PM Order method of work completed duration calculation

Hi
Please advice how to configure the PM order work completion duration calculation.
I need to calculate the work completed hours based on the user status.
Not based on the Order status ( TECHO). It User status = TECHO order work completed hours should be calculated.
Please advice how to do this..
Regards
Kesharika

Hi
if you want to calculate the time using user status yo have to create the Z report which will fetch the when the user status has activated ,consult with you technical team on this
regards
thyagarjan

Similar Messages

  • TS1398 My Wifi has completely gone, the option on the slider is greyed out, and the slider won't slide. Tried all the fixes on the forums, (except the fridge/frezzer method), none work. Grrrrr!

    My Wifi has completely gone, the option on the slider is greyed out, and the slider won't slide. Tried all the fixes on the forums, (except the fridge/frezzer method), none work. Grrrrr! This has been an issue since installing new IOS! How long will it take apple to come up with a fix. My carrier offered me an early upgarde at a massively inflated monthly cost (how kind of them!).

    My Wifi has completely gone, the option on the slider is greyed out, and the slider won't slide. Tried all the fixes on the forums, (except the fridge/frezzer method), none work. Grrrrr! This has been an issue since installing new IOS! How long will it take apple to come up with a fix. My carrier offered me an early upgarde at a massively inflated monthly cost (how kind of them!).

  • Custom '% Work Complete' in project center views

    Hi,
    My projects typically have two main summary tasks under the project summary task. When calculating the % work complete at the project level, I would like to use the % work complete of one of the summary tasks instead. Also, when I show a tracking gantt in
    a project center view, I would like this custom % work complete value to be the progress fill in the tracking gantt bar. Does anyone know of a way to do this?

    Hi Steve.Pierce,
    You can achieve the 1st part simply enough by using a custom field.  The image below should give you enough info assuming you can find your way around MS Project.
    For the 2nd part, you'd need to work out a formula that calculates the customised % work complete and puts a end date into a free Finish field (1-10), and then change the progress lines from Actual Start to
    Finish (1-10).  This would assume the work is flat line prorated across the duration.
    Ben Howard [MVP] | web |
    blog |
    book | P2O

  • Project progress vs % Work complete

    Hi,
    As far as I've read the %Complete field doesn't state the progress of the project. I would like to see how much work has been done (% Work complete) and compare it against a percentage that's the same as days past since beginning divided by total duration
    times 100%. So in a project lasting 100 working days, I want this project progress at 50% after 50 working days and compare it against the % Work complete. Is there an option to do this?
    If this function isn't available by default, I would have to use some custom fields in which is calculated:
    The number of working days passed since the startdate of the project
    The total number of working days (equals duration)
    Divide the days passed by the days total * 100%

    Hi Jan,
    Thanks for the quick response! Can see you work with a Dutch version of MSP. ;) Are you in Belgium? 
    In the meantime I was trying myself to accomplish it. I did it like this:
    Custom Duration 1: ProjDateDiff([Project Start];Date();"Standard")
    Custom Duration 2: ProjDateDiff([Project Start];[Project Finish];"Standard")
    Custom Text 1: Round([Duration1]/[Duration2]*100) & " %"
    Starting to like MS P!! :)
    Is there any possibility to only show this for the Project Summary (ID 0)?

  • My iPhone 5 won't charge properly, computer doesn't recognise it and the home button has stopped working completely, it hasn't been dropped or water damaged at all, any ideas?

    My Iphone 5 won't charge properly, computer won't recognise the device and also the home button has stopped working completely, it hasn't been dropped or suffered any water damage, anybody else had anything like this? and what are the solutions? thanks

    If your iPod Touch, iPhone, or iPad is Broken
    Apple does not fix iDevices. Instead, they exchange yours for a refurbished or new replacement depending upon the age of your device and refurbished inventories. On rare occasions when there are no longer refurbished units for your older model, they may replace it with the next newer model.
    You may take your device to an Apple retailer for help or you may call Customer Service and arrange to send your device to Apple:
    Apple Store Customer Service at 1-800-676-2775 or visit online Help for more information.
    To contact product and tech support: Contacting Apple for support and service - this includes international calling numbers.
    iPod Service Support and Costs
    iPhone Service Support and Costs
    iPad Service Support and Costs
    There are third-party firms that do repairs on iDevices, and there are places where you can order parts to DIY if you feel up to the task. Start with Google to search for these.

  • Re-ordering tags using ORDER panel doesnt work in Acrobat X

    I am having major problems re-ordering tags (text and form field) using the Order Panel. When I select a tag from the Order Panel and try to drag it from position #20 up to position #5 it does not work.
    In fact, my tag completely disappears???
    I've been working on tryin to get my text tags and my form field texts in the proper order for over a week now with no luck at all. I am also have several problems with 2 text tags merging into 1.
    If anyone knows how I can get the reading order to display correctly in the Order Panel that would be great. My docs are failing the accessibility standards set by our office for the province and i need the forms to be compliant with gov acts/legs.

    CT Dave is correct.  The structure tree is used as the reading order by screen readers.  The structure tree is defined in the Tags Panel.  As long as "use document structure" is selected in the Page Thumbnails/PagesPanel /Page  Properties / Tab order tab " your document should read properly. 
    As to whether it meets the legal standards in your jurisdiction... well some cllient requirements used to  include the "Content Panel" match but --  the "Order Panel"?  , I can think of none  that does.
    Are you referring to the form field "Tab Order" or the Order Panel?  Working with Form Fields the Tab Order should match the Tags Panel reading order and this can be a bear to work out sometimes.
    I know working within the Content Panel can cause unexpected changes in the appearance of the page. There is definitely a trick to it. It seems the Order panel is likewise "buggy" (at least from a user's perspective). I have had Tags occasionally "disappear" in the Tags Panel if they are inadvertently moved "on top of" instead of under or over another Tag. So it doesn't surprise me that this would happen in other panels.  You have to position them "just so". 
    I am in the States and not familiar with Provincial code--could you forward a URL or cite? Client standards may have requirements regarding elements or situations that may but do not necessarily affect accessibility. Perhaps they are  trying to cover as many bases as possible or may lack a full understanding of document accessibility. Government standards are usually more general.  Are there other accessibility workers in your Province that you can refer to for guidance on this?
    If matching the order panel to the reading order is  the standard then you will need to examine how your documents are being made, and under what circumstances the Order Panel is or is not correct.  Start with a simple document and work up from there. If you are creating documents in Word with text boxes, figures (Not to Mention Form Fields) you will likely have problem as Word does not always manage to arrange lists or Figures in the correct order in Acrobat's Tags Panel.   I would  be interested in seeing the document you are having problems with or a similar one.  
    Good luck!

  • Work Completion in the cProjects Dashboard is not working

    Hi All
    In my cProjects dashboard Work Completion is not reflecting the actial figures. It is always displaying as '000'. I have run the evaluation report for dashboard and all other fields are reflecting except this field. Can you guys let me know what could be the problem.
    Thanks
    Rajesh

    Hi Rajesh,
    have you entered actual work + remaining / planned work? This KPI is calculated based on that. It is NOT the 1:1 aggregation of the % complete on task level. Regards
    Thorsten

  • Task dashboard - work complete column

    Hello experts,
    Could you please help me figure out what should I do in order to have the column Work complete from My Tasks dashboard automatically?
    1. First, I set a percentage of my complete work on task level, tab Dates and Work , field % completed
    2. Second, after saving I would like to see this percentage on my tasks dashboard
    Please let me know what customize to do in order to can implement the scenario described above.
    Thank you!
    Best regards,
    Ruxandra P.

    Hi Ruxandra,
    Have you done the evaluations? Since the dashboard's data are updated through extract layouts/evaluation in configuration (The details about it is answered by Hans in the below thread)
    cProjects severity status can’t chang the icon according to the formula
    And also for 'Work complete' field in configuration of extraction layout '0_Dashboard', calculate after aggregation has been set, so try to aggregate severity in project by selecting project definition of the project and clicking on 'Aggregate' button.
    Try this & let us know.
    Regards,
    Ravi

  • Setting up Email Order methods in ECC

    Dear SRMers',
      System Information: SRM 5.0
                                    ECC  6.0
    Can some one please let me know what is the procedure to set up the Catalog PO email Order methods in ECC.
    Points will be rewarded for answers.
    Thanks in advance,
    Bobby.

    railtechnician wrote:
    I setup my main email account in Thunderbird following the instructions on the help page. Then I logged in to BT Yahoo and setup a sub account. I proceeded to set that up in Thunderbird too and it receives email but I cannot send email from it. The main account works correctly but when trying to send a message from the sub account the password is rejected. The password is correct because I can login to BT Yahoo and send/receive email no problem.
    I hate webmail, especially the BT Yahoo login page which is awash with a page full of unwanted graphics making it difficult to use. If it is a design feature that up to 10 sub accounts can be used only as webmail then they are next to useless to me. I have had multiple email accounts from my previous ISP running until last week all easily manually setup in Thunderbird and using the same smtp server and a single password and yet this does not appear to be the case for BT Yahoo email in Thunderbird. When attempting to send from the sub account neither the password for the main account nor that for the sub account is accepted by mail.btinternet.com 
    So what is wrong?
    Hi. Welcome to the forums
    Due to the way BTYahoo! email functions, you need to make sure that you have a unique smtp server setting for each account in Thunderbird, otherwise you will get errors - including "553 address not verified".
    (Tools/Account settings then on the left down to Outgoing Server (SMTP) and setup a similar one to that of your primary account, but using the sub account email address. Give it a name. Then point at this server name from the main account setting).
    http://www.andyweb.co.uk/shortcuts
    http://www.andyweb.co.uk/pictures

  • After Method not work

    Hello guys,
    I need your help.
    In activity step I added one method in "Methods AFTER Work Item Execution (Modal Call)", but this method not work after complete the workitem.
    This method run in background, and insert data in one table.
    My workflow use BUS1001006 object type, and this method too.
    Any idea?
    Thanks!!!
    Kleber

    Hi Arghadip!!!
    Now it's work fine!!! Thanks!!!
    Please... more one question...
    In my method, I need the value of the element <b>_Workitem.WorkitemStatus</b>.
    It's possible:
    ===========================================================
    swc_get_element container '<b>_Workitem.WorkitemStatus</b>' vl_status.
    ===========================================================
    or
    ===========================================================
    swc_get_element container '<b>_Workitem-WorkitemStatus</b>' vl_status.
    ===========================================================
    How I do this?
    Thank a lot!!!
    Kleber

  • Sale order status not getting completed

    Hi Friends,
    I had sales order with milestone billing for which I completed billing, even though sale order status is showing as being processed. The same way with periodic billing also.
    Kindly suggest.
    Kumar

    Dear all,
    I have cleared my actual issue. But the below doubt was regarding the standard SAP.
    Hi All,
    Thank you for your answers. First point is that I hope completion rule is only for quotation and contracts but not for normal sales orders. Second point is that I am using TAO item category which tells order related billing with billing plan. This means there was no delivery, then why schedule line CP (MRP) was assigned to TAO in standard? This is the problem for me. As the schedule line is MRP the system is not completing the status of the sale order even I have completed total quantity and value also. Can anyone tell me why this was assigned like this in statandard?
    Kumar

  • Facing problem in creating socket in a method from an already deployed application exe while same method is working from another exe from same environment from same location.

    Dll Created In: - MFC VC
    6.0
    Application Exe Developed In:
    - VC 6.0, C# and VB.net (Applications which are using dll)
    OS: - Windows XP sp2 32bit
    / Windows Server 2008 64 bit
    Problem: - Facing problem in creating socket
    in a method from an already deployed application exe while same method is working from another exe from same environment from same location.
    Description: - We have product component which
    has an exe component and from exe we invoke a method, which is defining in dll, and that dll is developed in MFC VC6.0. In the dll we have a method which downloads images from another system after making socket connection. But every time we are getting Error
    code 7, it is not giving desire result while same method is working from another exe from same environment from same location. And also me dll is deployed on many systems and giving proper output from same application.
    Already Attempt: - Because error is coming on
    client side so what we did, we created a driver in C# which invokes same method from same environment(on client machine) using same dll and we are astonished because it worked fine there.
    Kindly Suggest: -
    We are not able to figure out root cause because nothing is coming in windows event logs but what I did, for finding the problem line, I wrote logs on each line and found the exact line in application exe which is not working,
    actually  it is not executing Create () method,
    I will give snippet of the code for understanding the problem because we are not finding any kind solution for it.
    Kindly assist us in understanding and fixing this problem.
    Code Snippet: -
    Int Initialize (LPTSTR SiteAddress, short PortId)
    try
    CClientTSSocket *m_pJtsSockto;
    m_pJtsSockto = new CClientTSSocket;
    LONG lErr = m_pJtsSockto->ConnectTS(csIPAddress,PortId);
    ErrorLog (0, 0, "--------ConnectTS has been called ------------","" );
    catch(...)
    DWORD errorCode = GetLastError();
    CString errorMessage ;
    errorMessage.Format("%lu",errorCode);
    ErrorLog (0, 0, "Image System", (LPTSTR)(LPCTSTR)errorMessage);
    return  IS_ERR_WINDOWS;
    Note: -
    CClientTSSocket extends CAsyncSocket
     IS_ERR_WINDOWS is a macro error code which value I found 7.
    LONG ConnectTS(CString strIP, UINT n_Port)
    ErrorLog(0,0,"ConnectTS is calling Create [is going to call]","");
    if(!Create())
    ErrorLog(0,0,"ConnectTS is calling [Create not called successfully] ","");
     n_Err = GetLastError();
     ErrorLog(n_Err,0,"ConnectTS is calling1111111111111111Erorrrrrrrrrrrrr","");
    return NET_INIT;
    ErrorLog(0,0,"ConnectTS is calling2222222222222222222","");
    if(!AsyncSelect(0))
    n_Err = GetLastError();
    return NET_INIT;
    if(!Connect(strIP,n_Port))
    n_Err = GetLastError();
    ErrorLog(n_Err,0,"ConnectTS","");
    return SERVER_NOT_CONNECTED;
    Code description: -
    From
    int GETImage_MT() method we call Initialize() method and pass client machine IP and Port and there we call
    ConnectTS() method, In this method we Create() method and finally it returns the error code as mention in macro 7.
    Logs after running the program: -
    --------ConnectTS has been called ------------
    ConnectTS is calling Create [is going to call]
    Image System 
    0
    Note: - According to logs, problem is coming in Create method().
    Here 0 is errorMessage received in catch block. And from catch block it returns macro value 7. And when we run same method individually from same machine, same environment through same dll
    from different exe, it is working fine and we are facing any kind of problem. While same problem application was working properly earlier but now continuously it showing problem.
     Kindly assist us to resolve the issue.

    Pointer variable was already initialized; I have mention in code; kindly assist us.
    Dll Created In: - MFC VC 6.0
    Application Exe Developed In: - VC 6.0, C# and VB.net (Applications which are using dll)
    OS: - Windows XP sp2 32bit / Windows Server 2008 64 bit
    Problem: - Facing problem in creating socket
    in a method from an already deployed application exe while same method is working from another exe from same environment from same location.
    Description: - We have product component
    which has an exe component and from exe we invoke a method, which is defining in dll, and that dll is developed in MFC VC6.0. In the dll we have a method which downloads images from another system after making socket connection. But every time we are getting
    Error code 7, it is not giving desire result while same method is working from another exe from same environment from same location. And also me dll is deployed on many systems and giving proper output from same application.
    Already Attempt: - Because error is coming
    on client side so what we did, we created a driver in C# which invokes same method from same environment (on client machine) using same dll and we are astonished because it worked fine there.
    Kindly Suggest:
    - We are not able to figure out root cause because nothing is coming in windows event logs but what I did, for finding the problem line, I wrote logs on each line and found the exact line in application exe which is not
    working, actually it is not executing Create () method, I will give snippet of the code for understanding
    the problem because we are not finding any kind solution for it. Kindly assist us in understanding and fixing this problem.
    Code Snippet: -
    Int Initialize (LPTSTR SiteAddress, short PortId)
    try
    CClientTSSocket *m_pJtsSockto;
    m_pJtsSockto = new CClientTSSocket;
    LONG lErr = m_pJtsSockto->ConnectTS(csIPAddress,PortId);
    ErrorLog (0, 0, "--------ConnectTS has been called ------------","" );
    catch(...)
                       DWORD errorCode = GetLastError();
                       CString errorMessage ;
                       errorMessage.Format("%lu",errorCode);
                       ErrorLog (0, 0, "Image System", (LPTSTR)(LPCTSTR)errorMessage);
                       return  IS_ERR_WINDOWS;
    Note: - CClientTSSocket extends CAsyncSocket
     IS_ERR_WINDOWS is a macro error code which value I found 7.
    LONG ConnectTS(CString strIP, UINT n_Port)
              ErrorLog(0,0,"ConnectTS is calling Create [is going to call]","");
              if(!Create())
                       ErrorLog(0,0,"ConnectTS is calling [Create not called successfully] ","");
              n_Err = GetLastError();
              ErrorLog(n_Err,0,"ConnectTS is calling1111111111111111Erorrrrrrrrrrrrr","");
                      return NET_INIT;
              ErrorLog(0,0,"ConnectTS is calling2222222222222222222","");
              if(!AsyncSelect(0))
                       n_Err = GetLastError();
                       return NET_INIT;
              if(!Connect(strIP,n_Port))
                       n_Err = GetLastError();
                       ErrorLog(n_Err,0,"ConnectTS","");
                       return SERVER_NOT_CONNECTED;
    Code description: - From int GETImage_MT() method
    we call Initialize() method and pass client machine IP and Port and there we call ConnectTS() method, In
    this method we Create() method and finally it returns the error code as mention in macro 7.
    Logs after running the program: -
    --------ConnectTS has been called ------------
    ConnectTS is calling Create [is going to call]
    Image System  0
    Note: - According to logs, problem is coming in Create method(). Here
    0 is errorMessage received in catch block. And from catch block it returns macro value 7. And when we run same method individually from same machine, same environment through same dll from different exe, it is working fine and we are facing any kind of problem.
    While same problem application was working properly earlier but now continuously it showing problem.
     Kindly assist us to resolve the issue.

  • How to get a list of production orders for a work center?

    Hello SDN Community, 
    I have an requirement to display in a pop-up window a list of production orders for a work center.
    Does anyone know which screens/transactions would show this relationship?
    Or better yet, does anyone know how to demonstrate this from the tables themselves?
    Thank you,
    Dean Atteberry.

    Hello Mangalraj.S
    >>Goto COOIS-->For the field List select PPIOO000 - operations and layout -->standard layout
    >>and execute,by this you will be able to see the operations for each order and to which
    >>work center they are assigned.
    The system I am working on is ECC 6.0.
    For this system the values in the dropdown for the "List" field are "Capacities, Items, Order Headers, Sequences, Trigger Points, etc".  But nothing that says PPIOO000 - operations and layout.
    >>Or else in the in input screen of COOIS,enter the work center for which you want to see which
    >>are the production order's assigned and execute.
    For system I am working in, I do get a grid display when entering a work center.  It has columns like "Order, Material, Icon, Order Type, MRP cntrlr, etc."   But no column with Work Center.
    Any further insight into how to use this transaction to display a list of production orders for a work center would be greatly appreciated.
    Thank you,
    Dean Atteberry.

  • Service/maintenance order type SM01 not completely maintained in plant 1001

    Dear All,
    Am trying to configure Service Management where there is a scenario in which , when the user creates a Sales order for a installation item say TV or Fridge, automatically Service order has to be generated.
    I have checked all the item Category Settings but am getting an error
    Service/maintenance order type SM01 not completely maintained in plant 1001
    Message no. IW216
    Diagnosis
    For the selected order type and plant, no check control is maintained in Plant Maintenance/Service in 'Availability Check for Materials, PRTs and Capacities'.
    Procedure
    A check control must be maintained for this combination of order type and plant.
    Can anyone throw some light on this as i know you would have faced this problem.
    Satish

    Nothing

  • Service/maintenance order type SM03 not completely maintained in plant 1000

    Dear experts,
    when I use T-code:iw31 create a service order,It show the following error message:
    Service/maintenance order type SM03 not completely maintained in plant 1000
    Message no. IW216
    Diagnosis
    For the selected order type and plant, no check control is maintained in Plant Maintenance/Service in 'Availability Check for Materials, PRTs and Capacities'.
    Procedure
    A check control must be maintained for this combination of order type and plant.
    Best regards,
    Lance

    Hello,
    Go to SPRO --> Plant Maintenance & CS --> Maintenance and Service Processing --> Maintenance and Service Orders --> Assign order types to maintenance plants.
    Maintain the order type SM03 against the plant.
    Go to SPRO --> Plant Maintenance & CS --> Maintenance and Service Processing --> Maintenance and Service Orders --> Completion confirmations --> Define the parameters for completion confirmations.
    These both should be done, try to raise the SM03 order now.
    PRase

Maybe you are looking for

  • How can I instruct SqlMetal to exclude the 'storage' attribute of all the columns on a mapping file when converting a .dbml file to a mapping file?

    Hi, I'm trying to use LINQ to SQL with a top down approch using my own POCO classes. I'm using a XML file for the external mapping but in order to avoid typing a long file by hand I found that I could use the O/R designer to create the .dbml and from

  • Website Load Screen Issues

    Hello everyone, I'm fairly new to flash web design.  I have designed 2 websites so far.  www.byfaithmusic.com and www.gravityyouth.com.  I haven't had many problems with our group website (By Faith Music), but I am having a difficult time with the lo

  • Incorrect alias and SMTP address

    Hello, some users were imported into Unity Connection 8.5 with an incorrect alias.  They were demoted out of LDAP, had their alias changed and then integrated back with LDAP.  Their SMTP address in Unity was still the old address based on the incorre

  • MouseListener in JTree node.

    Hello. I've built JTree with JButton as child nodes. Root | --JButton | --JButton My point is to execute actionPerform when mouse is over JButton. MouseListener public void mouseEnetered(MouseEvent ev) works only when I click on specifig JButton. I w

  • Bonehead layer mask question:  CS5

    I am new to photoshop. I am running PS CS5 on a Macbook Pro. I have a document with two layers. The top layer is a black & white adjustment layer with mask. Opacity is set to 50% The bottom layer is a colored background layer. I don't know what the l