Plant Revision Level in QP01 Selection

Hi,
We have a requirement to add 'Plant Revision Level' field in the selection screen of QP01. Do we have any configuration steps to select that field, so that it will appear in the transaction selection screen.
It is critical requirement for business. Please share your solution options.
Thanks & Best Regards
Lakshmi

Dear,
Go to OP5A and select  task list header then select PP/QM task lists: header screens--here active redio button PLKOD-WERKS for plant. and PLKOD-AENAM change number
SPRO--> Logistics - General> Engineering Change Management ( ECM) -> Revision Levels--> Define Revision Levels .
SPRO--> Logistics - General> Engineering Change Management ( ECM) -> Set Control Data--> Revision Level Tab 5 check boxes so you can get idea of Revision Level Assignment
Please check this come back.
Regards,
R.Brahmankar

Similar Messages

  • Q info record without revision level

    Hi
    I found out that if the materials is manage by revision level, if the q info record is not maintain by revision level, it will not take effect. This meaning, that the q info record now need to be maintain by revision level as well, additional work.
    Anyone come across that it is possible not to maintain the revision level in q info record and it is still working even though materials is manage by revision level and PO is created with revision level.
    care to share?

    Dear Danny
    Yes if the material is maintained with revision level , then quality info record has to be maintained accordingly
    I think you can try with this BADI  and create with one quality info record applicable for all the revision of the material
    QB_Q_INFO_RECORD.
    The four reference fields in the Q-info record - material, plant, revision level, and vendor - can be changed using this BADI.This enables a reduction in the number of Q-info records. A single Q-info record can refer to different combinations of the fields mentioned above
    Regards
    Gajesh

  • Synchronizing Material Master revision level across multiple plants

    Hello,
    If an organization uses material master revision level to maintain the details of material's validity across different plants then we see a material master with different revisions in that organization. Now I  would like to understand the impact of this practice in big organizations , is it advisable to have a material master with different revisions in different plants? , if not then which is the best way to synchronize these material masters ( with different revision level ), which are already in use?
    Bets Regards,
    Avinash
    Message was edited by: Ulf Petzel

    Hello Ulf,
    Thanks for your reply, the actual issue is..
    There are two companies; both are using the same material.
    We are building a central system and synchronizing the materials from all companies.
    While synchronization, we found that revision level are different across companies.
    1.      Should we avoid using revision level in our organization?
    2.      If I can find the validity of a material with change no + material + plant, then what is the purpose
             of the revision level?
    3.     What will be the impact, if we remove the entire revision level across all companies?
    4.     In real world, across different organizations, how revision level is synchronized across companies or at least in the central system.
    Please let me know your valuable inputs.
    Thanks
    Sridhar  

  • How can I link to pages in a 2 level popup index/selection tree with java script?

    I can do a single level popup index using the java script below (#1) and link the selections to pages but to change to a  2 level popup index selection tree as below (#2) I can't seem to figure out how to link to pages. Any help greatly appreciated. Thanks
    1
    var itemIndex = app.popUpMenu("INTRODUCTION", "ALPHABET", "GRAMMAR", "NUMBERS", "DATES & TIME", "GETTING TO KNOW PEOPLE", "PHRASES FOR LEARNING", "DIRECTIONS & TRANSPORTATION", "DESCRIBING THE TRAIL", "DO'S & DON'TS", "EQUIPMENT", "FOOD", "INTRODUCING A VILLAGE", "CULTURE AND ETHNIC GROUPS", "HANDICRAFTS", "TEMPLES & MONKS", "AGRICULTURE", "ANIMAL HUSBANDRY", "SCHOOL & EDUCATION", "LEADING A TREK", "NATIONAL PROTECTED AREAS", "IDENTIFYING WILDLIFE", "PLANTS & FORESTS", "BOATS", "CAVES", "HEALTH AND SAFETY")
    switch (itemIndex) {
    case "INTRODUCTION":
    this.pageNum = 1
    break
    case "ALPHABET":
    this.pageNum = 2
    break
    case "GRAMMAR":
    this.pageNum = 5
    break
    case "NUMBERS":
    this.pageNum = 30
    break
    case "DATES & TIME":
    this.pageNum = 35
    break
    case "GETTING TO KNOW PEOPLE":
    this.pageNum = 42
    break
    case "PHRASES FOR LEARNING":
    this.pageNum = 56
    break
    case "DIRECTIONS & TRANSPORTATION":
    this.pageNum = 59
    break
    case "DESCRIBING THE TRAIL":
    this.pageNum = 63
    break
    case "DO'S & DON'TS":
    this.pageNum = 68
    break
    case "EQUIPMENT":
    this.pageNum = 74
    break
    case "FOOD":
    this.pageNum = 83
    break
    case "INTRODUCING A VILLAGE":
    this.pageNum = 96
    break
    case "CULTURE AND ETHNIC GROUPS":
    this.pageNum = 105
    break
    case "HANDICRAFTS":
    this.pageNum = 120
    break
    case "TEMPLES & MONKS":
    this.pageNum = 126
    break
    case "AGRICULTURE":
    this.pageNum = 131
    break
    case "ANIMAL HUSBANDRY":
    this.pageNum = 140
    break
    case "SCHOOL & EDUCATION":
    this.pageNum = 145
    break
    case "LEADING A TREK":
    this.pageNum = 151
    break
    case "NATIONAL PROTECTED AREAS":
    this.pageNum = 155
    break
    case "IDENTIFYING WILDLIFE":
    this.pageNum = 161
    break
    case "PLANTS & FORESTS":
    this.pageNum = 169
    break
    case "BOATS":
    this.pageNum = 175
    break
    case "CAVES":
    this.pageNum = 178
    break
    case "HEALTH AND SAFETY":
    this.pageNum = 182
    break
    2
    var aINTRODUCTION = ["INTRODUCTION", "How to Use This Book", "Format"];
    var aALPHABET = ["ALPHABET", "Vowel Sounds", "Consonant Sounds"];
    var itemIndex = app.popUpMenu(aINTRODUCTION, aALPHABET);
    Thanks.

    Thanks. I've got it now. I was mistakenly renaming itemIndex to each section...Introduction, Alphabet

  • BOM explosion in subcontracting order according to revision level

    Hello experts
    I have different revision levels available for a subcontracted material, e.g. the BOM of this material has different versions depending on the validity date.
    When a BOM explosion is carried out in the subcontracting order (either in the purchase request or in the purchase order) the selected version of the BOM is done accordingly to the delivery date. It does NOT take into account the revision level even when I change it manually.
    Do you have any idea if it is possible to force SAP to consider the revision level instead of the delivery date for the BOM explosion ? (custo, user exit, BAdI, ...)
    Many thanks
    Amaury

    Hi
    BOM explosion in Subcon PO will be carried out automatically when you select the item category L.
    If you want to control the BOM selection based on the Alternative then you can go with Production version option and get the help from PP consultant to create the production version.
    Assign the production version in Subcontracting Inforecord.
    Click the BOM explosion button the switch to alternative BOM during the PO creation.
    Hope it helps
    Thanks/Karthik

  • Inspection Plan/Revision level

    Hi PP Gurus,
    I have a Problem in Inspection Lot.The system is not reading the new Inspection Plan.
    The material is assigned to a Revision level with valid from date 10.12.2007 and the earlier Inspection Plan(Group 21) was also created on 10.12.2007.Now this inspection Plan( Group 21) is deleted and New Inspection Plan(Group 100) is created with the Valid from date 10.04.2008.
    I have created an Inspection Lot dated 12.04.2008, Now the system is not reading the new Inspection Plan(Group 100).And the system is giving error "No Insection Plan found" while recording result on the inspection lot.
    We cant change the material ECO revision date as this would contravene our traceability record and  since, the Revision Level is maintained at Global level so cant afford this to change for other Plants.
    Kindly help me to assign the new Inspection Plan to the Inspection Lot.
    Thx in Advance
    Regards,
    Rakesh wade

    Hi,
    I do not know the impact of revısıon level on İnspaction lot.
    But, with reference to the Revısıon Level only the Confırmation wıll work both in Descrete and aswell as in REM.
    Say ıf yor Revesıon Level ıs AB, and the date ıs 01.03.2008, then during confirmatıon the sytem will explode the BOM with referenec to this Date.
    It may be possıble that there may not be any BOM available on that date then there wıll not be any Components suggested for GI or backflush.
    Probably you can corelate the same thıng to your ınspectıon lot... ( inspectıon lot not available etc..)
    Hope thıs helps..
    Regards,
    Siva

  • How to find revision level

    hi my requirement is that,
    i have to get the revision level for each material number in a specific plant,
    is there any function module which can get this data,
    actually this revision level has to be brought from table AEOI table,
    but its key fields are
    AENNR
    AETYP
    OBJKT
    i donot know how to get these fields.
    can some one help.
    thanks & rgds.

    hi charlie,
    thanks for the response,
    actually my problem was that the table AEOI had the value to be extracted but i didnot have input fields to retrive that value, what all i had were material number and plant,
    so i was asking how to find the link between matnr, werks and  fields  aennr, aetyp, objkt.
    anyways, i found from sdn that, we can pass matnr as objkt, and aetyp as 41( for material) ,
    and out of the records retieved latest would bare the correct revlv.
    thanks.

  • ECO number with revision level and release key

    Hi All,
    I have a requirement from client with regards to Engineering change manangement.
    The scenario is that we are maintaining BOM for materials.Whenever a change is required  for BOM a ECO number is created with release key.
    Once the BOM is changed against ECO number is created a workflow is triggered for approval.
    Then it goes through a series of approvals in the heirarchy.In each level the reviewer will propose a new value for the changed line item.
    All these changes have to be maintained in record.At the end the final approver reviews all the proposed changes and release the ECO number with the appropriate change.
    I had a thought of implementing the above scenario with ECO with revision level and release key.
    But I am unable to replicate the scenario due the fact that,when I select the ECO number with release key,I cannot select the material in Object type.
    Its disabled.Its available when I create a ECR with release key.
    Please suggest a way to create ECO number with release key and revision level for BOM.
    Regards
    Richie

    Hi,
    You create the revision level against the material (via MM02, basic data tab)) not against the serial. The serial number, by definition, would be unique to the combination of material and revision.
    Regards

  • Updating Revision level in purchase contract

    Hi All,
    I want to update the Revision level field (EKPO-REVLV) in a Purchase contract. The BAPI_CONTRACT_CHANGE is not updating the field. Please suggest me some options to update the same. 
    Thanks in Advance.
    Senthil J

    Hi Senthil,
    Have you seen  the documentation of this bapi .Please check
    Notes
    Master conditions
    When creating outline agreements, you can specify only one period per variable key. This means that just one period can be specified for the document header (i.e. condition table A019). The same applies to each item (i.e. condition table A016) and to each item/plant combination (i.e. condition table A068).
    You can use any periods. However they must not overlap for a variable key.
    When conditions are changed, new condition records are nevertheless written.
    Because volume rebate conditions are not taken into account in outline agreements, they are not processed.
    No subitems (e.g. inclusive/exclusive bonus quantities, display, etc.) are taken into account.
    The control key for quality management in procurement (EKPO-SSQSS) and the certificate category (EKPO-ZGTYP) are only taken into account to a certain extent. These two items of information are copied from the reference contract or material master, but cannot be changed; neither are any checks carried out for these two fields.
    The revision level (EKPO-REVLV) cannot be changed because various quality management routines were not implemented.
    Version management (Document Change Management) is not supported.
    External services (planned or unplanned) are not supported.
    The creation or changing of configurations is not supported.
    Post if need help here.
    Regards,
    Madhu.

  • Revision level issue in Material Master maintenance

    Hi All,
    When I try to change the revision level for a certain change number in our production client in the material master I get the following error
    Priority of revision level E is too small
    I have checked in CC13. But I could not find anything relevant.
    There are a number of revision levels available in the dropdown list.If I select some of the last revision levels available in this dropdown list in the material master the system accepts it readily but if I select any of the earlier revision levels in the list the system throws the above error message.
    Please can someone tell me what is wrong here.
    Regards,
    V S

    Hello All.......any clues???
    Does this belong to MM?......if not where can I get answers?.....which forum can I refer?

  • Reverse Revision Level

    Experts,
    The current Revision Level for a material is F and a user created another revision level G by error.
    Now the revision should go back to F and the system will not allow this.
    Is there anyway this can be done? I will appreciate a feedback.
    Thanks in advance.

    Hi Anirudh Kodgule and Ravindra Shirase,
    The Change master was created in CC01 and the object types selected are
    BOM
    Task List
    Document
    Material
    The change master number is 300000530
    This was then assigned to a material via MM02 in basic data 1 and the revision level was F.
    The initial revision level was E and we needed to return back to E because the Rev level of F
    is not yet reached for the material.
    Ravindra, could you please explain more your suggestion
    Anirudth, I am not sure the document type to enter at the initial screen
    THanks for your anticipated replies

  • Tracing of Revision levels in logistics

    Hi, Memebers,
    I have some questions about revision levels.
    1. Can the revision level of a material be displyed in purchase order?
    2. If yes, can craetor of PO select the revision level of the material to be purchased when multi revision levels exist?
    3. Can the revision level of a material be seen / traced in inventory management? e.g. can material be stored seperately according to its revision level?
    Pls kindly tell me yes or no, and how. Thanks.
    Best regards,
    Yu

    1. Can the revision level of a material be displyed in purchase order?
    Ans:
    a. yes surely you can displaythe revision level in the PO
    2. If yes, can craetor of PO select the revision level of the material to be purchased when multi revision levels exist?
    a.yes.in the purchase order item level data..in the material data tab you have the revision level. the purchases can change the revivsion level and the same can be printed in the PO.
    3. Can the revision level of a material be seen / traced in inventory management? e.g. can material be stored seperately according to its revision level?
    a.NO the revision level is for information we can not segeregate the stock at the revision level.
    Kindly let me know hte feedback.
    reg
    Dsk

  • Fetch latest revision level

    Hello Experts,
    I am writing a select statement to fetch REVLV field from AEOI table by passing AEOI-OBJKT = MATNR from selection screen.
    multiple records are coming into internal table.now i need to take latest record for each material.there is a chance of having multiple records on same date.but they are not maintaining Time field.so how can i capture latest revision level.

    Howdy,
    As the table has a sequential ID number (AEOI-AENNR is the Change Number), you can grab the highest Change Number to be the most recent entry.
    One note with this though is it won't work if you have multiple application servers and your system uses Parallel Buffering as per OSS note 599157 - so you might want to check with your basis consultant on that.
    The only other alternative is to enhance AEOI using include structure CI_AEOI and then find and exit to populate the system time when the record is created.
    Cheers
    Alex

  • What are the Uses of Revision Level

    Dear All,
    I have been searching for articles pertaining to "Revision Level" in the Material Master Record and found out that revision level is used purposely in Engineering Change Management and Document Management System. Is this true?
    I want to know if activating revision level can purposely be used also in tracking MRP Tab Changes in material master record. There are some cases that user change MRP Type and reorder levels (minimum/maximum) in the material master record and i want to record this changes and who made this changes. Can this revision level help me on this purpose?
    Can anybody please enlighten me on this revision level usage?
    Thank you.
    Regards,
    Bernardo Soledad

    Please check these answered links:
    Revision Level
    Revision Level
    Edited by: Afshad Irani on Apr 20, 2010 7:04 PM

  • Open PR Material Master Revision Level

    Hi,
    I am working on upgrade from 4.5b to ecc6.0.In this Project Material Revision Level and Change Number is assigned with Z Program.
    The Requirement is the Program has to check the Open PR 's and that particular Material  needs to be updated with Change Number and Revision Level.
    Now the Functional Specification to be prepared for the Technical Team -Based on the Open PR condition  -Now what are the fields to be specified in EBAN table in order to fullfill the open PR.
    As per my understanding Open PR means PO is not created and PO is created means that PR is closed.
    Or any other fields are to taken into consideration for preparing Functional Specification
    Please reply me ..
    Thanks for the reply.

    It is very much possible. You can try this use case. It's pretty simple. But Vice-versa is not possible.
    ~ Guru

Maybe you are looking for

  • Messages are being repeated

    Whenever someone sends me a message, my skype sends it back to them (as me) (with the persons skype name in brackets) with a /u00c3 somewhere in the sentance. I have no idea what is happening and would like a quick fix if possible. Thanks in advance

  • Best drives for sharing and editing Lightroom library remotely or onsite?

    Small company needs to move Lightroom folders from one iMac to a new drive, so more than 1 of us can import and edit in Lightroom 5.6. I need to move all my Indesign documents and Lightroom folders and photos off my iMac and onto something accessible

  • Opening Garageband Projects in Logic-Question

    When I open a garageband project in Logic 8, most of the audio tracks won't have sound, and when I create new audio tracks in those same projects, they also often don't have sound. It seems random which tracks don't work and which do. And doubling tr

  • Help needed with fax setup

    Help!!  My home phone service is provided by Verizon and I have a wireless router..no phone cord. All my other services are through a centuryLink DSL router..connected with phone line but does NOT provide MY phone sevices.  How do I hook up my 8600 t

  • Please stop launching apps on boot up!

    Even when I uncheck the dialog box on shutdown or re-start I often get all the apps rebooting from my last session.  This computer is used in a professional environment and I often have a client waiting for some information but I can't do what I need