Hi Gurus,
Is there any transaction code avalible for  copying the planning hierarchy from one infostruture to another infostructure.
Regards
Praveen

Hi Ratan,
Thanks for your reply, MC9A can be used only for consistent planning but we are looking for level by level planning infostrurcture.
Can yoy provide the way of copying the planning hierarchy from one infostrurcture to another infostrure
Regards
Praveen

Similar Messages

  • Product Allocation:  Planning Hierarchy

    hello, friends.
    in tests, product allocation is performing as required.  it is now time to set the data in PRD.
    the hierarchy involves Material, Plant and Sold-to.  all-in-all, this translates to a large number of nodes (in the thousands, due to the many possible combinations of the 3 levels).  it is not practical to do MC61/MC62 manually.
    is there any BAPI that would allow uploading of the planning hierarchy?  can the database table accomodate potentially 1 million line items in the table SxxxE?
    thanks.
    jy

    Hello Jonathan
    I am not aware of any BADIs, BAPIs to do this. But if there are programs for deleting, regeneration (RMC**, MC**), so  there could be programs for creation/generation also. So check the OSS notes blow.
    I am also wondering if you could use SE16 since an infostructure is essentially a table and SAP kind of alluded to it in OSS note 674719 - Planning hierarchy: Highest level is deleted.
    Also may be you could use Copy From functionality available within the Transactions MC61 and MC62?
    I beleive the recommended largest size of the database is 500, 000 ( 1/2 Million) entries. Take a look at  OSS note 631323 which talks about this and provides some useful tips. Also check out the notes mentioned within.
    631323 - Planning hierarchy: Known problems
    624731 - MC62: Bad performance with large hierarchies
    Hope this helps.
    ps: did my reply help you in resolving the retrobilling  issue you posted on August 3rd?

  • Is there any way to do a mass copy and paste of song titles from the "name" column to the "sort name" column? I know it can be done with individual titles but I have over 6,000 titles in my library.

    In iTunes, is there any way to do a mass copy and paste of song titles from the "name" column to the "sort name" column? I know it can be done with individual titles but I have over 6,000 titles in my library.

    Thank you. I have heard of Logic Pro 7, but I have never personally used it. I'm still growing in the world of Composition, and I know that it is something I will be studying in one of my Computer Music classes coming up for my degree. I think it is something I will look into getting once I can justify the price of it. I guess for the time being, I will continue to play and grow in my ability to use and take advantage of GB, and then see what I can do about or with Logic Pro when I'm ready. The thought of spending $1000 for a program is hard to bite, because I've already spent a lot to produce my music, not only electronic music, but also chamber music and so on. I had no idea it would be so expensive to dive deep into the world of composition! lol.
    Finale 2007: $500
    Sibelius 4: $500
    Jam Packs: $400
    Midi Keyboard Interface: $100
    PowerBook: $1700
    Printer for printing scores and analysis: $150
    Logic Pro 7: Oy!
    As you can see it adds up very quickly...that doesn't even include my personal instruments and study materials.
    Thank you for your input, as I haven't really worked much with LP, and therefore didn't know which features are available. I will talk with some of my Composition buddies, and professors and see what they have to say as well, and who knows, I may be able to get the express version through one of them.

  • Planning Hierarchy Maintenance with Gaps

    Dear Experts,
    Iam using flexible planning for sales plan. I am using flexible planning. I wanted to create planning hierarchy with Gaps. I mean at some levels I will not be having any data to enter. For eg. My first level is country and second level is region. I will not have region for some countries. So when I maintain the planning hierarchy I will not have any value at the region level for a country.
    How can I achieve this. When I dont enter any value, system throws the error message, enter the values without gap.
    Thanks in Advance
    Prathib

    HI There,
    SAP does not allow maintaining Plng Hier with gaps coz that breaks the planning chain. We had a similar situation &  we made up "distinct" dummy values at that level & plugged them in.
    The values need to be distinct for each level/segment/CVC (unique), else it'll mess up the planning. The aggregation/dis-aggregation would go for a toss, if the system finds a common value at one given level.
    Bottom line, the Planning Hierarchy structure cannot converge at any intermediate level with a common value, it has to be a pyramid structure.
    Good Luck

  • Planning function to copy  version A of year 2007 to Version B of 2008 - IP

    I have a copy planning function which has a variable on from version and to version and it works fine.I can copy.So version to version for the same year works fine.
               Another requirement is to copy Version A of year 2007 to version B of year 2008.For this in the planning function I made version,year and calyearmonth all 3 as changeable and have variables on from version from year and to version and to year.I don't have a variable on calyearmonth.
              I run the query for version B and year 2008 and CALYEARMONTH 1/2008-12/2008 and it returns empty results as there is no data for version B for year 2008.then I execute the planning function to copy data from version A and year 2007 to version B and year 2008.I am getting the following error "CalyearMonth is not included in selection".I ran the query for 1/2008 - 12/2008.I didn't understand this.
            In the planning function filter I don't have any filter for calyear and calyear month.But it is there in the query.
    Thanks

    Hi Siva,
    Since you do not have the calmonth as the change characteristic in your plannning function.The values would be copied to year 2008 with month as #.
    So there would be no values for months of 2008 and hence you are getting that error.
    You need to copy the month figures also for data to be seen in the report.
    Assign points if useful.
    Ajay

  • User defined characteristics for planning hierarchy

    Hi Experts,
    I am using flexible planning for sales planning when I define a planning hierarchy, I want to include a user defined field also.
    The requirement is like this, Planner wanted to see the cumulative sales figures of domestic and exports (Exports will be to more than one country. So I cant use countries for this).
    How can I do this?
    Request your expert advice.
    Regards

    Hi Ram,
    Thanks for the reply. Since Iam using flexible planning, I will be creating a user defined info structure. But my question is can I include a custom defined characteristic also in the hierarchy which is not available in the field catalogs for characteristics system is showing?
    If so where should I define this characteristics first before assigning to the information structure.
    Thanks & Regards
    Enrico

  • How to make a mass copy of all pictures from iphoto?

    I bought new IMac and I have a lot o pictures in my old Imac. How to make a mass copy or transfer so files will sorted as they are in old IMac Iphoto?

    Are the photos on the old iMac in iPhoto?  If so just connect the two Macs together and copy the iPhoto Library from the old iMac to the Pictures folder of the new iMac.
    If you already have an iPhoto library with photos in it on your new iMac be sure to rename the old library to something else so it won't overwrite you new library.
    If you want to merge the two libraries into one library either the latest verson of Aperture or the paid version of  iPhoto Library Manager can be used.
    Happy Holidays

  • Any function module to change planning hierarchy (tcode: MC92)?

    I need to change planning hierarchy for product alloction.
    I have tried to do it via transaction recorder, but some screens are missing when I tried to record it.
    Could any one please advise if there is any function module that can serve the same purpose? Thanks.

    Thanks Bhanu for ur quick reply.
    Is that enough to change the technical name in the table RSZCOMPDIR.
    Let me give some more information, idea is to change the technical name of all the queries present in a system based on a new naming conventions.
    Eg.
    Change all the technical name of queries ZQSAP to ZQXYZ.
    If there is function module which allows to change the technical name of the queries that not only updates the table RSZCOMPDIR but also all the interlinked tables.

  • BAPI / FM to update planning hierarchy details

    Hi,
    I need to update planning hierarchy details. Please suggest.
    I see some forums where they say there is no BAPI or FM. I also saw one where it said the BDC did not work.
    Have anyone done updation on planning hierarchy details?
    I would also like to know if it is a better idea to update the table directly.[For example: if i need to update details in table S350, can i just a update statement on that table].
    Thanks in advance.
    Regards
    Shanthi
    Edited by: shanthi v on Sep 28, 2010 8:14 AM

    Hi,
    I used update on the table directly. It's not a good idea but i was not able to find any FM or BAPI.
    Thanks

  • WANTED: Function Module (Product Allocation Planning Hierarchy Upload Tool)

    Hi,
    I would like to seek assistance in utilizing the <b>right function module</b> in uploading Product Allocation Planning Hierarchy to MC62.
    I've tried direct table update and BDC but to no avial.
    Points will be rewarded.
    Thanks in advance

    Hi,
    I'm having trouble using the FM 'MCP_GET_HIERARCHY'.
      CALL FUNCTION 'MCP_GET_HIERARCHY'
        EXPORTING
          i_gstru             =
    IMPORTING
      RETURN              =
        TABLES
          t_filter            =
          t_char_values       = .
    What do I put in i_gstru, t_filter, and t_char_values?
    I'm very new with this.
    Thanks in advance for the help.

  • Planning Hierarchy

    During the creation of planning hierarchy, after entering the info structure system is generating an error stating that No planning type is maintatined. I don't have much idea on this.. Can any one explain me how to create a planning hierarchy?
    I want to change the fields in existing planning hierarchy? Can i change it?

    Hi Naren,
    See if this infostructure entry is there in the following config task. If not, you need to add or ask someone to do it.
    Implementation Guide for R/3 Customizing (IMG)
    -->Production
       -->Sales & Operations Planning (SOP)
          -->Master Data
             -->Set parameters for info structures and key figures
    Alternative path to the same task is
    Implementation Guide for R/3 Customizing (IMG)
    -->Logistics - General
       -->Logistics Information System (LIS)
          -->Planning
             -->Master Data
                -->Set parameters for info structures and key figures
    Srinivas

  • How to Mass-copy Orders

    Dear Experts,
    I have a requirement of mass-copying of orders and then do littile changes in the new orders.
    I would be grateful if you share various maethods of doing this.
    Regards
    Jogeswara Rao

    Hello Naveen,
    Thanks for reply.
    We need to have few general orders created on top Functional Locations (monthly) for day to day material postings in that area.
    These orders are required to be closed at the end of the month. We need to replicate same set of orders for next month.
    So that is the scenerio.
    This is an arrangement until we get to the status of positng materials in the very specific equipment work orders.
    Regards
    Jogeswara Rao

  • Periodic Mass Copy Oracle Assets

    Hi guys,
    Hopefully an easy one for you: we have a situation where Depreciation has been run in one of our Tax Books and the period closed, before the Periodic Mass Copy for that period was performed.
    Now Periodic Mass Copy doesn't pick up the month that the book is on, only the period prior to it, and hence will not run.
    Is there a way to reopen the period in this book. Not looking to re-open GL, just to be able to run Periodic Mass Copy.
    Cheers

    Hi
    You might want to post your question in Assets forum. This is Oracle Projects forum, where people may not be knowledgeable on your issue.
    Dina

  • Periodic Mass Copy Oracle Assets Issue

    Hi guys,
    Hopefully an easy one for you: we have a situation where Depreciation has been run in one of our Tax Books and the period closed, before the Periodic Mass Copy for that period was performed.
    Now Periodic Mass Copy does not pick up the month that the book is on, only the period prior to it, and hence will not run.
    Is there a way to reopen the period in this book. Not looking to re-open GL, just to be able "to run Periodic Mass Copy.
    Cheers

    Once the period is closed, there is no way you can reopen the period back.
    You may need to contact Oracle Support if they have an way out of it.
    Thanks
    Manish

  • While doing planning hierarchy, it is saying that planning level is not....

    hi,
    every body,
    while defining planning hierarchy, it is saying that planning level does not exist.
    please suggest me in which t code planning level is defined in sap.
    please throw some light.
    regards,
    balajit

    ok

Maybe you are looking for

  • Error message when shutting down

    I'm getting a message that says tss.exe is preventing your computer from shutting down. What do I do to fix this? I have to manually shut down.

  • Current Day EBS

    Hello SAP Friends, I need help on Current Day Bank Statement. Appreciate your input/help/opinion. My client wants to update Current day bank statement to G/L and Sub-Ledger so that any electronic payment received from customer updated in real-time. A

  • How  to get lightroom work with CameraRaw 5.2?

    Hello im using Lightroom 2 and CS4 on a imac 24". How is it possible to get Lightroom to work with CameraRaw 5.2? A simple installation don´t work. Any help is welcome! Greetings, Volker

  • Deadlock while perform JDBC operations?

    Hello, We are running Weblogic 7.0SP2 with Oracle 9.2.x as the db. We use Oracle for TOPLink as our orm tool for all db access. We are encountering strange deadlocks while doing db reads and updates from a message-driven EJB (MDB) whose onMessage() m

  • Trying to export a 47 minute timeline

    I am trying to export something form my timeline, it is about 47 minutes long, I have set an in point at thes start and an out point at the end, and I am selecting to export this particular sequence as a quicktime movie. It takes ages to export it, a