PO creation from POR: quantity rounded. Why?

Hi,
when I create a PO from a Purchase Order Requisition (with transaction ME21N) the system round the quantity. Why?
Example: in the POR the quantity is 1000,345. When I create the PO the quantity become 1000.
Where do I have to check the parameters set in my system?
Thanks
Fabio

Hi Rafael,
the material I'm using doesn't have the MRP screen.
When I create the PO the message error is the following one:
Purchase order unit ST allows fewer decimal places only
Message no. ME678
Diagnosis
The purchase order unit ST that you are using has been defined in Customizing in such a way that the system uses only 0 decimal places for the order quantity.
However, in your current PO item you are using more decimal places than this.
This may happen if you copy data from a requisition into the purchase order, for example.
Procedure
Either check and correct your PO quantity, or change the order unit if necessary.
In Customizing, where can I check this set up?
Thanks again.

Similar Messages

  • Automatic PO creation from SC

    Hi Experts,
    I am using SRM 7.0 with extended classic scenario and I have issue in the automatic po creation. For some Shopping Carts the PO is not automatically created. The SC is having Source of Supply Assigned and all the approves have completely approved the SC.  The latest status is  I1111          Item in Transfer Process.
    I checked in RZ20, ST22 and could not find any error or dumps.
    For the SC item under BBP_PDBEI the BE_OBJECT_TYPE is BUS2201 and BE_OBJECT_ID 1, once I trigger the PO creation manually the PO object id is reflected here.
    For such SC I am running the report BBP_ALERT_SB_NOTTRANSFERED manually which puts the SC in I1112 Error in Transmission Status and later I can trigger the SC creation from the alert monitor.
    For POs created in this manner the PO is created in Held Status without any line items, is this normal?
    I have two questions which I want to understand, how is the automatic po creation from SC setup, is there any customizing involved for the po creation from SC to happen automatically?
    What else should I check to find the reason why the the SC was stuck in I1111 status and PO was not created?

    You need to configure the Purchasing group and this will take care of automatic transfer of Doc to sourcing cockpit. Make sure you also maintain the customization for sourcing always carried out for Prod categories.
    Regards
    Saurabh

  • Blocking RdA creation from Sales Order Schedule Line

    Hi Gurus,
    please do you know if there is a way to block the RdA creation from Sales Order schedule line, for TAS item category? I tried with Header Delivery block without quantity confirmation but even if quantity on schedule lines are not confirmed, RdA is created anyway.
    Thank you very much
    Kind Regards
    Andrea

    thank you

  • PO creation from Accepted bid

    Hi All
    We are on SRM 7.0 classic scenario.
    Trying to create a local PO from an accepted bid in Plan driven scenario
    1) Is there a way to alter the quantity in the PO, or create partial PO's from 2 or more accepted bids.
    I didn't see any way to do this as the PO is instantaneously triggered & no option to change
    2) The scales and Pricing conditions entered by the supplier in the bid , are not transferred to the PO?
    Only the final Price calculated , based on the conditions is transferred? Is there a way to transfer the conditions and scales too?
    3) The bidder can enter the validity dates in the Price conditions. However what is the effect of those? If the buyer tries to create a PO from the accepted bid, beyond the validity date, is there a hard stop error?
    Is there any other place at Header level, where the bidder can specify the validity date for the bid, except the conditions?
    Thanks
    Kedar

    https://wiki.sdn.sap.com/wiki/display/ESpackages/Service+Procurement
    Please check with SAP via OSS message refering the same.
    sorry i could not help you
    What is the item type (category) ? in the Material works fine but service not works?
    dont hesitate to create a new thread for geting quick reply.
    Check your back end docuemnt type PO too.(Item category- D)
    Service PO  item has different layout of Purchase order than material. you may require to map accordingly.
    Note 1268336 - Synchronous peer-to peer Services Configuration
    Any clues
    Note 1270144 - Backend PO tracking in RFX & Classic Scenario SC BE PO fix
    1.Backend PO number not getting displayed in RFX tracking during PO creation from winning quote through Enterprise services.
    2.Classic Scenario : SC with services created in SRM with supplier details, does not create a follow on PO in the backend system returning an error in process status on the User interface.
    Other terms
    Enterprise services,SOA,BID,RFX tracking,winning quote,quote,Back End PO ,classic scenario,services,error in process
    Reason and Prerequisites
    Programming error.
    Prerequisite:
    For RFX tracking:
    Backend PO creation successful from winning quote through enterprise services.
    Solution
    Import the support package or implement the attached advance correction manually

  • PO Quantity rounded off with BAPI

    Hi,
    We are using BAPI to create the POs coming from interface.  When the PO quantity input is given as 3.5 EA it is getting rounded off to 3.0 EA when the PO is created.  This is working fine for account assigned POs but not for Material PO s. 
    Could you please throw some light on this?
    Regards
    Venkat

    Hello Venkat ,
    Are you trying to avoid the PO quantity rounding ?
    If so , try setting 'Decimal pl. rounding'(ANDEC) if you want to avoid PO quantity rounding.
    User exit EXIT_SAPLMDR1_001 is another possibility which can achieve your requriement if you are trying to avoid the rounding.
    Please also take a look at SAP Note 569326 and 583676.
    Please advise if this is what you are trying to do.
    Best Regards,
    Frank

  • Automatic PO creation from PR with no master data

    Dear gurus,
    Is it possible to run ME59- Auto PO creation from approved PR with no master data/source assigned/PIR? Assuming user create adhoc PR.
    Is it possible to run this process successfully if i didn't meet on the criteria below? let say no.1 is not checked?
    1.Material Master purchasing view, check automatic PO check box.
    2. Vendor Master purchasing view, check automatic PO check box.
    3. Maintain Source list for Vendor and Material (transaction ME01) and also see validity period.
    4. Maintain Purchase Info Record (transaction ME11), check info record category (must be standard or pipeline or subcontracting)
    5. Create a Purchase Requisition ( transaction ME51N), during creation select check box of Source Determination.
    6. Use transaction ME59 and execute for purchase requisition for vendor, you will be able to create automatic PO.
    Thanks in advance.

    Hi,
    yes all point should be checked
    check following link
    [http://www.sap-img.com/materials/steps-to-create-auto-po.htm]
    Regards
    Kailas Ugale

  • Purchase Order Creation from ME5A Report

    Hi experts,
    My client wants Purchase Order Creation from ME5A Report.
    He wants show Open Purchase Requisition through ME5A report then he will select Purchase Requisition Number or line item for po creation from there only.
    Please advice how I can map this process in sap.
    Thanks in advance,
    Chandhu

    Why don't you use ME57 to display open PRs and then assign sources and convert them to PO?
    Or use ME57 to assign sources and ME59 to automatically convert them to PO.
    You can create your very own format for report display using  custom "Scope Of List" for ME57.
    Look in SPRO under Purchasing>Reporting>Maintain Purchase requisition lists.

  • IDOC/BAPI for Production order creation from Legacy system

    Hi all
    We are using an interface to create Production orders from legacy to SAP. Would you recommend an IDOC or a BAPI to create Production orders. If IDOC or BAPI then could you please mention which one?
    thanks a bunch

    Hi John,
    For your purposes, please use BAPI for production order creation from legacy system. There is no standard inbound IDoc available to use. SAP has an IDoc for outbound interface only (message type LOIPRO).
    If there is an inbound IDoc available, I would recommend to use an IDoc.
    IDoc technology has excellent error handling and will allow you to reprocess an error (if any).
    BAPI is also good approach to use and fast in term of  processing.
    For BAPI approach, you can use BAPI BAPI_PRODORD_CREATE.
    Hope this will help.
    Regards,
    Ferry Lianto

  • Recently, when I create a new album (untitled), it immediately fills with picture either from the album above it or, if I have a Faces collection open, with the pictures from that collection. Why and how do I fix it?

    Recently, when I create a new album (untitled), it immediately fills it immediately fills with picture either from the album above it or, if I have a Faces collection open, with the pictures from that collection. Why and how do I fix it?

    When a new album is created it will fill with whatever is in the right hand window,  If you're in the Events or Photos mode it will contain all photos in the library.  Yes, strange behavior.
    OT

  • While watching an iTunes movie from my Apple TV, why does my movie stop playing at the 1 hour mark?  I'm assuming I have a setting causing this to happen, but I have no idea what setting needs to be changed.  Can someone help me?

    While watching an iTunes movie from my Apple TV, why does my movie stop playing at the 1 hour mark?  I'm assuming I have a setting causing this to happen, but I have no idea what setting needs to be changed.  Can someone help me?

    It's right at an hour (consistently), but the computer goes to sleep prior to that. It's as if iTunes goes to sleep. Also, it wasn't always this way. Originally, the movies played through without interruption. At some point, I guess a setting was changed, and now I only get an hour. Also. My energy settings are set to go to sleep at 10 minutes.

  • Using Adobe My Sketch, I can no longer upload pictures from my Library. Why?

    Using Adobe My Sketch, I can no longer upload pictures from my Library. Why?

    Hi Dan,
    Based on the title of your post, seems like the application you were using was "My Sketch". This forum is for Adobe Photoshop Sketch: Adobe Photoshop Sketch on the App Store on iTunes. If you have not tried Adobe Photoshop Sketch, please give it a try. Hopefully, it will be a better fit for what you want to do. You are allowed to select any of your images from your photo gallery.
    Regards,
    Jose

  • Item category determination during Purchase Requisition creation from APO

    I’m creating a  SNP Purchase Requisition in APO and when it is  published to R/3, a Purchase Requisition document is created in R/3.
    When this PR is created in R/3, I want the Item Category to be determined based on the Material master Special Procurement Type. ( eg: I’d like the Item category to be ‘L’ if the Material master Special Procurement Type = 30 (Subcontracting) ). But by standard, this field is coming as ‘Blank’ and this field could only be populated during the creation from APO.
    I found a user exit ( CIFPUR02 :  Enhancement of Purchase Order Interface (Inbound) ) on R/3 where I tried to populate the Item Category, but  when I do this, all the purchase order related data is getting deleted and hence no PR’s are getting created in R/3.
    Could anyone please tell me if this could be resolved using configuration and if not any  tips to do this technically would be very helpful.
    Thanks,
    Harsha

    Hi Karun,
    This is the code i'm using...
    select single * from marc into lit_marc
    where  matnr = c_eban-matnr
    and    werks = c_eban-werks.
    append lit_marc.
    read table lit_marc with key matnr = c_eban-matnr
                                 werks = c_eban-werks
                                 sobsl = 30.
      if sy-subrc = 0.
      c_eban-pstyp = '3'.
      endif.
    Here sobsl = 30 is the Special procurement type
    But when i try to populate c_eban-pstyp = '3', during the creation of Purchase Requisitions in R/3, in the program SAPLEMPI -> LMEPIF01
    this condition is encountered which deletes all the data in the tables that is used to create Purchase requisitions.
    <i>* get rsnum in the case of subcontracting
          IF XEBAN-PSTYP EQ PSTYP-LOHN AND                      "RB240999
             EXITFLAG_ORDID IS INITIAL.                         "RB240999
    refresh all component tables
            CALL FUNCTION 'ME_COMPONENTS_REFRESH'
                 EXCEPTIONS
                      OTHERS = 1.</i>
    Could you please suggest me anything to get around this.
    Thanks,
    Harsha

  • Automatic PR Creation from Sales order

    Hi All,
              This is with respect to PR creation from Sales order for 3rd party items.
    I am able to create PR from standard sales order and i dont have any issues with that.  I have used schedule line categories which is configured with Order type Z2, Item rel for dlvy checked and Acct assigment group as E.
    Now my question is , I want to copy partners from sales order to Purchas req. Currently some partners are getting transferred from Sales order to P.Req, But not all there in sales order. Where do we control the data that can be copied from Sales order to P. Req
    Thank you
    Kris

    Hi,
    Genrating PR, Mostely depends on shedule line,see which shedule line u r determining for HIGH LEVEL ITEM ,for that shedule line maintain setting is VOV6.
    kapil

  • While automatic PO creation from GR conditions to be fetched from condition

    Hi SAP Gurus, i have a requirement where in I want PO to be automatically created while doing GR.All other settings I have done. Now my requirement is tat say freight conditon FRC1 should be picked up from condition record.I already have condition record maintained.please let me know if this is possible or is it like that for automatic PO creation from GR info record is mandatory.Please let me know.Thanks

    Hi,
    Condition record will not help for the automatic PO creation from GR. Use Info record and maintain your conditions like discount, freight,packng and forwarding etc.....

  • Auto PO creation from PR through ME58 problem.

    Hi experts.
    We are providing facility to our client  auto po creation from PR through Me58 transaction code.
    I am facing amazing problem is that it is working fine in development client , not working in Quality and  Production client , exactly  problem is that ME58 u2013 Ordering Assigned Purchase requisition  & Process Assignment  Create PO , Purchase order cannot be created, PR  shift in document overview , it means user want to drag and drop in purchase order then system create PO , this problem I am facing in Quality & Production , but it is working fine in development server there is no need to drag and drop , immediately after Process assignment Create PO , system directly convert PR into PO  just only need to check and save PO. I compare everything with development & quality data including material master , source list and everything still I am unable to understand where is the problem , is there any customization settings related to auto po ?  pls. suggest any solution to solve this issue.
    Kumar

    Hi,
    Config setting.
    Settings for Automatic PO creation is:
    1. Select the Automatic PO check box/option in Purchasing view of material master
    2. Select the Automatic PO option in the purchasing data view of Vendor master
    3. Maintain Purchase info record
    4. ME56- Assign the vendors to PR's
    5. ME58- Create PO via assignment list(PR-> PO)
    6. ME57- Assign and process PR's
    7. ME59N - Create PO automatically via PR
    Above step by step procedure is involved in the Automatic PO creation.
    SAM

Maybe you are looking for

  • Problem in Creation of Change Master Record in CC01 (ECM)

    Hi folks, me got a problem. whenever i create a Change Master Record using the transactuion code cc01, Change Master is generated but it is not updated to the database and instead throws up a dump error. Regards, maximus.

  • Check on open items during payment

    Hi experts. When we release payment to vendor system show all open items whether these are due or not due. Is  there any check available by which system show only due items . Regards Parkash Chand

  • Non-durable Topic subscription with ClientID in a cluster environment

    forgive me for asking this, i spent the entire day trying this out in my pc but still not able to get the exact result. If i deploy an MDB on jms2 server with the following configuration in a cluster enviroment (jms1[masterbroker] <--> jms2) under Su

  • Custom metadata field with autonumbering sequence

    I have created a custom metadata field and I need it to be able to start a zero and then increase by one with each checkin. There were other qualifications for this particular field as well, which I have managed to do. Currently, the field is V99_999

  • TS1702 I pad apps.

    I broke my I pad2 and it has been replaced with an I pad 3. I cannot get all my games back without having to pay again. Some games I purchased gold bars for 1 game, bingo chips for another and so on, how do I get all those extras back ? I will be out