Planning Level Root Question (Periodid Vs Monthly)

Hello,
I have a question related with planning level configuration.
In the standard SAP Planning area
SAP2 - All  the planning levels have been defined monthly attribute as the root for time
SAP4 - All the planning levels have been defined periodid attribute as the root for time
What is the difference between both type of configuration. (Selecting Monthly / period id as the root, what difference it creates and how it affects other areas)
I was testing consensus demand key figure in SOP 3.0 and I am unable to edit the key figure value in my planning area (KF value change in Excel) which is a copy of SAP4 planning area. Initial response from SAP OSS is to modify the planning level and use monthly instead of Periodid (But I have just copied the standard SAP4 planning area).
Uploading the key figure using KF template works fine but issues comes only when I tried to change the value in Excel or try to input new values in blank cells.
Same thing I also tested in IBP 4.0 FP1 Patch 1 and configuration is exactly the same as SOP 3.0 (Both SAP2 and SAP4 planning area) but I am able to modify consensus demand key figure in both the copied planning area (Copy of SAP2 and SAP4)  irrespective of monthly / periodid selected as the root.
Please let me know if you have observed this before and what are your feedback/suggestions.
Thanks
Girish

Hello,
I have a question related with planning level configuration.
In the standard SAP Planning area
SAP2 - All  the planning levels have been defined monthly attribute as the root for time
SAP4 - All the planning levels have been defined periodid attribute as the root for time
What is the difference between both type of configuration. (Selecting Monthly / period id as the root, what difference it creates and how it affects other areas)
I was testing consensus demand key figure in SOP 3.0 and I am unable to edit the key figure value in my planning area (KF value change in Excel) which is a copy of SAP4 planning area. Initial response from SAP OSS is to modify the planning level and use monthly instead of Periodid (But I have just copied the standard SAP4 planning area).
Uploading the key figure using KF template works fine but issues comes only when I tried to change the value in Excel or try to input new values in blank cells.
Same thing I also tested in IBP 4.0 FP1 Patch 1 and configuration is exactly the same as SOP 3.0 (Both SAP2 and SAP4 planning area) but I am able to modify consensus demand key figure in both the copied planning area (Copy of SAP2 and SAP4)  irrespective of monthly / periodid selected as the root.
Please let me know if you have observed this before and what are your feedback/suggestions.
Thanks
Girish

Similar Messages

  • Cash Management Report FF7B - drill-down from planning levels to AP/AR OIs

    Hi
    I'm configuring cash management and have created all planning levels and groups needed.
    All master data, ie GL accounts, vendors and customers, have the correct planning level or group.
    I've created all the groupings etc that I need.
    I'm running the reports FF7A and FF7B. I have two questions and problems.
    1. When running the Liquidity Forecsat for customers and vendors I drill-down to the standard PL or SL planning levels for AP and AR postings respectively. Then I drill into the planning groups correctly  (E1-E9 and R1-R8). But when I try to drill into the cash management detail records  (or is it the AP/AR line items?) I get "Memo Records: List - List Contains No Data". This happens every time. Should I now see the AP or AP line items? Or should I see some cash management memo records? I have deleted all the cash management data several times and recreated but I still get this problem  (using reports RFFDDL00 and RFFDKU00)
    When I do the same for purchase orders, purchase requisitions or sales orders I see a Memo Records List which agrees with the previous planning level total and I can then drill into the actiual POs, PRs or SOs from this list without an issue.
    2. When running the Cash Position and I do the drill-down to the GL Line Items, I get an enormous list which does not just show the total of items at the previous planning level. Why is this please? Example: a bank account with a balance of £2,000  (shown on the panning level) but with 000's of line items totalling say £5m. Again I have deleted the CM data and recreated but without any improvement to the problem.
    Any help anyone can give me with these issues will be very much appreciated.
    Thanks.
    Wayne

    Hi
    I have the same trouble with Tcode FF7B.  There´s a message "Memo Records: List - List Contains No Data"; bit in the TcodeFF7A, it runs OK.  The message appears just witn Tcode FF7A.
    Also, There´s all TR data in tables FDSB for GL accounts, FDSR and FDFIEP for customers/vendors.
    Can you help me??  can you solved this issue?
    Tanks for your Help

  • What is the significance of having a compound master data in the planning levels?

    In "SAP2" model there is PERPRODCUST as a planning level.
    This planning level has PERIOD, PRODUCT, CUSTOMER and PRODUCT-CUSTOMER master data as part of the planning level.
    Wouldn't PERIOD, PRODUCT, CUSTOMER be sufficient? Why is the compound master data required to be added to this planning level.
    Could someone clarify this for me.
    Thank you.

    I'll attempt:
    It depends on if you want to surface the result/value of the compound master data type on the key figures in your planning level.  If you do then you'll need to include it in the planning level.
    If the question is why would I want a compound master data type, then my attempt at that answer is as follows:
    From my understanding, the idea of a compound key figure is that you are able to derive an attribute or attributes that are related to, in this case, two master data types - all without having to 'store' that attribute on the transactional record.
    Here is a simplistic example:
    Master data on PRODUCT (where PRODID is the key)
    PRODID,PRODDESCR,PRODSIZE
    P1,Widget A,Big
    P2,Widget B,Big
    P3,Widget C,Small
    P4,Widget D,Small
    Master data on CUSTOMER (where CUSTID is the key)
    CUSTID,CUSTDESCR,CUSTREGION
    C1,Store A,West
    C2,Store B,West
    C3,Store C,East
    C4,Store D,East
    Master data on compound MDT PRODUCT-CUSTOMER (where PRODID and CUSTID are the key)
    PRODID,CUSTID,SALESREGION
    P1,C1,BIG_WEST
    P1,C2,BIG_WEST
    P1,C3,BIG_EAST
    P1,C4,BIG_EAST
    P2,C1,BIG_WEST
    P2,C2,BIG_WEST
    P2,C3,BIG_EAST
    P2,C4,BIG_EAST
    P3,C1,SMALL_WEST
    P3,C2,SMALL_WEST
    P3,C3,SMALL_EAST
    P3,C4,SMALL_EAST
    P4,C1,SMALL_WEST
    P4,C2,SMALL_WEST
    P4,C3,SMALL_EAST
    P4,C4,SMALL_EAST
    Finally you have some transactional data for the Key Figure on the planning level (ex: Sales)
    PRODID,CUSTID,SALES
    P1,C1,10
    P3,C4,15
    P4,C3,30
    P1,C3,20
    P2,C2,15
    *Note that you don't need to 'store' the sales region attribute on the record
    Then on your report, you can pick the SALESREGION and get your aggregated values:
    SALESREGION,SALES
    BIG_WEST,25
    BIG_EAST,20
    SMALL_WEST,0
    SMALL_EAST,45

  • Variable in the planning level

    Hi,
    One variable X is assigned to Y characterstic in the Selection tab of planning level.
    I want see the properties of X variable, i want to see the defination part of X varaible.
    where can i find the x variable?
    It would be great help for me.
    will assign the points.
    thanks
    BPS

    Hi Maynak,
    Thanks for ur quick reply.
    I assigned the points.
    So my question is : if i want the see vairable properties do i need to change the planning area to change mode?
    Is it any other way without changeing the planning area to change mode to find out the variable dfination part.
    Please help me in regards.
    thanks
    BPS

  • Selecting the Planning Level for Statistical Forecast in S&OP on HANA

    Hello together,
    we currently face an issue regarding the statistical forecast in S&OP on HANA:
    The customer wants to implement an S&OP process containing the two steps statistical forecast (automatically calculated) and sales forecast (manually determined). The planning level of the statistical forecast should be higher than the planning level of the sales forecast, i.e. the statistical forecast is calculated on a higher planning level and then disaggregated to be an input for the manually determined sales forecast.
    Since it doesn't seem to be possible to disaggregate any key figure below its base planning level we need to have the lower sales planning level as base planning level in all key figures, including the input and output key figures of the statistical forecast.
    When running a statistical forecast with a defined forecasting profile, the planning level used for the forecast seems to be the base planning level of the input/output key figures defined in the forecasting profile.
    However, we need to define a higher planning level for the statistical forecast in order to have a better data base for recognizing trends and sesonality. In APO DP it is possible to define the planning level for the forecast when running/scheduling the forecasting job. Is this also possible in S&OP on HANA? Can we define the planning level for the forecast in the forecasting profile or when running the forecast from the Excel AddIn? I tried to use the field "Filter" in the forecasting profile as it listed all the planning levels (as well as a lot of other things, we don't know where they come from), but the forecast was still carried out on the base planning level.
    Do you have any other idea where to define the forecasting planning level that is different from the base planning level of the input/output key figures?
    Thank you in advance,
    Jonathan

    Hi Bert,
    thank you for your fast answer. I checked the forum again and found this post:
    Question about Statistical Forecast
    However, I don't really get how the disaggregation is meant to work; the suggestion seems to be to calculate a forecast on an aggregated level, i.e. with input and output key figure with an aggregated base planning level, and then disaggregate it "somehow".
    Do you have any idea how this disaggregation might work and what other steps I have to consider?
    It seems as if I'd have to define a whole bunch of new key figures and have more than one output key figure but no input key figure for the statistical forecast, which doesn't make sense in my eyes.
    Actually I was looking for a solution where I can define my forecasting profile with both input and output key figure on the lower planning level and then insert the level I want the forecast to be done at either in the profile as well, or even more flexible when running or scheduling a forecast. Defining more key figures any time I need another forecasting level does not appear very comfortable. Is it meant to be like that or is there another way to reach the goal mentioned above?
    Cheers,
    Jonathan
    Edit: The mentioned thread contains some valuable information on how to disaggregate key figures. However, the really tricky decision is how to define the disaggregation ratio.

  • 2 variables for same characteristic in planning level in BPS

    Hello,
    I would appreciate your help implementing this scenario: a user has access to certain versions and should be a able to copy data between 2 of those versions.
    We have 4 versions on our master data: 001, 002, 003 and 004.
    A certain user should be able to access versions 001, 002 and 003, and should not be able to access version 004.
    So we have an authorization object applied to that user with:
      -> 0TCAACTVT EQ 03
      -> 0TCAIPROV EQ <real time infocube>
      -> 0TCAVALID CP *
      -> 0VERSION EQ 001, 002 and 003
    Then, users should be able to copy data between versions.
    We created 2 variables on planning area, named ZVERSOLD and ZVERSNEW, with these characteristics:
      -> Characteristic: 0VERSION
      -> Replacement Type: USERVALUE User-defined values
      -> Restriction of Values Required by User: enabled
      -> Input Allowed by User: enabled
    So this particular user should only see those 3 versions when pressing F4 when filing both variables.
    After that, we created the planning level with the u201Ccopyu201D planning function.
    But now, on planning level, we need to restrict 0VERSION, but we have a problem because we are not able to restrict it using 2 variables (ZVERSOLD and  ZVERSNEW). Only one.
    If we donu2019t use any variable, user gets an authorization error because he is not able to access to all data due to authorizations.
    Does anyone have a way to avoid this issue? Should authorizations be defined in a different way? Should variables be defined in a different way?
    Hopefully I exposed all required details to get help, and that my question wasnu2019t too much confused.
    Again, thank you very much in advance for your support.
    Rui

    Hello,
    If you restrict the VERSION with variable ZVERSNEW for target version then the function should work. But if you get any error related to reading reference data for the source version then you can create a new variable of type exit and populate it with the values selected by the user in two variables ZVERSOLD and ZVERSNEW using the two APIs :
    API_SEMBPS_VARIABLE_GETDETAIL  - to get the current value of the two Variables
    API_SEMBPS_VARIABLE_SET - to set the Variable Values for the Exit type variable
    Regards,
    Deepti

  • Current View as filter in BPC Vs Planning level and package in BPS

    Hi,
         If I understand correctly, the current view is as like a filter in BPC as planning level and package in BPS, by comparing then I notice that the value for current can only be single value while in planning level and package we can have range, multiple value of single value.
        Let's have a planning scenario  we need to planning for every month based on the actual month data,
    in BPS we can easily configure two type of columns with actual and planning data, while in BPC, since the current view only  allow single value, we have to copy the actual data to planning data, then with the category set to planning, we can do our planning. Of course if there is hierarchy, we can use parent to allow to display all the child.
       The other option is to use the EvGTS function which can retrieve the data outside the current view.
       Anybody have other though on this?
    Edited by: JW on Jan 7, 2009 5:51 PM
    Edited by: JW on Jan 7, 2009 6:25 PM

    Hi JW-
    I did not mean to imply that the Current View (CV) is not a filter.  It can definitely be used to filter data presented from an EVDRE as well as other Ev functions, just like filters in BPS and IP.  However as a developer you have the option to use the CV or, through your configuration, disregard and/or override the CV settings.
    One example of disregarding CV settings is using standard Excel functions to provide the user a dropdown list from which to select certain dim members.  The drop down box selection could be used instead of the CV for defining Ev function selections.  My point is that you have multiple design paths of controlling what data is selected/processed; you are not only limited to the CV values.  From a performance viewpoint, you are correct in assuming that limiting the data selection will greatly impact overall performance.  Using the CV to limit data selection to enhance performance is very valid approach, just be aware that there are several alternative ways (other than using CV to control data selection) available to the developer.
    -Sheldon

  • COPA-KE3I, Tranasport for Planning Level

    Dear All,
    When i am using Transaction Code  KE3I to create a transport Request for transporting Planning Levels, i am being prompted with a Work Bench Request and a Customizing request. Can you please explain the significance of the Work Becnh Request here(since in the T Code SE09 i find all the Planning Levels i intended to transport under Customising Request and the Work Bench Request seems to be empty).Should both these requests be transported ? Can you also guide me in the sequence of releasing them.
    Best Regards
    COTINYFEET

    Dear Ajay ,
    It seems i have no other option but to use KE3I in my Project. Now if i am using KE3I, and i have got two Reuests a) Workbench Request( this does not contain any Data when i see using SE09) b) Customizing Request(all the Planning Levels that are intended to be transported are there in this , used SE09 to view here).
    These are my Questions
    1) Should i Release both the Request. If so what is the sequence?
    2) What are the consequences if i dont release Workbench Request(since it contains no objects to be transported) and release only Customizng Request?
    3) Why should there be a Workbench Request Created here(KE3I), when i dont get it in KEPM(here only Customizing Request Is Created when i transport Planning Levels)
    Could you please shed some light into my queries.
    Best Regards
    COTINYFEET

  • KF defaulting to multiple sources, both defined at more granular planning levels

    Hello Experts,
    I hope this will be an easy one for you Personally, I have been trying to figuring out how to overcome this issue and I must admit that I am short of solution.
    So here is the situation:
    I have two sets of data for my actual sales :
    - First one is loaded at planning level @ Period | Product | National Group | Point of Sales(POS)
    - The other is loaded @ Period | Product | National Group | Ship-To Party
    To get a valid portrait of my actual sales, I must compare these two sets of data at a common planning level (i.e. @ Period | Product | National Group).
    Then, the adjusted result must be "re"disaggregated @ Period | Product | National Group | Point of Sales, the base planning level used to forecast. 
    Based on what I could understand from SAP2 model, I created the following key figures:
    ActualsQtyPOS : Stored at base planning level @PERPRODNATPOS and calculated @PERPRODNAT. Here are the 2 calculation definitions I used:
    ActualsQtyPOS@REQUEST = SUM ("ActualsQtyPOS@ERPRODNATPOS")
    ActualsQtyPOS@PERPRODNAT = SUM ("ActualsQtyPOS@ERPRODNATPOS")
    ActualsQtyShipTo : Stored at base planning level @PERPRODNATSHIPTO and calculated @PERPRODNAT. Defined with this calculation:
    ActualsQtyShipTo@REQUEST = SUM ("ActualsQtyShipTo@PERPRODNATPOS")
    ActualsQtyShipTo@PERPRODNAT = SUM ("ActualsQtyShipTo@PERPRODNATPOS")
    AdjustedActualsQty : Created at base planning level @PERPRODNAT. This KF must be stored and editable. The value must be defaulted to ActualsQtyPOS@PERPRODNAT, unless no data exist (then, default to ActualsQtyShipTo@PERPRODNAT).
    AdjustedActualsQty@REQUEST=SUM ("AdjustedActualsQty@PERPRODNAT")
    AdjustedActualsQty@PERPRODNAT=IF(ISNULL("AdjustedActualsQty@PERPRODNAT"),IF(ISNULL("ActualsQtyPOS@PERPRODNAT"),"ActualsQtyShipTo@PERPRODNAT","ActualsQtyPOS@PERPRODNAT"),"AdjustedActualsQty@PERPRODNAT").
    My issue : I tried several (and I mean several!) configuration possibilities. So far, the best result that I got was to default the good value in AdjustedActualsQty based on the calculation rule above. But my core problem persists: I am not able to edit manually the defaulting value and save the new value in the database.
    Based on my comprehension, the problem would be related to ActualsQtyPOS and ActualsQtyShipTo Key Figures. Both are stored at a more granular planning level, and then calculated @PERPRODNAT level. In addition to storing them at their base planning level, would it be possible to store the aggregated results at a higher level (@PERPRODNAT)? This way, I would be able to use them as stored input in AdjustedActualsQty@PERPRODNAT calculation and duplicate the AdjustedActualsQty KF used in SAP2.
    Any help would be greatly appreciate.
    (I tried to summarize the best I can, don't hesitate if you need more details on some points.)
    Best regards

    Hi Philippe
    you dont  need access to HANA, it is pure config
    Go to Configuration -> Miscellanious --> Manage Planning Operator
    If not existing yet, create a new type by clicking on teh white "sheet" symbole "create new" on the right side.
    In the popup enter the EXACT name COPY (not more than one possible):
    Provide info for "Add Job Procedure" and "Schedule Procedure":
    Add Job Procedure = "SAP_SFND"."sap.sop.sopfnd.catalogue::SOPAPI_OPERATOR_SCHEDULER_JOB_ADD"
    Schedule Procedure = "SAP_SFND"."sap.sop.sopfnd.catalogue::SOPAPI_EXECUTE_SCHEDULER_COPY_JOB"
    Than add you operator lines by clicking on the plus symbol
    with the following parameter:
    DURATION
    PERIOD_OFFSET
    SOURCE_KFID1
    SOURCE_KFID2
    DURATION: e.g. 24 if you want to copy 24 months
    PERIOD_OFFSET: e.g. 0 when you want to copy starting current months, or -1 if you want to start previous months
    SOURCE_KFID1: starting keyfigure FROM which you copy. MUST NOT have any UoM or currency conversion
    TARGET_KFID1: your target keyfigure. UoM or currency conversion in here is allowed
    You could have SOURCE_KFID2 and TARGET_KFID2 as well. And you can have more than just one line.
    Flag the batch and filter mode flags, but not interactive (not supported yet)
    Provide a useful DESCRIPTION as that is seen by the users
    Make sure that not too many users get the authoriozation for it as if you execute that withiout a filter accidentially it does not only change all values, but if you run more than one at a time that migt get to conflicts. Like normal batch jobs: You usually give admins or power users access
    It copies on the very lowest possible level. You cannot tell the system as in APO-DP to copy on an aggregated level. PLus, source and target kf must have the same planning level. So you may copy from a calculated kf that does the calculation on the level of the target kf
    Dont have any docu, sorry. Hope that helps
    Yours
    Irmi

  • Question, the 18 months financing with order total $429 and above. Is it before or after tax?

    Question, the 18 months financing with order total $429 and above. Is it before or after tax?

    Hi Hoan,
    Kst8no1 is spot-on here: your purchase would need to total $429 before sales tax is applied to qualify for 18-month financing. Full details on this particular financing plan can also be found here.
    Aaron|Social Media Specialist | Best Buy® Corporate
     Private Message

  • Creation of new planning level in BPS0 in BW 3.5

    Dear Experts,
    I have to create a new planning layout in BW 3.5 BPS
    for this ,I have followed the below procedure:
    -Maintained the master data of new keyfigures in Info Object: Key Figure (0MEASURE) in RSA1
    -Copied the Similar Planning level in the same Planning area (in which I need to add the new one) and created a new planning level with its subordinate objects and then changed by deleting  the keyfigures except # and added the new keyfigures, to be maintained in new planning area and saved.
    -Changed the planning layout (which is created automatiacally whne we copied planning level) by deleting the existing key figures except 0KEYFG_FLAG and added the required key figure and saved.
    -copied the planning profile and created a new planning profile and changed it with required planning level and package and saved.
    -In T-code:upx_mntn1, I could see the new planning level with the required key figure there.
    But this new planning profile is not appraring in the CRM server.
    As I haven't  worked in BPS , please guide me if there is any thing needs to be done or any changes in the procedure followed.
    Please share any documentation or links you have ....regarding this
    Please share your Ideas
    Thanks in advance....
    Arjun

    Hi,
    The Planning Profile has been created in CRM also and hence the configuration is working

  • Setting # for 0CALYEAR in selection for planning level in BPS

    hi all!
    when i try to set # for 0CALYEAR (and other time variables) in selection for planning level in BPS, i recieve the following error message: 'Value # is not permitted for characteristic Calendar Year' (UPC003). As i understand, this problem began to occur after upgrading to SPS12.
    we have BI 7.0 installed
    can anyone help me solve this problem please?

    <FONT FACE = "Tahoma", Font Color = "Blue">
    Hi<br>
    Check in year master data if value BLANK (#) exists. System should permit only those values for characteristics which are available in master data tables.<br><br>
    Secondly, does system allow you to select value # for calendar year using the F4 drilldown?
    <br><br>
    Hope it helps.<br>
    Cheers Abhijit</FONT><FONT FACE = "Verdana", Font Color = "Red">
    Please assign Reward Points if I above information was useful
    </FONT>

  • How to make authorization to different planning level on one planning area?

    now the situation is one planning area call one global company, under that we create several planning level for serveral sub-company. The authorization should that one sub-comp. only can display, change his planning level, and can not display any other sub-comp. So, in this case how to make authorization? Thanks!

    I didn't create an authorization variable on sub-comp. pls, let me know how to create an authorization variable on sub-comp, and the info for the next steps. thanks!

  • Objects transported when we transport a Planning level in BW-BPS

    Hi All,
       Can anybody tell me what are the objects that will get transported when we transport a Planning Level under a Planning Area in bw-bps.
    Thanks in Advance
    Asif

    Hi
    I am facing a problem that whenever I transport BPS objects everything comes in ,but the formula written in Excel Sheet doesnot gets transported .
    I have tried doing 2-3 times but problem still exists ...can someone help me
    Regards
    Tom

  • Affect of a new planning level selection

    Hi,
    we have a BW-BPS environment with lots of BPS functionalities, palnning sequenses, save, copy functions...
    Until now we have all products from SAP R/3 extracted.
    Newly there are now in SAP R/3 lots of small products. Planning people donu2019t want to see and plan all products in planning layouts. They want to see to plan only the "important products".
    The following solution is thought.
    we will create a product hierachie with 2 hierarchie node: "important products" and "small products".
    the hier. node u201Cimportant productsu201D should be used in all planning levels in selections.
    How can it (selection in planning level) affect the current planning functions ?
    What would you suggest here?

    Hi,
    Planning functions are assigned to just one planning level. So if you have planned to restrict the values using Hierarchy at planning level, then the underlying functions will apply only to that hierarchy members.
    regards,
    Lokesh Nandula

Maybe you are looking for