Hi Guy,
Any body so kind to help me to find out a standrd SAP report which give the account assingnment detail about PO order line item.
The standard SAP report ME2K give the assigned cost center but not about  the assigned GL account.
My requirement is as following:
PO NO  Item   Material   Quantity   Cost Center     GL Account No
It means PO line item assinged to cost center & GL account.
Thanks in advance.
Rgds,
sp sahu

Mr Radhakrishnan & Mr MS,
The ME2K transction only give cost center wise PO. Not give the information about the GL account assigned to the PO.
Whereas in KSB1 report give the information about the PO for which some material document already posted. I mean to say, KSB1 include those PO which have PO histrory is present. what about those po for which no GR or IR has done. It may come in commitment report that is in KSB2.
My requirement is a report which give information about the GL account assigned to all the PO created in the system.
Thanks for reply.
Regards,
sp sahu

Similar Messages

  • Finance and Controlling report in combination with Cost center, GL account, Internal Order

    Hi Members,
    Finance and Controlling report in combination with Cost center, GL account, Internal Order.
    Please provide any slandered report in all 3 dimension.
    Thanks
    Dileep Kumar

    Search this query in FI Controlling forum am sure you will get useful results there.
    This kind of reports related to Controlling are usually created using Report Writer tool.
    In fact majority of reports in Controlling component is created using Report Writer only.

  • G/l Account Balances Report with Cost Center

    hi all,
    In F.08 T-code i need to place a Parameter of Cost Center in G/L Account Selection and
    after executing the report i need to place populated cost center field at the last column.
    Please help me in creating this report with different possibilities.
    thanks,
    Sankaresh S
    Moderator message: "spec dumping", please work yourself first on your requirement.
    Edited by: Thomas Zloch on Jan 24, 2012

    Hi,
    It looks like a complex system is in place. It is good that Non-SAP system is being discarded.
    Let us assume CC1 and CC2 are two company codes in SAP nad NC is a company code in non-SAP system. Further let us consider CC1 as a replica of NC. And all invoices are entered in CC2 and interfaced to NC month end. As payment details are not interfaced back to CC2, all items will be open items. I presume only closing balances from NC are interfaced to CC1, as such both are in sync.
    Under the given circumstances my views will be as under:
    1. As CC1 is already a replica of NC, why can't this continue as a Company Code in SAP. Probably you may have to create Customer and Vendor Masters in this Company code.
    2. Second option is discard both CC1 and CC2 and create a new Company Code say CC3. In this scenario, we can start with a clean slate. Basically, you need to extend the following:
       - GL Accounts to new Company code
       - Vendor and Customer Masters to new Company Code.
    The closing balances need to be transferred to new Company code along with Open items of Vendors / Customers.
    3. Third option as you have planned to update balances in CC2. In this scenario, how are you planning to write off the open items (which are already paid). You will be transferring it to a dummy / conversion GL Account. But I think this may be a significant balance and proper analysis need to be made about the implication of that.
    I would recommend option 1 of creating a new Company code.
    Thanks
    Murali.

  • Report with cost center, Wbs element and cost element

    Dear Experts,
    I am creating Income Statement report with report painter using table CCSS.
    In this report, I need cost centers, cost elements/ GL accounts and WBS elements.
    Report is okay except sales. Because my cost elements for revenue are created with the category "11", it is not showing in the report.
    Please suggest what changes to make to get sales revenues in the report.
    Thanks

    Hi Simi
    Structure CCSS of Report Painter is combination of several tables including COEP
    Even your revenue should have been updated in COEP table...
    May be your report's selection conditions are preventing the revenues from being displayed... Can you check that?/
    Also, you can build this report from FI Structures
    Br, Ajay M

  • PO report with cost center, order and delivery date

    Hi,
    pls. I just need a report to display the next fields Account Assigment and Delivery Date.
    I attempted with standard reports like ME2N, ME2K but it is impossible to display all the information in the same screen.
    Thanks a lot for cooperation.
    Regards.

    HI,
    Create a Infoset query or ask ababper
    Tables EKKN, EKPO, EKKO
    Regards,
    Pardeep Mlaik

  • Cost centre report with all GL expense accounts

    Hi Gurus;
    Can you please give a cost centre report that gives all GL expense accounts with the correponding Cost centres or functional areas ni the next column?
    Example:
    Column A                        B                C                          D
    GL 12005                Cc 52001        Amount 100          function area 1000
    That is without expanding the report gives you in total amount per requested period in the format shown.
    The report should tally with Trial balance for all expense accounts.
    Thanks
    Lameck

    Hi
    Did you check the available reports in cost center accounting ?
    Also check the report layout and check the desired fields.
    Now you could see whether they match or not your requirement.
    If not also, you could add fields from the options.
    If nothing works, create a Z Report.
    reg
    suresh

  • Cost Center Report with Cost Element wise Subtotal

    Hi All,
    We have a requirement where customer wants a Cost Center report with Cost Element wise Subtotal and selection options required are Company Code, Cost Center, Cost Element.
    KSB1 solves the requirement, but when executed for 2 or more company codes it is taking 3 to 4 hours.
    The other alternative report we tried is S_ALR_87013611- Actual/Plan but this report gives debit and credit values in seperate columns.
    Please let me know if we can copy the report S_ALR_87013611 and change it using report writer to have the output by Cost Element wise total.
    Also please let me how we can increse the speed of KSB1 report.
    Thanks
    Satish

    for KSB1 Report the following is my suggestion
    1. Please go to the selection criteria for the cost elements and de select the secondary cost elements in the the exclude range and try running the report this is generate the report faster.
    2. also check the date range please give the date range for 3 t months and if you want to run for multiple company codes. if you want to execute it for longer periods say 9 months or 6 months generate the report in 2 to 3 installments and download them to your excel and consilidate them in excel for your analysis
    Best Regards,

  • Exchange Rate Difference in PO with cost center assignment

    Hi All,
    In case of exchange rate difference in a PO with a cost center assignment the system Do not post the difference in the exchange rate difference account (maintained under transaction type - KDM - in T-code OBYC). However if the PO is a normal material PO it posts the exchange rate difference to the exchange rate difference account.
    I want the exchange rate difference to be posted to the exchange rate difference accout for PO's with cost center assigned as well.
    I have searched for SAP notes and found that note # 980402 & 1102481 provides a solution for this issue - but it seems both the notes are valid for 4.6 and 6 release only. We are on ECC 5.0
    I have also checked note # 1136145 for this and implemented in the system successfully without any luck.
    Can some one please help me with a solution for this issue.
    Thanks and regards,
    Ankur

    Even I have implemented this note in our 4.6C system for account assigned POs, but no luck. Please let me know if are successful.
    Thanks
    Neel

  • Can S_PLO_86000028 Financial Statement report generate Cost-center report?

    Dear Experts,
    I've tried with S_PLO_86000028  Financial Statement report and it could generate report based on Profit Center but when I tried with Cost Center, it show no record.  Can this report generate cost center wise report?
    regards,
    Abraham

    Hi Saga,
    S_PL0_86000028 is a new FI report  for Financial Statement, created by tool Report Painter with tcode FGI1 (Create Drill-down Report).
    For adding new columns, I think we can modify the form it used (0SAPBSPL-01)
    It's not a good idea to copy it to z-program 'coz I still struggle with it and doesn't work well.
    Solaris.

  • Report on cost center

    Hi all,
    In standard SAP Controlling,There is a report called cost center actual/plan/variance (s_alr_87013611),this report you can also see in excel ,same time you can down load to excel .If you down load in to excel ,SAP system only capable of downloading
    the data with respect to only one cost center,My question is ,is there any report which will allow me to download multiple cost centers data in to excel instead of single cost center,i tried few reports ,but no luck, Your inputs will be appreciated
    Thanks
    Srivani

    Hi 
    With your reply,though the answer is not straight,but it has given me the way to go for work around,finally i got the soloution.
    i rewarded the points,Thank you,

  • Vendor report with expense G/L account

    Hi,
    My client needs a vendor balance report with expense G/L account. I mean against what expense account they made a payment to the vendor. There are no such standard reports available in SAP. So can some one suggest me how to get this report done.
    Appreciate your response in advance.
    Regards,
    Sunny.

    HI,
    Though there is no Std. report for your requirement, you can add field of GL ACcount to reflect the expense accountin the line item display. However this will not be a total solultion for your requirement. But for a particular vendor analysis will become easy.
    Path:
    Financial Accounting> Accounts Receivable and Accounts Payable> Vendor Accounts> Line Items> Display Line Items> Define Additional Fields for Line Item Display
    <b>Pl. Note: Consider whether you really need to enhance the line item display. Note that this enhancement can reduce performance, since the system has to read more table entries.</b>
    Thanks
    Vijay

  • Table where cost center assessment cycle details are saved

    Hi,
    Can anybody tell me what is the table where Cost center assessment cycle details like sender cost center,receiver cost center, assessment cost element, SKF etc... are saved?
    Regds,
    Bijay

    Hi,
    Look at the T81* tables.
    Regards,
    Eli

  • Freight Costing - Problem of G/L account with Cost Center

    Dear Gurus,
    In VI02, I have the following u201CAccount Assignmentu201D message of error:
    u201CG/L account 60900000 cannot be used (please correct)u201D
    u201CComparison of the field selection strings from the G/L account 60900000 and the account assignment category K reveals that there is an incompatible combination of field selections for the field selection group 'Earmarked Funds'.u201D
    Questions:
    Bearing in mind that I am in the Shipment Cost cockpit, I need to mention that the system directly allocated me the following Account Assignment Category: u201CKu201D for u201CCost Centeru201D.
    1-     I could there either way create another Account Assignment Category for Shipping instead of Cost Center
    2-     The system tells me about an incompatible combination of field selection, how can I change that field selection to make it compatible? There are so many possibilities that I get bogged down in choosing the right combination.
    I have been to OME9 and OB14 to try to maintain fields, however those fields have different values or names.
    My aim here is to coordinate a G/L account group with a Cost Center for Freight Costing
    Can anyone help?
    Thanks
    Chris

    Dear Zafar,
    If you desire you maintain two different cost centers for the two company and you need to have both of them posted on the same G/L account and Cost element, I would advice you to:
    - create a Z table where by controlling area you define where the specific cost center need to get posted
    - include this validation check in the exit for validation for controlling
    - include this validation check in the exit for validation for finance
    - include this validation check also in the sales order user exit
    Standard SAP seems do not have direct link between cost centers & cost elements. For this reason ideal solution is to generate a table where you may define you needed structure.
    E.g.: some ideas on the table you may create
    Controlling area
    Cost element from
    Cost element to
    Cost center from
    Cost center to
    I hope this suggestion may answer to your need.
    Regards,
    Viviana A.

  • Cost Element with Cost center in column in one report

    Hello experts,
    Kindly, can you help me to create a report where I can see for each cost center all the cost element balance related.
    B. R
    F Tay

    Use KSB1...
    Thanks

  • Invoice with cost center

    while creating invoice via va01, if the material is mapped with GL accs that require cost center, we will choose the cost center in Order reason field, after that we create billing and then we can see the accounting document. In case if we not choose the cost center we can still create invoice and billing but the accounting doc is not generated, then we have to create credit note to clear the incorrect invoice and recreate new one..
    to over come the above issue is there any way the system throw the message stating that this specific material requires cost center and dosen't allow to save ? ( or) if the above message cant be added is there any chance whether the system allow us to amend the cost center in billing and can recreate the accounting doc automatically ?

    You can control this by maintaining Incompletion log for Sales Item (Tcode OVA2) and correspondingly assign the same to your I Cat.
    And FYI, you can't make any change in cost center details at billing level.
    Thanks & Regards
    JP

Maybe you are looking for

  • Error with ARRAY- ArrayDescriptor

    Hi! I've a very weird error with an application built in JDeveloper 10G 10.1.2.2.0 (Build 1929). I need to call an store procedure and pass an ARRAY parameter. To do so, I just       Connection conn = callStoredProcPST.getConnection();           Arra

  • Need solution for a Reporting Requirement

    Hello Experts, I need design a solution for Report, where in I need to show ageing of Invoice based of Due date of Invoice for last four weeks as explained below: In cube i have records like this: Industry       Invoice Number      Due Date      Amou

  • EJB 2.0 Spec Clarification

    I quote directly from the EJB2.0 Specification: " Clients are not allowed to make concurrent calls to a stateful session object. If a client-invoked business method is in progress on an instance when another client-invoked call, from the same or diff

  • Old email reappearing after deleted

    I am experiencing two problems 1) I delete emails and when I check my email again it reappears. how do I stop this from happening? 2) i close applicarions and they reappear? Please help

  • Problems connecting to 32 bit msaccess database from 64 bit 11G

    Here is the issue: I have a 9i (32 bit windows) database with an hsodbc connection to an an older access database so once schema can see & copy data from said access database, all works fine. I'm getting ready to move the database to 64 bit 11.2.0.3