Plant Maintenance - Maintenance Order Completion Confirmation

Dear Experts,
When i am confirming maint. order and checking final Confirmation Box then system confirm particular operation / order.
but when i check the clear open reservation then system will not set deletion indicator of reservation. I want to cancel reservation whenever clear open reservation check box will check.
Please guide me how i have do configuration for above mentioned requirement in Maintenance and Service Processing --> Completion Confirmations --> Define Control Parameters for Completion Confirmations.
Thanks in advance.
Best Regards,
Rajiv Sinha
Message was edited by:
        RAJIV RANJAN

hi rajiv,
as far as my knowledge there is no setting for automatically deleting the reservation, what it does is, it will mark the material as final issue for this reservation ,any future material you are adding will be reserved under different no.
you have the followoing option
after confirming you can make the material as MOVEMENT NOT ALLOWED in the order
or
you can technically complete the order which will delete the material and goods movement will not be carried out.
i cant understand you process why you are adding the material, which you want to delete it during confirmation.
regards
thyagarajan

Similar Messages

  • How to configure G/L accounts for maintenance order completion confirmation IW48.

    Hi Gurus
    When doing completion confirmation of a maintenance order material costs are being posted to Cost of goods sold account. How do I bypass the posting of material costs to this account because the same costs are being posted during settlement of order costs as well?
    Regards
    Joseph

    Hi Joseph,
    I'm not sure that Completion Confirmation if Maintenance Orders (MO) will generate FI Posting.
    Normally, Completion Confirmation will generate CO Document with Secondary Cost Element.
    But, at Settlement process of Maintenance Order (MO), it's possible to generate FI Posting depends on Settlement Rule.
    Please ensure about your inquiry.
    Thanks
    Adi

  • Goods issue for plant maintenance order

    Goods issue with ref to plant maintenance order( Componenets of the order) is not possible in transaction code MIGO. Error message " MIGO is not possible for the refurbishment order".
    Goods issue for the same order can be posted with transaction MB!A.

    hi santhosh
    kindly check the order type .i think you are using MB1A for refurbishment process.but it is not possible.only maintenance order can be posted via MB1A
    follow the procedure for goods issue in refurbishment order.
    Choose Logistics ® Plant maintenance ® Maintenance processing ® Completion confirmation ® Goods movement ® Goods movement.
    The entry screen for a goods issue appears.
    Choose the pushbutton For order.
    Enter the relevant order number in the dialog box and choose Continue.
    An entry screen appears.
    Choose Copy.
    The Maintain Serial Numbers dialog box appears.
    Choose Reference document.
    Enter the order number in the Refurbishment order group box and choose Execute.
    A list appears with the planned serial numbers for the refurbishment order.
    Check the selections of serial numbers, for whose material you want to post a goods issue, and choose Copy.
    The serial numbers are copied into the Maintain Serial Numbers dialog box.
    Choose Exit window.
    The goods issue is posted.
    regards
    thyagarajan

  • Plant maintenance order settlement

    hi gurus
    activity hours confirmed on plant maintenance order
    1. order Dr maintenance cost center Cr with internal activity allocation cost element.
    2. actual activity price calculation
    3. order settlement to cost center, at this time entry is
    Order balance Zero
    Receiving cost center DR
    Maintenance cost center CR
    I think at this time no entry should be made on Maintenance cost center.
    imdad

    not ans

  • Problem printing plant maintenance order (DEFAULT PRINTERS)

    Hi,
    I configured default printer in SPRO --> Plant maintenance and customer service --> Maintenance and Service Processing --> Maintenance and service orders --> Print control --> Define printer
    I created 2 plant maintenance orders to test the printings jobs.
    For 2 different orders, I got the following error message in the printing logs (it's in french): INOPÉRANT (means not working in english). What config should I correct. Could the problem be in the orders? Thanks.
    TEST IMPRESSION 31.03.2009 u2013 PROTOCOLE IMPRESSION u2013 BORDEREAU 11100942
    000011100942 0010  5210A   YUL_CONTROL#2    2060 Bon de main-d'oeuv  3  VALLIEMA   31.03.09   07:20:53
    000011100942 0020  5235    YUL_ENTR#6       2060 Bon de main-d'oeuv  2  VALLIEMA   31.03.09   07:20:53
    000011100942 0030  5235A   YUL_ENTR#12      2060 INOPÉRANT
    000011100942 0040  5235B   YUL_ENTR#9       2060 INOPÉRANT
    000011100942 0050  5235C   YUL_ENTR#9       2060 INOPÉRANT
    000011100942 0060  5280B   YUL_ENTR#4       2060 Bon de main-d'oeuv  2  VALLIEMA   31.03.09   07:20:53
    000011100942 0070  7230I   YMX_ENT#2        2060 Bon de main-d'oeuv  2  VALLIEMA   31.03.09   07:20:53
    TEST IMPRESSION 31.03.2009 u2013 PROTOCOLE IMPRESSION u2013 BORDEREAU 13208581
    Ordre Nº     Opé.  Poste   Uté sortie       APap Formulaire        Cop. Utilis.    Date       Heure
    000013208581 0010  5235A   YUL_ENTR#12      2060 Bon de main-d'oeuv  1  VALLIEMA   31.03.09   08:03:16
    000013208581 0020  5235B   YUL_ENTR#9       2060 INOPÉRANT
    000013208581 0030  5235C   YUL_ENTR#9       2060 INOPÉRANT

    Hi,
    I am not sure but are you trying to print shop papers at default printer specified in config.First thing is are orders released,I presume they are released hence you are getting message.
    Next thing is check config as below:
    Application area - O for maint orders
    Planning plant -  * or define your plant
    Planner group - * or same as above
    Shop paper - Define shop paper or *
    Output device - LOCL or your device property...It is advised to put LOCL as different users can ahave different printers.
    Storage mode -1 for printing only
    then select print immediately and delete after output.
    After this in your master(SU01) define output device as LOCL and this will pick up your default printer of your desktop or working station as configured in windows.
    Also check if right shopapers you have assigned to order type,you can confirm them if you see in print preview.
    regds,
    atul

  • Pur Req via Plant maintenance order

    Hi,
    When Non stock item is assigned to a Plant Maintenance order, A purchase requisition is created automatically for that item.
    During the creation of purchase requision it is required to enter goods recipient and unloading point( few fields are made mandatory)
    Issue: At this stage we are giving planne delivery time and GR processing time.
    But when we check the Purchase req for that item, Only GR processing time is considered not Planned delivery time.
    Please provide your suggestion, why planned delivery time is not considered for scheduling of purchase req.
    Thanks and regards,
    Nataraj

    Hi!,
    I think you should check the operation control key you are using. Whether that key allows 1. Externally processed opearation 2. allows the scheduling of externally processed operation. If both are true then it will take the standard values defined for that opearation for scheduling. if 2nd is not true then it will schedule as per planned delivery time.
    I think this will solve your problem.
    Regards,
    Uday

  • Origin Object Type for Plant Maintenance Orders in Profit Center Accounting

    Hi,
    I want to make a selection for plant maintenance orders in transaction KE5Z, report for line items in Profit Center Accounting. When checking possible input options for the selection field <b></b>Origing Object Type<b></b> the system shows value 15 for Maintenance Orders. However I discovered in our system the maintenance orders are reported as Origing Object Type 03, which is Overhead Orders according to the selection list. So I cannot distinguish between overhead orders and maintenance orders in this report.
    What is the cause our maintenance orders are assigned to Origin Object Type 03 in stead of 15 and what is the customizing transaction to correct this ?

    Looks like, this is no longer supported. Refer to note 168004 and  102434.
    Cause and prerequisites
    These functions were not programmed to meet the above requirements.
    As of Release 4.0, the object type is transferred directly.
    Solution
    Once you have implemented the advance correction. the origin object type 'Overhead cost order' (03) is assigned irrespective of what is the SCOPE for orders.
    As a result of implementing this note or as of Release 4.6B, the order category distinguishes between overhead cost orders and production orders in the origin object type. In this case, the following origin object types result (as described above in 1.):
    Order category 04 to 10, 40 => 04 (production order)
    All other order categories => 03 (overhead cost order)
    The logic that the origin object type was set depending on the object class (as described above in 2.) is no longer supported. The object class can be evaluated separately in Reporting. -
    The corrections of this note refer in Release 4.0B to the corrections from Note 102434.

  • Plan cost in Plant maintenance order

    Hello,
          I need to show plan cost in plant maintenance order on the report. It appears in the cost tab (overview tab inside the cost tab). Please let me know if you know any function module.
    Regards,
    Eswar.

    Try
    CALL FUNCTION 'PM_WORKORDER_PLAN_COSTS_SET'  
    Standred program is using this FM and it has table " PMCO "<b>
    include = LCOIHF2Y</b>
    Hope this’ll give you idea!!
    <b>P.S award the points.</b>
    Good luck
    Thanks
    Saquib Khan
    "Some are wise and some are otherwise"<b></b>

  • Revoke release of Plant maintenance order after change is done to the order

    Hi
    I need to know if thorugh some configuration I could enable the feature which revokes the release of a plant maintenance order after certain change is done to the order. Please help.
    Thanks,
    Ankbat

    hi
    you cannot revoke the status of released after changing the order. you can explore the use of user status profile
    regards
    thyagarajan

  • Automatic release of plant maintenance order at Plant level

    Dear All
    I would like to release plant maintenance order automatically and would like to enable only for a specific plant.
    Could you please suggest different options for this
    Thanks in advance
    Regards
    Yogesh +48 500287949

    Hi ,
    There is no tcode for automatic release of Maintenance order . You have the below options :
    1. Activate the user exit IWO10009 PM Order: Customer Check for 'Save' Event which checks for specific plant and status of order is not released then it would release automatically ..
    2. Create a programme which runs as a batch job and this programme checks for PM Order and filters specific to plant and then filters the orders which are not released and then auto releases....The proramme should be set up as  a batch job which runs at every 30min or etc..
    this would give you some idea ..
    regrds
    pushpa

  • Permits issue in plant maintenance order

    How to give the authorization <b>to two different persons</b> for <b>permits issue</b> in plant maintenance order?

    If you see the purpose of permits it is very basic. If you need permission to do hot work you need permission from the fire department. There will be a designated person from the fire department to issue the permit. And that's it. No more advanced features.
    If you want additional features I think your solution lies in WCM.
    thanx
    "Whoever reaches first wins"

  • Transaction for Mass processing of PM(Plant maintenance) orders

    Hi all,
    Pls let me know if there is any standard tcode for  for Mass processing of PM(Plant maintenance) orders
    I checked for COHV ,but it's appplicable only for produciton orders it seems
    Costing has to be recalculated for all the orders of order type PM02 for financial year 2008-09
    Awaiting eagerly for your reply
    Thanks,
    SVP

    Hello,
    Please try using IW38,IW39
    execute the screen and then you get the option for releaseing , teco etc
    Regards
    gajesh

  • Maintenance activity type  and order type  for plant maintenance order

    How can i get the maintenance activity type  and order type  for a given plant maintenance order. Please let me know the table where i can get these two fields
    In AFIH i can only get the MAT for an order number

    Maintenance activity type -
    AFIH - ILART
    Order Category Indicator Plant Maintenance -
    AFIH - AKKNZ
    reward if heplful

  • Settlement rule Mandatory for Plant Maintenance order

    Hi Expert!
    I want to make the option Settlement rule mandatory while creating plant maintenance order. I would really appreciate if you provide me the menu path in customisation to make this mandatory.
    Thanks
    J

    Hi Jean
    I do not think you can make it mandatory while creation itself.
    But, you can make it mandatory (Check Functions for setting order types->settlement rule....) for order release.
    Best regards
    Ramki

  • Define Purch. Req. transaction type for Plant Maintenance Order

    Hello,
    Does anybody know how i can specify the (default) Purch. Req. transaction type for a Plant Maintenance Order (IW31)? By default it picks up 'NB' but i would want to change this.
    Kind regards,
    Tim

    Hi,
    Go to this menupath spro>IMG->Plant Maintenance and Customer Service>Maintenance and Service Processing>Maintenance and Service Orders>General Data>Define Account Assignment Cat. and Document Type for Purchase Requisitions.Here you can change the doc.type for the PR.
    Regards,
    Venkatesh

Maybe you are looking for

  • Tuxedo client running under Windows CE

    Does anyone know if the Tuxedo client portion can under on a Windows CE device and make service calls? (Windows CE 3.0)

  • Shared tab in left menu column does not show on one of the computers after setting up Home Sharing

    For iTunes 10.3, I have set up home sharing on two computers that run windows 7, I have authorized both computers.  The iTunes Shared link for computer 2 shows up on left column for computer 1(main iTunes computer).  The problem I am having is that t

  • Correlation for asynchronous system via websphere MQ from a BPEL client

    I could able to find samples for correlation in BPEL while invoking asynchronous webservices. Query 1. Are there any samples for Correlation while invoking asynchronous system via websphere MQ from a BPEL client? Eventhough I could see some BPEL samp

  • No option for emailing photos

    Hi, After installing iLife06, I am unable to email photos. In the iPhoto prefs, nothing shows up in the "General: Email photos using:" dropdown list. I use Apple's Mail, and Mail prefs show "Mail" as my default email client. I tried deleting the com.

  • Bridge linksys BEFW11S4 and Airport

    I am trying to extend my home network by bridging my wireless network between two routers. Currently, the Linksys is plugged into the cable modem and the Airport is in another part of the house. My laptop with Airport can see both and I can configure