Plant stocks in MRP run

Hi All,
I have a material maintained in 3 plants say A, B, C. The stock is also maintained in all 3 plants. The production happens only in plant C. MRP is run in plant C.
But while MRP run, I want that system should consider the stock in all plants - A, B, C.
Regards,
Manish

Hi
It can be achieved only by APO.
In R/3, we can run MRP at Plant Level (Maximum). When you run MRP at Plant C, System will consider the stock at C Only.
From Plant C to Plant A requirements should flow (It can be done by using special Procurement Key)
From Plant A to Plant B Requirements can flow by using special procurement Key
Here we should understand that from Plant C requrements can flow to Plant A only directly.
Generally we will requirements that system should consider the stock in all plants as well as requirements should go to 1 or more plants automatically.
We can do this by using Quota arrangement. But it doest not solve the issue.
regards,
Nag

Similar Messages

  • How to make Open Sales Orders consider unallocated stocks in MRP run

    Dear Experts,
          Maerial BOM   MATERIAL TYPE    STRATEGY GROUP        PLANNING STRATEGY      DESCRIPTION
                                                                                    Req-DM      Req-CU
    3.    TF180TK               fert                           20                                                       KE             make-to-order
    2.    TH300TK               halb                          20                                                       KE             make-to-order
    1.    TA300TK               roh                           10                                  LSF              KSL           make-to-stock  
    As listed above material in line no.1  is required to produce 2 and
                                                           2 is required to produce 3.
    I have open open sales orders for material TF180TK(fert).
    What settings do I need to effect,  to make the System consider Stocks & Open Purchase Orders for material  TA300TK (roh) which are not allocated to these Sales Orders , when  MRP run is carried out at plant level using MD01? 
    Regards

    Dear Bisolaaina,
    I Think by mistake this duplicate thread might have been created so pls close it
    Regards
    Madhu

  • To consider subcontract stock during mrp run

    Dear all,
    while mrp run it is not considering subcontractor stock .Is there any setting in spro so that it will consider subcontractor stock into consideration.
    with regards
    cp vijaya kumar

    Dear,
    Special stocks are not considered for MRP run. Subcontracting stock is a special stock(O), hence is not considered for MRP.
    Hope clear to you.
    Regards,
    R.Brahmankar

  • Consider Special stock in MRP run

    Hi all,
    Is it possible to consider the special stock (table MSLB) when I run MRP (MD01)?
    The type os special stock is 'O'
    Thank in advance,
    Felipe Simionatto
    Edited by: fsimionatto on Feb 8, 2012 8:09 PM

    Special stock cannot be included in the MRP run, either you have to make it unrestricted or implement a BAdI or userexit.
    BAdI/Enhancement implementation may not be very reliable :
    The following BAdi's are available for MRP related stuff
    MD_ADD_COL_EZPS           BAdI: Extra Columns for Evaluation PP-MRP Reqmnts P
    MD_ADD_COL_OVERVIEW       BAdI: Display of Additional Columns in the Material
    MD_ADD_ELEMENTS
    MD_ADD_ELEMENTS           BAdI for Adding Additional Requirements/Receipts
    MD_CHANGE_CALENDAR        BAdI: Change Calendar for Range of Coverage Calcula
    MD_CHANGE_MRP_DATA        BAdI: Change Data when Importing MDPSX
    MD_DISPLAY_ELEMENT        BAdI for Changing Display of MRP Elements
    MD_DISPLAY_ELEMENT
    MD_EXPORT_TREE            Order Report: Export Contents of the Order Tree
    MD_EXT_SUP                BAdI for Determining the Issuing Storage Location
    MD_INTERACT_PLANNING      BAdI for Deactivating Changeability of MRP Elements
    MD_LAST_LOT_EXACT         BAdI for Calculating Last Lot Exactly in Individual
    MD_M61R_DELKZ_POPUP       Definition: Display data for MRP element (MD04)
    MD_M61R_EXT_REQS_TXT      Definition: Supplement data of MRP element for ext.
    MD_M61X_EXT_REQS_GET      Definition of selection of external rqmts in FuGr M
    MD_MODIFY_PRODVERS        BAdI for Modifying Production Version
    MD_MODIFY_SOURCE          BAdI for Modifying Source Determination in MRP
    MD_MRP_LIST               BADI for further processing of MRP list
    MD_MRP_PARAMETERS         BAdI: Change Planning Parameters
    MD_MRP_RUN_PARALLEL       Add-Ins for parallel planning run of requirements p
    MD_PIR_FLEX_CONS          BAdI for flexible planned ind. req. consumption/red
    MD_PLANNING_RESULT        BADI for Issuing Planning Result
    MD_PLANNING_SCENARIO      BAdI for Maintenance of Add. Parameters in Planning
    MD_PLDORD_BOMEX_CIF       BAdI: Deactivation of BOM Forced Explosion in CIF
    MD_PLDORD_CHANGE          BAdI for Changing Planned Orders
    MD_PLDORD_POST            BAdI: Update of Planned Orders
    MD_PLDORD_SCHEDULING      BAdI: Schedule Planned Orders
    MD_PLDORD_TIME_STAMP      BADI for publishing time stamp problems
    MD_PURREQ_CHANGE          BADI for changing purchase requisitions
    MD_PURREQ_POST            BADI for updating purchase requisitions
    MD_PURREQ_REL_STRAT       BAdI for Deactivating Release Strategy for MRP Purc
    MD_STOCK_TRANSFER         BADI: Change the Requirement Date During Stock Tran
    MD_SUBCONT_LOGIC          BADI: Determine Subcontracting Logic
    Available userexits for MD01.
    LMDR2001                                User exits restr. profiles of opt. pur.ord.-based load bldg
    LMDZU001                                User exits in additional planning
    Edited by: Jeevan Sagar on Feb 8, 2012 2:30 PM

  • How to create STPR(Stock Trasnsfer Pruchase Req) in MRP Run

    Hello PP Guru ,
    I am running MRP in various branch-plant .I maintained Special Procurement Key 40  for all the material in branch-plant .Here we have one supply plant .We run MRP at Supply plant once all our other branches(plant) completes their MRP run .My  requirement is
    1.How to create STPR/STPO while running MRP at branches ? I did not find any option in MD01 to create STPR/STPO while executing MRP at plant level.Is there any configuration seting required?
    2.How to create PR/PO in Supplying plant (Central plant) so that it will consider all the branches STPR/STPO and show List of PR in MD04 ?
    Thanks and regards
    Jia

    Hi Jia,
    Yes, there is some special setup for Stock Transport orders.  There are some business decisions you must make first.  Pls refer to [Stock transport orders|http://help.sap.com/saphelp_erp60_sp/helpdata/EN/4d/2b90dc43ad11d189410000e829fbbd/frameset.htm] for basic functionality in helping you to make your decisions. 
    For configuration settings, refer to
    [Purchasing IMG|http://help.sap.com/saphelp_46c/helpdata/en/32/72369adc56d11195100060b03c6b76/frameset.htm] then Purchase Order>Set up Stock Transport order.
    and
    [Purchasing IMG|http://help.sap.com/saphelp_46c/helpdata/en/32/72369adc56d11195100060b03c6b76/frameset.htm] then Purchase Requisition>Set up Stock transport Requisition.
    These steps can be reached in IMG>MM>Purchasing>Purchase order>Set up Stock transport order, and
    IMG>MM>Purchasing>Purchase Req>set up Stock transport requisition.
    For question 2, there is no special setup.  Once your STOs/STRs  are properly set up, you will see new requirements in your central plant, which represent the un-fulfilled requirements from the branch plants.  Assuming that you already have set up MRP in the central plant, MRP will create new proposals (pureqs or plndords) just as if all of these new requirements were new sales orders.
    Rgds,
    DB49

  • Only one MRP run for diffrent companies plants

    Hi PP expert,
    my bizness scenario  is . there 2 companies  code one company code has 2 plant and another comp has 3 plant..only one product is assembling in all plant. suppose  finish material  X is producing in all company plants
    but  finish material X have component K and L, L is manufacturing in only one plant and supply to all company plant
    my client want to produce material component "L" for all plants  for his monthly  requirement with MRP run.
    component L is semi finish material and its is component of X
    but i am not under standing how will get requirement from  same company plants and other company plants. for Monthly MRP run
    Kindly suggest me how will take requirement from others companies plants for MRP run...
    kindly suggest me step by step
    Regards
    Aqueel

    Dear Friend,
    Only one MRP Run i.e. the Total MRP Run is possible at different plants but all must be under same company code.
    in your case ,plants are under different comp.codes , so it s quite difficult.
    Here I have to check the posiibility of using the special procurement key  to tranfer the material  between plants assigned to different comapny codes.  The particular Keys are ..
    40--Stock transfer (proc.from alter.plant);   70 -- Withdrawal from alternative plant   or 80----Production in alternative plant*
    If it is possible , then you can use this option of Special Procurement key.
    Otherwise you can use Plant to plant transfer movements like 647 to transfer beween plants against the Purchase order.
    Regards,
    Edited by: Girishprasad Subhash Pawar on Jun 28, 2010 12:26 PM
    Edited by: Girishprasad Subhash Pawar on Jun 28, 2010 12:30 PM

  • Qulaity stock included in the Plant stock -MD04

    Dear All ,
                      I am having  following stock for the Material A ,
    Unrestricted Stock  =  0
    Quality Stock           =  10
    When i check in the T-code :MD04 , System shows the Plant Stock as 10 , and this stock is included in MRP also ..
    I have checked the Checking Rule assignment in the configuration  plant parameters under MRP .
    How the Quality stock is included in the plant stock and the same considered for MRP .
    Is this logic is correct one ...
    I am expecting some replies from you all

    hi,
    What you notice is standard SAP behavior. QC stock is considered in plant stock & same is available during MRP run. However for Av. Check you can exclude QC stock in the checking rule.
    If your business need is not to include QC stock in MRP run, then create a SLoc which is not MRP relevant & maintain the stock in this location. In MRP - 4 view you need to maintain the value 1 for Sloc MRP indicator. You can get this value defaulted for all newly created materials in OMIR. For mass changes of existing materials you can use MM17.
    Regards,
    Vivek

  • MRP run - misalignment for planned order between Date and Production Date

    Hi All,
    We've just integrated SAP for a new plant.
    The MRP runs based on Routing Lead Time for Make materials instead on Material Master Lead Time, for Capacity Assessment purpose.
    When requirements dates lay in the past, MRP performs forward scheduling starting from current date and properly defines Production End Date according to Routing.
    By checking MD04, for the proposed Planned Order, the basic date is same as Current Date (= same as Requirement Date) instead of being same as Production Date.
    It works as it if checks stil the MAterial MAster LEad time instead of Routing. In fact if I updated the LT of MM the MD04 provides the right Date.
    For future requirements, the MRP works properly, by having basic dates (both start and end date) aligned with Production Dates of Planned Order.
    How can I do the alignment w/o updating In House Production LT?
    Thanks,
    D

    Hi Caetano,
    we have already done this configuration in OPU5 but it doesn't provide any benefit.
    Below how we configured it:
    Scheduling level: Via detailed scheduling
    Adjust dates: adjust basic dates, adjust dep. reqmts to operation date
    For capacity scheduling: Always basic dates, dep. reqmts to operation dates
    Scheduling type: Backwards.
    Regards,
    D.

  • Automatic MRP Run while saving SO

    Dear All,
       our customer requirement is when ever they make a sales order there should be an automatic MRP Run for all the materials available in Sales order.
    How to map this scenario.
    Useful answer will be definately awarded.
    Regards,
    HT

    Hi
    Firstly you plan what kind of planning you again do, whether : Make to stock or Make to order,
    If it is make to stock: then we have keep then a re-order point planning at MRP setting at material master and maintain mrp type as VV (Re-order planning). when ever the stock comes to re-order point stock, automatically MRP run takes place.
    If it is Make to order: then maintain the item category group as 0001 (Make to order planning) and after create Sales Order, we have do the MRP Run at MD02, and MD50.
    Reward if it helps
    Regards
    Prasanna R

  • MRP User Exit/BAdI for changing plant stock

    Hi,
    I have a client who is wanting to add consignment stock to plant stock during the MRP run for materials with a certain material group.
    I need to find an exit or a BAdI which is called at an appropriate time to have a developer code this function.
    Anyone have any ideas? I don't want to make changes to SAP Standard code!
    Thanks,
    Mark

    Hi,
    If am right, you want to consider the customer consignment stock in MRP, if yes then I believe the BADi -> MD_CHANGE_MRP_DATA should meet your need.
    I have not used this BADi, but check with your abaper if the method CHANGE_MDPSX_MARD reads the stock & then the unrestricted stock can be added with customer consignment stock from MSKU.
    Check & revert if the above meets your need.
    Regards,
    Vivek

  • Stock Transfer Reservation in spite of Purchase Requisition in MRP run

    Dear SAP gurus,
    We are running MRP heuristic on the PP/DS and we have different results comparing our development and productive environments.
    In our productive environment purchase requisitions are generated and in our development environment stock transfer reservations are generated as result of the MRP run.
    Where can I check differences of configuration that would be causing this?
    Thanks and BR
    Mauricio

    Mauricio,
    I guess I was not clear in my suggestion, I apologize.  Differences in T001W between ERP dev and prod will not necessarily generate your problem, differences in sourcing within APO between APO dev and APO prod will generate the differences.  I only mentioned the vendor number because a transportation lane can exist 'source plant > destination plant', but also you can have a transportation lane 'vendor of source plant > destination plant' which would also have an impact on the type of req created.
    Easier to check the sourcing, //PWBSRC1, mentioned earlier.  Your dev system should contain no objects that relate to Stock Transport orders.  You can delete the STO sourcing records within that transaction, which will also delete the material assignment to the Transportation lane.  Hopefully you will then get the default external supply proposal, which is normally a Purchase req.
    Also check for presence of quota arrangements //SCC_TQ1.  Delete any that unnecessarily refer to an STO object.
    Best Regards,
    DB49

  • How can I include the minimum stock of storage location in the mrp run.

    Hi all,
    I have in plant 1030 storage location 1001 and 1006.
    MRP1  Lot Size = EX
               MRP type = PD
               Reorder Point = 5
    MRP2  Safety Stock = 5
    MRP4 for 1001 is not filled
    MRP4 for 1006 Sloc MRP Ind = 2
                             Reorder point = 2
                             Replenishment qty = 3
    If no stock and I run the mrp I get
    a PurRqs for 8 with a automatic MtlRes of 3 going to storage loc 1006
    If I create a reservation in 1006 for 10 units and run the MRP again
    a PurRqs for 15 with a MtlRes of 10 going to storage loc 1006.
    I want the result to be PurRqs for 18 with a MtlRes of 13 going to storage loc 1006.
    10 for the reservation and 3 to fill storage loc 1006 with the replenishment qty.
    How can I acheive this?
    Best Regards!
    Curtis

    Hello Curtins
    Please observe what is stated on question 6 of FAQ note 550954, regarding storage locations planned separately:
    6. Question:
        A storage location should be planned separately. Is it possible to
        consider external requirements?
        Answer:
        No. The storage location MRP is a very simple reorder point planning
        procedure, during which only reorder point and replenishment
        quantity are defined. More complex settings can be implemented via
        storage location MRP areas.
    Therefore, I'd suggest you to use MRP areas to map this scenario.
    Best Regards
    Caetano Almeida

  • How MRP Run exclude QI Stock Type of a Raw Material SLOC?

    Dear all
    Fact:
    All of our raw materials must be subject to quarantinee upon GR. We have Storage Location of Raw Material: RMSL
    In Material Master of that Raw Material
    We are using the "SLOC of EP" (MRP View 2) to put the defaulted GR SLOC. And we also make use of the "Post to QI Stock" in View: Purchasing.
    Upon GR:
    During GR, the Raw Mat SLOC (RMSL) will be copied from "SLOC of EP" of the material master data, and it will be posted to the stock type "QI STOCK".
    Problem:
    However, when the MRP Controller run MRP, it will take the QI Stock Type of Raw Material SLOC into account.
    Is there anyway we can exclude the QI Stock Type of Raw Material SLOC from MRP Run?
    I have read from some threads to suggest to post it to the Quarantinee SLOC. We prefer not to create another Quarantinee SLOC (QISL) which will be filled in SLOC of EP and then after passing QC, we perform Transfer Posting from SLOC: QISL to SLOC: RMSL. We have a few Raw Material SLOCS and we do not want the Warehouse guy to get confused which Raw MAterial SLOC to choose upon GR. Rather, we prefer it to be defaulted in the "SLOC of EP" in the material master.
    Please advise.
    Edited by: Daimos on Jul 13, 2009 1:16 PM

    Hi,
    Generally MRP consider stock from all the storage location when run the MRP for Plant level for material.
    However we can exclude the particular storage location from MRP Run, for those following settings to be done.
    Go to MRP-2 View of material master and select the storage location to be excluded from MRP. (Press Shift +f1 ex .sloc2) As per your case it should be RMSL
    In that MRP view go to Storage location MRP Tab.
    And assign u201CSLoc MRP indicator = 1 (Storage location stock excluded from MRP)u201Dand save.
    Now run the MRP, stock from sloc2 will not be considered to create-planned order.
    Please try this and revert back.
    Cheers,
    Kumar.S

  • During MRP run unwanted plant and storage location include and exclude

    Hi There,
    During MRP run how to include and exclude the unwanted plant and storage location pls let me know the required configuration settings.
    Thanks in advance.

    HI,
    To control whether a particular storage location will be included or excluded from the MRP run.  (MD02/MD41).
    To exclude it from MRP run :-
    OMIR - Define storage location MRP per plant
    Put the MRP ind. as.         1 - storage location stock excluded for MRP
    To include it from MRP run:-
    OMIR - Define storage location MRP per plant
    Put the MRP ind. as.      space - storage location stock also planned at plant level and save it
    Next go to transaction MM01 - tick only view MRP 2
    Key in Plant and Storage Location
    Look at the Storage Location MRP section
    change the SLoc MRP indicator to space  and save it
    MMD1 - Create MRP Profile - MRP profile is a useful entry aid and makes it easier to manage MRP data.
    You define which fields are filled with values when MRP data is entered in the material master record, which of these values can be overwritten and which not.   You use the information stored in a profile is standard information that is needed again and again in similar constellations when material master records are maintained.
    Regards
    KK

  • Plannning Material and Plant for MRP Run

    Hi,
    If I have a material (01) extended on 2 plants, on one plant (A) we have production and planning/MRP + stock and on the other one (B), just stocking and transfer. B's requirements are to be entered and planned at A. I also want stock at B to be considered with stock at A when MRP runs at A. In the material master, I have some settings. I want to know if these would be any good:
    Material 01 on Plant A:
    MRP PD
    Strategy 40
    Lot size EX
    Coverage profile applied
    Material 01 on Plant B:
    MRP ND/PD tried both
    Strategy 40
    Lot size EX
    Coverage profile applied (same)
    Planning material: Material 01 itself
    Planning plant: Plant A
    I particularly want to know about points 5 and 6. Will they make any difference if I run MRP on scope of planning(all plants) or just plant A? Will stock at B be considered? What difference does that setting make in my case? Please help!
    Thanks!

    No sales on Plant A. Only transfers and STO's. Stock is STO'd to Plant B (and other Plants, as well)
    Plant B sells the stock.
    Yes, I want to load the forecast in Plant A (COPA to SOP to DM to MRP). What do I do in this case?
    I tried another case, as well. In that I put a special procurement on the material in Plant B view and marked it as external procurement. (the planning material and plant were there, didn't remove)
    Then I entered the forecast in both plants separately (PIRs for both Plants) The requirements from Plant B made STPO Planned orders in Plant B and STCK Planned orders in Plant A. I am using coverage profiles (period is month, standard length 25 days, target 10 days for 1st period for 2 months, target 10 days for 2nd period  for 1 month, target 10 days for the rest of the horizon) Not using any consumption modes.
    The results I am getting don't make sense to me. I have attached screen shots for both plants MD04 and the MRP + work scheduling views

Maybe you are looking for

  • MacBook Pro Display (window) shifts off the screen when I move my mouse

    With a slight move with my magic mouse, my entire open window will shift completely off the screen with only a part of the window still visible. I have to click on the exposed edge of the window for it to shift back into place. It's only the window o

  • Error loading web page

    Not sure if this is the place for this, but I'll take whatever I can get Am trying to open a web page that opens on a desktop unit www.ngs.noaa.gov/UFCORS/UFCORS2.jsp When I try to open in my laptop, I get: Error page UFCORS2 An error occured in the

  • How do I remedy storage issues with Adobe Premier Pro?

    I'm trying to download a trial version of Adobe Premier Pro. It's saying that I don't have adequate storage. However, the download only requires 3914MB but I have 10GB's worth of storage in my drive. What should I do?

  • Doubt on LSMW

    Hi Abapers,     I have complete data of MARA, LFA1 and some other tables which are imported from one SAP system. Now I have to upload into the respective tables in another System by using LSMW. This is not like master data upload, for example transac

  • L'écran de mon ipod touch 4ième gén. est grise

    Bponjour, je ne sais pas si quelqu'un va m'éclairer, mais l'écran de mon ipod touch 4ième génération est devenu tout grise, en fait le son marche...et même lorsqu'on le touche aussi. C'est tout simplement l'écran qui ne marche plus. C'est tout gris.