PO creation without Purchasing view in material master
Hi
i am using 4.6 version
system is allowing to create PO without purchasing view in material master.
how it would be possible ?
Regards
Rahul
Hi,
i have checked with MARA for that material PSTAT value it is showing there "KDALBPCGV"
please suggest
regards
rahul
Similar Messages
-
Significance of purchasing view in Material master
Hi,
What is the significance of purchasing view in Material master.
What could be effect if this view is not maintained?
Like for material type FERT there is no Purchasing view, but we can do procurement for FERT items.
So what is the significance of purchasing view in Material master?
UtsHi,
I cant Agree your statement,because for the Purchasing Activities it is mandatory that you Maintain the Purchasing view of the Material.
it Gives a error ..material not maintained by Purchasing.
Material XXXXXX not maintained by Purchasing
Message no. ME046
For Inhouse Production through Quota arrangement,it can be optional.
but for the remaining cases ,it is Mandatory.
and the Material type your are speaking is FERT.which is standard material type for Finished products.
if you are having External Procuremnt 100% sure it would be having Purchasing Tab activated .
if not so that,if it is a inhouse production.
check it in OMS2 ..for clear information
Regards
Anjanna. -
Creation of Classification View in Material Master
Hi,
I need to create Classification View for a Material. The user would provide the data in the file, example
Material Number MATNR
Class type TCLA-KLART
Class Type description TCLAT-ARTXT
Class Group TCLG-KLAGR
Class Group Description TCLGT-KTEXT
Class M_CLASB-CLASS
Class Description M_CLASB-CSCHG
Status RMCLF-STATU
Std class RMCLF-STDCL
Characteristics Group TCMG-ATKLA
Characteristics Group Description TCMGT-ATKLT
Characteristics RCTAV-ATNAM
Characteristics Description CABNT-ATBEZ
I read in the posts there is BAPI_OBJCL_CREATE. But I am not able to Map the above fields to pass to this BAPI.
Can someone please suggest me how to do this..
Thanks and Regards,
VanessaHi,
Thanks for the suggestion. But i want to do this through a program. There is a selection screen with 6 radio buttons based o view to be created and an input field for the filename.
Could you provide me any BAPI to do the same.
Thanks and Regards,
Vanessa -
What is the concept of view in material master?
Hello sap gurus
Some quetions regarding Material Master
what is the concept of views in material master ?
what is determined by specifying industry sector in material master ?
To sell material which views are material are maintened in Material master?
Regards
AmitHi,
<b>Material master for finished ggods is related with SD, MM & PP departments</b>. If you carefully go through the various screens in MM record you will realize the importance of the respective fields and the department to which they belong.
<b>1.Suppose Base unit of measure</b> in Basic data 1 screen. The production people will keep the stock of the item using this UOM.
<b>2. In Sales:Sales Org.1</b> screen we have sales unit in which we will sell the material.
<b>3. Then we have the plant</b> data in which we enter the delivering plant. Also the taxes are determined from the plant so we have the settings for taxes also - whether this material is fully taxable/50% tax/Tax exempted.
<b>4. Then we have purchasing</b> screen in which the data like the purchasing group, variable units,etc are entered. This will effect the purchasing cycle when we are procuring a material from outside. This is related to MM.
<b>5. The we have MRP</b>, this is related to PP as to how to manufacture the product, the MRP type, the strategy group - whether it is MTO/MTS like that.
<b>5. Sales:Sales Org.2 screen</b> - Here we mainatin the account assignment group which is very important as far as the generation of the accounting document is concerned. This triggers the system where to post the value in which G/L account. Accounting document is generated when we create the invoice in VF01 & save it.
<b>6. Work scheduling</b> - Related with the sceduling of the production as to whether underdelivery or overdelivery is allowed, the storage location
<b>7. Quality</b> - Here you can select for a particular finished item where where it has to be checked for quality during its journey from the raw material stage to the finished goods store as a finished item.
<b>8. Accounting</b> - Related to accounting, product costing, total value of the stock in hand, etc. Also related with FI & PP
So all the screens have data which effects one or more modules for the proper functioning of the system to give the optimum results.
<b>Industry Sector:</b>
Key that specifies the branch of industry to which the material is assigned.
<b>Use</b>
When you create a material master record, the industry sector you specify determines
1. which screens appear and in what order
2. which industry-specific fields appear on the individual screens
<b>Screens for Sales:</b>
Sales:Sales Org.1, Sales:Sales Org.2. But other screens also have data which is related to sales. You cannot just maintain the sales views and save the master. It has to be properly linked with the other modules also for the proper functioning of the system. That is why the system is called as "Enterprise Resource Planning" You have to paln the resources of your company and these resources are related with all the modules.
Reward points if solution helps.
Regards,
Allabaqsh G. Patil -
Control inspection lot in QM view of material master
Hi
this is regarding the setting for control inspection in QM view of material master.
can anyone give me a prictical example of
1. 'X' An inspection lot for each purchase order item/order item
2. '1' An inspection lot for each material document and material
3. '2' An inspection lot for each material and batch
If my requirement is to create one inspection lot out of several batches made from a production order( eg, 10 batches are created, only 1st one needed for RR and UD), which one should I use?Hi,
the concept of batch comes when there are some property changes (property in terms of business, that may be quality or something else). if you are confirming production order partially, it means there is something that changes with batches. that's why std sap does not allow to create single lot though all those batches have been created from same production order.
and henceforth, your requirement cannot be fulfilled by any config. you can try for development.
partha -
How to maintain translation of views in material master
Hi,
How we can maintain translation of views in material master
E.g.
Basic Data
Classification
Purchasing
MRP1
MRP2
Ect…
We want to maintain translations in different languages.
Thanks
SudhirDear Sudhir,
Check this link may be help you.
https://help.sap.com/saphelp_nw70/helpdata/en/ad/06dcf1c4be11d291c70000e8a5f6e6/content.htm
Regards,
PK. -
View using Material master,Vendor master and PO tables
Hello folks.
There is a requirement to create view using material master tables ( MARA,MARC,MARD,MAKT & MBEW ) , vendor master tables ( LFA1 & LFB1) and
Purchase order tables ( EKKO & EKPO tables).
I have created the attribute views for material and vendor master tables separately.Now I am thinking about the following design pattern.
1. Join the material master master attribute view to EKPO table using the inner join to create a analytic view1.
2. Join the material vendor master attribute view to EKKO table using the inner join to create a analytic view2.
3. Now create calculate view using join to combine analyticalview1 & analyticalview2.
Please suggest me the best optimize pattern and am strange to SAP HANA. Please also clarify the following doubts.
1. What is the role of system supplied default aggregation node?
2. How can I use Union node in the calculation view in the current requirement because people/documentation always suggesting using of Union than Join?
Thanks & Regards,
Suresh KuturuI have managed to create the Analytic view as per my requirement.. No need to use calculation view in this case..
-
Adding fields in costing view of material master
Hi gurus,
I need to add 4 fields in costing view of material master. I have followed the steps in SPRO, for configuring customized screen in material master.
1) Created a function group YMMCO and copied the screen 2904 from program SAPLMGD1.
2) Added 4 fields in my customized screen.
3) Created copy of 01 ( Screen reference ) to z1 in OMT3B.
Since 2904 is not there in the sequence . I changed one 0001 sequence at the end to 2904 . I also assigned my program
SAPLYMMCO to it. I can see the changed fields in data screen and subscreen.
4) Then I assigned the SSq to z1 in transaction OMT3E.
But unfortunately, when I go to MM01 to create a material , I am not able to view the fields I added in costing view.
I have checked the screen for the previous field, it shows 2904 only.
Two days back, I did the same thing in basic data view 1 , it was working properly. As per client's suggestion I put it in
costing view, it is not working . Please give me suitable suggestions.
Thanks in advance.
D. MallickHi,
I also need to add custom fields to Basic data view. After copying & changing the screen sequence in Config, I could able to see the custom fields in Basic Data view.
I have appended structure with custom fields to MARA table.
But the values I enter in the screen is not getting updated to the table MARA.
Can you please let me know the code, I should have have in PAI (Process After Input) module in the Sub Screen to update the values?
Thanks,
Dasa -
Current period in Accounting 1 view of Material Master
Dear Experts,
In Accounting 1 view of Material Master there is a current period, now it is 12 2009.
Is it possible to make it 11 2009, if yes how to do it.
Please help if you have solution. it is very crucial for me.
Thank you for your support.
Regards,
ZusenHi,
Please read the Solution part of note 487381. There is still a few things need to be carry out before you can proceed
with the initialization :
Bear in mind that the initialization of a posting period has the
following effects concerning the period stocks:
o The initialization of the posting period to a previous or to any
posting period may lead to the loss of the information of the
inventory balances of the previous periods.The book value of the
current posting period is taken as the basis also for values of
the previous period in this case.
If you want to continue working with this new posting period, in
addition you should execute report Z_DEL_HIST_ENTRIES attached so
that history entries greater or equal to the new posting period
will be deleted.
o If you have to briefly reset the posting period by one period
(for example, postings must still be posted in a certain period)
just to make a correction (and for a small number of postings),
you should initialize the posting period back again to the old
value so that the values of the previous period will not be lost
(you should forbid postings when carrying out corrections).
However, afterwards the values of the previous period or the
history records (as of Release 4.5) of the materials posted in
this case are inaccurate.
You should NOT execute report Z_DEL_HIST_ENTRIES in this case.
o However, if the posting period is generally reset again to a
previous posting period and if postings were made during this
time, all information on the inventory balance of the previous
periods is lost.
As of Release 4.5a, you should use the cited correction report
Z_DEL_HIST_ENTRIES in order to delete history records that are
more current than the current posting period.Otherwise, it can
result in deviations (inconsistencies) for the update of the
history records.
o Important! If there are open physical inventory documents that
have status 'counted' or for which indicator 'Freeze inventory
balance' has been set, you should reject these if they refer to a
previous period or have been created in the former previous
period.The inventory difference to be posted can be determined
from the current book value of the previous period and the book
quantity frozen in the physical inventory document (ISEG-BUCHM)
and does not match the inventory balance of the previous period
that is currently valid. -
Problem with *serial no. profile* in work sheduling view of material master
Hi ! !
I am here with a problem with serial no. profile in work sheduling view of material master.
By mistake for some FHMI type ( PRODUCTION RESOURCE TOOLS )materials, serial no profile exist in 'work sheduling' view. Due to that we are facing problem in GRN.
when I am trying to remove that with MM02. i m getting a message as Serial numbers already assigned to this material
Please suggest how to remove serial no. profile.
Thanks in advance,
PrabHi,
go to MMBE and check the Current Serial number...for FHMI type
and go to IQ02 and close the Serial number range at the Current number range...
Now you can assign this serial number range to another material type...
Thx
Raju -
Hi Gurus,
How to delete the view of material master say ex:storage location view for a material
Regards,
SubbuHi Subbu,
Views are dependent on the the material type.
if u do not want a view for a material type then, u can go to tcode OMS2 and there u can deselect the view in the userdepartment. and save.
Now that view wont be their for that material type.
Hope it wud have answered ur question
Reward if useful
Shawn -
Purpose of maintaining classification view in material master
Hi gurus
can anyone explain Purpose of maintaining classification view in material master with example
Regards
Vishal...Hi
One of the reason we maintain classification is for batch management where characteristics like shelf life expiry date is being attached to a class & that class is maintained in material master so whenever transactions takes place it will read from the characteristics value.
the other purpose is with variant configruation, for a configurable material there will be more than one characteristics for ex: in a car it comes with A/C - non a/c, metallic - non metallic, normal steering - power steering all these are mainatained as characteristics & assigned to a class & we use that class in classification for materials.
there is many more advantages & ways of using classification in material master.
Regards
Rang -
Sequence of maintaining views in material master
Hi
Is it possible to maintain sequence of maintaining different views in material master.
For example: Basic Data 1 should be maintained first & then Basic Data 2 and then General Plant Data/Storage 1 and then General Plant Data/Storage 2 and so on.
If the user misses the sequence, it should give a error message.
Regards
Pradipta SahooHi,
u r requirment is possible, that u change screen sequence of material master so the apperance will be as per u r requirement. In changes can be done in OMT3B in SPRO.
Rdg
Shekhar -
Sales org 2 view in material master
hi gurus,
Iam not able to see all fields in sales org 2 view in material master and i would like to know how to configure to restrict end users not to change it . thank you in advance.
regards,
GopioHi naga gopathi
go to Spro->logistics general ->materials management-> there you select the options of material feilds and select the material type and click on till you reach the sales orgn 2 view , .
In MMR settigs you can see table wise so i think it should me MARA table. for sales orgn 2 view
There you check the feilds wat you want is in display or supress mode
Regards
Srinath -
Label Data View in Material Master
Dear Team,
Despite of performing all below standerd steps, i am not able to view Label Data view in Material Master.
pls guide
steps performed.
1. Check whether the screen sequence SP exists in Customizing for the Material Master under Define Structure of Data Screens for Each Screen Sequence.
2. Check whether screen 92 has been assigned to screen sequence SP and has the screen type 1 (main screen).
3. Check under Subscreens whether the subscreens were assigned to screen 92 of the screen sequence SP.
4. In the Assign Screen Sequences to User/ Material Type/Transaction/Industry Sector IMG activity, set up the users who are allowed to edit the screen sequence and when it appears.
also I have SAP_ALL Authorization.
Regards,
Amol JoshiHello Amol,
For IMG activity: Define Structure of Data Screens for Each Screen Sequence, for screen sequence 21, with logical screen 92, in subscreen, please see below settings:
Program: SAPLMGD1 , screen no. is 1002
Program: SAPLCBGL_LD00 , screen no. is 8020
Program: SAPLCBGL_LD01, screen no. is 1010
Regards,
Niraj
Maybe you are looking for
-
Solaris 9 remote login (ssh) drops connection
Hello All, I wonder if you can help me... Let me give you some set-up details before I ask you the question. I have Ultra-60 at home with Solaris 9 and recommended patch cluster installed. The machine is connected to a Linksys WAG54G ADSL router/mode
-
? how do I create a 'Search' system without being linked to a server ?
Hello, I have a project which I am trying to make simple and would like your help. I need to create a 'navigation system' which at the moment is a series of Flash .swf files uploaded to a Dreamweaver HTML page. Now I need to get them working together
-
hi, there are a lot of blog posts and excellent documentation on using runtime css. however, none of them really address the *why*. the adobe docs say: "By loading style sheets at run time, you can load images (for graphical skins), fonts, type and c
-
Application dying with core dump on what appears to be berkeley
I have a web app being run on a solaris server. This web app ran for approximately 20 hours before crashing. I have the core dump file, but it is quite large (11GB). Using mdb I am able to get the stack trace from the core dump. Could this be an issu
-
Cannot Install "BT Net Protect Plus (McAfee)"
Cannot Install "BT Net Protect Plus (McAfee)" Download and run - "McAfeeSetup-Serial.exe" Nothing happens apart from 10 seconds of windows loading icon.... I checked Windows Logs for Application Faulting application name: Install.exe_McAfee Integrat