.<BR><BR>[Thu Jul 13 16:39:28 2006] /IS/Coordinator/0/Critical/2002003/Build-EIS71B168<BR>Invalid session identifier, please log in to Essbase Integration Services Server again.<BR><BR><BR>Please let me know if this is something to do with the EIS limitations or some setting<BR>Thanks<BR>Kris
Normally if the drill through report fetches a wrong combination of members or huge amount of members than the way it was designed in the Drill through Report template. The database may fail due to improper query. Check the database and table status. Also fetch the report with proper combination of members.
-
EPMA Essbase Studio Drill-through
If I deploy a Planning application via EPMA is it possible to configure drill-through from Planning via Essbase Studio?
Thanks,
JzThe drill-through path from Planning is from a web-form to FDM.
Can this hack drill through from a Planning web-form or would I need to created reports in Planning to drill-through?
The Studio documentation only talks about Reports...
Thanks,
Jz -
Drill-Through from Planning in 9.3.1
Hi All,
We are on 9.3.1 and want to implement drill-through capabilities from Planning. We are building our dimensions in DRM and through HAL uploading it in Planning. We are not using EIS. Can someone guide me anyway to implement this. We don't mind using EIS but I have read in some forum that you can do this bypassing EIS but not sure how to implement it.
Can anyone please guide me. Thanks in advance...I really wanted it to be from Planning web forms but if it is possible with SmartView I can take a look at it. Custom VBScript would be a real pain as we don't have that kind of resources so have to give this functionality using what we have.
I found some documents which talk about this process from Planning web but couldn't really figure out what needs to be done. The docs are below:
1. http://ranzal.wordpress.com/2009/01/08/adding-drill-through-to-your-hyperion-implementation/
2. http://ranzal.wordpress.com/2009/06/23/adding-drill-through-to-your-hyperion-implementation-%E2%80%93-part-2/
3. http://mi-oaug.org/Presentations09/Workarounds%20for%20What%20the%20Essbase%20Developers%20Forgot%20MIOAUG%283%29.pdf
(This one uses System 11 Studio to some extent... see page 54) -
Drill through from Planning to Oracle
Hello,
Quick question: If I load data into Hyperion Planning using ODI, will I be able to drill through to the source which is an Oracle database ? If not, what do I need to be able to do the drill through ?I might run into an issue with that: My infrastructure uses single sign-on (using OAM). FDM does not support single sign-on according to the platform matrix. But it apparently does support it for HFM applications. Single sign-on is also a Connection Option, according to the DBAG for FDM. (which really confuses me: Why does the platform matrix say SSO not supported but then it does work with HFM and it is one of the connection options?
But anyway as far as I know, the above is not the case for planning. Is my understanding correct? If a user provisioned using single sign-on has accesses a data form in the planning application, is there any way he/she will be able to drill through to the source Oracle 10g/11g database? Users also need to push planning and forecasting data from the planning application to the Oracle DB.
Maybe there's a workaround?
Any insight into this will be greatly appreciated as always. -
FDM Drill through capabilty from Hyperion Planning
Hi,
I have currently some questions regarding the Drill through capability from Hyperion planning.
I successfully loaded a multiperiod excel file into FDM with the interface with this property :
Account Centre Description Legal Entity BU Product Currency Version Application Customer Supplier
A C D UD1 UD2 UD3 UD4 UD5 UD6 Default Supplier V V
ROYALTIES Default_Site SOI - Prime - 4 - 3400/4000 Å - COMPANY_INC 4.PRO.RD0003.PF USD Sales Initial App_1 Customer1 Default Supplier 100 200
When i did the drill back I could see all the info except the description. It is true that description field is not present in Hyperion planning but I thougth I could see it in the drill back.
On top of that I have been to my FDMApplication directory to see the file that is used in the drill back (SAMPLE0748.dat) and open it with notepad. I can see all the information except the description column.
Does anyone know how I can keep in FDM all the informations I want from my first excel file ?
Thank you,
DavidI understand what you explain to me and I agree.
Only one problem is that I don't think in my Hyperion Application I use the account description or Description 2 that would explain the fact I can not use it in the drill back.
So my next question on this topic is, how do I make sure that I can copy attributes values in FDM into Planning.
For your info I check on the workbench and "Account description" & "Description 2" are under my application "Attributes dimensions"
By the way I have an other question wich is not far from the last one.
Regarding the drill back if do an import like this :
CUST1 (Mapping) GROUPCUST1 100
CUST2 (Mapping) GROUPCUST1 200
Will I be able to see in the Drill back CUST1 & CUST2 ?
by the way do you agree with this discussion Dimensions/Fields Displayed on Drill through screen ? Because it is something I wanted to do in FDM...
Thanks again, -
Error drill-through from Hyperion to Oracle GL with ERPI
Hi
I am using ERPI to load data from Oracle GL 11.5 to Hyperion PLanning 11.1.2.1.
The data are well loaded. Tje drill-through from Hyperion Planning to FDM is ok.
But whe I try to execute the drill-through from FDM to Oracle eBS, I have the following error message :
Invalid ERPI URL
Return value from erpi web service : java.lang.exception: Invalid DataKey (33487765): No record found.
ERPI Data Key value: 33487765
I have another application with the same source and the same target and the drill-through is ok.
Thanks in advance for your help
FannyAre you modifying the source value in any way before import into FDM? Using an import format in FDM for example?
Maybe you are looking for
-
I want to use the save passwords and login information for the websites I use frequently but am unsure how to get the program to prompt me to save them...
-
Parallax no longer works in Firefox 16+
I created a Parallax ( scrolling interactive images in layers which tells a story) about 10 months ago or so, it works in every browser and at that time it worked in firefox 10-ish. I just saw today that it no longer works in Firefox 17 or 16, it doe
-
Hello: I would like to setup two completely seperate instances of JDeveloper. So I installed JDev#1 in a seperate directory than JDev#2. Each seems to work ok. I would like to keep these two JDev installs completely seperate. JDev#1 I plan to modify
-
Interactive script editor: read values of answers into non-branching action
Dear all, When we develop a new interactive script, I would like to read the value of the answers into a non-branching action. For examle: Are you ill? yes/no If no --> are you staying on another addres then [customer_adres]? yes/no if no --> please
-
Final Cut Pro X long form videos
I've done a number of short videos on Final Cut Pro X using my Macbook Pro.Now a client wants me to send out 90minute seminars with a "watermark" logo. First one seems is very slow going. Do i need something like a Mac Pro with dual processors, etc.?