Dear all,
   I have an urgent issue, and I have absolutelly no idea how to resolve it, because it takes place in the module PM, and I dont know anything about it.
   The problem is that when users go to tcode IR02 and make an asignament of a employee to a work center the system also changes the position of the employee for the work center (I mean, SAP in the back ground goes to Infotype 0001 of the employee and changes the position of the employee).
   Is there a way of avoiding it? I think it is due to a bad customizing in the integration PM-HR, but Im not sure at all.
PS: sorry if this is the wrong forum to post it, I didnt find a PM forum, If you know a forum that fixes better please let me know!!!
Any advice will be GREATLY appreciated and rewarded
Thanks a lot in advance

Hello Wayne,
I am not sure how you 'assign' an SFC to an operator (User). Anyway, you may use Certification functionality of ME to 'certify' some particular Users on Operations/Resources etc. KBA #1618564 may be helpful for you.
Regards,
Alex.

Similar Messages

  • How to assign work center to class

    hi any one tell me how to assign w c to class

    Mukesh,
    In the Workcenter Create(CR01) or Change mode (CR02), in the basic data tab down you will find a function button "Classification" hit this button, system will prompt for Class assignment.
    Class Type for work center is 019.
    Regards,
    Prasobh

  • CNR2 HR Assignment - Work Center Description

    Hello,
    We use CNR2 to maintain work centers.  In the "Change Work Center: Basic Data" section I am able to change the description of the work center.  I then click the 'HR Assignment' button at the top of the screen and notice that the work center description located above where the 'persons' are assigned does not get updated.  Is there a separate location where the work center description must be maintained? 
    Thanks,
    Jordan

    I figured it out.  Transaction code PO01 can be used to update the work center description for the HR assignment.
    Thanks,
    Jordan

  • Work Center(Capacity Level) Change Documents

    We have a requirement to capture work center change documents at the capacity level which I understand is not supported by standard SAP; note 352485(point 15). Is there, though, a customized solution that can be developed? Any thoughts would be greatly appreciated.
    Thank you in advance.

    Hi Usman,
    I have already tested the method you are mentioning. You cannot save a order without work center. So, you need to use a dummy work center and change all the open orders.. if you want to change capacity category from A to B. New capacity category should be mentioned in dummy or original work center.
    When you replace the work center, order will be gng for scheduling.. which leads to change of Basis start date and earliest start date... this is an inconsistency...
    To avoid it... i followed below steps
    1. Uncheck the capacity requirement indicator in all open orders
    2. when u try to delete, it will say "Capacity is still being used"
    3. Table KBED, use capacity ID and run, it will list out the pending orders
    4. When the table has no entries, delete the capacity category
    5. check all capacity indicator
    - Pithan

  • Work center screen sequence change

    Dear Guru,
    Can you guide me how to change the screen sequence of work center.
    Regards,
    Sanjay  Sahoo

    Dear Sandeep,
    My requirement to change in sequence in Tab page.
    I changed the sequence in OP13, But screen sequence does automatically change as per sequence maintain in OP13.
    If we use the navigation tool, then only system take you to the next Tab Page which we maintain in the OP13.
    Can it be possible to diaplay the Tab Page sequence as per OP13 at the time creation of work center?
    Regards,
    Sanjay Sahoo

  • Assigning Work Center to Operatios?

    HI,
    I Create two operators, named op1 and op2,
    and they are in the same Workcenter.
    I assign a SFC named sfc001  to op1,  But if I login use op2 account, op2 can to start and complete with sfc001?
    is it normal condition? or someone have another solution to setting their's permission ?
    THANKS,
    WAYNE
    Edited by: Sergiy Katerinich on Dec 15, 2011 3:12 PM

    Hello Wayne,
    I am not sure how you 'assign' an SFC to an operator (User). Anyway, you may use Certification functionality of ME to 'certify' some particular Users on Operations/Resources etc. KBA #1618564 may be helpful for you.
    Regards,
    Alex.

  • User exit/Badi for changing operation work center based on service product

    Hi,
    I have an requirement to change the operation work center based on the service product in IW31/IW32 transaction. I am using the BAdi 'IM_SM_BADI_READT399A' for changing the main work center. It changes all the operation work centers except the first one. But I need to change it all the operations.
    Thanks in Advance.

    I am using the enhancement spot 'IWO1_TL_INTEGRATION2' for changing the first operation work center

  • Change the default work center in CRM 2007 webclient

    Hi all,
    With IC_AGENT role,the default work center is 'Account identification'.When I click the buttone'end' ,it jump to account identification work center ,how to change this default,config or coding ?
    Thanks a lot!
    Best regards,
    LeKa

    Hi Ashwin,
    In our ZIC_AGENT, I have defined the navigation bar that contained the 'IC_BPIDENT:account identification' work center.  This is as default pages whatever ending phone call on webclient or cancell any action, it also jump to 'IC_BPIDENT' view.
    I want to enhance the function, when i end a call from webclient ,it could jump to 'call list' work center instead of 'account identificaton'.
    did you have any ideas ,please tell me.
    Thanks.
    Best regards,
    LeKa

  • Change work center

    Hi all,
    Please excuse my ignorance in what is probably an easy operation.
    What is the transaction code for changing a work center that a production order is setup default to be completed in?
    For example if i have product 'A' that is usually completed in work center '1' but I want to change the data so that next time and every other time I create this product it identifies work center '2' on the production order.

    Hi Gman,
       For producing "Product A" currently you are using work center 1. Instead of using this work center 1 you want to use work center 2. To change the work center, you need to change the routing for the "Product A". Go to CA02  and enter the material and select the routing and press operation, in the operation you will see the work center 1. Change the WC1 to WC2 and save it.
      After changing this, when ever you want to produce "Product A", system will select WC2.
    Hope it clears your doubt. Revert back if you have any questions.
    BR / US

  • Work center assignment HR - PS

    Hi everyone
    is there anything else to do to assign work center in HR except what I've already accomplished:
    1. work centers have been created in CR01and customized in OP42
    2. via T-Code PO01 I assigned a work center to a position (connection A!003).
    What else should be done? How can I see the work center in organizational plan (PPOSE) besides Detailed description of an object???
    Will PS team-members be able to observe my work center from HR in their T-Codes???
    Best regards,
    Eldar

    HI,
    you cannot see ur work center directly in the Org.Structure.Please use this report RHXSTR06 which will give the existing work centers that are assigned to ur Organization Unit.
    Thanks and Regards
    Swati

  • How to assign work centre in OM

    Hi,
    In organizational structure how to assign work centre.
    it is necessary to assign cost centre to org structure.how ?
    President has to be given personnel no.?
    if employee is reporting to two superiors of different depts or different regions ,how the employee should be placed i.e dual reporting?
    Urgently reply.
    Thks
    Archana

    Hi Archana,
    1. To assign Work Center the T-code is PO01.
    2. Yes. In SAP HR every employee has to be given Personnel Number irrespective of their designations.
    3. No its not possible according to me (Gurus Pls correct me too if I am wrong)
    Hope above answers are helpful to you.
    Regards
    Pavani
    Remainder: Points to be given on answered.

  • Re:assign profit center to a order type

    hi gurus,
    good morning to everybody,
    i have a question i have 1000 materials in my organization using by 5 company codes in that few material i need to assign profit center so i went to mm change and assigned the profit center for sales:general/plant and plant data/stor.2, if i want to assign profit center to order type how can i assign, if i cannot assign in order type i need to assign profit center in mm change for 500 materials, so if i change manually in mm change for 500 materials is it going to effect for the other company code when they post the transactions please give me your opinions.
    thanks in advance and points will be assign for useful answers.
    kumar.

    Dear Kumar
    You cannot assign the Profit Center to Sale Order type.  Whatever you maintain in Material Master, that will flow automatically in sale order as and when you create. 
    If you want to change the profit center in material master in bulk, you can do so via MASS.  In fact for sale order also, you can achieve this via MASS but no partial delivery should have been made against that sale order.  In case, you have already made partial delivery, then the field would become grey and you cannot change the same.
    thanks
    G. Lakshmipathi

  • Re: assign profit center to order type

    hi gurus,
    good morning to everybody,
    i have a question i have 1000 materials in my organization using by 5 company codes in that few material i need to assign profit center so i went to mm change and assigned the profit center for sales:general/plant and plant data/stor.2, if i want to assign profit center to order type how can i assign, if i cannot assign in order type i need to assign profit center in mm change for 500 materials, so if i change manually in mm change for 500 materials is it going to effect for the other company code when they post the transactions please give me your opinions.
    thanks in advance and points will be assign for useful answers.
    kumar.

    Dear Kumar
    Go to VA02, input the sale order reference and execute.  There double click on the line item and select the tab "Account Assignment".   There you can see the field "Profit Center". 
    As I said in your other thread, if you have generated subsequent documents like delivery or billing, you cannot change this for that line item.  You have to close this line item by assigning "Reason for Rejection",  and create a new line item but then, b4 doing this, you should have changed the profit center in material master.
    Alternatively, if you want to update in bulk, go to T.Code MASS, input "BUS2032"  in Object Type and execute.  There select "Sales Order Item Data" and click on "Fields". 
    Select the field name "MASSVBAP-PRCTR" and execute.  Either you can input the sale order references for which you would like to change or just execute.
    Now you will have a screen "New Values" on top and below the existing sale orders listed.  Give the new profit center against the field "New Values" and execute.
    thanks
    G. Lakshmipathi

  • Automatic creation of work center

    Hi gurus,
    Is it possible to instantly create work centers every time an employee is hired and created via HR module?
    We would like to link the work center per employee. The ratio is 1:1. 1 work center per employee.
    We are thinking this will be done via ABAP, although do you think this is possible as a SAP standard?
    Thank you!
    Regards,
    Mozart

    Hi Mozart,
    Maintain Relationship and check the same is flowing in table HRP1001, you can do that in transaction PP01.
    It depends on Org data, infotype. least not last it can be possible through ABAP.
    Check with you HR consultant about this and post the same question in HR forum.
    Regards'
    Syed

  • Work Center in equipment master

    Dear All,
    We have created equipment master for 1000 palnt and then assigned work center belongs to 1100 palnt.System accepted 1100 plant work center.My requirement is  plant number and work center palnt must be same.

    You will need to develop something to stop this occuring.
    The the user-exit link at the top of this forum
    PeteA

Maybe you are looking for

  • How to get the list of database Views modifying the DB tools list tables.vi

    Hi, I have a problem, I just started using LabVIEW and in particular the LabVIEW connectivity toolkit and I am lookig fgor suggestion regarding how to get the list of database Views modifying the DB tools list tables.vi... Thanks in advance, Michela

  • Change colors in multiple pie chart - with legend

    I need to change the colors of groups shown in multiple pie chart diagram in CR XI. I managed to actually change the colors in the diagram by using highlighting rules in the wizard. (Sorry, I need to guess the correct English terms since I am using t

  • Site-specific error pages do not render images?

    A weird one, but here goes..... Does anyone have any idea why our site specific error pages (Network Error, Site Busy Error...) would not serve images? Our custom HTML and pages appear as desired, but our logo and other .gifs do not and appear broken

  • Using the unix telnet command in java

    I am using Runtime.getRuntime().exec("telnet ......") to excute the telnet command within my java program. Basically, I'm writing a program to automate a bunch of processes, and one of them requires the process to be executed in another machine. It k

  • Javax.servlet.ServletException

    Hi guys, i'm developing a jsf application... i'm trying to use a myfaces email validator and now i'm this error when i run the application... what can i do?? Please help me solving my problem,i'm inexpert of jsf... type Exception report message descr