Planning strategy grp in MTO

Hello All,
We have a pure make to order scenario (Stgy grp 20). In one of the orders, the material master creation group forgot to enter the stgy grp in MRP 3 (It is actually left blank). Also, the sales order for that particular material is created and MRP run taken.
To my surprise, i found that planned orders are still getting generated and are still percolating down to the bottom most level even after not defining the planning strategy group in material master of FERT.  How is the planned order getting generated due to presence of a sales order even without the stgy. group? I believe it should not have got generated.
Need ur help..Am i going wrong somewhere?
Thanking you in anticipation,

During sale order creation system will check the schedule line category first (  based on MRP type system will pick the schedule line category) if  the schedule line category has CP ( relevant to MRP), system will set theis sale order as relevant to MRP.
and then system will check the stratergy group in material master, based on this requirement type for customer requiremnt is picked, during MRP, system will behave based on requiremnt type.
if the stratergy group is not mainatined in material master then only system will check for MRP group for stratergy type and find the requiremnt type.
If the stratergy group is not find in material master and MRP group, system will trigger MRP for sale order with schedle line category .
In schedule catergory config( V0V6) you can fid the requiremnt transfer tick), this setting will trigger the requiremnt to MRP eventhough stratergy group is not maintained, if stratergy group is mainatained, system will behave based on stratergy group( reuirement type.

Similar Messages

  • The system is not considering the free stock in planning strategy grp - 25

    Dear Frndz,
    The system is not considering the free stock of child items available in the system.For the parent item, I have maintained a planning srategy of 25 (Make to order variant config).My client would like the system to consider the free stock available for child items.pls help me...
    Regards,
    Srini

    Dear,
    Strategy 25 will not consider the existing stock.
    What you enter in MRP4 view ind/collective rquirement is applicable only for dependent requirement.
    Also refer this thread?
    Re: Strategy group 20
    Run MRP in MD50 and then MD02 with palnning mode 3 deleted and recreated and check your result.
    Regards,
    R.Brahmankar

  • Confirmation date - Strategy grp 50

    Hi, can anyone advise why when we use strategy grp 50 'Planning without final assembly' for MTO scenario, the confirmed date/lead time in the SO is based on the inhouse production time only?
    When i use strategy group 20 'Make-to-order production', the confirmed date/lead time in SO is based on inhouse production time + GR processing time.
    Can i know why the difference in th delivery scheduling?
    Thanks
    Peter

    Hi PP,
    The following links may help to clarify your doubt:
    [Strategy type|http://help.sap.com/saphelp_46c/helpdata/en/e0/71bb169c9f11d191920000e8a5f6e6/frameset.htm]
    [Availability check|http://help.sap.com/saphelp_46c/helpdata/en/cf/70124adf2d11d1b55e0000e82de178/content.htm]
    Regards,
    Abhee.

  • When will EK02 appear in the Sales Order?? For different planning strategy?

    Hi Experts,
    In our SAP system ,when you create a sales order with a material which planning strategy is
    50 Planning without final assembly (MTO) , in the item detail screen , on the "Conditions"
    TAB, we will see condition type EK02 and its value.
    But when I create a sales order with a material which planning strategy is 40 Planning with
    final assembly (MTS),in the item detail screen , on the "Conditions" TAB, condition type
    EK02 will not appear.
    I have checked the customizing of our SAP system ,as follows:
    For planning strategy 50, the Requirements class is "045"(MTO val. with cons.),and on the
    configuration screen of Requirements class,we see "Condition type for copying costs from
    line items" (CndTyLineItems) is null ,no value ,not "EK02".
    And for planning strategy 50,the the Requirements class is "050"(Warehouse consumpt.) and
    and on the configuration screen of Requirements class,we see "Condition type for copying
    costs from line items" (CndTyLineItems) is also null ,no value ,not "EK02".
    And on the configuration screen of Sale Order Type screen(VOV8), we see  "Condition type for
    copying costs from line items" (CndTyLineItems) is "EK02" for all the sales order type we
    have used.
    So I am very confused.
    Why material with planning strategy 40 there is no EK02 in the sales order?
    Why material with planning strategy 50 there is EK02 in the sales order?
    Where is the EK02 come from? The requriement class ? Or the Salse order Type?
    Are there any other customizing for Condition type EK02 determination?
    Thanks very for any reply!!

    Hi,
    In MTO you will create Process order.
    And to Produce a Item you use Sub components that is Raw material
    That raw material cost is EK02 which you maintain in the Material Master - Accounting View 1.
    You can see cost in the Process Order also .
    Note : Dont post same in different posts

  • Planning strategy for Both scenario of Make to order and make to stock

    Hi
    My client having Both scenario of Make to order and make to stock ,so please explain me step by step which Planning strategy is use for following situation
    1.Forecast the production quantities for the variants and create the PIRs
    2.sales order is created for variants
    3.Planned independent requirements should consumed by incoming sales orders
    Note:If it is MTO scenario i need sales order reference number in production order
    With regards
    Laxmipathi

    Hi,
    You can Define Strategy Group under SPRO>Production>Prod.Planning>PIR>Planning strategy-->define st.Group.
    In this step, you group strategies together into a strategy group. You can determine a main strategy as well as up to seven alternative strategies.
    The main strategy is proposed in demand management or in sales order management and can be overwritten by another planning strategy defined in the strategy group.
    You can allocate the strategy groups to the materials directly in the material master record, or you can allocate the strategy groups to an MRP group and then in a second step allocate the MRP group to the material in the material master record.
    Hope it will help you.
    Regards,
    Mukesh

  • Planning Strategy 63

    Hello All
            In my current scenario am using planning strategy 63 (Planning with planning material & without MTO), am having planning material X-PL with its variant materials X-1 & X-2, BOM of X-PL is having a component X1-C which is common to planning material and its variant materials. Am creating PIR for X-PL and running MRP, with that am procuring X1-C(common component) internally. When i enter sales order for X-1 system consumes PIR of X-PL which is all OK, & when i run MRP for X-1 system creates planned order for X-1 and also for X1-C, here i am having issue becaue system shall create Planned order & purchase requisition for all the components of X-1 leaving the component X1-C because it is already procured & is in the stock because of the planning of X-PL. Looking forward to your positive & prompt response. Shall be thankful for your valuable guidance & inputs.
    Regards,
    J K Tharwani

    Hello All
          Thanks to you all for your valuable support & inputs regarding this issue, my issue has been resolved, SAP service gave me the reply to this query & that too their development team.
    In my current scenario am using planning strategy 63 (Planning with planning material & without MTO), am having planning material X-PL with its variant materials X-1 & X-2, BOM of X-PL is having a component X1-C which is common to planning material and its variant materials.
    Am creating PIR for X-PL and running MRP, with that am procuring X1-C(common component) internally.
    When i enter sales order for X-1 system consumes PIR of X-PL which is all OK, & when i run MRP for X-1 system creates planned order for X-1 and also for X1-C, here i am having issue becaue system shall create Planned order & purchase requisition for all the components of X-1 leaving the component X1-C because it is already procured & is in the stock because of the planning of X-PL.+ In planning strategy 63 the system doesnt take into account avaialbility check which we define in MRP view.+
    At this point as the sytem was supposed to switch the dependent requirement of X1-C from planning material X-PL to dependent requirement of X1-C from variant product X-1, but it doesnt work like that. We have to run MRP again of Planning material X-PL, & its result is that the dependent requirement of X1-C from planning material X-PL is switched to dependent requirement of X1-C from variant product X-1, moreover the planned order(type VP) of planning material X-PL is also reduced/consumed in proportion to the quantity of sales order of variant product X-1, after we re run the MRP for planning material X-PL.
    Hope this shall clarify many doubts about this strategy, & i think many of us shall be using this strategy now as per the client requirement.
    At last thanks to you all for your valuable support & inputs. Shall look forward to the same support & guidance which i get from you people, this issue of mine is now resolved & am sure that this shall help many of us now.
    Regards,
    J K Tharwani

  • Planned independent requirements for MTO material

    how can i maintain PIRs for an item that has strategy 20 (MTO)? when i try to access MD61, sap tells me that i need a requirements type, however strategy 20 doesnt really have these,

    Hi Raf,
    If you are using planning strategy 20 (MTO) then directly create sales order
    If u r use planning strategy 10, 11, 40 (MTS) then you can use create PIR (planned independent requirements)
    Regards,
    Sankaran

  • Availability Check / Sales Order / Planning Strategy 50

    Hi,
    the material master has been setup with planning strategy 50.
    now if i sales order is created. the system directly created planned order for the sales order quantity.
    Now, there is smtimes a situation that some stock is already present in unrestricted stock for that material. thus during order creation, the system should first check the stock available in unrestricted stock...and if the stock is available, then system should confirm the stock without creating any planned order. and if there is no stock available, then system should go with creating planned order.
    now what should i do in ATP check to cater this requiements? Please guide.
    Hope i have explained the issue correctly.

    Hi Robert,
    check this thread Re: Emergent! Can MRP consider unrestricted-use stock with MTO plan strategy???
    Best regards,
    Zuzana

  • Combining Planning Strategy

    Hello All:
    One of our requirements happens to be that when sales order comes in near future (within time fence as an example) - we want to explode into the BOM and look at components availability and promise the sales order to the comp availability. Additionally, When sales order comes in FUTURE - we want to leave MRP to plan for that instead of ATO to be invoked.
    One of our potential solutions we tried was to have Planning Strategy 81 (create planned order based on component availability based on works availability of component). This will be a order type 'KD' from MTO/Assemble to order. This makes it an ATO all the time (even for  a sales order which is way far out).
    We want to be able to create a 'standard' planned order outside of planning time fence. This will be the 'LA' type of stock order. Is this possible thru combination of planning strategies with 81 or any other strategy like 63 etc..? Thanks in advance.

    VG,
    Why don't you use Strategy 81 throughout the entire horizon?  If you set the ATP of your components to consider 'Lead time', then all sales orders 'far' into the future will be automatically confirmed.  Regular MRP runs will tell you when you actually need to buy/build the components.
    Best Regards,
    DB49

  • Planning strategy group

    Dear Gurus,
    Please elaborate the function & logic of planning strategy group used for production planning? How the alternate strategies works under main strategy?
    Regards,
    SAP CONS

    Once Planning strategy is created , Then we need to assign planning strategy  in Planning Strategy Group in IMG> Prdn> prdn planning> PIR> define strategy Group,
    In Planning stratergy Group we can assign 1 main strategy and 7 alternate strategy.
    Ex: If the same material is produced both MTS and  rarely MTO means
    Maintain a Main strategy as 10 and Alternate strategy as 20
    Then when ever sale order comes System will take KSL is sale order, system will consider MTS as per Main stratergy
    If you want to procure based on Customer for that Material Then Go to procurement Tab of sale order change the Requirement type as KE. and save, ( system will allow only KSL and KE based On streatergy Group, System will take deafult main stratergy, IF you want to change the stratergy got to sale order procurement tab, change the reqmt type)

  • Reg:planning strategy

    Hi,
    what would be the Planning strategy if we have both make-to-order and make-to stock scenario for the same finished product
    Regards,
    Raj

    HI
    Normally Str 40 works in the both ways, but its still a Make to Stock stratergy which also considers SO.
    but this does not  behave as a pure MTO as you would not get the SO reference in production order.
    If you want it that way, one option would be to combine these stargtergies 10 & 20 in a Zstartergy group
    & assign it to the material. Latter when creating the SO for the line item you the option of selecting
    the requirement type, & based on this the Production order would be created as MTS or MTO order.
    Hope this helps.
    Mithun

  • Link between process order and sales order for planning strategy 52

    Hello,
    I investigate the possibility of a link between "sales order" and "planned order / process order" for the usage of planning strategy 52 (planning w/o final assembly, make to stock).
    I know, this is not conform to the basics of planning strategies (EITHER make to order OR make to stock) and I suspect it would be a modification. Of course we have the alternative "make to order" - strategy 50, but we do not want to use individual customer stocks.
    Is anybody there with similar customer requirements or project experiences?
    Thanks in advance,
    Joerg
    Message was edited by:
            Jörg Demtschuk

    Hi Jorg,
    To my understanding if you need hard pegging then in SAP only Individual requirement is possible.
    Or else you need to create a custom transactions/table to identify Sale order and when ever a process order is created by selecting the sale order record, the process order detials should also get updated against that.
    You need to take the help of ABAP expert for this,
    Regards,
    Prasobh
    Reward points if this was useful

  • MRP exception message 64 and planning strategy group 52

    Hi Gurus,
    I have done extensive search online in the forum to find the route cause why we are getting MRP exception message 64 for a specific material in one of our plants. This exception message does not occur for the same materials which is also produced in another plant.
    I was just wondering whether the planning strategy group of 52 in MRP 3 view would have any effect on the frequent occurrence of exception message 64. I know that the 64 message occurs when the routing time is higher than the in house production time. If that's the case where to look for in routing to correct this, apart from this do we need to look at work centers and other details. I'm not a  PP person but still was curious to know see if i could take a shot at it.
    Also the MRP settings that we follow in the plant where this problem does not occur is NETCH, Create PR - 2, Schedule lines - 3, create MRP list - 1, Planning mode - 3, scheduling -2
    in the plant where the 64 message occurs quite often is Netch, Create PR -2, Schedule lines - 3, create MRP list - 1, planning mode - 1, Schdeduliing - 1
    I was  thinking do MRP settings and planning strategy group would have any impact on why we are getting the 64 wexception message
    Because of this 63 exception message, the downstream components are getting wrong signals.
    Thanks
    Ravi

    Hello Ravi
    Generallt, exception message "64 - Production finish after order finish" is triggered when the order start date is in the past and system automatically changes to forward scheduling to calculate the finish date.
    Note 1913017 explains how the order basic date is calculated and adjusted in case of forward scheduling, however, you are using strategy 52 and this is a very special scenario, whever VP planned orders are generated.
    The VP planned orders will always be adjusted to the requirements date even if the requirements date is in the past. This is a special feature in the planning segment, since these orders are only kind of 'virtual' planned orders. These orders only have to provide the demand requirements for the components in time.
    Therefore, there is a relationship between strategy 52 (VP planned order) and the exception message observed.
    BR
    Caetano

  • Planning Strategy

    Hi all
    i am pretty confusion about decide the planning strategy.
    here my client requirment is construction project and  they have their own plant to full fill their requirments.process flow is like this
    get requirments from different projects
    Project Plann dept will raise the indent to commercial dept(purchasing)
    procure raw material and they will send to storage location
    production will run MRP and create pln order
    then execution of production
    issue of finished Goods (Hot Mix and WetMix) to projects
    reconcilation of rawmaterial consumption to tht project.
    can any one tell which strategy will suits my client requirment

    Hi there,
    you can use strategy 40 Planninh with planning with final assembly....
    Regards
    Hemant g

  • Reg:Planning Strategy 40

    Hi friends,
    i need to know about planning strategy 40.
    For EX:
    1. suppose if we have  planned and created PIR from january to march(quarterly plan) for any product, now if we want to change the plan how the system will behave..can we change the PIR  which we have generated from JANUARY TO march.
    If it is possible to chnage ,,how to change the PIR..what will be the impacts.
    2' Can we create another PIR once again from january to march...or feB to march apart from existing PIR
    3. suppose if i have created PIR from january to march , and splitted into daily  plan, in between if the sales orders comes how this planning strategy 40 will behave.As it is make to stock.
    For Ex:
    We have planned 1000 numbers in the month of january, daily 50numbers production.
    Suppose if we get sales order for another 2000 apart from our planning 1000numbers ,how this planning strategy will behave.
    Thanks in addvance.

    Dear
    Planning startegy 40 works like follows :
    It is basically Consumption of PIR not Reduction of PIR .
    Example :Let say you have  PIR for 1000  for January  and it is appearing in MD04
    Now you have sales order for another 2000  for same month .Here PIR quantity is less than the Sales Order Qty ! Now run MRP -MD03/MD02 -NETCH , 2,1,3,3,2 and check the Result .Here PIR will be vanished and PR/Planned  of 2000PC will be appearing in MD04.So PIR is consumed by Sales Order .
    Now you have   PIR for 2000   and you have sales order for another 1000  for same month .Here PIR quantity is more  than the Sales Order Qty ! If you goto MD04-Sales Order will not appear at all .That means Sales Order is geting fullfilled by PIR deamnd. Now run MRP -MD03/MD02 -NETCH , 2,1,3,3,2 and check the Result .Here Sales will be vanished and PR/Planned  of 2000PC will be appearing in MD04.
    Refer : Re: Industry wise planning strategy usage
    Answer of your questions :
    1.You can goto MD62-Change and add PIR questiy at Material level , Plan Numbers , Product Group Level
    2.You can create but it will update th exsiting motnhly requirement  in the same planning table in MD62
    3.This question is answerd in the above explanation .
    Hope it helps
    Regards
    JH

Maybe you are looking for

  • Need suggestion on importing BC SET : UKM_DCD_CUST in SAP ERP system

    Dear Gurus, Client wants me to import BC SET : UKM_DCD_CUST into SAP ERP system. I have found BC SET : UKM_DCD_CUST in T code SCPR20. I have read most of the SCN discussion and got two way to import BC SET into ERP system as given below. But I need t

  • Problem importing Word document with TOC

    I am trying to import a Word document containing a table of contents into Pages. The TOC does not appear at all and I get a box saying: "The table of contents is empty because none of the paragraph styles selected in the Document Inspector are used i

  • What may interfere with 802.11n?

    Hello! I've got a very strange problem with my MacBook. I've just bought a new TC to replace my old 802.11g wireless access point. Now, there is a very strange thing: 802.11n has a very good signal in all my house, except my room. In the corridor, th

  • Nokia N97 Mini - Network coverage disappeared

    My Nokia N97 Mini, about 1 year old, suddenly decided it did not want to get any reception at all. I have travelled via train to different places for work and such and noticed it still was not getting reception. I have also tried restarting the phone

  • How to distinguish use of cmdlet versus alias

    It appears that Microsoft did not perform a very clean vetting of verb-nouns within its own products.  The Hyper-V folks have a set of cmdlets that are of the form verb-VMxxxx.  It seems like the System Center Virtual Machine Manager folks created al