Pls help - Urgent - Planned order transfer from APO to R/3 - inconsistency

Hello experts ,
         Iam creating planned orders in APO using CTM planning. The planned order is getting transferred to R/3 but the order number is different in APO and R/3 .
         I tried deleting the application logs in R/3 and APO using transactions CFGD and C6 and running CTM planning again. But it did not work.
        Kindly suggest a solution. Thanks

As other members adviced
Please check the following as a list
1) Check first fi the Material is in APO relevant
2) Check if it has active integration model in cfm5 (R/3)
3) Check if the material has no blocked queues in /n/sapapo/cq (APO)
If there are any blocked queues please clear them accordingly.
4) After that perform a reconciliation of the transactional data through.
/n/sapapo/ccr(APO). perform it only for that material and on planned orders.
If there are any errors it will usggest you to follow few steps.
5) then again go back and check the /n/sapapo/cq transaction.
6) Check if the material and its location has publication Types maintained in SPRO transaction.
7) Check if the change pointers of this Planned order exists in /n/sapapo/c5
This si change pointers transaction , soemtimes you can release ti from there also.
If you still have problem, give the resutls of the following for reference.
Let us know once you perform all these.
8) Incase you need to perform the consistency checks  externally.

Similar Messages

  • Handling Planned order created from Demand planning and Sales order in MTO

    Hi all
    In MTO\ Repetitive we genrate Dependent requirement from demand planning (PIR) after running MRP which finally planned order created but on the other hand in short term we have Sales order which generate planned order after running MRP(In MTO), How we should handle planned order generated from Demand planning and the ones generated from sales order.(both after MRP Running).
    Regards
    Babak Bolourchi

    Dear,
    You can combine the planning strategy also main as 56 and second as 65 and in demand managment MD61 you have the option select requirement type.
    Then while creating sales order use MTO strategy and take MRP run through MD50 and then MD02.
    and if you want to assign the stock to sales order then you and do it through MB1b with 412 E movement type.
    As per my knowledge, generally 56 strategy only takes Sales Order Stock into consideration.
    Consider setting the Individual/Collective indicator to 2.
    Mark those characteristics that should have a usage probability in demand management as Relevant for planning.
    Hope clear to you.
    Regards,
    R.Brahmankar

  • Error in Plan Data Transfer from CO

    Hi,
    I need to use Plan Data Transfer from CO (FM9C). But when I execute it, I have an error "CO Objects without FM Assgmt".
    How can I setup the derivation between CO and FM objects?
    All documentation that I've found are for SAP 4.6, but we are using SAP ECC 6.0...

    Hi,
    Are you using former budgeting or BCS? If you use BCS, you should use FMCYCOPI_CO. In any case, to link CO objects to FM entities, use FMDERIVE strategy - it works for planning in the same way as it does for real postings.
    Regards,
    Eli

  • Issue when doing Delta loads from PSA to DSO using DTP - Pls help Urgent

    Hi All,
    I have done 3 data loads into PSA and from PSA, iam loading the data into DSO - by splitting that load into 3 using 3 DTPs. (Split that by Fiscal Period).
    2 of the DTP loads are extracting the data from 3 PSA requests.
    But, one of the DTP load is filtering on ONE PSA request.
    So, we are not getting the full data into DSO.
    Can some one pls help me why the DTP load is beheaving like this ???
    Even though i have not given any filters for Request id, still , for one load its picking up the data by filtering on One Req ID.
    Cheers,
    Nisha

    Hi Jr,
    Sorry for late reply.
    I think i found the solution, the diff between the DTP's is i ahve ticked " Get request one after another " .
    I have changed it now and its working fine.
    Thanks,
    Nisha

  • Planned order created by APO or R/3

    Hello,
    we have a planned order could we see if this planned order is created from APO or manually created in R/3 via MD11? please help.
    thanks

    Hi,
    If you want to check the Planned Order is created manually or from APO, then check with the Table: PLAF.
    Here you will find the User who created the Pl. Order.
    If the User is System User then it is CIFed from APO, otherwise it is created by the respective user who created the Planned Order.
    Once the Planned Order is executed then there will be no trace in the Table.
    Hope this clarifies..
    Regards,
    Siva

  • SNP planned order deleted in APO, but not in R/3.

    OK Guru's,
    We have a situation where during the weekend SNP planning runs, SNP Planned orders are deleted in APO, but the order is never deleted in R/3.  The change pointer is not in CPP and there are no failed queues.  Also, when you run CCR on planned orders, we will get an error on some orders saying "Not in APO" and the only option to reconcile that order is to "Send to APO".  The option that should exist is "delete in R/3" becuase the deletion never occured in R/3.
    If you send the order back to APO, the order will show in the "Production Confirmed" line of the Planning Book.  This is because APO is thinking that this order is an order that was created in R/3 when in fact is it really is a SNP planned order.
    Any clues to why this would happen?
    thanks,
    Brian

    How are you getting the SNP Planned Orders to R/3 in the first place.
    If you are transferring them using /SAPAPO/RRP7 then I guesss its a manual transfer and system does not consider SNP Planned Order deletion flag relevant for transfer to R/3.
    You will need to look into CIF enhancement to send the deletions to R/3.
    Normally SNP Planned Orders are not relevant for transfer to R/3 unless its replaced or converted to a PPDS planned order.
    Somnath

  • Planned orders created at APO side are not coming to the ECC

    Hi All,
    I am not getting the planned orders generated in the APO in to the ECC side after running the Product Heuristic. Many times I refreshed the stock requirements at ECC side and also APO side but still the planned orders generate has not come to the ECC. I am just new to APO. It would be great help if somebody can help me can guide/advice me on this.
    Thanks & Regards
    psamp1

    As well as Sajeev's reply, you also need to ensure that the Products and Plants you are planning are in an active integration model and that the transactional data you are expecting is also in an active integration model
    You can check this by using the transaction CFM5 in ECC, enter your products and plants in the general selection options then tick the checkboxes for Materials, Plants and Planned Orders. On execution the system will tell you if they are in an active model or not.

  • Table For Planned Order Details From PP Module

    In our organisation we are taking Plan Vs Acheivement from Production. So, intialy we taken Plan details from "PLAF" Table and Acheivement details from "S225" Table. But After running MRP at month end. Previous month plan get deleted and new order create.
    how to get history data for Planned order.
    Please help us.
    Regards
    Naga

    I don't think that there is any history in regard to planned orders.  PLAF will get rebuilt according to your MRP parameters and I don't believe that the data is stored.
    Regards,
    Rich Heilman

  • PLANNED ORDER CREATION FROM SALES ORDER SAVING (REQUIREMENT CLASS 200)

    Dear All,
    By using requirement class 200, assembly type 4 (dinamic planned order) Iwould like that at sales order registration the planned order for the sales order material is created.
    I have two problems.
    The system doesn't schedule the planned order, even if the scheduling parametres are entered for planned order type (relation between routing id and planned order type).
    So I have a planned order in which i have to manually schedule it.
    The second problem is that the planned order is firmed at creation. I would like that it was not firmed to adjust by MPS procedure the components from BOM modification. Infact at the creation of the sales order The complete BOM is not defined, and I don't want to unfirm the planned order so run th mps procedure.
    Can anyone answer to these questions?
    Thank's in advance
    Luca Pastura

    Hi Luca Pastura,
    For Scheduling
    1. You need to Give the appropriate check mark ( 1 or 2 ) In the capccity check of the requirement class configuration (ovzg)
    For Firming
    1. Since youare using dyanamic processing ""During dynamic assembly processing, you can not change the quantities and deadlines"
    2. kindly refer the F1 help for the assembly type inthe OVZG.
    Check and confirm
    Reg
    Dsk
    1.

  • Planned Order Release from SNP to R/3

    Hello All -
    We are facing a situation where in we just want to release only a certain number of planned orders that are there in a particular horizon...
    Now i am not sure as to can we or we cannot do that? can anyone please confirm and explain as to what transaction code we use to release the data into R/3.
    Regards,
    Suresh

    In Spro,you can configure
    Supply Chain planning>Supply Network Planning>Basic Settings-->Configure Transfer to OLTP system
    as "period transfer"
    and use /n/sapapo/c5 to process the change pointer with creation time stamp date range as horizon you want to transfer
    I wonder why you need to transfer SNP  transfer Orders to R/3..SNP being rough cut planning for critical compenents and resources.
    Edited by: Thukral on Sep 11, 2008 7:35 PM

  • Planned order details from PR

    Hi All,
    Planned orders are converted to purchase requisitions. Is there any way to find from which planned order the PR got created.
    As we find that the planned order gets deleted once converted to PR.
    thanks

    Try in ME5A
    Thanks
    MK

  • File to File Scenario with Secure Connection. Pls help urgent

    Hello All,
    I tried a lot to get a link/blog that expalin full scenario
    for File to File Scenario with Secure Connection
    Kindly let me know if somebody have link/doc for it
    that describe all the steps to do configuring this scenario.
    What is difference in simple words between
    FTPS and SFTP.
    Pls help it is urgent as I require for Project work urgently.
    Regards

    hi rich
    go through these links
    FTPs connection failed - error ".. certificate rejected by ChainVerifier"
    Re: What is SFTP, FTI channels
    http://help.sap.com/saphelp_erp2005/helpdata/en/e3/94007075cae04f930cc4c034e411e1/frameset.htm
    http://help.sap.com/saphelp_erp2005/helpdata/en/bc/bb79d6061007419a081e58cbeaaf28/frameset.htm
    FTPS implementation question.
    http://help.sap.com/saphelp_nw04s/helpdata/en/43/0e16bfd7b021aee10000000a1553f6/frameset.htm
    Server certificate rejected by ChainVerifier:FTPS server(Points Guaranteed)
    /people/krishna.moorthyp/blog/2007/07/31/sftp-vs-ftps-in-sap-pi
    File adapter
    thanks
    Kunaal

  • Music wont download - pls help urgently

    i have tried 5 times to download an album from itunes and every time i have to re-renter my billing details and double check everything is correct but to no avail. after doing this, there's no downloaded music and i don't know if apple will charge me 5 times as well for trying (hopefully not!!). pls help me. thanks

    Yes, I have, i think it may have something to do when
    it says, "playlist selected for updating no longer
    exists"
    But making a new playlist didnt work
    Then you didn't name it exactly the same as the ones that were deleted. It WILL work. Been there, done that.
    Good luck!

  • Pls help, urgent... I'm giving out all my duke dollars...

    Hi, thanks for reading...
    My problem is I need to assignment some value into an variable when the "main" program start and I want the data inside this variable visible to all the class to use (by using the getter methods to get the value),
    For example: From the code below (the clsMain), it is possible to get the same value assigned into the "strGrandChildName" variable in the "main" program inside the "clsChild" class? Any idea how to make this thing work? pls help me... with some sample code... i really appreciate any help you guys can give.
    Thank You,
    Best Regards.
    public class clsGrandChild {
    private String strGrandChildName = "";
    public void mtd_setGrandChildName(String strIn) {
    strGrandChildName = strIn;
    public String mtd_getGrandChildName() {
    return strGrandChildName;
    public class clsChild {
    private String strChildName = "";
    public void mtd_setChildName(String strIn) {
    strChildName = strIn;
    public String mtd_getChildName() {
    return strChildName;
    public String mtd_GrandChildName() {
    // can i get the same value of strGrandChildName assigned in the main frm here?
    public class clsMain extends clsGrandChild {
    public static void main(String[] args) {
    mtd_setGrandChildName("grand child name");
    clsChild objChild = new clsChild();
    objChild.mtd_GrandChildName();

    public class clsGrandChild {
    private String strGrandChildName = "";
    public void mtd_setGrandChildName(String strIn) {
    strGrandChildName = strIn;
    public String mtd_getGrandChildName() {
    return strGrandChildName;
    public class clsChild {
    private String strChildName = "";
    public void mtd_setChildName(String strIn) {
    strChildName = strIn;
    public String mtd_getChildName() {
    return strChildName;
    public String mtd_GrandChildName() {
    // can i get the same value of
    alue of strGrandChildName assigned in the main frm
    here?
    public class clsMain extends clsGrandChild {
    public static void main(String[] args) {
    mtd_setGrandChildName("grand child name");mtd_setGrandChildName("grand child name") shouldn't be called here, it should be called after the
    clsChild object has been created
    >
    clsChild objChild = new clsChild();objChild. mtd_setGrandChildName("grand child name");
    objChild.mtd_GrandChildName();
    If to access the variable strGrandChildName before the instanciation of clsChild object is what you needed, then you will need to set the string strGrandChildName as static and also setter method
    needs to be static too.
    private static String strChildName = "";
    public static void mtd_setGrandChildName(String strIn) {
    strGrandChildName = strIn;
    by doing it this way, the static variables will be created when main thread starts.

  • PSE12 recognises my scanner, however, asks to connect??!! Pls HELP urgently

    Hello
    I have win7pro and win 8.1. PSE12 recognises my scanner, however, after going through and pressing scan it comes up with a error to coonnect the device!! The printer scanner is a HP Officejet 6500a plus if this helps.
    Pls advise urgently.

    Download and install this: http://support.apple.com/kb/DL907
    Restart your Mac.
    Reset the printing system:
    - Go to System Preferences > Print & Scan
    - Right (or control) click in the rectangle listing your printers and select Reset Printing System.
    WARNING - this will delete ALL of your printers!
    - Select the plus sign to re-add a printer. Select the Defualt tab on the top of the window. Look for the printer, select it and then next to the "Use" pulldown, select the printer model (not AirPrint). Wait until the "Add" button becomes available. Click it.
    Say thanks by clicking "Kudos" "thumbs up" in the post that helped you.
    I am employed by HP

Maybe you are looking for

  • What is the best way to establish sso between iphone and IIS?

    Hi experts, I try to configure the SCEP, and I can view a IIS content with "Certificate required", but, can I validate the username with this certificate? thanks in advance,

  • How to Use Image Processor for Multiple Sizes

    I'm trying to use Image Processor to work on a folder of images and to create several sizes of .jpg's . I find an option to Save as JPEG in one size only. Is there any way to set up Image Processor to save JPEG to multiple sizes? Thanks in advance fo

  • Anchor mobility configuration getting lost in wlc 5508 ios code 7.4.100.0

    It is observed that in WLC 5508 , ios 7.4.100.0 ,  mobility anchor configuration on wlan  is getting lost .  we configure anchor ip address on  guest wlan > mobility anchor >  Switch IP Address (Anchor). We have configured the template on NCS 2.0 to

  • Business Connector to XI

    Hi, I have tried to find some documents on replacing XI with BC. I found one document, how-to migrate sap bc scenarios to sap xi. I am little bit confused with that doc. It says URL, I dont see any URL there to import. If anybody worked on replacing

  • Why personal hotspot missing from Symbian!

    I don't understand why in this day and age Nokia Belle is missing a personal hotspot? Why should I buy a 3rd party app and use it if it can be tweaked into the existing software? Hello Nokia? Are you listening/reading?