PO: Cannot Split Shipment for Future Period

Hi All,
We are implementing Oracle 11i release 11.5.5 under multi org setup.
I have question in PO module that should I open current and future periods in PO module in order to receive PO in a future period?
In details: my current opened period in Purchasing is may 2002
And Im not able split the PO line into two shipment. First shipment in may 20002 and second one in future period June 2002
But unless and until I open the period June 2002 in purchasing module, its not allowing me to split the shipment.
But one of our operating unit running in Oracle 11.O.3 and they are able to able split the shipment for any future period.
So my question is that, is it pertaining to any Profile option or something or how its control in PO module?
We are on apps 11i on Windows NT 2000 and multi org setup
RDBMS 8.1.7.1.1
please provide your valid comments on this matter.
Thanks
Altaf
[email protected]

Thank you for the response.
FYI, the asset posting actually has been executed but no document was posted as there's no value.
I've check the 2 tables below:
ANLC - No numbers of run for any period in FY2013
ANLP - No depreciation run was posted in FY13 (all periods).
Is there anyway for us to do normal planned run for Pr 1/2013? As i understand SAP has no function to perform reversal depreciation run in AFAB. How
With regard to the posting period 12/2013 that is open for user, I already highlighted this to the respective custodian.
Thanks.

Similar Messages

  • Depreciation error - Unplanned posting run allow for future period

    Dear ,
    Need urgent advice for depreciation error happen in our production system.
    FYI, our fiscal year variant 2013 = Feb 2012 - Jan 2013 ( We are now at month-end close for Pr 1 2013 ).And fiscal year close 2012 AJAB and Carry forward ARJW have successfully run for new FY 2013.
    In short, in our asset accounting user was accidentally run unplannned depreciation for future period 12/2013 of one particular asset, while we are now in Pr 1/2013. And, Pr12/2013 is open for asset posting.However, no FI posting posted into the system.
    Just a curiosity as to why system allow user to run unplanned depreciation for future posting without giving an error message to follow the posting cycle.
    The impact/error of above unplanned depreciation run:
    User is not allowed to execute AFAB depreciation run for Pr 1/2013. Even worst, in the AFAB program shows from Pr 1/2013 - 12/2013 is already posted when we do depreciation test run. We can't perform any planned,repeat,restart  for Pr1/2013.
    Because of only one asset had accidentally run for Pr12/2013, all of our asset (96,773 asset) cannot proceed with depreciation run for Pr 1/2013 in the new fiscal year.
    This is high priority as it will impact the entire depreciation run for 12 month of our company.
    Your early reply on this issue is greatly appreciated.
    Thank you,
    Regards,
    Latifah

    Thank you for the response.
    FYI, the asset posting actually has been executed but no document was posted as there's no value.
    I've check the 2 tables below:
    ANLC - No numbers of run for any period in FY2013
    ANLP - No depreciation run was posted in FY13 (all periods).
    Is there anyway for us to do normal planned run for Pr 1/2013? As i understand SAP has no function to perform reversal depreciation run in AFAB. How
    With regard to the posting period 12/2013 that is open for user, I already highlighted this to the respective custodian.
    Thanks.

  • Can't Run AFAB - Posting run requested for future period

    Hi,
    While taking depreciation run for company code in AFAB system is generating the error message "Posting run for future period requested (check entry)" SAP error AA697
    Diagnosis
    There was a check of your entries in the company code and posting period fields for the current system date. The result of this check is that you requested a posting run for company code xxxx for a future fiscal period.
    Please help me, cause I must close the period.
    Thanks

    Hi
    Check Table TABA, whats your last posted period for depreciation
    If you are executing depreciation for last period + 1, then this error is not justified
    If you are doing it for last period + 2, then its justified
    Br, Ajay M

  • Posting run for future period requested (check entry)

    Hi,
    While taking depreciation run for company code in AFAB system is generating the error message "Posting run for future period requested (check entry)" SAP error AA697
    I checked in OB52 postings periods are open for 2009(all periods)
    SAP note 1150235 (all corrections) and 1153718 are completely implemented.
    Still the problem is not resolved.
    Regards,
    Sankar

    Hi Sankar,
    I would like to refer you to the already implemented note 1153718 which states :
    After you implement the changes, the system issues error message AA 697      
    "Posting run for future period requested (check entry)" immediately when     
    you use a fiscal year that is in the future.  In principle, you can          
    customize this message. However, in this case, no settings are taken         
    into account; the system always issues an error message.                     
    Regards Bernhard

  • Posting run for future period requested

    Dear Team,
    While taking depreciation run for company code in AFAB system is generating the error message "Posting run for future period requested (check entry)" SAP error AA697
    please help to reslove the issue.
    Regards,
    MAhendra

    Hi,
    look into the Threads,
    Can't Run AFAB - Posting run requested for future period
    Regards
    Andi

  • Posting run request for future period; check your entry message no.AA697

    Hello Guru's,
    I have below error while Depreciation run in T.Code AFAB
    "Posting run requested for future period; check your entry" message no.AA697
    Request help
    thanks in advance
    Regards
    Chintamani

    Hello Chintamani,
    Why you want to post the depreciation for future period?
    Is the future fiscal year in open or is the posting period open for that? If no, please open that period with AJRW T code if you want to post the depreciation for future period but it is not recommendable.
    Check the posting period once again because the given posting period belongs to future year? So please do re-chk and give correct period according to your current fiscal year.
    You can get your fiscal year details and assignment of fiscal year variant to the co,code details in OB29 and OB37 t codes respectfully.
    Check the OSS Note: 1150235 - Preventing depreciation posting run for future
    I hope it helps else revert us with your query.
    Thanks & Regards,
    Lakshmi S

  • Depreciation for future period

    Hi Guru's,
             Could anyone tell me how we can get dep report for future period is there any standard report in sap or what is the option.
    Thanks
    Ravi

    Hi Ravi,
    You can use the below Standard Report Provided by SAP for Depreciation Simulation for future period.
    S_ALR_87012936 - Depreciation on Capitalized Assets (Depreciation Simulation)
    While executing the report specify the future report date to view the deprecaition amount of future periods.
    Hope the above helps.
    Regards
    Nitin

  • Time Card entry for future period

    Hi ,
    We want to enter time cards for future period ,like now we're in jun and we want to enter time cards till sep 2012 but the self service screen allowing me to enter till aug 2012 only. Can any one explain me what could be the reason. anything we need to enable for this? please advise. Thanks
    Regs
    RG

    Yes it is possible , but it is not advisable in production system.
    Open ur time schema using PE01 and comment the line
    ACTIO TD10                      End if daily WS still active
    Then the sys will allow u to run time eval for future period

  • Accidentally submitted AP ECE VAT Report in Final mode for future period.

    Hi,
    I have submitted the AP ECE VAT Register report accidentally in future period with parameter has Final in oracle 11.5.10.2 version.
    What are all the data it will effect?
    Also can you please let us know if there any way to Undo this?
    Regards,
    Anil.

    You can raise an SR and ask Oracle for a datafix script.

  • Problem: Run Time Evaluation for Future Period

    Hi SAP Gurus, can someone help me solving this problem:
    My client need to run time evaluation for 2-months period ahead of time. But every time I tried, time evaluation always stops at end of the current month, no further dates in the future. I had created attendance data 2002 for all the future dates. IT7, 2002, 2006 and all configurations seem to be OK (T510S,T569R). Test run is also OK with good future results. What could possibly be missing? Thank you in advance.
    Bill

    Thank you very much, Arun, Banu, Stefan and Om.
    Yes, I have entered the "Evaluation up to" date (60 days later);
    The schema has a function "Check FUT".
    Test future run result was generated correctly.
    Still I can't have future results in real run.
    So, what else I should check into?
    Thanks again.
    Bill

  • Query for Future period on a non cumulative cube

    Hi Colleagues,
    I have a non cumulative cube. It has data till June,2006. When I query on the cube to report the balance with period as "July,2006" it doesnot return anything. What I expected is that it would show me the balance value as of June,2006 which is the last period for which there is data.
    Am I missing anything ?
    Regards,
    priyadarshi

    If you filter by jul06 and there is no data in cube, no matches with selection happens. You need to select any data to apply calculation of balance, try to select a range of months, with an offset.
    Maybe if you put the month in free characteristics instead in filter section ir worked.

  • KKS2 ran for future periods; Target costs double the actual costs

    Hi
    Variance calculation was accidentally run for period 011/2012 and it affected several orders in that the target costs are showing double the actual costs (period 01 + period 11) of year 2012.
    Is there some report in SAp that would give us a list of orders for which KKS2 (variance calc) was run for period 11 2012.
    Best wishes
    Raj.

    hi
    Thanks for your responses. But nothing has answered my question
    Is there a report in SAp that could give me a list of all orders for which variance calculation was run for period 11 2012?
    I used several reports including KOB3 and s_alr_87013140 but nothing gives me that list.
    Thanks in advance for your replies.

  • Kinect for Windows v2 cannot reliably remain online for prolonged periods

    We are developing a .NET 4.5 app that records Kinect frame streams to a huge disk array, 24/7. However, it appears that a vanilla installation of the Kinect cannot remain online for prolonged periods. After a day or so, frames simply stop arriving for no
    apparent reason. There is nothing in the Windows Events Viewer that seems related; Device Manager also does not show any problem for the Kinect devices.
    Could somebody look into this issue?
    We have just disables power management on the whole chain of hardware (PCI express -> USB 3.0 controller -> Kinect) and will see if it helps.

    Are you using any custom code to write the Kinect Frames to disk? or are you using Kinect Studio?
    If using your own custom code, check to make sure you're releasing all frames (Disposing them) appropiately. Not doing so, even in the most subtle way could easily cause this behavior.
    Sr. Enterprise Architect | Trainer | Consultant | MCT | MCSD | MCPD | SharePoint TS | MS Virtual TS |Windows 8 App Store Developer | Linux Gentoo Geek | Raspberry Pi Owner | Micro .Net Developer | Kinect For Windows Device Developer |blog: http://dgoins.wordpress.com

  • Run Forecast for previuse period

    We have certain materials with MRP type VM  and want to run forecast first The Period Indicator is M (month).
    When user press the run Forecast button, a pop up screen periods appears and you should select a current period 8.2007 or next 9.2007 to run a forecast but for testing AND Due to business requirements, we upload consumption and open PO till 31-5 so we need to run forecast for 6.2007 period to compare values with legacy system before going life.

    Hello Chintamani,
    Why you want to post the depreciation for future period?
    Is the future fiscal year in open or is the posting period open for that? If no, please open that period with AJRW T code if you want to post the depreciation for future period but it is not recommendable.
    Check the posting period once again because the given posting period belongs to future year? So please do re-chk and give correct period according to your current fiscal year.
    You can get your fiscal year details and assignment of fiscal year variant to the co,code details in OB29 and OB37 t codes respectfully.
    Check the OSS Note: 1150235 - Preventing depreciation posting run for future
    I hope it helps else revert us with your query.
    Thanks & Regards,
    Lakshmi S

  • Change future periods for Fiscal year variant-OB29

    Hi experts,
    We are using 4-4-5 rule, Fiscal year variant is M1, Future Periods for FY variant M1 is not maintained correctly.  Our year end is on 6/25/2011 but in our variant M1 it is defined as 7/2/2011 and periods following that are defined incorrectly.
    Company - US (4-4-5 rule)
    FY variant - M1
    Period - P12/2011 and following periods are not defined correctly
    1.     There are risks involved if you change the fiscal year in Live SAP system.  What is the risks for changing future periods - 2 months from now.
    2.     Posting are not carried out for the periods we are changing.  We need to check plan data if any
    3.     Impact on other modules, organization structure, master data, transaction data
    4.     How intense the testing needs to be.
    Any help will be appreciated and point will be assigned.
    Thanks
    Monica

    Hello,
    If you change the Fiscal year period in the live system the following problems may come as per my understanding.
    For Costing Module Planning would have already been carried our at the start of the year,
    similarly for CS, PP and PS modules if they are implemented in your company the planning data will be effected.
    If there is any Budjet posted even you have to consider how to change  the budget and reaccolation
    Best Regards,
    Ravi

Maybe you are looking for

  • ITunes 11.0.4.4 crashes when I play certain songs and the problem is spreading.

    Ever since I downloaded iTunes 11.0.4.4 (for windows 7), the program has been crashing whenever I play certain songs and at this point the problem is spreading, more and more songs that weren't problems before. I have been through just about every tr

  • How do it get the phone back on?

    My phone was low on charge but not on red.  I put it on to charge and a few minutes looked at the phone and it had gone dead. Now it won't switch back on.  Any ideas  what i can do to get my phone back.  I've only had this phone a couple of weeks?

  • The update for Photoshop CS6 Creative Cloud (64bit) downloads but failsto extractand install

    The Adobe Application Manager reports an update for Photoshop CS6 Extended but when I tell it to update, it goes through a download and reports "Unable to extract downloaded files. Press retryto download again. U44M11210" Repeated attempts to downloa

  • U310 clickpad button problem

    Sorry if this has been discussed already; could not find it with search.  I am having a problem with the cursor moving when I click either of my buttons because the active area of the pad includes the buttons.  It is very annoying and limiting with t

  • Capture ENTER key on numeric keypad

    I have several chemistry tutorials where users type something and then have it evaluated by pressing the ENTER key. This works fine for the ENTER key on the main part of the keyboard, but does not work for the ENTER key for the numeric keypad on keyb