Planning upgrading from t3i

Hey guys!So I've had my t3i for a while and I think I'm hitting the limitations in the t3i in terms of what I'm doing now. I've had the camera for about 1-2 years (was given to me as a xmas gift) and up until now, I've done automotive photography, nature photography, as well as portrait photography. I thought that the T3i was already a good enough camera for me to suit my needs but I realized I might need more now but I'm not sure. One night, I was doing rolling shots with a few buddies of mine and noticed in post processing, that there was a ton of grain in most of the pictures if I turned up the shadows (was shooting in betwen 1/10-1/20th of a second at F8.0 at 3200ISO. What are the benefits of upgrading from a T3i or do I just need a better lens? I was thinking of going to either a T4i or a T5i but at the same time, I want to go for a full frame sensored camera but I don't know if the types of photography I'm doing right now require such an advanced camera such as the 5D MkII  or if the t4i/t5i will be good enough. Also, do the lenses for the T3i work for the 5D MKII or do I have to purchase new lenses for it? I'm guessing the lenses for the T3i are compatible with the T4i and the T5i. Thanks!  

If you "turned up the shadows" on these, they were heavily underexposed... which is pretty much guaranteed to make for a ton of noise as soon as you turn it up in post processing. SHOOT RAW AND AVOID UNDEREXPOSURE LIKE THE PLAGUE. To me your sample shots still look a bit underexposed (nore on that in a moment). In fact, it's often better to overexposure your images a little... I use +1/3 stop for 3200 and +2/3 stop for 6400... then pull the image brightness back down in post processing. This minimizes noise, rather than amplifying it. I hope you don't mind... I took one of your images into Photoshop, lightened it a lot and increased the contrast... then applied Noiseware noise reduction (same "formula" that I use with my 7Ds when shooting at ISO 3200)... then resharpened the image a bit. Normally sharpening will really increase the appearance of noise, which is why I didn't do any more until after applying NR. It improved quite a bit, I think. But would have been even better working from an original, full size RAW file that had not been so heavily underexposed. I also fooled around with the color balance a little.... But there are mixed types of light in the image so, I didn't go to far with this. If it were my image and I were spending more time optimizing it, I'd do a color balance on the main subject and foreground, then adjust the background separately. Anyway, here's the result...   Regarding underexposure... Do you have your computer monitor calibrated? The reason I ask is that most monitors are way too bright to work with photographs, leading you to make too dark images, to the point you don't realize how much you are underexposing them when shot. The first step in calibration is setting the monitor's brightness. When I first got my current monitor 3 or 4 years ago, I had to set it down to about 20% brightness for accurate prints.  Now, after several years use I still have to turn it down to about 50% or my prints and images posted online end up way too dark. I am afraid you might be disappointed with a new camera if you don't resolve some other things first. Don't blame the gear! As it is, you likely aren't getting anywhere close to the best possible high ISO shots out of the camera you've got now. ***********
Alan Myers
San Jose, Calif., USA
"Walk softly and carry a big lens."
GEAR: 5DII, 7D(x2), 50D(x3), some other cameras, various lenses & accessories
FLICKR & EXPOSUREMANAGER   

Similar Messages

  • Hyperion Planning Upgrade from 11.1.1.3 to 11.1.2.2

    Hyperion Planning Upgrade from 11.1.1.3 to 11.1.2.2
    So far I have done the following 3 steps:
    1. I have successfully installed and configured Hyperion Planning 11.1.2.2 in a new Server. (Windows Server 2008 R2).
    2. I have created a blank classic Planning Application in 11.1.2.2.
    3. I have copied the relational database from 11.1.1.3 to 11.1.2.2
    Could you please let me know the next steps to perform the upgrade?
    Should I use the Migrate Button in the Hyperion Planning Webpage or use the option in the EPM System Configurator "Upgrade existing database to the current release from 11.1.1.3". Please advise.
    Note : A native User is the owner of the Planning Application in 11.1.1.3 and hence I made the same in 11.1.2.2 also.
    Also, please let me know if I need to migrate the shared services security and convert the HBRs to Calc Manger rules first before upgrading the Planning Application.
    Thanks in advance.

    Thanks John for your quick response.
    Yes, I have performed a clean install and then going for upgrading the existing Planning Application.
    The Application owner in both the source and target Applications is a native user named hypadmin (not the default admin user). Do you want me to change the owner to default admin user, or the user hypadmin is ok to go with?
    Please advise.
    Also, is there any specific order I need to follow for migrating the below components?
    1. Shared Services Security
    2. HBRs to Calc Manger Rules
    3. Existing Planning Application Upgrade

  • Planning upgrade from system 9.2 to System 11

    Hi,
    Can any one pls. let me know the upgradation process from Hyperion Planning version 9.2 to version 11 ? Can we directly migrate from version 9.2 to 11 ?
    Thanks,
    PR

    Hi,
    I would not go down trying to directly upgrade from 9.2. to V11.
    I would back up all your planning objects, install configure V11 and perform a standard planning migration, it will upgrade the planning relational database.
    Cheers
    John
    http://john-goodwin.blogspot.com/

  • Ipad 2 prepaid plan upgrade from ipad 1

    I have an unlimited plan with my iPad 1.  I want to transfer it to my new iPad 2 when it arrives in a couple of days.  What is the best way to do that?

    I have already done this.  There are two easy ways.  One is to access your iPad AT&T account via the web and enter the new numbers in place of the old numbers.  This is what I did.
    Go to http://www.att.com/ipadlanding
    Sign into your account
    Select Edit User & Payment Information
    Select Update Device Information and enter the numbers from your new iPad.
    The second is to call AT&T and have them perform the edit.
    A third way I've heard also works is to just swap the SIM cards.
    As stated by gdgmacguy:
    Do NOT activate the data plan on the new iPad before performing the edit yourself or talking to AT&T first if you do not wish to have both iPads activated.

  • Upgrade from SAP R/3 4.6 C to ECC6.0 - To find obselete and new tcodes

    Hi,
    We are planning upgrade from 4.6C to ECC6.0 .Is there a table in SAP which contains old and new transaction codes? or is there any easy way to find obselete transaction codes and new Tcodes.
    I also want to know the new tables added and replaced tables .Any
    help is appreciated.
    thanks
    Venkateswara Rao Yeleswaram

    Hi
    Try this link, which will give functionality enchancements between different versions of SAP.
    http://solutionbrowser.erp.sap.fmpmedia.com/
    Regards
    Ramakrishna

  • Upgrade from ECC 5.00 to ECC 6.00

    We are planning upgradation from ECC 5.00 to ECC 6.00. What will be the role of FICO consultant in detail.

    check the customization setting after upgrade
    run a Unit Test and Integration Test.
    run the Report developed

  • Using upgrade from another family plan

    My family has 2 family plans. 1 with 4 phones and 1 with 3 phones. All under same account person. Although, 2 seperate bills. Question, can i use a upgrade from one of the numbers on the plan that I am NOT on?

    Probably not directly.  The easiest way would be to just upgrade that line normally with your choice of phone, and then activate it on the line that used the upgrade briefly.  After that, they have accepted the new contract and can swap back to their old phone, freeing the new device to be activated on any Verizon line.

  • TS4009 How do I get my money back from an iCluod storage plan upgrade that I don't want?

    How do I get my money back from an iCluod storage plan upgrade that I don't want?

    You can cancel an iCloud storage upgrade within 15 days of buying:
    Apple have made this as difficult as possible. However two posters have managed to achieve this. Elizellen was able to use Express Lane to get a refund:
    https://discussions.apple.com/message/19323996#19323996
    However if you use Express Lane may find you cannot proceed without entering a hardware serial number which is still eligible for AppleCare.  julia22 managed to find a way round that by phoning them - please see this post:
    https://discussions.apple.com/message/16968425#16968425
    it gives the USA number - if you don't live there you will have to find an equivalent number from the 'Contact Us' link at bottom right of this page.
    If it is more than 15 days since you purchased the storage you cannot cancel it for a refund; you can downgrade your plan as from your next renewal date. Please see
    http://help.apple.com/icloud/#mmd602084a
    and expand 'Downgrade your storage for the next plan year'.

  • Upgrade from Planning 9.2.0.2 to 9.3.1 or 11.1

    We are currently on Sytem 9.2.0.2 and are looking to upgrade to 9.3.1 or 11. Does anybody know where I can go to get some information on the difference between 9.3 & 11. Any specific things I should look out for with regards to an upgrade to either version. I wouldn't look to do an upgrade until early 2009 and by then there would probably be a 11.1.2. Any info would be much appreciated. Regards John

    Hi,
    You can find all the Version 11 documentation at :- http://download.oracle.com/docs/cd/E12825_01/index.htm
    There are a number documents outlining the new features or you could have a look at the blog I wrote on looking at the new features of Planning V11 :- http://john-goodwin.blogspot.com/2008/07/planning-11-new-features.html
    In theory you can upgrade from Planning 9.2 to 9.3.1 or 11, I must admit when it comes to planning I prefer to do a fresh install of planning and then migrate the planning apps.
    Cheers
    John
    http://john-goodwin.blogspot.com/

  • Considering upgrading from CF8 up to CF11... notice in the CF11 support matrix that Sybase Adaptive Server Enterprise 15.0, 15.5  is not supported.  While we primarily connect to Oracle DB, we do need to connect to Sybase DBs periodically. Is the plan to

    Considering upgrading from CF8 up to CF11... notice in the CF11 support matrix that Sybase Adaptive Server Enterprise 15.0, 15.5  is not supported.  While we primarily connect to Oracle DB, we do need to connect to Sybase DBs periodically.
    Is the plan for CF11 to support Sybase again in the near future?

    Did you ever get a response? I'm merely trying to connect to a Sybase database - and it gives me a java.sql.SQLException:null  error - with no other information.
    I'm running the server on Ubuntu 14.x, 64bit.
    Thanks.

  • Planning to Upgrade from PI 7.0 to PI 7.1

    Hi All,
    Need your help . Planning to upgrade from PI 7.0 to PI 7.1. What are the pre-requisites for PI 7.1.
    earlier version PI 7.0 (SOA) and PI 7.1(Enterprise SOA), Architecutre point of view what's the major difference between PI 7.0 and PI7.1

    Hi,
    search in sdn ...
    refer below guide.
    http://www.sdn.sap.com/irj/scn/index?rid=/library/uuid/90baf3dd-dbf9-2b10-47aa-ac5f56bb5030
    regards,
    raj

  • Upgrade from XI 3.0 to PI 7.1 Test plan

    Hi All,
      We are in the process of upgrading our XI server from XI 3.0 to PI 7.1.  Our landscape is connection different Non-sap system(web, FTP, JDBC) and with different sap system. 
    we need to have concrete test plan before upgrading from XI 3.0 to PI 7.1 wherein non of our existing interfaces should not get affected.
    Please provide your solution how can we have our test plan in development perspective. what are the area and functionality we need to test.
    For eg.
    1. do we need to test each and every communication channel?
    2. do we need to go each and every mapping object and check whether any custom code involved?
    3 I understand from the blog that when we go for upgrade we need Java proxies need to be redeployed and custom adapter module need to be redeployed. If so do I need go one by one communication channel and check is there any customer adapter module is there or not?
    Along with this let me know is there any standard test plan strategy is available.
    Thanks,
    Dhill

    Hi,
    While upgrading to PI71. you should have consider few things as per below link
    SAP NetWeaver Process Integration 7.1 Upgrade Considerations
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/40a0868a-9d40-2b10-8cb4-8e0c53b56655
    SAP NetWeaver PI 7.1 and SLD - Webinar Presentation
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/300e3ca7-31cd-2a10-a6ba-87c7447d5fd7
    Decision-Making Factors when Moving to SAP NetWeaver Process Integration 7.1 - Upgrade or New Installation with Phase Out
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/40328fc8-4844-2b10-b7a2-8930c16df2ba
    Thanks
    swarup

  • Planning to upgrade from Hyperion v9.3.1 to Hyperion V11.1.2.1

    HI,
    I have doubt on upgrade part.
    Planning to upgrade from Hyperion v9.3.1 to Hyperion V11.1.2.1
    Below products are using in v9.3.1
    1.     Essbase
    2.     EIS
    3.     Web Analyzer
    4.     Excel Add-in
    Below breakup for Hyperion objects
    Total number of cubes – 10,
    Total number of analyzer reports – 100
    Total number of users – 50
         Can we upgrade all essbase cubes from v9 to v11?
         What consideration need to take while EIS upgrade?
         Can we upgrade all 100 reports?
         Can we upgrade all 55 users?
         Any other points need to look while doing upgrade?
    welcome your feedback.
    Regards
    Praveen

    Here is the document that will help you.
    http://docs.oracle.com/cd/E17236_01/epm.1112/epm_install_11121.pdf
    I would think the answer to all your question is "Yes" but that said, I am not very sure about Essbase.:)

  • Planning for Mobile Service Pack Upgrade from 2007 SP2 to SP6

    Hello Mobile Gurus,
    We are planning for upgrading mobile from 2007 SP2 to SP6. Can anyone of you guess a time line for achieving this?
    I mean, how long will it take in dev env to upgrade commstation, mrs, mdw etc. apart from upgrading the field laptops?
    thanks

    Hello Mahesh
    had missed 5th point. ie Rollout to the client laptops . the amount of time it takes will be based on the kind of customization and kind of issues that you face in your application . etc.
    Repostiroy upgrade from n to n+1 release will take approx 1-2 hours (with out additinal language) and it is correct.
    I have given you the rough estimates so that you will get a fair idea how much time it is going to take.
    Best Regards
    Shankar

  • ICloud new pricing upgrade from existing plans

    This, I suspect, will be the beginning of a flood of questions related to this, but I don't see so far a way I can change my current pricing to a new one.  My existing iCloud storage plan (50GB + 5GB) is due for renewal later this month for $100.  I would like to switch to 200GB for $3.99/month before it auto renews.  Anyone has any insights on timeline?

    I'm puzzle as this  make no sense to me when I got email from them.
    We recently announced new, more affordable iCloud storage plans. As a thank you for being a current iCloud storage plan subscriber, we’ve upgraded your storage plan.
    Your plan has been upgraded from 25 GB of total storage at $40.00 a year to 25 GB at just $11.99 a year. On May 22, 2015 this 25 GB plan will automatically renew and you will be charged $11.99.
    We upgraded our storage plans so you can get the most out of our new features like iCloud Drive, which lets you store and access any type of file from all your devices. All edits you make are automatically updated, which means you’ll always have access to the latest version of all your documents.
    I did paid upgrade last May with 25 GB data plan for $40.00.  They didn't offer me prorate or refund the different yet with new plan yet.  They also didn't offer anything extra data plan too. 
    Something missing here as whole thing doesn't make sense to me.

Maybe you are looking for

  • Error while starting application server

    Hi, I've installed SAP NetWeaver 7. Abap Trial Version. I can start AS by using MMC but server stopped after 1 minute so that I can't log on. (color is not green as Manfred Lutz wrote in his blog but yellow!) pls look here for detailed info http://ww

  • How to use image load gif of 「GIF87a」 by ByteArray ?

    Hi all: I want use image load gif file of 「GIF87a」 by ByteArray, but it not be displayed correctly on the screen, How can I do it , or How to conver 「GIF87a」 to 「GIF89a」 ? private function onButtonClick():void {     fileRef.browse([new FileFilter("Im

  • Can you extract higher resolutions from Smart Objects or Linked Smart Objects?

    When I am designing at 1x resolution, can I extract assets from smart objects or linked smart objects for 2x or more? If so, how do they scale up?

  • Servlet error after deploy to app server

    Hi, When I run my jheadstart app from local pc then everything is fine. When I deploy the same app to the app server it starts correctly, and works somehow. But, when I click the new button in any kind of jsp, I get the following error: 05/05/18 09:5

  • Lightroom CC: GPU NOT supported

    Hi! I have just installed LR CC and it doesn't seem to support my ATI Radeon HD 6670 (1GB GDDR5 VRAM, OpenGL 4.2). Latest AMD driver ist installed. Sysinfo: Version von Lightroom:  CC 2015 [1014445] Lizenz: Creative Cloud Betriebssystem: Windows 7 En