PO status if you change the release strategy procedure
What will happen to the half released PO/PRS if we change the release strategy?
Hi,
It won't Happen for Half release PO Document. The rerelase will get affect once the final release done or No release initiated to the document.
SAM
Similar Messages
-
How do you change the status of a survey in CRM_SURVEY_SUITE?
Hi,
How do you change the status of a survey in CRM_SURVEY_SUITE, e.g. from Activated to not?
Thanks!Hello Anne,
I would like to suggest you that once you have created any survey and activated it there is no such option to deactivate it.
The only option is that if you go and edit the survey then it deactivate the survey and creates a new version of the same.
thanks
Willie -
How to set the Release Strategy without classification for PR
Hi,
I am able to set Release Strategy for PO with classification, however, now I want to set the Release Strategy for PR with classification. Can someone tell how to proceed to set the Release Strategy to PR with Account Assignment.
I crated the Release Codes, however not able to find what options to choose in the following steps :-
Release indicator
Assign Release Indicators
Release Points: Prerequisites
Determination of Release Strategy
Regards,
Yogesh1. Release codes
Create the release codes. For Purch. Officer, Manager and Sr. Manager
Like PO, MG, SM
2. Release indicators
Define release indicators and branch to the detail screen. Here you
define whether fixed purchase requisitions may be changed by Materials
Planning, for example, and whether an RFQ or a purchase order may be
created from the requisition.
You can also determine the field selection here.
In the area "Changes after the start of the release procedure", you
specify whether a requisition may be changed after the release
procedure has begun. You specify whether the strategy has to be
redetermined after changes, or whether the release procedure has to
start all over again from the beginning.
This parameter bears a relation to the parameter "Value change". For
example, previous releases are not cancelled if the value of the
requisition item after the change does not exceed plus 10% of its
original value.
Attention:
Be sure to create a release indicator (e.g. B for "blocked") that
serves as the starting point for subsequent indicators. Do not set the
indicators for release for the issue of RFQs and PO on the detail
screen for this indicator.
Also create a release indicator characterizing the released status.
Set the indicators for release for the issue of RFQs and PO on the
detail screen.
You can use sytem defined indicator in this case you dont have to do anything
3. Assignment of release indicators
Assign a release indicator in dependence on the status of the release.
Example:
You create a release strategy S1 consisting of two release codes 01
and 02. Release with 01 is a prerequisite for release with 02. If
release has been effected with 01, the requisition has been given the
"all clear" for the issue of RFQs.
You have created the release indicators B (blocked), 1 (cleared for
issue of RFQs) and 2 (cleared for RFQs and PO).
Now enter the following as assignment:
Strategy C1 C2 C3 ...
S1 B (blocked)
S1 X 1 (RFQ)
S1 X X 2 (RFQ/PO)
4. Release prerequisites
Define which release codes are involved in a release strategy. Specify
whether a code is set for a release status following release, and
whether one release status is a prerequisite for another (+).
Example:
Strategy Code C1 C2 C3 ...
S1 01 X
S1 02 + X
5. Determination of the release strategy
Determine the conditions under which each release strategy is
assigned. The criteria are account assignment category, material
group, plant, and value of the requisition item.
Here you can define the you criteria but one thing you keep in mind that you hae to define all criteria.
E.G if you will not define the Material group here but it will default in req in that case this will not work thats the reason you have to work with Classification.
<b>In the classification whatever criteria you need that only you have to include like in your case you care about A/C category and value only. </b> -
Item category control the release strategy?
Hi,
Currently the purchase of a material needs to be released.
My issue is that as soon as I change the item category in the sales order,
the material does not need to be released.
How does item category control the release strategy?
Sincerely,
KetanHi Ketan,
You can set item category in the characteristic of a release strategy.
In your case, I guess the item category characteristic is already created. So you can just add the desire value into the characteristic.
Go to SPRO > IMG > Material Management > Purchasing > Purchase Requisition > Release Procedure > Procedure With Classification > Set Up Procedure With Classification > Release Strategies
Select the related release strategy, double click to view the detail. You will see there are 4 buttons in the bottom of the screen. Choose 'Classification' and enter you value of item category.
Thanks & regards,
JT -
Reset the Release Strategy of PO when Terms of Payment key is modified
Hi All,
Please let me know how to reset the Release Strategy of PO, whenever the Terms of Payment Key value id modified.
Thanks in advance.
Regards
NaveenHi,
This is not possible in SAP standard.
You have to use User Exit;
M06E0004 - Changes to communication structure for release purch. doc.
And Function Module;
EXIT_SAPLEBND_002 - Changes to Communication Structure for Release of Purchasing -
Restrict to change the released document
hii all,
i am seeking for a suggestion whether its avalable in standard sap or not.
i want to restrict to change the released document. once,document has released, then chage shud not affect.
thanks.Hi,
For this you only need to set the changeablity from the release indicator to "1".
Best Regards,
Arminda Jack -
Source Determination resets the release strategy of the PR
Hi
I am trying to automate the Purchasing Cyle by running ME57 as a batch job along with ME59n for stock items on contract, however when I create the PR and approve it, when ME57 picks this approved PR it assigns the source automatically but removes the approval! I am having the ABAP consultants debug this, however is there something elementary that I have left out?
Regards
Thasmei ReddyCheck if u have release strategy based on vendor - FLIEF. This could be a reason. When u change the vendor or assign a vendor, the release strategy is getting reset .
-
Can you change the year of all songs in an album without changing the year of the album?
Hi everyone,
I was wondering if it is possible to change the year of all the songs within an album while keeping the year of the album. This is particularly relevant in 'Compliation' or 'Best of' albums, where all the years the songs were produced is different o the year the album was produced.
Foe example, The Beatles' best of album '1' was created in 2000, but all of the songs were from 1963-70. In iTunes, the album is listed as being released in the year 2000, which is correct, but all of the songs are listed as being released in 2000, too, which is incorrect. However, when I change all of the individual songs to their correct year in which they were created, the year of the album also changes to that of the first song on that album. In short, either the album year is correct but all the song years are incorrect OR the album year is wrong but all the song years are right.
Does anyone kinow if there is anyway to change this or get around this?
Many thanks!Hendylele wrote:
Do you have any idea whether or not Apple are seeking to do anything about it in any upcoming updates?
None at all. If you'd like them to consider it you'll need to use the feedback link I gave above.
A long standing bug bear for some is not being able to correctly sort two albums released in the same year by the same band. Having both copyright date and release date would (if implemented properly) give the option to sort, or filter tracks on either date as required.
iTunes is a database of tracks. Albums don't really exist separately. There are a few collective properties. Year can have a separate value in each track but obviously only one value can (or at least should) be used when sorting as Album by Artist/Year. If you change the album rating of a single track in iTunes (which can be done with a script) iTunes automatically updates all the others to match.
tt2 -
How to change the release of the sesment?
Hi gurus:
I have created a custom segment type Z automatically when i release the segment the system set the release of my segment at 700 (the release of my SAP), but i have to set the release at 640. How can i do?
alex zhangHi
When your system release at 700 , how can you set the release status of your segment for 640, I think its not possible.
in WE31 when we create the Segments and release them( from menu EDIT-> set release/Cancel release), By defualt it will get released as per your system version.
<b>Reward points for useful Answers</b>
Regards
Anji -
How can I customize my status bar to change the color?
Hello:
How can I customize my status bar to change the color?
ThanksOn which phone model? Either way, modifying the notification bar text color usually isn't something you can do with a standard stock phone.
-
How do you change the default font in Illustrator CS5?
I have upgraded my Illustrator to CS5 and my default font has changed to a strange font. In Photoshop and InDesign, I was told that all you have to do is change the font in the Character menu to the font that you wish to be set as "default" and it will be the font that you always start with.
NOTE: Does this mean that if I use a different font in a different document, the font will stay that font unless I change it back? Isn't there a way to make a particular font the font that I would always what I start with? All this setup means, is that the "default font" will always be whatever the last font that was being used was. There has to be a way to make a default font that I will always start with no matter what the last font that was being used was.
Illustrator gives you no option on font type, unless a file is open. Then, if you change the font and close the file, next time you start a file, it will go back to what is was to begin with. There has to be a way to change the default font for all of these programs to where the font always stays the same unless you change it. Mine is just set to use a weird font that I would probably never use.
I just never thought it would be that big of a deal to change default settings for the font.Okay, I basically made three different documents and I made sure that I had everything chosen in each. I then saved the three to that file and they now appear in the list:
Settings for all 3:
72psi, 150psi and 300psi
Rulers Visable
Times New Roman
12pt
14.4pt
I then went in and started three new documents. I used the three different New Document Profile's that I made and they all had Rulers, their sizes were correct, but the font stayed Myriad Pro. Did I miss anything? And, Yes, I did change the font and the setting before I saved them in the New Document Profile.
One other thing, I did create a file in the folder, but it was spelled incorrectly. I then went into the folder, erased it and made a second. Then, I went to open it in IllustratorCS5 and it was still listed. I went to the file and it wasn't there anymore, but it was still listed in the New Document Profile. Is there a way to get it off of the list or is all I have to do is restart Illustrator? -
You changed the order of the menu for "Open in a new window" or "Open in new Tab", How can I change it back? Or how can I omit any reference to tabs? I do not use them at all.
You can use the Menu Editor add-on to rearrange or remove menu items - https://addons.mozilla.org/firefox/addon/menu-editor
-
Can you change the legth of time (or number of rings) it takes for on iphone 4 to time out making an outgonig call?
Mostly it's to call in for radio contests. The Iphone is really good at making a quick call, but it seems to timeout after 15-20 rings. I realise this is a small thing, but free tickets is free tickets.
Most commenst I see is abotu incoling calls, not outging.
Thanks.No. You can't do this with any phone.
-
HT5312 How do you change the email address used to send security answers?
How do you change the email used to send the security answers you have forgotten? I have changed the alternative email adress in Name, ID and Email Addresses but this does not change the email address in the Password and Security section.
Jus what do you want to accomplish? The Apple ID email address is used for variosu thing onthe iPod like:
- For purchasing media. Srrings.iTunes and App stores. Sing out and sign into anoterh account
- Settings>iCLoudl for iCloud account
- Settings>FaceRome for Apple ID and where You can Be Reached At email address
- Settings>Messages for Send And Receive email address.
- Maybe for Game Center -
Hi....How do you change the name? When I sync my iPhone, it shows my wife's name on it?
Unfortunately it is not doing it....
Let me give more details..We have 3 iPods and 2 iPhone4....I recently purchased the iPhone4 and when we connected it..It was already reading my wife's iPhone4..We went to the Apple Store at the Grove today and was told to de-authorize the system and connect my iPhone4 back and I should be able to change the name.
Nothing happened..Right now, I clicked on RESTORE settings...and it is uploading a new iPhone update.
Maybe you are looking for
-
When `ve downloaded the latest itunes and then i go to install it i get a message saying there is a problem with this windows installer package a program required for the install to complete could not be run, contact your support personnal or package
-
Can not create a sdn userid, going to same page again and again
Hi, I got my S000 ID from certification, by using which I have logged in to sdn. When I try to shop/buy some thing it is saying I need to use some public id. I created a new userid one but when I try to logon, it is not letting me to to goto any
-
Is it possible to edit a path made with wacom tablet?
i have a path (made with pressure using the paint brush) that has segments that do not handle a calligraphic style well. 1. Can i somehow edit the path thickness of those segments? cut segments and redraw? i believe the line thickness is screwing up
-
I live in Australia, should I use PAL or NTSC settings when creating my DVD?
I am new to creating DVDs and I am not sure what settings will give me the best quality when I burn it to DVD. I live in Australia, should I use PAL or NTSC settings? Any other hints?
-
When I edit a remote image, it doesn't refresh in DreamWeaver - I have to restart.
Surely there has to be a way around this, but I can't seem to find a refresh button. If I edit an image in PhotoShop and save it to a remote URL, I have to restart DreamWeaver and reopen the file to get the remote image to refresh in the work area. T