Planning Horizon - Two T Codes

Dear Experts,
We have 2 T-Codes where we can maintain Planning Horizon.
OPPQ - Maintanence of Plant Parameters.
OMDX - Planning Horizon
If I change the value (no. of days) of Planning Horizon in a T-Code, it gets automatically changed if I view it with another T-Code (OPPQ & OMDX).
I want to know, why 2 T-Codes are provided to do the same thing?
Is there any reason behind?
Pls guide.
Regards,
Rohit.

Dear,
In OPPQ is for plant parameter so it is not only relevancy for Planning Horizon. You can change the rescheduling horizon, Coversion type. Same thing you will get in OPPR also.
But OMDX  is only for  to maintain the Planning Horizon if you change her it will get copied to OPPQ and OPPR if in MRP group.
So you can say it is short cut to define planning Horizon.
Regards,
R.Brhmankar

Similar Messages

  • Planning In two Plant (Two company Code)

    HI..
        SCENARIO
    I have two company code, each having separete plant .
    Comapany Code A , Plant A
    Company Code B, Plant B.
    Now Plant A supplies raw material to Plant B, which after doing processing will give back to plant A.
    this Senifinish material after processing at plant A gives finish assembly.
    Can i plan these two plant in One Planning stage . (MRP at Plant A).
    If not what can i do to transfer the requirenement to PLant B, after MRP run at Plant A.
    Note: Its different company code.Spl pro Key 40,70,80 not work.
    please suggest
    Thnks in advance

    Hi!,
    Please go through the following link
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/4d/2b90dc43ad11d189410000e829fbbd/frameset.htm
    and check for  Stock Transport Order with Delivery and Billing Document/Invoice (Cross-Company-Code). I think you might have missed some setting otherwise it must work. I have already used this fuctionality.
    Regards,

  • WBS for two company codes

    Dear Experts,
    This requirement is for an IT service project.
    The process is - I have two company codes Comp code 1 & Comp code 2, In which Project is created in company code 1. Employees are assigned to project to onsite & offshore from company code 2. This means the employees are created in the company code 2. But working for the project in Comp.code 1. Comp code 2 get revenue thru intercompany billing based on number of hours/days the employee worked in the project created by the com. code 1. The employee books the timesheet in comp code 1 against the project id.
    To acheive this
    1)  i need to maintain same project for two company codes?
    2) Or same project, one wbs for one company code & other wbs for another company code?
    Will the above two possible to work in SAP? or
    anyother we i can workaround this
    Please advise
    Regards,
    Deepu Pillai

    Hi,
    This is possible through Resouce Related billing in PS.
    For e.g. Consider business scenario, where we have created T-10006 as a customer project.
    Now this project is mapped using a work breakdown structure that contains activities.
    The activities define the flow of the project and form a quantity structure for determining costs and payment data automatically.
    The project cost plan is used to create quotations.
    When the sales order is received, it is assigned to the project. This means that it can be used to plan revenue and then post this revenue.
    Actual costs are entered when activities are confirmed, components are purchased and when invoices are assigned. Actual revenue is posted to the project by means of milestone billing.
    Two companies are responsible for executing project T-10006.
    Company 'A' is mapped using company code 1000 and performs all services except for those planned in WBS element T-10006.1.2.
    Comapny 'B' is mapped using company code 2000 and performs some of the engineering services. (WBS element T-10006.1.2).
    Here Comapny 'B'  bills its services to Company 'A' on a resource-related basis.
    A results analysis is carried out for the billing elements T-10006 und T-10006.1.2 in the project.
    The results analysis values are settled to the profitability segment.
    Regards
    Tushar

  • Subcontracting b/n two company codes

    Hi friends
    i have caome across the subcontracting scenario which takes place between two company code with their respective plants, Please Provide best way to map the scenario
    Thanks
    Regards
    Deepak.Goura
    SAP-Consultant

    Sub Contracting Cycle
    (1) You have a material that can be procured externally, and you have maintained BOM with components. Any waste generated and received during subcontracting process can be maintained as component with negative quantity. 
    (2) You create a subcontracting PO (PO with Item Category L). You can also maintain Purchase Info Record for Subcontract category for material and subcontractor. 
    (3) You make a transfer posting to issue components for SC PO. Material is sent to subcontractor.  As material remains under your ownership, system does not make any value entry. But quantity is shown as "Material Provided to Vendor" 
    (4) You receive finished material against SC-PO. You also specify components consumed in manufacturing of finished goods. Additionally, if you have negative components in BOM, now you'll also receive subcontracting by-products. There are three events, so three accounting entries are generated: 
    DR FG Stock/ SC By-Product Stock 
    CR Change in Stock (FG/ SC By-Product ) 
    (for finished goods received) 
    DR Subcontracting Charges 
    CR GR/IR Clg 
    (for moneys payable to Subcontractor) 
    DR Consumption (Components) 
    CR Change in Stock (FG/ SC By-Product ) 
    (material provided to Vendor is now charged to expense) 
    (5) You do the IV for SC Invoice, and the process is complete. 
    Process of Subcontract in MM
    Sub-contract business process: 
    You want to buy material from the supplier (processed material/ assembled item) , but for some reason (quality of certain item / price ) you will give some component to vendor . 
    Vendor shall process the item / use the item provided & supply the final item. 
    SAP process: 
    1.Create the finished goods material code. 
    2.Maintain the BOM for the material. 
    3.Create PO with item category as "L" . 
    4.Issue material to vendor with movement type 541 
    5.Receive the material against the PO with movement type 101. 
    6.MIRO to account for vendor's invoice for the service charge& material used by him. 
    Can anybody tell me how a process has to be given to subcontracting?
    Suppose, I have 3 operations  1)weaving 2)dyeing 3)cutting & packing 
    if no 2 process (i.e Dyeing) has to be given to subcontracting, what process should i follow ?
    Vijay 
    The following process to be followed for subcontracting. 
    1. Item code(material master) to be created at the stage of before dyeing. 
    2. Item code(material master) to be created after Dyeing as subcontracted item.(F30) 
    3. Bill of material to becreated for the material(2) calling for material(1) 
    4. Inforecord and source list to be created for material(2) with the corresponding vendor 
    5. PO to be released for material (2) 
    6.Along with PO the material(1) to be issued to vendor 
    7.On receipt of material when GR is made the stock with vendor will get updated. 
    B.N.Rao 
    How to Create a Subcontract Order?
    To create a subcontract order, proceed as follows: 
    Enter the material you want to order and the item category for subcontracting (L) in the order item. 
    Press ENTER to display the screen for component processing. 
    Enter the components that the vendor requires to manufacture the product. 
    Please note: 
    – You do not need to enter the date required for the components. This date is proposed by the system when you press ENTER. 
    It is calculated as follows:
    Delivery date of the item - Planned delivery time
    – If you do not want the quantity of the components to be changed if the order quantity of the end product is altered, set the indicator Fixed quantity (column F). 
    – You can determine whether the components are available on the date required by selecting Edit -> Availability check. 
    If you entered a bill of material as the material in the subcontract order, the components are created automatically. 
    If you want to determine the components in the bill of material at a later date (for example, if the bill of material is subsequently changed), choose Item -> Component -> New BOM explosion. The existing components are deleted and redetermined in the bill of material. 
    Save the purchase order. 
    When you print the purchase order, the components are printed per order item
    Subcontracting - Key Points
    Special Procurement Process.
    Item category: L
    Order type: NB
    In info record vendor should be maintained as subcontractor.
    Vendor (Subcontractor) receives the components used to manufacture a finished product directly from your company or through third party.
    Your company should place a purchase order for the finished product.   In this manually you can enter the required individual components or it can be determined via the explosion of BOM (if exists).
    Stock check at vendor level: ME2O
    Company stock check: MMBE
    GR for individual components through movement type: 501 or 561 (if with out PO or without reference).
    GI to subcontracting vendor: through movement type 541.
    GR from sub contracting vendor: through movement type: 101
    Movement type 543 is displayed to cancel the material cost account.
    If the subcontracting order has to be generated through materials planning,the special procurement key has to be set in MRP 2 screen.
    SAP MM Tips by : Sundaramoorthi
    Email                     : [email protected]
    Editor Note:
    - To create the Subcon Info Record : Tcode ME11 - Info Category - Click Subcontracting
    - To create Material BOM : Tcode CS01
    - With the Info and Material Setup, you can then create the Purchase Order in Tcode ME21N

  • Subcontracting- with two company codes.

    Hi PP Gurus,
    We got two company codes say company code 1000 and company code 1100. We're having plants 4000 in company code 1000 and 5000 in company code 1100. Manufacturing of all SFG and FG take place at plant 5000 in company code 1100.
    Now the requirement is all Raw materials are supplied from plant 4000 in company code 1000 to plant 5000 in company code 1100.
    Client want all the RM cost to be captured in company code 1000 and plant 5000 will only invoice for Services that are utilized for manufacturing....
    How could we map this scenario? Either through making BOM and Routing in both plants 4000 and 5000. and in Routing of plant 4000 need to activate operation subcontracting and material to be supplied to plant 5000 and latter service cost to be captured through Service entry sheet. OR MRP area or Special prcurement key to be configured in plant 5000 to suffice the requirement?
    Please reply with your prompt comments.
    Thanks and Regards,
    Abu Arbab

    Hi,
    This you can handle through the special procurement. Both the plants you need to maintain the material master. In Plant 4000 is your supplying plant. In plant 4000 the raw materials you need to maintain as external procurement. Plant 5000 you need to maintain this materials as special procurement as withdrawal from alternate plant. Since your production plant is 5000, you need to maintain the BOM in this plant. In Plant 4000 you need not maintain the BOM. When you run MRP in plant 5000, the planned orders will be created in Plant 4000. This you can see in MD04 screen as planning plant as 5000. But the planned order number will be same in both the plants.
    Regards,
    V. Suresh

  • Production order on two company code

    I have two company code A110, plant p110 and A111, plant P111.
    My requirement: I want planned order in P110, production order in P111, goods receipt in P110, goods issue to plant P111.
    I setup material code 200201 for both plant, in plant A110, I use special production, receiving plant A111. besides this, what should be configured to meet with my requirement, thanks

    SivKumr,
    First, a technical question.  You mention A110 and A111 as company codes in the first statement, then you mention them as plants in the second statement.  Can you elaborate?
    Actually I don't know what you want from us, you haven't mentioned yet what your problem is.  Exactly what do you want to happen that currently does not happen?.   
    In your original statement you have described your desired solution, which I must say is...ah....odd.  How about also enlightening us with a statement of your business requirements?    I personally am at a loss to conceive of any business reasons why a company would wish to implement such a solution.
    You might also want to refer to SAP help, to see what special planning processes are available.
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/41/32b8371a2c9912e10000009b38f889/frameset.htm
    Best regards,
    DB49

  • Planning Horizon (NETPL) Period

    Please inform where to assign or enter short planning horizon period in SAP PP, based on which MRP will be carried out for that particular period(short planning horizon)? i know we define short planong horizon through processing key "NETPL". Thanks in advance.

    Hi ys yadav,
    Go to T.code OPPQ in that select your plan and go inside there you find Planning Horizon there you maintained your planning horizon.
    Hope this will help you,
    Regards,
    Rajesh Tayade

  • Planning horizons of SNP and PP/DS

    In didn't understand the  below terminolgy , can anyone please explain the meaning of it in detail..
    The planning horizons of SNP andPP/DS overlap , if the SNP  production horizon is shorter than the PP/DS horizon

    Please see the following two forum threads
    SNP and PPDS planning horizons
    Difference between Plannnig Horizon and Production Horizon
    Also refer to SAP Note 481906 - SNP - PP/DS integration for more details (its a pretty lengthy note)
    Hope this helps.
    Somnath

  • Applicability of Two Tax codes in one line item

    Dear Experts
    How can I set two tax codes (one is VAT & other is Service Tax) in one line item.

    Dear Parikh,
    You can't set / maintain 2 tax codes for one line item in PO.
    You can craete the new tax code and maintain the values in tax code (TAXINJ)
    If you are using the TAXINN then maintain the condition record as per requirement.
    Regards,
    Umesh

  • Two tax code in one invoice?

    Hi,
      Is it possible to maintain two tax codes in one invoice?
      Or can Is is it possible maintain tax codes line item wise of invvoices?
         Thanks and Regards
              Anil Patil

    HI,
    YES you can use taxcode item wise.
    THe items in the PO can have different tax codes for different material.
    And the same can be there in MIRO also.
    Thanks & Regards,
    Kiran

  • One vendor for two company codes

    Hi Frds,
    I have two company codes and i create a vendor which is applicable to both the company code.Is it required for me to create separate Payable reconciliation GL account  for each company codes or creation of one common recco  account is enuf.
    Please elaborate on this as am new to this..
    Thanks,
    Rashmi Ravi

    Dear all,
    SAP allows You to create a customer / vendor master data that contains information that is valid for all the Company code --> into General data.
    Then there is a part, Company Code data, where You can define specific details for each Company Code.
    The transaction is the same FD01 or FK01.
    I hope this helps You.
    Mauri

  • Different Bank charges GL account for two company codes with same COA

    Hi,
    While configuring OBXK ( Automatic GL account for bank charges)  , I see there is provision to enter only one GL account per chart of accounts.
    We have two company codes using same chart of accounts but different bank charges GL account. Please tell me how to configure this.
    Thanks,
    suresh

    Hi,
    Thanks Krishnan and Chandra.
    I agree with you it could be the same GL account for bank charges, but the business requirement is such that in one of the two company codes, bank charges are required to be tracked separately to be subsequently transferred to the other company code. This means two separate GL accounts are required for two company codes which needs to be configured in OBXK.
    Hope this clarifies my query further.
    thanks,
    suresh

  • Can I create a single PO for two company codes

    Hi
    Can I create a single PO for two company codes. Though I know that Company code is assigned at header level but still I know there is a setting in controlling which when activated two company codes under same controlling area can procure the goods under the same PO.But i forget from where to activate that message or control in config.
    Thanks

    Hi Lekhram,
    I'm just beginner so maybe I got the wrong end of the stick.
    If you order something that something must belong to a definite company > plant. How could possess two company the same thing at the same time (totally)?
    (companies are at the same organisational level - none of them is subject to the other).
    Maybe I'm mistaken.
    So I <b>guess</b> you can use only one company code for one PO.
    Controlling area & company code
    http://help.sap.com/saphelp_46c/helpdata/en/e5/077a704acd11d182b90000e829fbfe/frameset.htm
    http://help.sap.com/saphelp_46c/helpdata/en/08/513f4b43b511d182b30000e829fbfe/frameset.htm
    Purchasing & organisation
    http://help.sap.com/saphelp_46c/helpdata/en/75/ee0a9555c811d189900000e8322d00/frameset.htm
    All the best
    Csaba

  • Getting an error while activating a planning area "Enter values for planning horizon From and planning horizon To for the storage time profile level"

    Dear S&OP community,
    I am getting following error while creating a planning ares in a newly installed sandbox. "Enter values for planning horizon From and planning horizon To for the storage time profile level".
    This what I did...
    1) Created new attributes and master data objects and activated them successfully.
    2) Time profile created and activated successfully
    3) Trying to create planing area by assigning  time profile in step 2 and assigned master data from step1..Unable to save the data and system returns 
    this error - "Enter values for planning horizon From and planning horizon To for the storage time profile level"
    My understanding is time profile needs to be active  but doesn't have to have values...
    Any help is appreciated.
    Thanks,
    Krishna

    YS,
    Here are my time profile settings
    Level       Name          Display Horizon - Past  Display Horizon - Future
    1             Monthly     -6                                       11         
    2             Quarterly     -2                                       3
    3             Yearly        -1                                       2
    Time profile is active and but time profile data is not loaded
    Thanks,
    Krishna

  • Stock Transport Order between Two Company codes

    Dear All
    Scenario-- Stock transport order Between two company codes.
    The valuation of Comapny Codes is at Moving Average Price.
    I have a scenario
    MAP of Issuing Plant-- Rs. 10 / kg
    I am able to pick up the price of Rs.10 (MAP) of issuing plant while creating PO.
    in receving plant.
    At the time of Goods issu the MAP has changed & become Rs.12/kg. Hence the goods issue takes place at Rs.12/- perkg.
    When we make GR at receiving plant ,the valuation of GR is at Rs.10 i.e at PO price.
    Is it possible to have a GR valuation at Goods issue price for that delivery note?
    Request Your feedback urgently.

    The invoice has the material costs at time of goods issue.
    You receipt is valuated to PO price. But when you post the invoice, then the MAP is adjusted,
    By setting up EDI, SAP will probably post the invoice before the goods receipt is done, hence the GR should be valuated with the invoice price.
    from Note 518368 - FAQ: Valuation for the purchase order;
    With which price is the goods receipt posted for a purchase order?
    Answer:
    If the goods receipt is executed before the invoice receipt, the goods movement is valuated with the purchase order price. If an invoice is already posted, the system uses the price of the invoice. If a partial invoice is received, the partial quantity corresponding to the invoice is valuated with the invoice price, the rest is valuated with the purchase order price.
    For more detailed information, refer to both the documentation of the material valuation and Note 380883.
    see as well Note 547570 - FAQ: VPRS in pricing

Maybe you are looking for

  • Window hang

    Recently I had installed a new harddisk to my computer.But I faced a big problem is my computer will automatically hang once the window came out.It looked like some loading can't operate well.Can anyone please give me some advise.Thanks 1.intel celer

  • Restore database in a currupted OS

    hi all my datbase server is running on MS windows 2000 server..OS has formatted while database is running. oracle installation is in a differance drive. though database files and all are not formatted. what is the optimal way to restore this database

  • Chicago blues style drum track shuffle

    I want to find some chicago style drum tracks for garage band. Style like Elmore James, Howlin Wolf. Where can I find drum fills and beats for this style?

  • Why are EJB's in containers?

    Why are EJB's in containers? Isn't it annoying that you have to always install Jboss, Weblogic,... What's the advantage then? Is this one of the reasons why to use EJB and not Hibernate?

  • Printing with the setMask on a clip???

    I'm trying to print a movie clip that is being masked with a jpeg that is shiny surface. printAsBitmap("_root.designStage.designImageMC","bmovie") or my_pj.addPage(_level8, {xMin:570, xMax:980, yMin:100, yMax:500}, {printAsBitmap:true}); both are pri