PO 7.4 Upgradation details
Hi Experts,
Could you please guide me what are all the things need to take care while migrating from PI 7.11 to 7.4 single stack.
Also kindly let me know what are all the post configurations needs to be done once all existing interfaces are moved to 7.4
Cheers
Sai
Hi Sai,
Please refer below link for deatils for things to be taken care of:
https://websmp207.sap-ag.de/~sapidb/011000358700000422062013E/uug_nw740_sr2_java.pdf
Regards,
Sriram
Similar Messages
-
I just finished upgrading my old MBP - pre Santa-Rosa.
It has BC1.4 and XP-Pro installed in addition to Tiger.
Here is my story:
12:20PM local time: inserted Leopard DVD
Reboot, default option is upgrade.
Here is where many may get lost. At this screen you have to choose "Options" in order to see all three install options - upgrade (default), A&I and E&I
I am the kind of person who would choose the default, upgrade, escpecially since I have a bootable clone of Tiger, unplugged from the MBP.
12:25 Standard DVD self-check - OK - 12:48
12:48 Install begins
Initially says time remaining 2:10 quickly jumps down to :45 by 1:11PM
Reboot at 1:30
Login to Leopard 1:32
Connect to .mac
Done: 1:38
Total time: 1 hour 12 minutes
Problems to date: none
Airport was turned off by default, I turned it on in order to tie in my .mac account.
My router is encrypted - Leopard connected, meaning that the keychain with router pw is OK.
Will check Windows later.
This is my second box to upgrade to Leopard. My G5 also went without a hitch.
I believe that preparation is key to a successful Leopard install, but I understand that there can be issues.
I did a disk check and filesystem verification before upgrading - both were OK.
When I upgraded my G5, I remarked that it didn't look any different from Tiger. This is because Leoapard, with an upgrade or migration maintains the exact same desktop, and since my dock is on autohide, there really is no difference in the look. But the "feel" is quite different.
I turned on TM and it figured out that I wanted to use the larger and empty partition on my LaCie HD. The smaller partition is my bootable Tiger clone.
I am not bragging, only relating my second experience in installing Leopard.
And I did choose the simple upgrade - which is probably the most "difficult" but the best when it works, as mine did.
I am adding this line from the Leopard MBP as an additional test.
Curiously, TM has backed up my WinXP system, too. That's a feature I did not think about.
TM seems quite fast - backup is completed. I also think Spotlight is done - I don't notice any slowness that others have reported immediately after Leopard. Maybe upgrading preserves previous spotlight data??
Message was edited by: nerowolfeUpdate:
Just booted into XP and installed new drivers. Be patient.
Reboot back into XP - fine.
Wireless internet connection already established. Nothing to do there.
Now updating AVG.
So far, no problems whatsoever. Leopard did not touch or affect the Windows install in any way.
I can now safely consider this XP install out of beta and start using it for real.
I don't believe in luck. -
IOS4 upgrade - details on changes
I am looking for a site or document that explains all the updated functionality that comes with IOS4. I found the user guide, but that is specific to the new hardware as well. I want something that describes the functionality that comes with an upgrade to a 3GS phone.
A) Cover the camera and take a black picture - that is the solution I have heard of
B) The phone will automatically close programs that have been in the background for a while and have not be used if resources are needed. Should be no need to worry about shutting things down all the way any more.
C) Remove your pictures from your phone and re-sync. That has been reported to clear up blurry pictures. -
Detail Project Plan for R12.1 upgrade
Dear Experts,
Let me update you that I have been appointed as a Project Manager for one of the R12.1 upgrade project.
Can you guys help me in preparing the R12.1 upgrade detail project project plan ?
Regards
Mohammed.Let me update you that I have been appointed as a Project Manager for one of the R12.1 upgrade project.
Can you guys help me in preparing the R12.1 upgrade detail project project plan ?https://forums.oracle.com/forums/search.jspa?threadID=&q=Upgrade+AND+R12+AND+Project+AND+Plan&objID=c3&dateRange=all&userID=&numResults=15&rankBy=10001
Five Key Resources for Upgrading to E-Business Suite Release 12
http://blogs.oracle.com/schan/2008/04/28#a2657
Oracle R12 Upgrade Project Plan
http://tinyurl.com/3llulrx
Thanks,
Hussein -
7.0.2 Upgrade issues for 10.2.8
Hi there,
Software update indicated that I upgrade to 7.0.2 and I duly attempted this twice unsuccessfully - the upgrade proceeded as normal but upon completion I was left with version 6.0.5. After checking the upgrade details I was aware that 7.0.2 requires 10.3.9 or later. I have 3 questions.
1) Why did software update indicate that I should install 7.0.2 when I am only running 10.3.8?
2) Having read some of the horror stories in this forum regarding 7.0.2 I am glad I have not installed the update but what are the implications of performing the software update unsuccessfully?? Does this mean that if I upgrade to 10.3.9, iTunes 7.0.2 will automatically install, which I don't now want
3) How do I prevent iTunes automatically hooking up to the music store if I open iTunes whilst online?
Thanks in advance for any help.
DaveIn reference to #3 - don't select the iTS in the far left column - better yet go to iTunes prefs>Parental> and select the "Disable iTunes Store".
MJ -
ISE 1.2 to 1.3 upgrade clarification question
I am looking to upgrade from ISE version 1.2 to version 1. 3 and am reading through the upgrade guide. The basic steps they outline are to create a repository pointing to disk: and then run the application upgrade prepare using the new repository. They say the prepare should copy the file to the local repository and list the MD5 and SHA256 checksum.
Do I not need to "copy" the file to the server before the prepare or is there a different format for specifying the file on the prepare step? It seems this is looking for a local copy instead on on my FTP server but any format I use to try to specify my FTP server is not working.
The documentation simply gives application upgrade prepare {filename} {repository}.
BrentHi Brent,
To prepare upgrade you need to get the support bundle on the local disk.
conf t
repository local
url disk:/
exit
exit
copy ftp://<repository_url>/ ise-upgradebundle-1.2.x-to-1.3.0.###.x86_64.tar.gz disk:/
To upgrade using this file, use the following command:
application upgrade ise-upgradebundle-1.2.x-to-1.3.0.###.x86_64.tar.gz local
You can use prepare to put the file in local repository that you created and then use proceed to upgrade.
Also, visit this link for upgrade details:
https://supportforums.cisco.com/blog/12341806/upgrading-identity-services-engine-ise-13
Regards,
Kanwal
Note: Please mark answers if they are helpful. -
What are the important points during a Linux upgrade with Oracle database?
Is there a specific document or metalink note that I may follow similar to this one during a Linux os upgrade -
http://download.oracle.com/docs/cd/B28359_01/server.111/b28300/toc.htm
Lets talk on an example; we may talk on upgrading details of a RHEL3 RAC system with Oracle options used like ASM,OCFS etc. to RHEL4. What steps are important to take by order and what are the best practices to be careful about during this type of an os upgrade for Oracle?
Best regards.may I need to get support from https://linux.oracle.com/pls/apex/f?p=101 for this kind of a documentation?
-
HR Payroll Data Migration from 4.6C to ECC Upgrade
Hi
We are going to Upgrade our 4.6c R/3 system which includes HR to ECC6.
After this upgrade we going to start the Data migration of all data inclduing HR payroll from 4.6c to ECC.
1).Can anybody advise what are the options for loading Payroll data from 46c to ECC ..? After Payroll data migration we must be able to see all the Payroll results from the previous system.
2) is there any standard programs availble for Payroll data migration ..?
Also if anybody have any info/links on Payroll/HR data migration please help to advise.
Thanks a lot for your info/Time.,
Edited by: Dp on Apr 3, 2008 11:41 PMHi Somar,
I could not find the mentioned post "HR Upgrade". Please let me know the details of the "HR Upgrade" details which need to be kept in mind during upgrading R/3 4.7 to ECC 6.0
Yes, we have got the list of "Modification Objects" using the SPAU. Please confirm that during our upgrade, we just need to work on these objects which were changed/repaired by us according to our business need.
And, apart from that, please let me know should I need to worry about any OSS notes specific to 4.7, which is not applied to our system and got released after the ECC 6.0 Enhancement Release 3.
I understand that if we have a system that has the Patch and SP level as in our production system and do the upgrade to ECC 6.0 all the HR functionalities will be automatically taken care. Please confirm.
Thanks in advance for your help.
Regards,
Vijay -
What is the impact of R/3 upgradation from 4.7 to ECC 6 on BI
Dear all,
Can any one tell me what will be the impact of R/3 Upgradation on BI... as we are shortly going to upgrade our R/3 from 4.7 to ECC 6.
Do we need to take any precautions in R/3 and aswell as BI
Please give the information...points will be given
Regards
venuHi
Please Refer this as this vll give u the Pros and Cons for upgrade.
Refer
http://wiki.ittoolbox.com/index.php/Upgrade_BW_to_Netweaver_2004s_from_v3.0B
This Wiki contains Rob Moore's ( BW Manager, Edwards Limited) teams experiences in upgrading Business Warehouse System from 3.0B to BW 7.0.
Contents
1 Upgrading from BW 3.0B to BW 7.0 (Netweaver 2004s)
2 Introduction
3 Overview & Scope
4 Drivers
5 Environment
6 Resource & Timescales
7 High Level Plan
8 Summary Task List
8.1 #Support Pack Hike
8.2 #Plug-in installation
8.3 #PREPARE process
8.4 #Dbase upgrades
8.5 #System Upgrade
9 Lessons Learnt
10 Issues & Fixes
10.1 Unfixed Issues
10.2 Fixed Issues
11 Regression Testing Process
11.1 Introduction
11.2 Set up
11.3 Actions
11.4 Security
12 Transport Freeze
13 Web Applications
13.1 Dashboards
13.2 Internet Graphics Server (IGS)
14 Detailed Task Lists
14.1 Support Pack Hike (detail)
14.2 Plug-in installation (detail)
14.3 Dbase upgrades (detail)
14.4 PREPARE Process (detail)
14.5 System Upgrade (detail)
Upgrading from BW 3.0B to BW 7.0 (Netweaver 2004s)
Introduction
This Wiki contains my teams experiences in upgrading our Business Warehouse System from 3.0B to BW 7.0.
Hopefully it will be useful to anyone else who's about to embark on this. If there's anything I've missed or got wrong, then please feel free to edit it or contact me and I'll try to explain.
Rob Moore - BW Manager, Edwards Limited.
Overview & Scope
This was to be a technical upgrade of BW only. The new BW 7.0 web functionality & tool suite which requires the Java stack rather than the ABAP stack was out of scope. We had heard that the latter was where most of the problems with the upgrade lay. Our plan is to wait for this part of BW 7.0 to become more stable. Also it has a big front end change and the business didn't have sufficient resource to cope with that much change management.
Drivers
3.0B at the end of its maintenance
Opportunities to do better reporting
Options to utilise BI Accelerator
Environment
Our R/3 system was at 4.6C and was not going to be upgraded. We have APO at version SCM4.0.
Our BW system is approximately 300 GB, with 125 global users. It was at version 3.0B SP 18
We have Development, Acceptance and Production environments.
Resource & Timescales
The Project ran for 3.5 months from Feb to May 2007. We used the following resources. The percentages are the approx. amount of their time spent on the project.
Project Manager * 1 70%
BW technical team * 3 50%
ABAP coder * 1 10%
SAP Systems Development expert * 1 20%
Basis * 1 25%
High Level Plan
These are the basic areas. We planned to complete this process for each environment in turn, learning our lessons at each stage and incorporating into revised plans for the next environment. However we did the Support Packs and Plug-Ins in quick succession on all environments to keep our full transport path open as long as possible.
Upgrade BW to the minimum support pack.
Install R/3 Plug-ins PI 2004.1
Run PREPARE on BW
Dbase upgrades (Database & SAP Kernel upgrade)
System Upgrade
Summary Task List
This list contains all the basic tasks that we performed. A more detailed check list is shown below for each of the headings.
#Support Pack Hike
We moved only to the minimum acceptable SP as this seemed most likely to avoid any problems with the 3.0B system prior to the upgrade.
Apply OSS 780710 & 485741
Run Baseline for Regression tests
Full Backup
Apply SP's (we were at SP18, going to SP20)
SPAU list review
Regression testing
#Plug-in installation
Apply SAP note 684844
Import and patch Basis plugin PI 2004.1
SPAU list review
#PREPARE process
BW Pre-Prepare tasks
BW - Inconsistent Data fix
Run PREPARE
Review of results
Any showstoppers from PREPARE?
#Dbase upgrades
Database Upgrade (FixPak)
SAP Kernel Upgrade
#System Upgrade
Reverse Transport of Queries
Reconnect DAB & SAB to AAE
Run Baseline for Regression tests
Full Backup
Run the Upgrade
SPAU list review
Regression testing
Lessons Learnt
Testing is all! We picked up on a lot of issues, but would have picked up more if we'd had a full copy of our production environment to test over.
Our approach of doing a full upgrade on each environment before moving to the next one paid dividends in giving us experience of issues and timescales.
Write everything down as you go, so that by the time you get to upgrading production you've got a complete list of what to do.
We succeeded because we had people on our team who had enough experience in Basis and BW to be able to troubleshoot issues and not just read the manual.
The SAP upgrade guide is pretty good, if you can understand what they're on about...
Remember the users! The fact that the loads have been successful doesn't count for anything unless the users can see the data in Excel! There's a tendency to get caught up in the technology and forget that it's all just a means to an end.
Issues & Fixes
I've listed the main issues that we encountered. I have not listed the various issues where Transfer rules became Inactive, DataSources needed replication or we had to reinstall some minor Business Content.
Unfixed Issues
We could not fix these issues, seems like SP 13 will help.
Cant delete individual request from ODS
After PREPARE had been run, if we had a load failure and needed to set an ODS request to Red and delete it, we found that we could not. We raised an OSS with SAP but although they tried hard we couldn't get round it. We reset the PREPARE and still the issue persisted. Ultimately we just lived with the problem for a week until we upgraded production.
Error when trying to save query to itself
Any query with a re-usable structure cannot be saved (more thsan once!)
OSS 975510 fixed the issue in Dev and Acc, but NOT in Production! SP 13 may solve this once it's released.
Warning message when running some queries post-upgrade
Time of calculation Before Aggregation is obsolete. Not a big issue so we haven't fixed this one yet!
Process Chain Scheduling Timing error
Process chains get scheduled for the NEXT day sometimes and has to be manually reset.
See OSS 1016317. Implement SP13 to fix this. We will live with it for now .
Fixed Issues
Duplicate Fiscal Period values in Query
If you open up a drop down box ("Select Filter Value") for Fiscal Year/Period to filter your query, you are presented with duplicate entries for Month & Year.
Due to Fiscal Year Period InfoObject taking data from Master Data not InfoProvider. Thus it picks up all available periods not just Z2.
Auto-Emails being delayed
Emails coming from BW from process chains are delayed 2 hours on BW before being released
Due to userids that send these emails (e.g. ALEREMOTE) being registered on a diffferent timeazone (i.e. CET) from the BW system (i.e. GMT)
Pgm_Not_Found short dump
Whenever a query is run via RRMX or RSRT
Call transaction RS_PERS_ACTIVATE to Activate History and Personalisation
Characteristics not found
When running a query the warning message Characteristic does not exist is displayed for the following: 0TCAACTVT, 0TCAIPROV, 0TCAVALID
We activated the three characteristics listed and the warnings stopped. NO need to make them authorisation-relevant at this stage.(also did 0TCAKYFNM)
System generated Z pgms have disappeared
Post-upgrade the system Z-pgms ceased to exist
Discovered in Development so we compared with pre-upgraded Production and then recreated them or copying them from production.
Conversion issues with some Infoobjects
Data fails to Activate in the ODS targets
For the InfoObjects in question, set the flag so as not to convert the Internal values for these infoobjects
InfoObject has Conversion routine that fails, causing load to fail
The routine prefixes numeric PO Numbers with 0s. SD loads were failing as it was not able to convert the numbers. Presumably the cause of the failure was the running of the Pre-Prepare RSMCNVEXIT pgm.
Check the Tick box in the Update rule to do the conversion prior to loading rather than the other way round.
Requests fail to Activate on numeric data
Request loads OK (different from above issue) but fails to Activate
Forced conversion within the update rules using Alpha routine. Deleted Request and reloaded from PSA.
Database views missing after pre-PREPARE work
Views got deleted from database, although not from data dictionary
Recreated the views in the database using SE14.
Workbook role assignations lost
We lost a few thousand workbook assignments when we transported the role they were attached to into Production
The workbooks did not exist in Development, thus they all went AWOL. We wrote an ABAP program to re-assign them in production
Regression Testing Process
Introduction
We were limited to what we could do here. We didn't have a sandbox environment available. Nor did we have the opportunity to have a replica of our production data to test with, due to lack of disk space in Acceptance and lack of sufficient Basis resource.
Set up
We manually replicated our production process chains into test. We didn't have any legacy InfoPackages to worry about. We asked our super-users for a list of their "Top 10" most important queries and did a reverse transport of the queries from Production back into test (as we do not generally have a dev/acc/prodn process for managing queries, and they are mostly created solely in prodn). We made sure every application was represented. In retrospect we should have done some Workbooks as well, although that didn't give us any problems.
Actions
Prior to the various changes we loaded data via the Process chains and ran the example queries to give ourselves a baseline of data to test against. After the change we ran the same queries again and compared the results against the baseline. We tried to keep R/3 test environments as static as possible during this, although it wasn't always the case & we often had to explain away small changes in the results. After upgrading BW Development we connected it to Acceptance R/3, so that we had pre-upgrade (BW Acceptance) and post-upgrade (BW Development) both taking data from the same place so we could compare and contrast results on both BW systems. We did the same thing once BW Acceptance had been upgrading by connecting it (carefully!) to Production R/3. To get round the lack of disk space we tested by Application and deleted the data once that Application had been signed off. Once we got to System test we involved super-users to sign off some of the testing.
Security
We chose to implement the new security schema rather than choosing the option to stick with old. For us, with a relatively small number of users we felt we could get away with this & if it all went wrong, just temporarily give users a higher level role than they needed. Our security roles are not complex: we have end user, power-user and InfoProvider roles for each BW application, together with some common default roles for all. In the event we simply modified the default "Reports" role that all our users are assigned, transported it and it all went smoothly. Apart from the fact that everyone's workbooks are assigned to this role and so we "lost" them all !
Transport Freeze
Once you've upgraded Development you've lost your transport path. We planned around this as best we could and when absolutely necessary, developed directly in Acceptance or Production, applying those changes back to Development once the project was complete. Depending on what other BW projects you have running this may or may not cause you pain!
Web Applications
Dashboards
We had various dashboards designed via Web Application Designer. All these continued to function on the upgraded system. However there were various formatting changes that occurred e.g. Bar graphs were changed to line graphs, text formats on axes changed etc. SAP provides an upgrade path for moving your Web applications by running various functions. However we took the view that we would simply re-format our dashboards manually, as we didn't have very many to do. Plus the external IGS (see below) powered all our environments and needs upgrading separately as part of the SAP method. Thus we couldn't have tested the SAP path in Development without risking Production. Sticking with manual mods was a lower risk approach for us. We did find we had to re-activate some templates from BC to get some of the reports to continue to work.
Internet Graphics Server (IGS)
We had an external IGS server with v3.0B. Post-upgrade the IGS becomes part of the internal architecture of BW and thge external server is redundant. We found no issues with this; after the upgrade BW simply stops using the external IGS and no separate config was needed.
Detailed Task Lists
Support Pack Hike (detail)
Apply OSS 780710 & 485741
Communicate outage to users
Warning msg on screen
Stop the jobs which extract data into delta queues
Clear the delta queues by loading into BW
Check RSA7 in PAE that delta queues are now empty
Run Baseline for Regression tests
Stop Delta queues
Lock Out users
Full Backup
Apply SP's
Upgrade the SAP kernel from 620 to 640
SPAU list review
Apply OSS Notes 768007 & 861890
Unlock Test users (inc. RFC id's on R/3)
Regression testing
Regression sign-off
Remove warning msg
Unlock users
User communication
Plug-in installation (detail)
Communicate outage to users
Warning msg on screen
Apply SAP note 684844
Lock out users
Full Backup
Empty CRM queues
Import and patch Basis plugin PI 2004.1
SPAU list review
Apply OSS 853130
Switch back on flag in TBE11 (app. BC-MID)
Remove warning msg
Unlock users
User communication
Dbase upgrades
Dbase upgrades (detail)
Communicate outage to users
Warning msg on screen
Run Baseline for Regression tests
Stop the Data extract jobs
Full Backup
Lock Out users
Apply FixPak13SAP to DB2 database
Upgrade the SAP kernel from 620 to 640
Apply OSS 725746 - prevents RSRV short dump
Unlock Test users (inc. RFC id's on R/3)
Regression testing
Regression sign-off
Remove warning msg
Unlock users
User communication
PREPARE Process (detail)
Pre-PREPARE Process
RSDG_ODSO_ACTIVATE
Repair Info objects and recreate the views
Communicate outage to users
Warning msg on screen
Run Baseline for Regression tests
Stop the Data extract jobs
Lock Out users
Full Backup
Run RSMDCNVEXIT Using BSSUPPORT ID
If there conversion process runs longer delay the regular backup
Re-run Baselines and sign off
If there conversion process Fails repeat the steps on Sunday after the regular backup
BW work
Back up customer-specific entries in EDIFCT (note 865142)
Activate all ODS objects
Execute report RSUPGRCHECK with flag "ODS objects" (note 861890)
Check Inconsistent InfoObjects - Upgr Guide 4.4; OSS 46272; Convert Data Classes of InfoCubes - Upgr Guide 4.3
Execute report SAP_FACTVIEWS_RECREATE (note 563201)
Make sure Delta queues are empty (RSA7)
Basis Work
Full Backup of BW
Lock users
Unlock id's RFC id's and designated test users
Confirm backup complete OK
Apply OSS 447341 Convert Inconsistent Characteristic Values - Upgr Guide 4.5
Confirm OK to PREPARE
Run PREPARE
Review of results
System Upgrade (detail)
Communicate outage to users
Process errors from PREPARE
Check disk space availability for PAB
Warning msg on screen
Reverse Transport Queries from PAB to SAB & DAB
Change BW to R/3 connection
Get backup put on hold, for Ops to release later
Ensure Saturday night backup is cancelled
Final run of PREPARE
Run Baseline for Regression tests
Clear Delta Queues
Delete Local Transports
Remove process chains from schedule
Lock Out users (with some exceptions)
Confirm to Ops and Angie that we're ready
Full Backup
Incremental backup of Unix files
UPGRADE "START"
Back up kernel
Unpack latest 700 kernel to upgrade directory
Check ids required for upgrade are unlocked
Check no outstanding updates
Turn off DB2 archiving
Open up the client for changes
Stop saposcol, & delete from exe directory
Run the Upgrade
Execute the saproot.sh script
Perform the database-specific actions
Perform follow-up activities for the SAP kernel
Reimport additional programs
Import Support Packages
Call transaction SGEN to generate ABAP loads
Transport Management System (TMS)
Handover to BW Team
SPAU list review
Apply OSS Notes from SPAU
Process Function Module XXL_FULL_API (part of SPAU)
Restore table EDIFCT (if required)
Transport Fixes from our BW Issue list
Convert the chart settings - manually
Perform activities in the Authorization Area
Activate hierarchy versions
Update the where-used list
Execute the conversion program for the product master
Transport New roles to PAB
Unlock selected users
Regression testing
Regression sign-off
Go / No Go decision
Restore if required
Remove warning msg
Tell Ops that the CR is now complete
Lock down PAB
Unlock users
User communication
Perform the follow-up activities for SAP Solution Manager
Reschedule background jobs
Reschedule weekly backup on Ctrl-M
Drinks all round.
Vendors mentioned: dBase
Hope this helps. -
CS3 Upgrade to CS5 Upgrade?
We currently have CS3 upgrade from CS1. Does that still qualify for the CS5 Upgrade from CS3?
Here are the quick links for Upgrade details, you can go to these links from Creative Suite Family from Products on adobe.com
For Master Collection CS5 Suite:
http://store1.adobe.com/cfusion/store/html/index.cfm?store=OLS-US&promoid=FBCPR&event=disp layProduct&categoryPath=/Applications/CSMasterCollection&distributionMethod=UPGRADE
For Design Premium CS5 Suite:
http://store1.adobe.com/cfusion/store/html/index.cfm?store=OLS-US&promoid=FBCOV&event=disp layProduct&categoryPath=/Applications/DesignPremium&distributionMethod=UPGRADE
For Web Premium CS5 Suite:
http://store1.adobe.com/cfusion/store/html/index.cfm?store=OLS-US&promoid=FBCPN&event=disp layProduct&categoryPath=/Applications/WebPremium&distributionMethod=UPGRADE
For Production Premium CS5 Suite:
http://store1.adobe.com/cfusion/store/html/index.cfm?store=OLS-US&promoid=FCRYA&event=disp layProduct&categoryPath=/Applications/ProductionPremium&distributionMethod=UPGRADE
You will need to select from drop-down menu's listed in the below section of the page.
Thanks,
Tahseen -
Dear Gurus,
We have ECC and CRM and SCM systems.
We are going to upgrade ECC to the next stack. Can MOPZ tell me if I need to update CRM and SCM also or not?
Regards
Vladimir KoganHi Vladimir,
In LMDB if the landscape Pattern is Hub (When the technical system is used in several product systems) then during MOPZ stack generation it will show the respective landscape upgrade details.
if the landscape Pattern is Sidecar(When the technical system is used in single product systems)
MOPZ will show only the particular upgrade details.
if the ECC is sidecar, then MNOPZ will show only the respective stack details. or ECC is added like HUB like ERP 6.0, SAP netwear 7.0 and SAP SRM , then it will show all the product system upgrade details
Check the below link also for more details:
https://websmp101.sap-ag.de/~sapidb/011000358700000044972013E/SpecificsInstUpgrade.pdf
New in SP05: Product System Editor in the Landscape Management Database of SAP Solution Manager 7.1
Rg,
Karthik -
System Upgrade/Optimization for Specific Software Installation
Can anyone provide hardware upgrade details for running Adobe Creative Suite 2 Standard (2006 release)? I have a MacMini (2005 version) and cannot fully install this software. I am a fairly novice Mac user and need to install and use CS2 for a new job. Can anyone provide upgrade specifications and approximate cost for running this program without degredation of performance? Thank you, in advance.
MacMini Mac OS X (10.0.x)
MacMini Mac OS X (10.0.x)Welcome to the Apple discussions.
I have a MacMini (2005 version) and cannot fully install this software.
It would also help to know how you know the software is not fully installed, what indicators do you have?
If it's a performance issue, beyond additional memory (if not maxed out) or a faster hard drive (assuming adequate free space on the existing drive), there's not many levers available.
I think a 2005 mini is a PPC mini, however, if it's Intel-based, then running CS2 under Rosetta emulation, which cuts performance roughly in half, can be remedied by using CS3 which was just released as a univeral application. -
BI70 upgrade and landscape sizing
We are currently part of the BI70 ramp up. Our whole BW landscape (21 systems) is currently running on BW 3.1 SPS 22. By upgrading the BW abap to BI70, I would like to have an estimate on how to size the different systems.
The quicksizer only allow us to enter data for a new installation and not to have the delta between different version.
So could anybody advice on how we can plan for the new sizing for the currently used process ? and how the additional or specifc BI70 process could impact the sizing in terms of Memory, CPU, disk capacity ?
Thanks
Message was edited by: Alexis LefebvreHi Vladimir,
In LMDB if the landscape Pattern is Hub (When the technical system is used in several product systems) then during MOPZ stack generation it will show the respective landscape upgrade details.
if the landscape Pattern is Sidecar(When the technical system is used in single product systems)
MOPZ will show only the particular upgrade details.
if the ECC is sidecar, then MNOPZ will show only the respective stack details. or ECC is added like HUB like ERP 6.0, SAP netwear 7.0 and SAP SRM , then it will show all the product system upgrade details
Check the below link also for more details:
https://websmp101.sap-ag.de/~sapidb/011000358700000044972013E/SpecificsInstUpgrade.pdf
New in SP05: Product System Editor in the Landscape Management Database of SAP Solution Manager 7.1
Rg,
Karthik -
Hello,
Syncing problems - but different.
I am trying to sync an old m505 to a new HP desktop.
- Palm m505, OS 4.1
- new HP desktop: Windows 7 Pro, 32-bit.
The m505 has worked fine for years on a previous XP computer (now dead from hard drive failure). Syncing via serial cable.
On the new PC I installed and reinstalled both Palm Desktop 4.1.4 and then 6.2,. along with palmhotsyncsetup. But still no luck - the sync cannot establish a connection. I've done a soft reset twice and now a hard reset.
I even bought a serial to usb adapter thinking maybe the usb cradle/charger was faulty, but that didn't work either.
Now the strange part... I have another m505 (given to me as a backup - I wasn't sure if it would even charge up as it sat in drawer for past few years...). I tried to sync with cradle/charger and it connected! So how can that be? As far as I know the only difference between the 2 hand-helds is that my current device's OS is 4.1 and the back up device was never upgraded, so OS is still 4.0. I don't recall now what the upgrade details where from 4.0 to 4.1.
So now I uninstalled Palm Desktop 6.2 software again. Reinstalled 4.0 from disk. Upgraded to Palm Desktop 4.1.4 and then synced to the 2nd device. So far it seems to be working. BUT, the 2nd device won't hold a charge so is not reliable. I left it charge overnight and it still will only stay on for a few seconds and turns off.
Has anyone heard of this issue? Why would one device (same model) be able to establish sync connection and the other not? When it was working fine in Windows XP just days ago?
Any insight/advice appreciated
Stumped,
Brent
Post relates to: Palm m505Check the HotSync settings on the device that refuses to sync - perhaps it's set to some other method than cable!
Compare both devices. Pull down the HotSync menu from the top left corner and go line by line.
WyreNut
I am a Volunteer here, not employed by HP.
You too can become an HP Expert! Details HERE!
If my post has helped you, click the Kudos Thumbs up!
If it solved your issue, Click the "Accept as Solution" button so others can benefit from the question you asked! -
iLugger makes travel case for 23" but not 20" ACD. Does anyone know of a good travel case for the 20"?
Thanks, ralph
1.67 GHz 17" PB, 20" Cinema Display Mac OS X (10.4.9) Airport Extreme Base Station and Airport ExpressHello Ralph,
The carrying cases from mylugger.com look like they will suit your needs perfectly. They have a 20-inch Cinema Display Carrying Case (Gray). I hope you like this case! (It also comes in black) Here is the link:
http://www.mylugger.com/index.cfm?fuseaction=upgrades.details&product_id=10&p=6
Jason
Maybe you are looking for
-
Is there a way of reducing the print borders in Numbers for ipad?
I've recently purchased Numbers for my Ipad 2 and now need to print off my spreadsheets. However when I go to preview the sheets there seems to be a massive print border around the data? I've looked all over the app for a way to reduce it but can't f
-
ORA-06531 reference to uninitialized collection in oracle 6i form
Hello, I am importing data from excel to database table with column mapping (oracle 6i forms)using ole2 package, then calling package which is having a procedure. while executing the package procedure, I am getting error 'ora-06531 reference to unini
-
I have a table with 15 columns of various questions/topics (year, course number, instructor, etc) and 14 rows of input fields. A couple are dropdown menus, but the rest are just text fields. The client wants (most) of the fields to be required but th
-
Printer Driver for PS CS5, Mac OS 10.8.5
What printer driver do I need to print from Photoshop CS5 to an Epson Stylus Pro 7600 printer from a MAC Mini running OS 10.8.5?
-
Photoshop cs4 access denied when trying to install from disc in Windows 7 64bit.
Photoshop cs4 access denied when trying to install from disc in Windows 7 64bit. I tried it in safe mode and it starts to install but get an error there as well. What do I do?