Planning w/o Final Assly for Variant Config matls

Experts,
I have a requirement where in my finished MTO Variant Config products have to be forecasted (at standard configuration, pre-determined BOM for the variant product) so that the dependent assemblies can be produced in advance. The assemblies & some components have huge lead times (22wks), hence the need to produce/procure them in advance. However, the assembly of the finished VC material will only be after the Sales Order is recvd for it.
I know strategies 56 & 89 allow me to plan based on char's, however, I'm looking for a strategy like 50 which will allow me to assemble the FERT right after the Sales Order has been recvd..Am I on the right track here?
Cheers

Andy,
Try 55
http://help.sap.com/saphelp_erp60_sp/helpdata/en/cb/7f944143b711d189410000e829fbbd/frameset.htm
Rgds,
DB49

Similar Messages

  • BAPI_SALESORDER_CREATEFROMDAT2 is not carrying out pricing for variant config materials

    Hi Guys
    I need to create a BAPI to create sales orders coming in through a web service from an external system, for normal materials all works well, but for variant config materials the pricing is not happening, like the way it does when I manually create an order, I don't want to manually pass the pricing condition in BAPICOND as I want the BAPI to dynamically determine the conditions from the access sequence.
    While debugging VA01 I found that the control goes to the 'PRICING' function module twice, ones for the main material , and next for all its config materials, the second time it calls the 'PRICING' fm with pricing type 'O'. Here it selects the price for all the variant materials and loads into an internal table vkomv and displays in VA01 the variant materials that we select while creating the order, but in the case of the BAPI call, the control is going only to the 'PRICING' fm call for the header.
    I have passed 'V'  in the application parameter and the variant material in the varcond parameter of the BAPICOND structure.
    Any idea what I might be missing ??
    Thanks
    Sameer

    Solved by reading the following OSS notes
    562124 Configuration change via
    549563 BAPI: Filling the configuration structures
    567348 – Fill configuration via BAPI

  • Manual cration on planned order in Planning w/o Final Assly segment

    Hello everyone,
    Is there any way to change/create SNP planned orders manually in SNP Planning book or product view in Planning w/o final assly segment.
    I am not able to create manual order in RRP3 view in Planning w/o final assly segment. It is giving below error.
    Note: I am able to create planned order in MTS segment.
    I am not sure whether SAP has purposfully not given this functionality. However, I believe user should able to create/change planned order in planning w/o final assly segment.
    Regards,
    Abhay

    Hi,
    If the planning strategy is Make to order, planned orders should not be created manually in RRP3 view and it comes from sales order only.
    Regards,
    LV

  • Tables, function modules for variant config data

    Hi all,
    I need to extract characteristics and values for variant material from sales order and production orders. Could you please tell me the relevant tables and function modules?
    Regards,
    Sachin M

    Hi
    Try the following;
    Function module to find values of characteristics - CLAF_CLASSIFICATION_OF_OBJECTS .
    Table # AUSP also holds values of characteristics, you can link to it via table INOB,which should also linked to table KONDH if you are using the same.
    Transaction code for Variant Config - CC04 (Product Structure browser)
    Cheers
    Chandra

  • IDOC / BAPI for Variant Config

    Can anyone help with getting data out of Variant Config detailing all possibilities?  Does an extract/upload BAPI / IDoc exist?
    If not does anyone have any other advice on how to do this?
    Rgds,
    Mark

    Hi,
    If you are looking for Variant Config data of a Sales Order, then the function is VC_I_GET_CONFIGURATION
    The function expects VBAP-CUOBJ as the input
    regards,
    Advait
    Edited by: Advait Gode on Oct 28, 2008 10:16 PM

  • BI Implementation for variant config

    Hi All,
    if Anyone having experience of BI Implementation for Variant config then please share detail steps with extractor/datasource available.
    Thanks

    Hello Sangita,
    Please check this link
    Implementing Variant Config (VC) as a characteristic in BW 3.5
    Thanks
    Geeta

  • Fields for Super BOM, Work Center & Super Routing for Variant Config

    hi! gurus,
    Please can you give me mandatory fields & values for Super BOM, Work Center & Super Routing for Variant Config
    thank you

    Hi,
    In the Super BOM you need to maintain the object dependencies.
    Workcenter fields are as usual for other production processes.
    Also you can use search option in the forum to view the threads posted in the past. There are many posts related to variant configuration.
    Regards,
    Senthilkumar

  • Text item cateory for variant config item

    Hi,
    I'm trying to create a text type item category for a variant config item. I tried to use the std TEXT but it doesn't work possibly coz its a variant config item. The item category grp assigned to this item is 0002. I used ZVAC and removed relevant for delivery n billing as I don't wnt this item to b relevant for either or even appear in either of those. But it still doesn't work. When i create the order and enter the item and hit enter, it takes the default item category grp for that order type (TEXT item category is added in manual item category field) and it grays out. I cannot make any changes to this item category although the order has not even been saved yet.
    Has anyone done any such config or know anything abt it? Pls help.

    0002 is basically for single-level configuration. So right there you are probably getting the issue, as well as using the standard TEXT item categoty..
    0004 is for multi-level config, which is, I guess, what you are looking for.
    But you will also want some other "Z__" item category defined for what you are looking for - don't use TEXT. I know, then it's a pain 'cuz you have to do all the copy control, but you really need to.
    Now with your new "Z__" make it Non-pricing-delivery-rqmts-picking-delivery-billing-etc.
    It's lots of fun, isn't it !

  • Enhancement for Variant Config Characteristic and RESB table

    We have a requirement to write the result of a variant configuration characteristic (an intelligent part number) to the RESB_ABLAD (material entered) field.
    Is there a user exit that will facilitate this process?

    Solved by reading the following OSS notes
    562124 Configuration change via
    549563 BAPI: Filling the configuration structures
    567348 – Fill configuration via BAPI

  • Variant config

    Hi gurus
    cofniditon type va00 is manadatory or manual conditon in prcing procedure.  Can any one suggest me.  When i am maintaining in conditon records for the condition type va00 is not coming the it showing messege variant not found.  So that price is not coming in sales order.  Please help me in this regard
    Points will be rewarded

    Dear rack,
          VA00 is a condition record maintained for variant config material. So if your material is not under variant config the error will come. you can delete that line if you dont have a variant material.
    Regards,
    Sudhir

  • Variant config in MM

    Hi,
    I need to map VC in MM side, i have went thru the blw link... where i need to work out on PO i.e how the characteristic values transferred from Sale order to PR and PO.
    Re: Variant config in MM
    rgds
    Jay

    Hi,
    For variant config. in MM you have to use the comunication structure as MMCOM in additional data for charactoristics.
    to configure follow the steps :
    u2022     Create a Material - KMAT as Material Type with Item Category - 0002 by using TCode MM02
    u2022     Create Charateristics using TCode CT04 - Zbike, where in values mention the Color of the bile like Red, Blue etc
    u2022     Create another Characteristics using TCode CT04 - ZPrice, where directly go the additional data tab and maintain the table MMCOM and field VKOND (ABAP Dictionary it will ask for)
    u2022     Assign these two characteristics to a Class using TCode CL01 - ZBikeclass (Type 300) in characteristics tab page.
    u2022     Then go to Configuration Profile using TCode CU41 select the material and enter the description click on the Class assignment, i.e., assign Zbikclass.
    u2022     Now go back to Characteristic using TCode CT04 - enter Zbike -go to values- select Red- go to extras - Other Dependencies - Select Procedure enter in front 10 write - $self.ZPrice='Red' and save
    u2022     Now go back go to Extras - Other Dependencies - Assignments and Assign relationship ( by default it will come just save)
    u2022     Now select Blue- go to Extras - Other Dependencies - Editor - Select Procedure enter in front of 10 write - $self.ZPrice='Blue' and save
    u2022     Now go back go to Extras - Other Dependencies - Assignments and Assign relationship ( by default it will come just save)
                         Create a condition type ( e.g. ZVAR) with variant condition tick.
    u2022     Now go to Condition Record using TCode MEK1 - Enter ZVAR (Condition)(For created  Pricing Procedure which contains the defined condition ZVAR) - enter variant Red and Blue give the rates accordingly and create the purchase order.
    In the material tab new button will appear for configuration-- here you select the variant value ( value for the charactoristics - e.g. 'Red') - press enter and come back.
    Check the pricing in condition tab.
    Br,
    Satish

  • Variant Config- Dependcy based on Material quantity

    Hi ,
    I have a specific requirement for variant config.
    If we have a material A1 and it has variants as b1( values 5/10/15) and c1(red/blue/green).
    when i create the sales order for A1 and enter 5 in the quantity field , then the variant B1 should be populated with value 5, if the quantity is 10 then B1 gets populated with 10 and so on.
    I know that using the quantity field to drive this is not proper.
    But I am trying to do a work around.
    Because the business process has material with many variants but while ordering the customer will never order for more than 1 quantity of the material. and if he wants to check the various options he will need to mostly change one particular variant. I am trying to reduce the work involved in going to the variant  and then choosing the value.
    Any help would be rewarded...
    Thanks
    BGS

    we can use the refernece object field to do this.
    though it required a lot of my.
    anybody who needs help in this direction can send me a message. I shall help calrify

  • Variant Config with Plng w/o Final Assembly case

    Friends,
    I have requirements to map Variant Config scenario for products that are Forecasted for the purposes of driving the dependent materials production/procurement.
    The Finished configured part is forecasted for standard configuration, however, it is only assembled at the receipt of a Sales Order. The sub-assemblies/components are manufactured/procured in advance driven by the dependent demand frm parents PIR's. I can use Strgy 50 & make the matl configurable, but the system asks me to create Config Plng Profile to be able to create PIR's for it.
    Want to know if there is a simpler way/strategy group with which I can manage the same? The configuration process itself is pretty straight forward, its the forecasting part that is creating the prblm to me.
    Any ideas.

    Guys,
    I found the way out for this. It all depends on how can the business:
    1. Forecast accurately on the diff configurations possible (Plng Profile & Table)
    2. Can they produce good consumption history on the lower lvl assemblies/components
    The following can be done based on the buss reqts:
    Finished prod's planned with Strgy 25, assemblies with 70 or Use Strgy 56, 89 for char based plng. The latter are v complicated unless the data is available on usage probabilities of config paramters..
    thanks

  • Error while converting planned order to production order for config materia

    Hi experts,
    While converting a planned order to production order for a configurable material.I am getting the following error meassage. Message No.CO684,
    "You cannot make an assignment to make-to-order stock"
    ( DiagnosisThe component cannot be allocated to an individual stock because make-to-order production and engineer-to-order production cannot be executed with this order.
    A possible cause is that you are trying to create an order with reference to a sales-order/project, where an account assignment to a sales order/project is not allowed in the settlement profile that is assigned to the chosen order type. This is inconsistant.
    System ResponseThe following responses are possible:
    Order processing is cancelled.
    The system resets the special stock indicator back to the original value.
    Procedure
    Choose another order type).
    I have checked some of the threads related to this error. But no where there is any solution.Please tell me if there is any settings to make so as to work on this scenario.
    Thanks,
    Sham

    Hi,
    This will be a MTO scenario. Please check your requirement type,Requirement class and strategy type config along with your Item category and schedule line category from SD.
    Also check your Production order type config and settlement profiles.
    I mean to say that you need new production order type to be configured for specific above mentioned combination.
    Are you working on a production system..?? is it the first time you are creating the order for this config material..??
    Regards,

  • Variant Config Strategy

    Hello all,
    I am currently implementing BW for Sales (SD) for a customer that uses heavily Variant Configuration.
    They are using 560 different characteristics to classify their various products. However, for each Material (ZMAT or modified KMAT), the number of characteristics used does not exceed 10.
    I know I can create DataSources in CTBW to load Variant Config transactional data.
    Anybody has experienced a data modeling strategy that would allow us to manage this efficiently?
    Thanks
    Jean-Luc

    Hi,
    we're having the same issue.
    We have a configurable material. Mat type KMAT. That we have a sales order and planned order for.
    When converting the planned order into a production order we get this message. It does not matter if the individual/collective indicator is set to 1, 2, or left blank.
    Any clues? Are we supposed to be able to manufacture KMAT materials?

Maybe you are looking for

  • SAP LSO : Error Checking in Content

    Hi All, I am trying to check in the content from Authoring Tool to Content Management Repository of Portal.And I am getting the following error. Address already in use: connect java.net.BindException: Address already in use: connect     at java.net.P

  • [JS CS3] RegExp Object containing only one backslash (how to escape)

    Hi I'm trying to escape one backslash in my RegExp Object, but I get a Syntax Error:      myObj = new RegExp ( "\\" ); I tried it phyton Style   myObj = new RegExp ( "\\\\" ); but that's not working right. Thanks for any hint. Stefan

  • 1 master 2 detailregions

    I have an idea but I can't figure out the solution to a problem. Let me explain what I'm trying to do and I'll see if anyone has an idea. I'm sure it's something easy that I'm missing. i have two mysql tables I'd like to make datasets out of to displ

  • Cannot browse to actual photos in finder but all there when I launch iPhoto

    Trying to browse to photos to select for misc. uploads to other sites. When I browse in Finder => Pictures => iPhoto Library , I see the iPhoto Library icon, but when I click, it just launches the program versus displaying the folders with the pics i

  • OT: Maximum upload filesize

    Can I change this? It appears (with PHP) that the largest file I can upload is one that takes 30seconds or less, since I timeout at that point. My client may want to upload 50MB files, and I'm hoping for a way to ease this process.... Murray --- ICQ