Plant Maintenance -- Work Center Tables

Hi,
I want to have a list of PM tables, where Work center data is stored.
Thnx,
Shivaa.

http://www.sap-img.com/plant/transparent-table-relate-with-pm-module.htm
http://www.erpgenie.com/abap/tables_pm.htm

Similar Messages

  • Plant Maintenance, work center & component.

    Hi, I have some question as below:-
    company code: 1000
    Plant A: 1100
    Plant B:1200
    Component storage location under 1100
    Q1: work center for plant B is under 1200, so if work center need the component for maintenance job, then they need do the STO to transfer component from plant 1100 to 1200?
    Q2: work center for plant B is under 1100, so they NOT need do the STO to transfer component to do the job at 1200?

    Hello Dear,
                       Can you please tell which is the Maintenance Plant,
    if the maintenance Plant is different from the main Plant then you need to do the STO for the Main Plant(B),
    if you have assigned both the Maintenance plants to the main plant then no need for the STO.
    Hope it helps
    Regards,
    Yawar Khan

  • To find 'Maintenance Work Center' for Equipment (without Production order)

    Hi,
    I have a Report for - 'Equipment BOM' - IB03.
    Problem: How to find the 'Maintenance work Center ' For Equipment ? (IE03--> Organization > Responsibility> Main. W.Cntr)
    [ Note: For Client -->  It's not necessary that each Equipment has Production Order, Few Equipments are taken only for Repair purpose, Equipment is there in table - EQUI,
    So - Not possible to fetch from AUFK, HIKO or any other order tables. ]

    I have a Report for - 'Equipment BOM' - IB03.
    Problem: How to find the 'Maintenance work Center ' For Equipment ? (IE03--> Organization > Responsibility> Main. W.Cntr)
    [ Note: For Client --> It's not necessary that each Equipment has Production Order, Few Equipments are taken only for Repair purpose, Equipment is there in table - EQUI,
    So - Not possible to fetch from AUFK, HIKO or any other order tables. ]
    EQUZ-GEWRK has the main work center. Pass the equipment number and valid-to date to get the main work center.
    Cheers
    Sujay

  • Maintenance Work Center : Capacity Planning CM01

    Hello Gurus,
    We are using T-code CM01 to determine the Requirements / RemAvailCap of the Maintenance Work Orders in a given Maintenance Work Center.
    After executing CM01, the detail capacity list contains Not Scheduled orders( CRTD )and  capacity of these not Released orders also taking into consider.
    How to restrict CM01 Order selection based on the work order System status or User status ?
    I found below discussions on SCN but couldn't get precise answere.
    Plant Maintenance: Capacity planning CM01/ CM07
    Configuring profiles in CAPACITY PLANNING (CM07)
    Please help.
    Thanks in Advance
    Ashok M

    There are a few ways:
    Create a new status profile via BS42 and assign the REL status only (see image 1). Then in the CM01 display screen, use menu path: Planning->Selection->Order and enter the status profile created above (see image 2)
    Create a new selection combination via OAP0. In the CM01 display screen, use menu path: Planning->Selection->Combination and enter the selection combination created above (see image 3)
    The above settings can then be defaulted via the various capacity planning profiles.

  • Maintenance Work Center, user status, system s into notification print out.

    I want to copy Maintenance Work Center(GEWRK), active user status and active system status to notification print out. I am not able to search from which table this field is coming. Can any body tell me the name of table ?
    Regards,
    VM
    Edited by: V M on Oct 5, 2008 4:03 PM

    VM,
    It may not work with print programs, but try putting the following code in your ABAP program:
    * get notification statuses
    data: lt_jest      type standard table of jest.
        call function 'STATUS_READ_MULTI'
          exporting 
            all_in_buffer  = 'X'
          importing
            status         = lt_jest.
    If that fails, then try this:
    data: lt_jsto_pre type table of jsto_pre with header line.
    data: lt_jest      type standard table of jest.
      call function 'STATUS_READ_MULTI'
           exporting
                client      = sy-mandt
                only_active = 'X'
           tables
                objnr_tab   = lt_jsto_pre
                status      = lt_jest.

  • HOW TO CHANGE PLANT IN WORK CENTER

    Dear All
                can anyone suggest me how to change the plant of work center in plant maintenance?
    Regards
    Jitender

    Hi,
    You cannot just change it, it is unique to the plant. If the plant is wrong then you need to create the work centre again to the correct plant.
    Thanks.

  • Varying Maintenance Work Center Capacity by Days of the Week

    I had submiited a question a month or so ago about varying the capacity of a maintenance work center depending on the day of the week.  I got an answer and it worked.
    We've set up another work center (in staging) for the same scenario (the work center is half staffed on Fridays).  Monday through Thursday the capacity is 36 hours, Friday the capacity is 18 hours, the validity from date is 04/05/2010.  When we use CM34 to do some scheduling though, the capacity shown is 40 hours a day, Monday through Friday which is what the capacity was set up for prior to the validity from date.  It's also the same capacity as shown in the 'Standard Available Capacity' section.
    I looked back at the work center I had modified previously and it's showing the same thing.  It's like it's ignoring the validity dates.
    Any ideas?
    David Macindoe

    David,
      I know for sure that this is reflected in the standard profile for Capacity Availability check as part of release of the order (SAPSFCG013). The Availability for the week does show the capacity for the interval dates of the week and not the standard available capacity.
      I haven't checked this on CM24 and if the standard profiles don't reflect the change then the profile probably needs to be changed.I need to look into it to make sure. In the meantime if you aren't able to resolve the same, i would suggest to raise a note and see where that leads you.
    Regards
    Narasimhan

  • Capacity Planer Group --- Maintenance work center

    Hi,
    I have a query
    1. like do we have to create capacity planner groups same as the planner groups in equipment master data....Do they have any link??
    2. What would be the start time and end time in maintenance work center, for 24 hrs open manufacturing industry with 3 shifts???
    thanks
    DM

    Hello Deepak,
    There is no relation between capacity planner grp & Maintenance planner group...These are 2 different things..
    Now the work centers can be defined for the technicians if  HR module is not implemented...
    To perform the capacity planning for the technicians, there daily working hrs must be maintained in the system..Though the maintenance is working for 24 hrs,Single technician cannot work for entire 24 hrs..
    Hope this will help..
    Thanks

  • ERROR TECO a Plant Maintenance Work Order

    Hi Expert,
    I create a Plant maintenance work order. With two operation.
    Operation 1: Internal maintenance task with standard labor hour. Control Key is PM01.
    Operation 2 : Trigger of external PR. With control key PM02.
    Now I want to do TECO to settle the Work Order. Whit operation 1 didn't do confirmation. Operation 2 did not do PR next business. The system display a Error message as below:
    'ERROR When calculating costs for order XXXX' 
    How to do analysis?

    Hi
    in the work order itself from the menu options Extras>Log>Cost determination . and solve the analysis
    regards
    thyagarajan

  • View labor and material costs in plant maintenance work order

    Hi
    I am aware we can bring in the costs in the work order through Activity types and assigning the costs to the acitvity type.
    Is there anyway we can bring in the actual cost for the work performed by the associate? should we link the work center to HRMS?
    Please advise. I need your valuable input for all the points below.
    Main points that need to be addressed:
    1. Each associate that is capable of confirming hours to a work order needs to be assigned an hourly rate that is reflective of the actual cost for the work performed by this associate. These hours are then tracked through the work order to give a cost for labor assigned to that particular job.
    2.Any materials used in the performance of the required task(s) dictated by the work order will be assigned to that order. These materials can be assigned through SAP purchase requisitions, tool crib spot buys, or procurement with a purchase card.
    3.Standard reports need to be created so we can track the total maintenance costs for any level of the equipment hierarchy as currently set up in SAP. When this report is created it should show the total maintenace costs for all the levels of the equipment hierarchy broken down into labor cost and material cost.  I am using Tcode IW37N and IW40 . Is there any suggestion?

    Greetings Chandra,
    1) You will need to create Work Centres for your associates and create the Activity Types. You can default the Activity Type for each Work Centre and maintain the rate for the activity via t-code KP26 planning.
    2) Planned and unplanned Purchase Requisitions for Components with category N will debit the order with material costs. But what do you mean by "tool crib spot buys" and "procurement with a purchase card"? You may need to develop a solution to do such postings to the Order (or for purposes of Cost controlling, manual activity allocation similar to confirming work may be desired such as Manual Activity Allocations via CO transactions (KB21N), unless you can cover that with Purchase Requisitions and POs with "F Order" account assignment.
    3) MCI8 Cost Report should be suitable for you, once you set up the Value Categories & Cost Key Figures.
    See
    PMIS Cost Analysis Reporting Overview
    Maintenance Cost Key Figures in MCI3 and MCI8 Reports
    PM Order Value categories and costs display

  • Cost Center - Work Center Table

    Hi!
    How to get Cost Center from Work Center? . Any Table?
    Thanks in Advance
    Bekele

    Hi Bekele,
    First get the Workcentre Object ID in CRHD table for your work center. Then with the Object ID, get the cost centre assigned in that work center in table CRCO.
    I guess, you dont get both in a single table. Hope this help you !!
    Regards,
    Hari.

  • Require help on coast center and work center tables through sales order

    dear experts
    my requirement is to report the cm05(capacity planning ) transaction.
    The original capacity planning consists of workcenter details.
    but my client needs the report as follows
    on which sales order and on which work center we require the capacity of materials.
    any tables and fields for this report please.
    help needed.
    kindly update me.

    hi,
    Please explore table CAUFV View "Order Headers PP/CO" ,here you will find the relationships between the three.
    Regards,
    Neha

  • Factory Calender assigned to Plant & resource/Work center

    Hello,
    If we have assigned the Factory Calender "XX" which has 5 working day(Monday to Friday) with no Special rules & no Holiday Calender to Plant & "YY" Factory Calender to Work center which has 365 days working with no no Special rules & no Holiday Calender.Now, when MRP creates Planned Orders for FERT material It did not create it on Weekends(i.e. on Saturday & Sunday) though the factory calender assigned is  "YY" (which has 365 days working )in work center.Why?
    Actually it should have consider the Work center assigned Calender for Capacity planning & Schedulling purpose.
    If I assign the Factory Calender "YY"  to plant then it will create the procurement proposal on weekends which is not acceptable to external procurement MRP Controller as plant office works only 5 days.
    Please guide.

    Dear
    Goto CR02/03 , select the Capacity tabe "hat" and u will fined there is tabe "Available Capacity " .U have to maintain the Active version ok.
    Basically , the active version is used for scheduling and capacity planning. If you have not entered an active version, the standard available capacity is used, even if an available capacity version has been entered.
    At the same u have to check out the below requirement :
    you must maintain the following data in the capacity header:
    1.The grouping, that defines which shift sequences and shift definitions can be used to maintain the available capacity
    2.The number of the active version of available capacity
    3.The base unit of measure of the available capacity
    3.The factory calendar, that is the basis of the available capacity-Workcentre
    If you do not enter a factory calendar , the system uses the default calendar for the plant.
    I hope in your case , u have the shift sequence of 5 work days for the calander you have assinged in work centre .
    Please check all those n come back .
    Reward points if usefull.
    Regards
    Jia

  • Work Center table

    Hi.
    Please advise which table holds the plant/workcenter information when post document via IR01. 
    Thanks

    CRHD is the table

  • Unicode Issue - Corrupted long texts in Plant Maintenance Work Orders

    we're having an issue regarding corrupted texts in a Unicode system. here's the scenario:
    - long text came from 4.5b wherein, of course, the japanese characters are viewable either in EN or JA logon
    - now, this long text when viewed in our acceptance/testing system which is already, take note, already in unicode long text is garbled. both in EN and JA logon long texts are garbled. we are expecting that since the system is already in unicode it can now support code page for japanese.
    (here's the tricky part -- the one seen in the field is properly displayed but when trying to view the complete long text, those that are not in the field are garbled.)
    - we also have some scenarios that came from 4.5b, when viewed in the testing system while not unicoded - it's garbled in EN. this is normal since it's still non-unicoded. and of course when viewed using JA logon it's not corrupted anymore. we're expecting that this will also be the same with the issue above. but it's not.
    please see link for screenshots. [http://img16.imageshack.us/img16/9760/unicodeissuee.jpg|http://img16.imageshack.us/img16/9760/unicodeissuee.jpg]

    i know it's weird.
    but then i talked to a friend, she's an abaper. she said that those that can be converted or properly viewed are texts elements in database tables and those that are like free texts or comments can not. and there's no possible way for this but to manually retype everything.
    makes sense right.

Maybe you are looking for