Planning Hierarchy Maintenance with Gaps

Dear Experts,
Iam using flexible planning for sales plan. I am using flexible planning. I wanted to create planning hierarchy with Gaps. I mean at some levels I will not be having any data to enter. For eg. My first level is country and second level is region. I will not have region for some countries. So when I maintain the planning hierarchy I will not have any value at the region level for a country.
How can I achieve this. When I dont enter any value, system throws the error message, enter the values without gap.
Thanks in Advance
Prathib

HI There,
SAP does not allow maintaining Plng Hier with gaps coz that breaks the planning chain. We had a similar situation &  we made up "distinct" dummy values at that level & plugged them in.
The values need to be distinct for each level/segment/CVC (unique), else it'll mess up the planning. The aggregation/dis-aggregation would go for a toss, if the system finds a common value at one given level.
Bottom line, the Planning Hierarchy structure cannot converge at any intermediate level with a common value, it has to be a pyramid structure.
Good Luck

Similar Messages

  • Table for maintenance plan and maintenance cycle and Unit

    Hello,
    I need to know the table where the values are stored for maintenance plan, maintenance cycle and Unit.
    I know that we can get the maintenance cycle and unit from MMPT table.
    Question 1
    If the maintenance plan has only a single cycle then the data is stored in above table MMPT, but if a maintenance plan has mutiple cycles like 1 maintenance plan has maintenance cycle as 364 Days and 1092 days then the data is not stored in MMPt table.
    Question 2
    Requirement is I need to develop a report where in I need maintenance order, maintenance plan and the relevant maintenance cycle and unit. Supose an maintenance order is created for the above maintenance plan which has 2 maintenance cycle how can I identify for which maintenance cycle the order is created.
    Regards,
    Narendra

    Hi,
    Please review PM tables
    PM/SM/SD Tables
    MPOS                       Maintenance Items
    AFAB     Network - Relationships
    PLKO     Task list
    PLAS
    AFFH     Operations
    PRT assignment data for the work order
    AFFL     Work order sequence
    AFFT     Order process instructions
    AFFV     Order process instruction values
    AFFW     Goods movements with errors from confirmations
    AFIH     Maintenance order header
    AFKO     Order header data PP orders
    AFPO     Order item
    AFRC     Table of planned changes to conf.: Automatic goods receipt
    AFRD     Default values for collective confirmation
    AFRH     Header information for confirmation pool
    AFRU     Order completion confirmations
    AFRV     Pool of confirmations
    AFVC     Operation within an order
    AFVU     DB structure of the user fields of the operation
    AFVV     DB structure of the quantities/dates/values in the operation
    MPOS     Maintenance ITEM
    AFWI     Subsequently posted goods movements for confirmations
    AUFK     Order master data
    AUFM     Goods movement for order
    MPLA     Maintenance Plans
    BGMK     Master warranty header
    BGMP     Master warranty item
    BGMS     Text item master warranty
    BGMT     Master warranty text
    BGMZ     Warranty counter information
    CRHD     Work Center Header
    CRTX     Text for the Work Center or Production Resource/Tool
    EQKT     Equipment short texts
    EQST     Equipment link to BOM
    EQUI     Equipment master data
    EQUZ     Equipment time segment
    HIKO     Order master data history
    IFLO     Functional Location (View)
    IFLOT     Functional location (TABLE)
    IFLOTX     Functional location: Short texts
    IHGNS     Plant maintenance permit segment
    IHPA     Plant Maintenance: Partners
    IHSG     Object-related permits in Plant Maintenance
    ILOA     PM object location and account assignment
    IMPTT     Measuring point (table)
    IMRG     Measurement document
    KAKO     Capacity Header Segment
    KONP     Conditions (Item)
    KONV     Conditions (Procedure Data)
    OBJK     Plant Maintenance Object List
    QMEL     Quality notification
    QMFE     Quality notification - items
    QMIH     Quality message - maintenance data excerpt
    QMMA     Quality notification - activities
    QMSM     Notification - Tasks
    QMUR     Quality notification - causes
    STPOA     Name is does not have an A at the end; BOM items
    T001     Company Codes
    T001L     Storage Locations
    T001W     Plants
    T077D     Customer account groups
    T003O     Order Types
    T352R     Maintenance revisions
    T353I_T     Maintenance activity type description
    T356     Priorities
    T357G     Permits
    T357G_T     Table 357G texts
    T370A     Activity category for PM lists
    TINCT     Customers: Incoterms: Texts
    TVKO     Organizational Unit: Sales Organizations
    TVKOS     Organizational Unit: Divisions per Sales Organization
    TVKOV     Org. Unit: Distribution Channels per Sales Organization
    TVTA     Organizational Unit: Sales Area(s)
    VIAUFKST     Order selection view
    MMPT Cycle detail
    Regards
    Carlos

  • Product Allocation:  Planning Hierarchy

    hello, friends.
    in tests, product allocation is performing as required.  it is now time to set the data in PRD.
    the hierarchy involves Material, Plant and Sold-to.  all-in-all, this translates to a large number of nodes (in the thousands, due to the many possible combinations of the 3 levels).  it is not practical to do MC61/MC62 manually.
    is there any BAPI that would allow uploading of the planning hierarchy?  can the database table accomodate potentially 1 million line items in the table SxxxE?
    thanks.
    jy

    Hello Jonathan
    I am not aware of any BADIs, BAPIs to do this. But if there are programs for deleting, regeneration (RMC**, MC**), so  there could be programs for creation/generation also. So check the OSS notes blow.
    I am also wondering if you could use SE16 since an infostructure is essentially a table and SAP kind of alluded to it in OSS note 674719 - Planning hierarchy: Highest level is deleted.
    Also may be you could use Copy From functionality available within the Transactions MC61 and MC62?
    I beleive the recommended largest size of the database is 500, 000 ( 1/2 Million) entries. Take a look at  OSS note 631323 which talks about this and provides some useful tips. Also check out the notes mentioned within.
    631323 - Planning hierarchy: Known problems
    624731 - MC62: Bad performance with large hierarchies
    Hope this helps.
    ps: did my reply help you in resolving the retrobilling  issue you posted on August 3rd?

  • WANTED: Function Module (Product Allocation Planning Hierarchy Upload Tool)

    Hi,
    I would like to seek assistance in utilizing the <b>right function module</b> in uploading Product Allocation Planning Hierarchy to MC62.
    I've tried direct table update and BDC but to no avial.
    Points will be rewarded.
    Thanks in advance

    Hi,
    I'm having trouble using the FM 'MCP_GET_HIERARCHY'.
      CALL FUNCTION 'MCP_GET_HIERARCHY'
        EXPORTING
          i_gstru             =
    IMPORTING
      RETURN              =
        TABLES
          t_filter            =
          t_char_values       = .
    What do I put in i_gstru, t_filter, and t_char_values?
    I'm very new with this.
    Thanks in advance for the help.

  • PLANNING HIERARCHY OPTIONAL FIELD

    Hi Gurus
    I have one scenario iam maitaining a Planning Hierarchy against my customised information structure
    It has the following characteristics
    1) Sales Org
    2) Sold to Party
    3) Material Group1
    4) Distribution Channel
    5) Division
    6) Material
    7) Plant
    During Planning Hierarchy creation by MC61 i don't want to enter the MaterialGroup1 and Sold to Party for some Materials,
    But the system not allowing me to do that and saying "Enter charateristic values without gap"
    Is there any setting possible to keep those charateristic value entry as Optional for our required characteristic fields
    Your early response is highly appreciated
    thanks
    K.Prabakarn

    Hi
    I don't think we can skip any of the Charactristics levels above , If you think it is absolutely necessary to create the Planning heirachy only for the combination of sales org and below without the Sold to Party and Material Group, PLease change the order of the characteristics like
    1)Sales Org
    2) Material
    3)Distribution Channel
    4) Division
    5) Sold to Party
    6) Material Group
    7) Plant
    In consistesnt planning it doenot matter How they are sequenced.
    Reward if you like the solution

  • Resource planning in cprojects with xRPM or MRS?

    Dear Experts,
    To my understanding there are four options to perform resource planning in combination with cprojects:
    1.     Do a planning in cprojects only
    2.     Use resource planning application (RPA) from SAP CRM
    3.     Schedule resources with xRPM
    4.     Schedule resources with SAP MRS (Multi Resource Scheduling)
    I have a couple of questions:
    (a) Is it correct that I cannot assign resources to project roles in xRPM based on qualification matching? Is it right that xRPM is used rather for a long-term view to define the available capacity of projects/roles than assigning specific resources to roles?
    (b) How can help SAP MRS in comparison to option 1 (planning in cprojects)? I assume that I can do also in cprojects itself a qualification matching. MRS provides a more detailed qualification object to cover complex requirements, right? What else provides MRS what cannot be managed in cprojects itself?
    (c ) If we want to use a staffing process were project lead and resource manager doing the staffing and have the option to suggest or reject roles, we have the option to use xRPM or MRS, right? What are the differences? In MRS we have options like using several resource managers, softbooking/hardbooking or itu2019s possible to define the workflow who proposes resources and who is doing the final staffing (project lead or staffing manager), reasons for rejections can be configured etc. Are these options in xRPM available as well?
    Thanks,
    Angie

    Hi Angie,
    I have not implemented MRS or RPA so can only answer your first question. You cannot do a resource search via qualification in Portfolio Management (aka xRPM), typically you would do this in Project Management (aka cProjects) and this functionality works fine provided you have maintained qualification data for BP's and roles. Portfolio Management financial planning function can be used for a long term view as you have mentioned. However, it is also typically used to summarize and/or roll up resource demand / assignment to a bucket or portfolio level or summarize resources for multiple projects via initiatives or collections. You can also use a top down approach and at a high level plan values at the bucket level (i.e. forecasted demand or business case demand) and compare against detailed planned / assigned demand rolled up from project management.
    Hope this helps.
    Regards,
    Lashan

  • Creation of Budget Billing Plan for Countries with Tax Jurisdiction

    Hello Experts,
    When I create a budget billing plan for a company code with country Canada/USA and jursidiction TAXCAJ/TAXUSJ using transaction EA61, I get the message "Taxes with jurisdiction code not permitted with down payments"(Message no. >0194).  The long text for this message says "Delete your entry in the field for jurisdiction code"  Is any one aware where from this jurisdiction code should be deleted.
    Is it possible to create budget billing plan for countries with jurisdiction code at all ?
    Thanks in advance
    Venkat

    Hello Roopali,
    What I learnt in the process of exploring the functionality is that Payment PLan (BBP or AMB) is the budget billing method for countries with Tax Jurisdiction. Statistical, Partial & Payment Scheme only works when jurisdiction is not defined for tax procedure. Payment scheme is the recommend procedure for Eurpopean market
    Thanks for your clarification
    Best Regards
    Venkat

  • Planning function ended with errors

    Hi Folks,
    Issue: While Executing The Planning Sequnce it is througing me Planning Function Ended with Errors.
    I have one existing Planning Sequence which contain the Filter and Planning Copy Function. And also Variable input ( two variables 1 is Profict Center and 2nd one is Fiscal Year)
    First i was tried to execute the Planning Sequece it througing me error message saying as in below:-
    Values entered are invalid; check these values again
    Variables contain invalid values.
      Specify a value for variable Fiscal Year (Single Value Entry, Required)
      You have to enter variables before you execute
    Then i have entered Fiscal year value in the Planning Sequece>Variable Input>select the Fiscal Year Variable>Input help>selected the 2008-->ok. Now then Fiscal year variable is showing 2008.
    And then i was executed once again here Planning Sequnce it is througing me Planning Function Ended with Errors.
    Here is cross checked Filter area associated Variables( two variables 1 is Profict Center and 2nd one is Fiscal Year).
    1.Profit Center Variable: Containing the default value is 1000
    2.Fiscal Year Variable : Does not maintained any default values.
    Can any one provide your v

    Hi Venkat,
    Please execute the planning function with Execution with Trace option.
    Verify the planning function particularly from Values.
    Also some simple tricks:
    1. Try with some other values.eg. FisYear 2007. ( Check in database)
    2. Save the variant in variable input panel & then execute.
    Hope it helps,
    Shamkant

  • LCM import of Planning Application Hangs with "In Progress Status"

    Hi,
    LCM import of Planning Application Hangs with "In Progress Status" . its already couple of hours. Earlier it was always within 10 mins.
    Any advise is appreciated.
    Regards,
    Vineet

    It is probably worth trying again, may be useful to first bounce the services.
    If it happens again after bouncing the services then investigate at what staging it is getting stuck at.
    Cheers
    John
    http://john-goodwin.blogspot.com/

  • How to create the Product Hierarchy maintenance ..?

    Hi All,
    How to create the Product Hierarchy maintenance (IN APO System), I know manual creation, going to the transaction : /n/sapapo/relhshow , how to create programmatically, is there any Function module?
    Pls let me know
    Puppy.

    Hi Puppy,
    Please check whether the below BAPI can be used by you.
    T-code: BAPI
    Object name: ProductAllocationAPO
    Obj type:- BUS11305
    Regards
    R. Senthil Mareeswaran.

  • What do you plan to do with java

    I know this is a game development forum, but I had one question. What does everyone 'who is nice at java example abuse' (i'm not saying that no one else is nice, but he's name is the most catchyest) what do you plan to do with java. Do you really want to make games in java for the rest of your life, and prove to the world that java is gaining power? Or you just use java as the jump off point to learn anything else.
    Sorry if i'm getting to personally, but I was just wondering. This is a question to everyone not just abuse. lol

    Development speed:
    C / C++ (DJGPP):
    downloading many parts - 1 week
    installing - 1 weekend
    looking for basic tutorials - 1 week
    getting hello world to work - 1 afternoon
    getting more tutorials - 1 week
    getting past hello world - 3 weeks
    doing something worth doing - never
    total time to becoming a basic C programmer - 18 months & counting (I still try every couple of months, it never works)
    compiling someone else's code - 1% success (only one program not specifically designed for DJGGP ever compiled - C is portable eh?)
    Java
    dowloading JDK - 4 hours
    installing - 1/2 hour
    basic tuts - 1 hour
    hello world - 3 hours (java.lang.NoClassDefFoundException :-) )
    more tutorials - 10 mins
    getting past hello world - 1 week
    doing something worth doing - 2 weeks
    total time to becoming a basic java programmer - 1 month
    compiling someone else's code - 95% success (some people use the GNU regexp and GL4java, now there's regexp & 3D in the main package, so that shouldn't be a problem for much longer)
    Running speed:
    http://members.lycos.co.uk/wjgoh/JavavsC.html
    pure java JITted for the current machine is faster than generalised C, it's just that in C you get like
    prog: printf("xxx\n")
    stdlib: some assembler
    wheras java
    prog: println("xxx");
    lib: print("xxx"+"\n");
    lib: print("xxx\n");
    lib: write("xxx\n");
    lib: write(new byte[] {'x','x','x','\n'});
    lib: native void write({'x','x','x','\n'});
    stdlib: write(bytes);
    stdlib: some assembler
    I know that's not the right chain, I'm just showing the idea. Also you get things like this:
    //deprecated - don't use
    getSize() {
    return size;
    //ok, use this
    getPanelSize() {
    return getSize();
    where it's faster to use dodgy old methods.
    Shish

  • Purpose of u201CMaintain Levelu201D and u201CText Nodeu201D in Hierarchy Maintenance(RSH1)?

    Hi,
    1.
    In RSH1, in the hierarchy maintenance screen, I played around in the u201CMaintain Levelu201D screen but could not get its purpose. What is it used for?
    2.
    I have also created a hierarchy and inserted characteristic nodes but what is the u201CText Nodesu201D used for and what is the difference between that and the u201Ccharacteristic nodesu201D?
    e.g.
    Under the Characteristic Nodes u201CRegionu201D, I created a text node XXX 1.
    What is the significance from the point of view of reporting and how will XXX 1 as a Leave under u201CRegionu201D get data when the entire hierarchy is dropped in a report?
    Thanks

  • User defined characteristics for planning hierarchy

    Hi Experts,
    I am using flexible planning for sales planning when I define a planning hierarchy, I want to include a user defined field also.
    The requirement is like this, Planner wanted to see the cumulative sales figures of domestic and exports (Exports will be to more than one country. So I cant use countries for this).
    How can I do this?
    Request your expert advice.
    Regards

    Hi Ram,
    Thanks for the reply. Since Iam using flexible planning, I will be creating a user defined info structure. But my question is can I include a custom defined characteristic also in the hierarchy which is not available in the field catalogs for characteristics system is showing?
    If so where should I define this characteristics first before assigning to the information structure.
    Thanks & Regards
    Enrico

  • Can ABAP web dynpro floor plan manager integrate with adobe flex ?

    Hi All,
    Is it possible to integrate Web dynpro ABAP with adobe flex ?
    Can we integrate the standard ABAP web dynpro floor plan manager screen with adobe flex ?
    Brief about my requirement: I have refer few articals about  ABAP web dynpro is easyely integrate with adobe flex. My client is currently implementing SRM 7.0 for procure to pay process. For your information, standard SRM 7.0 are developed in ABAP Web dynpro floorplan manager. In my client,other processess such as order to cash, resource management etc screen are designed in Web dynpro Java(deployed in SAP EP) to make it more user friendly and good in resolution. My client is very much happy with SRM  7.0 business logic, however not happy with the standard SRM screen. They have asked to redesign SRM screen to make it more user friendly and good in resolution. 
    Thanks in advance. 
    Regards,
    Jennyfer

    It is possible to insert Adobe Flash islands in Web dynpro. You could take a look at the following link for more information on how to implement this:
    Adobe Flash Islands in Web Dynpro ABAP

  • What are the report-relevant settings in the hierarchy maintenance?

    What are the report-relevant settings in the hierarchy maintenance?

    Hi,
    See these links.
    http://help.sap.com/saphelp_nw04/helpdata/en/0e/fd4e3c97f6bb3ee10000000a114084/frameset.htm
    http://help.sap.com/saphelp_nw04/helpdata/en/0e/fd4e3c97f6bb3ee10000000a114084/frameset.htm
    http://help.sap.com/saphelp_nw04/helpdata/en/0e/fd4e3c97f6bb3ee10000000a114084/frameset.htm
    http://help.sap.com/saphelp_nw04/helpdata/en/0e/fd4e3c97f6bb3ee10000000a114084/frameset.htm
    assign points if this helps.
    Thanks.....................
    vasu...................

Maybe you are looking for

  • How can I remove the list of 20 recently saved items when you click on the arrow on the far right side of the File Name screen for images, web pages, ect?

    When I right click and go save image/page/ect as the file save popup screen appears and on the right side of the File Name bar there is an arrow. If you click the arrow it shows the last 20? items that have been saved and their save location. Is ther

  • What is this error message? Just installed new HD

    Heyo, I just installed a new WD 320GB Internal HD on my girlfriends iBook G4, and after all was said and done (which is a lot!!!) when I turned it on for the first time it simply gives a white screen with a folder icon in the middle of the screen int

  • VGA or HDMI

    I have my MPB hooked up to a Celestial HD widescreen DTV with a VGA cable. Don't know the exact size of the screen but it is huge. The mac defaults to a resolution of 1920 x 1080 @ 60Hz on the Celestial with no perceivable horizontal or vertical dist

  • PsExec on Windows 7 64-bit

    Hi folks, We recently upgraded all our hosts running Windows XP Pro to Windows 7 64-bit Enterprise and we no longer able to run the psexec command line below. psexec -i -d \\remotehost "C:\Program Files\Microsoft Retail Management System\Headquarters

  • How to integrate app devloped in wls 5.1 with wlps features

    we have developed a B2B site in weblogic server 5.1 and interested in adding the personalization features to the site. Is there any documentation or guide which would give the steps to do that? Or anybody who has applied personalization using wlps3.5