[PM] - Work order (shifted) capacity availability check

Hi all,
I've created a shifted capacity work center (1 person) and attributed to it a planning intervals:
As you see, this person is available during the first shift on Sunday (07.08.2014)
I've tried to see if SAP will check the availability of this work center in the IW31 menu by planifying a WO in a non availability time of this work center (interval 4PM - 8PM)
But SAP mention that capacities are available
Could SAP check the availablity of persons
(sorry for my English)

Hi Anand,
That's why I'm talking about finite scheduling, the example that I've put in the start of this topic shows that:
- The technician is available by default from 3PM to 11PM (capacity)
- Specially, on the 07.09.14 (the last day of the inteval), the technician was declared available from 7AM to 3PM
In the work order, i've requested a job from 4PM to 8PM (normally the technician will not be available in this interval)
But as an output, SAP shows that the capacities are available (in this case, SAP refers to the default capacity and not the special interval..)
So i wonder to know how SAP could deep analyse the availability interval of every capacity (taking on consideration intervals)
@Kaushik: The 3rd screen capture shows "person responsible" that is different from the work center (MT-MED)..
Waiting for your reply guys !
Regards

Similar Messages

  • Capacity availability check during prod order creation

    When i create many  production order for a particular material with different huge quantities , while doing capacity availability check system issues a message *" No reqmts/caps exists or not relevant to finite scheduling*
    Here as per the message i have checked all the possible errors and everything is fine.
    As per actual requirements, work centers are overloaded. But here system displays that all work centers are available.
    Any help regarding this.

    Dear Nandi,
    Please refer the below link,
    No reqmt/capacity exist or not relevnt for finite scheduling: Mesage: CY298
    Regards,
    Sundhu

  • Capacity availability check

    Hi All,
    I need to check the capacity availability for a person who assigned to workcenter which is assigned to the activity in the network. I maintained the cap.planning profile for network order type.
    I have created 2 activity under the same network and assigned the same person to those activities. If i do check the capcity it always saying ALL THE CAPACITIES ARE AVAILABLE.Eventhough there is a capacity overload.
    PLease tell me what i shall i do...
    Thanks

    Hi ALl,
    I want to do capacity availability check for network. can you please explain waht are all the steps to be followed.....
    Thanks

  • Production order release Material Availability check

    Gurus,
    I have a production problem where the order can be released when the component for the order is in a restricted status.  This is not allowed by the batch search strategy.
    <u>Here's Problem Description:</u>
    When running on version 4.6C, I have a work order created. I release the work order successfully.  However there is a component that has an invalid material/batch according to the batch search strategy  The material availability check shows all components available. 
    However, I remove the batch and the batch can not be entered because it is not correct according to the batch search strategy.  I try and release and the material is added to the missing parts list.
    I change the component so that it can be used.  
    Put the batch number back in the order. 
    Save the order.  
    Change the component material/batch so that it is no longer valid.  
    The order will release and it shouldn't because the material/batch is not valid.
    <u>I've looked at the following transactions and master data:</u>
    OPL8 - Order Type - Dependent Parameters Overview for my plant and order type and the check batch box is checked.
    MM03 - Material Master MRP 2 view for the component to get the availability check
    OVZ2 - Availability check control
    OPJK - Order Control to get the checking rule for order release
    OPJJ - Availability check control details with availability check and the checking rule for order release - I did not see anything here that would influence the checking based on if the batch was entered or not.
    I did double check the batch search strategy for production order - COB3. Everything looks OK there.
    Does anyone have any other places to check? I must be missing something. I tried OSS - there weren't any notes that I could find.
    Thank you!
    Michelle

    Hi,
    Check in order control opjk for order type pp01
    Batch assignment /release material
    Release despite missing batches
    no release if batches are missing
    Regards,
    nandha

  • Auto Material & Capacity Availability check when releasing Production Order

    Dear Experts,
    Is there any configuration in Production Planning that will automatically check material availability and capacity availability automatically when a Production Order is released?
    Meaning to say, users will not need to manually click on the Check Material Availability and Check Capacity Availability button.
    Please advise.
    Thanks in advance.

    Hi,
    I've solved the problem. Just maintain the config in transaction OPJK.
    Thanks

  • MDVP - Plan order (NB type) Availability check problem

    Hello GUru's,
    I received one issue, the transaction MDVP does not select the plan orders for Availability check.
    DUring my analysis I found that, materials have procurement type is "F". Plan orders are generated by system,
    It has order type "NB" (generally our plan order type is LA - stock order).
    When user check the plan orders (NB type) in the transaction code MDVP or COMAC, system shows the message
    no plan order is available in the system but I checked in the MD12, plan order is available.
    What could be the reason, system is showing like this message and not selecting the plan order for coll. Avl check.?
    Procurement type is F and plan order type is NB this is the reason?
    Kindly help me.
    Thanks in advance.

    Dear,
    Yes collective availability check has only been implemented for in-house production only.
    Order type NB with F will be for the subcontracting. Also the collective availability check (Transaction CO28, MDVM) takes no subcontract orders or subcontracting purchase requisitions into account.
    If you want planned orders with special procurement subcontracting into account during the collective availability check then you need to activate the modification, set the variable MOD_SUBCON to 'X' in the include PPIOHF02 after the implementation.
    For more details refer the OSS  Note 198398 - Collect. availability check w/o subcontracting planned ords.
    Regards,
    R.Brahmankar

  • PM order - Collective component availibility check

    Hello,
    Looking for a transaction code which would allows me to conduct collective component availibility check for PM order. Similar to COMAC for PP orders.
    Any hints?
    Thanks.
    Christian

    Christian,
    Here's some useful info: Collective Material Availability Check for PM
    PeteA

  • Material Availability Check in Process Order Issue

    Guys, I need some help in understanding the folowing issue:
    I have a FG and 2 components.I created a process order and tried to release the order. Automatic availability check is done and a dailog box appeared to list out the missing parts. Missing parts list shows both the components. But one of the componet has unrestricted stock to use in the storage location. why did the availabity check show missing part for that component?
    I checked pp checking rule and it says for business rule 2 "no check" is unchecked. so that means checking is done. and this pp checking rule is assigned in OPJJ and also assigne dto the material master of the component.
    please let me know if you need more information. Thx

    Dear you are absolutely correct if you uncheck No check box in material availability in Order control OPJK  per plant and order type that no automatic material availability check is to be executed for the specified business transaction (order creation or order release).
    But further please note that the option of calling up a material availibility check manually and also of executing a collective availability check is not affected by setting this indicator. This indicator is also ignored if you work with Assembly orders and you have defined in Customizing for Sales Orders that a material availability check is to be carried out.
    Cheers
    kK

  • System status for capacity availability in Process order

    Hi,
    I have activated the capacity availability check in SPRO to have a capacity check while process order  creation.
    But system doesnt provide any status in the process order for this. No status is appearing even  if I do a manual capacity check in process order.
    Is there any system status for capacity is available?.
    Thanks in advance
    Prathib

    Hi Prathib
    System will be give any status if capcity is available, but it will give a status MSCP if there is Capacity shortage.
    Rgds
    UK

  • Control availability check during release of production order

    friends,
    Can you guys help me find the user exit/BADI which will allow me to control the release of production order after the availability check is complete.
    In detail, the scenario is that : based on a flag on material master, I should be able to ignore this product's availability during release. I cannot change the availability check to "KP" ( No check) as this product can be sold seperately. So what I thought was that if I get to control the availability check during production order release I would be able to ignore this product before check or may be after check and before the status change.
    I found PPCO0021 exit and function module EXIT_SAPLCOZR_003 which is actually intended for release control for automatic batch determination. I am not sure if I can use this.
    Please let me know if you guys have any idea.
    Thanks
    Prod_Planner

    Let me rephrase the scenario :
    I have a production order for a product P1 which consumes raw materials R1 and R2. R1 is supplied by a nearby vendor every 1 hour to my plant so I do not need to worry about the availability of it when releasing the order but R2 availability should be taken into consideration. So, function 1 or 2 in OPJK will not work (as release need to be stopped if R2 not available) hence I will be using 3. If I use 3, R1 availability is also considered hence the whole order is not released. I will maintain a flag on material master so if R1 has flag, I need to ignore R1's availability but still considering R2.
    As mentioned, I found PPCO---21 which could help me but need your help to understand if there is any other way.
    Thanks
    Prod_Planner

  • Changing Availability Checking Group in Sales Order.

    Hello Gurus:
    We changed the checking group in the material master.  The existing sales orders still shows the earlier checking group.  So how to change the checking group in existing sales order also (after it is changed in material master).  Also, once the checking group in sales order is changed, how to de-commit and re-commit material as per the new checking group.  Thanks.
    - Chetan

    Chetan,
    As you have changed Checking Group in MMR later on all ur availability check etc will be calculated as per previous MMR settings..
    Still go to OVZ9...See if your sales order has correct Check rule/Group..
    Then Go to sales order Carry out availability check again...See if Avalability Overview has changes as per your new Check Rule..
    Also Do Some R & D...
    Like test with change in quantity of line items...save and carry out avalability check gain..See if schedule line dates in Sales order Is there any change?
    See if any change is there...
    If not better create new  sales order...it will minimise your efforts and will be quicker way..
    REWARD IF U FINDS THIS AS USEFUL...
    Regds
    MM

  • Exclude stock reserved for production order from availability check

    Hi Experts,
    We have a problem in the availability check.
    There is a material used as selling product and components in the same time.
    When the material has been reserved completely for a production order, the new sales order still get confirmed despite there is no physical stock at all!
    Please advise how to exclude the stock reserved for production order from the availability check in sales order? Many thanks!
    Regards,
    Qiang

    Go to MM02 and check what availability check is maintained for that material.  Next go to OVZ9, select that available check with the combination "A" and maintain "X"  or  "F"  in the field  "Incl.production orders".
    thanks
    G. Lakshmipathi

  • Error during availability check for order

    Hi PM experts,
    How can I make below warning message (W) to an error message (E)?
    Message no: CO820 (Error during availability check for order)
    Regards,
    Nizam
    PM Consultant

    Hi,
    you can cantrol not to release maint orders in case if parts are missing by OIOI transaction, here under Material Availability  against Release material you maintain option 3 No release if parts are missing. This way you can achieve this. If there are other components which has stock on Maint order then delete the un-available material from maint order then it will allow you to release the order.
    Hope availability check rule is maintained on material master.
    Hope it helps.
    Regards,
    N.Nagaraju

  • Disable Availability Check Based on Sales Order Type

    Hi All SD experts,
    Usually ( correct me if i'm wrong ) availability check is set via schedule lines item type. Is there any way that I can disable the availability check based solely on Sales Order Type ? Meaning no matter what item category or schedule lines assigned to materials, availability check will still be disable.
    Besides setting in schedule lines type, what are others config that might trigger availability check ? MRP settings ? Movement type ?
    Any valuable feedback will be great and much appreciated. A big thank you in advance.
    Warmest Regards,
    Edie

    HI EDIE
        In order for the availability check to happen,the following configuration settings are required.
    Availability check:
         a) you have to define requirement class & requirement type.
         b) you have to activate at scheduline category level
         c) in deleviry item.cat ,there is availability check off field,,,,, if  u dont mention any values here,then system checks for availability.if u mention 'x' here,then system dont check for availability.
        d) you define checking group and checking rule ,these determine how availability check is going to be performed
    MRP:
       MRP determines how material is planned,whether it is inhouse production or external procurement.MRP also determines the time taken for the material to become available for ready use.When ever an order is rised,the requirement is passed to MRP through  transfer of requirements(TOR), here MRP determines the inhouse production time or external procurement time.
    Movement Type: Movement type determines the type of material movement ,whether it is Goods Issue ,,, or ,, Goods Recipt,,,,, stock transfer between two plants etc.Movement type is determined in schedule line category level.
                      Award points if it is useful
                        Prasad.G

  • Disable Availability Check on Sales Order  But Activate on Outbound Delv

    Greetings all experts !
    Currently, there's a new request to create a new processes whereby during the sales order creation, no availability check will be in place but material will still be posted to production planning ( TOR ).
    Availability check instead should be activated  during the creation of outbound delivery.
    I have already configured in such a way that the relevant sch line item ( VOV6 ) - availability check is unchecked and TOR is checked.
    But during creation of sales order, availability check is still in place for material specified.
    I have check on the necessary requirement class and requirement type settings. Fyi, requirement class used - availability check is ticked. Could this be the reason even though i have disabled availability check on sch line ?
    I have tried to untick the availability check setting in requirement class  ( OVZG ), and while this can disable the availability check in Sales order, but that configuration will also disable availability check in outbound delivery.
    My queries :
    1 ) What are the configurations that I need to look into to cater to the above request. To disable availabilty in sales order but instead, run availability in outbound delivery ?
    2 ) Is there any way I can disable the availability check on based on sales order type using userexit or function module ?
    3 ) Is there any additional function module/bapi/userexit that i can implement to force outbound delivery to run availability check ?
    My apologies for such lenghty message here but really really need some valuable feedback here as I'm totally at lost with the new requirement for now.
    Many thanks in advance.
    Warmest Regards,
    Edie O

    In SPRO
    goto SD>Schedule line>Define schedule line categories
    here check if the schedule line category associated with your mentioned order has a flag ticked for Availability.
    Availability check for sales
    You must carry out an availability check for the following transaction.
    The indicator is determined as a proposal in conjunction with the respective requirements type. It can be changed in individual shipping transactions. However, only one restriction is effective.
    Example
    You do not set an indicator for maintaining the requirements type. In this case, no availability check is carried out. This is independent of the selection in the respective transaction.
    You set an indicator for maintaining the requirements type. In this case you can decide whether or not you require an availability check for the relevant transaction.
    reward points if it helps
    regards
    Biju

Maybe you are looking for

  • I tones syc  with adobe photoshop ver 2.0 does not work

    Can not find way to load photos to iTones and suppost to be able to syc with adobe photoshop ver 2.0 bu tcan not.

  • BAPI_SALESORDER_CREATEFROMDAT2 problems

    Hi all. I have dificulties to make this BAPI working well. I use the .net connector 2.0. I entered the fields mandatory in the order_header_in and order_header_inx and the partners. After the call to the BAPI i have these folowing warnings: V4 081 :

  • Documents starts on Page 2

    I am trying to insert page numbers into the footer of a long document. When I place the cursor inside the footer of the first page, the number 2 is inserted and page numbers progress on from there. Why does Pages think page 1 of my document is page 2

  • Quicktime 10.1 export to iMovie '11 in Lion

    I am using OS X Lion, have made several screen recordings and I would like to use iMovie for editing. When I try to share to iMovie, I get a message stating iMovie is not set up. I have tried looking just about everywhere on this support site and hav

  • Get rid of unwelcome Bing

    For some reason, my Google search is converting to Bing, and I can't get rid of it.  I run 10.9.4.