PoductOrder Header Qty change when Row Qty is changed.

HI All,
I am Implementing a product in that according to Client, In production order when the Row level Qty is changed then all the rows should be changed with the changed quantity and header quantity.
can u help me in solving this please
Thanks,
mahi

Dear mahendra babu,
In B1 application, when you change the Header Planned Quantity then will change the Rows Planned Qty, but if you change the row's qty will not affect the header's and other row's qty, this is current system behavior.
Best Regards
Jane Jing
SAP Business One Forums team

Similar Messages

  • Do indices change, when data of table changes?

    Hello,
    if a table has got many indices and is changed frequently, do the indices change as well. Are all indices corresponding to that table changed. Are these indices processed in any way?
    thanks, resi

    "in indexes, the space can be reused only by rows with the same key-filed"
    That is incorrect. The space left in a index by a deleted row can be used by any key that is between the prior and next keys. For example, if you have Index entries
    Entry 1  Ball
    Entry 2  Bell
    Entry 3  BollNow, you delete Bell, the inndex would look like:
    Entry 1  Ball
    Entry 2  
    Entry 3  BollNow, add Bill, and the index would look like:
    Entry 1  Ball
    Entry 2  Bill
    Entry 3  Bollno wasted space.
    Rebuilding indexes is a waste of time and resources in the vast majority of cases.
    Search Tom Kyte's site here for rebuilding indexes or reorganizong indexes for many, often lively, discussions.
    John

  • Why does planning indicators change when the safety stock change?

    Hai All,
              I created a BOM for a finished material (FM1)and entered another finished material(FM2) in item list.
    Now in MRP, I did single item  multi level planning for the FM1. I checked the planning file entry through MD21 and it has NECH and NECPL marked. I checked for FM2. None of the indicators are set. Then I have been to material master for FM2 and in MRP2 screen and changed the safety stock to 950. Then I checked the plannig file again and I see the indicators NECH and NETPL are checked. I then made the safety stock 0 and checked the planning file. There is no change.
    My question is why were the indicators NETCH and NETPL checked when I increased my safety stock for material FM2 from 0 to 950?
    I understand that NETCH is the planning for Net changes and NETPL is for planning for changes in a horizon.
    Are these indicators set because I made a change to the material? or is there any other reason?
    Thank you.

    Visu
    The planning indicators change when there is an amendment to the planning situation that requires MRP to replan a material. Essentially, by upping your safety stock from 0 to 950 you are requesting that the MRP system replans that material to ensure that there is sufficient safety stock available.
    Hope this helps
    Ian

  • Auto numbering changes when the font size changes

    Help.
    I get files made in InDesign CS4 that have paragraph styles assigned to create numbered lists within the body. They are fine as they are when they are opened.
    When I make changes they often- not always- change to 'continue from previous number' instead of staying 'start at 1'. The changes I have make are to change the document size, the font size and the margins.
    Is there something I am doing that allows them to change, or is there something that I can do to keep them from changing?

    Hi,
    Your doubt is not yet clear.
    I think u have not used smartstyles just changed the Font.
    To Test it if data is not coming from driver program,then just excute the smartform-(Press F8) .
    The Print Page will be seen to you.
    Accordingly you can undrstand whether it is decreased or not.
    Affable,
    Arbind

  • Pricing is not changed when pricing date is changed at header level.

    Dear Gurus,
                           The query is about pricing. When I change the pricing date at header level it is supposed to chnage the pricing at item level also. But it is not happening. In our scenatio there is a ZPR0 price and there is a condition record for that.
    The order was created earlier and now when we change the pricing date price is not being changed. I checked the analysis button. There it shows the following messages for ZPR0(In this case condition already exists). ZPR0 has three condition tables
    1. Condition record exists, but has not been set (for the 1st table in acces sequence)
    2. Access has not been executed due to previous access(for the 2nd table in acces sequence)
    3. Access has not been executed due to previous access(for the 3rd table in acces sequence)
    As a result we are not able to change price in the header level by changing the pricing date.
    Please help
    Thanks in advance,
    Je

    Hi Felipe,
                    The pricing will change if we click on the update button and select 'C' or 'B' option in the item level. But when we try to chnage by clicking on the update button in the header level it is not getting changed.
    I would also like to add that customer wants the price to be changed without pressing the update button at tghe header level.
    Please clarify on the pricing validity configuration . What steps are required in the pricing validity configuration.?
    Thanking you,
    Je
    Edited by: jerryabap on Feb 4, 2011 12:17 PM

  • Excel row height changes when it should not change

    I have a client using Office 2010 on a Citrix server. They are using Windows XP Pro SP3 for the desktop and the server is running Windows Server 2003 R2 STD.
    I have two users working in a spreadsheet in Excel 2010. The spreadsheet opens fine and they can perform their updates by either adding manually or doing a cut and paste. The problem comes up when all of the sudden a number of rows in the spreadsheet
    change height for not reason. The spreadheet has the row height set to 14.5 but for some reason the rows that change height sent the height to 405.9. Usually all the user has to do is go back and reset the row height on these cells and save before they can
    go back to making changes.
    It's more annoying then anything else so if someone could provide any solutions, it would be greatly apppreciated.
    thanks, Joe Trainor
    Joseph Trainor [email protected] Weidenhammer Systems Wyomissing, PA

    I have been working with Excel for 20years, and have been hit with this resizing of row height and also drawings or shapes, after opening an old XL97-2003 file.
    Chad's method below works!
    Please try the following to resolve the issue:
    1. Boot Excel 2010
    2. Open [Excel Options] dialog. ([File]-[Options])
    3. Select [Advanced] tab, turn on [Cut, copy and sort inserted objects with their parent cells] option. (In [Cut, copy and paste] section)
    *This will not resize rows that are currently set to 409.5 but I would like to know if this keeps rows from doing this in the future.
    1) I found that after opening the workbooks the row height and shapes are correct.
    2) Save the file, then save as to the new .xlsx format (for a macro free workbook)
    3) After reverting to former; turn OFF[Cut, copy and sort inserted objects with their parent cells] option. (In [Cut, copy and paste] section), and then opening the XL97-2003 files, the fault is still there.  For the newer xlsx files, though,
    the fault has gone.
    4) So yes, Chad, it does keep rows from doing this in future, if the newer file format is used.  Thanks.
    Chad's answer is "the answer"!

  • Detail Table Not Changing When Master Table Selection Changes

    Using JDev 11.1.1.6.
    I am working through some Oracle tutorials (Storefront Demos).
    I am accessing the Fusion Order Demo (FOD) schema.
    I have created VOs based on BCs for Categories, Subcategories and Products.
    I have added all to my data model and tested functionality using the AppModule.  This works as expected.
    When I drag the Subcategories onto my jsf page as Master-Detail (Table-Table), the initial list is based on the first index of the BrowseCategory data control.
    When I click on another row in the master table, the detail table refreshes but the same data appears.
    I confirmed that the selection changes on the master table.
    I added a button on the page and checked the BrowseCategoryIterator using some backing bean code and the iterator remains on the first record.
    I checked the SelectionListener on the table and it is set correctly as   "#{bindings.BrowseCategory1.collectionModel.makecurrent}"
    Does anyone have any idea why the detail table is not getting updated based on a relationship to the master table?
    Thanks,
    Raymond

    Hi,
    From what you are saying:
         1. it's working in application module tester
         2. you verified the current row of the iterator and you found that it is stuck on the first row
    The problem is then that the selection in the table is not setting the current row in the iterator.
    Try to add a custom selection listener where you just execute the "#{bindings.BrowseCategory1.collectionModel.makecurrent}" expression. this is just to make sure that the listener is being called.
    Also, the problem might be that the current row is correctly set by the table selection, but later in the life cycle it is being reset. so maybe you can also overwite the methods that set the current row in your VOimpl (again by jsut calling the supper) to check if and when these methods are called.
    Regards,
    Elias.

  • Why does my layout keep changing when I make simple changes?

    I have made minor changes like changing the font size of a text style and my whole layout spreads all over the place when I publish it. I've tried to add a small section of copy and then all the text on that page squeezes into the first column of my layout. I spend hours tweaking just to add a small amount of text to one page of my website. I published the whole site to make sure all the appropriate was updated. I didn't have this problem a month ago when I published the site live the first time. Did one of the updates cause this or what?
    Thanks for your help!

    Hello,
    Please provide us some screenshots or a link to your website so that we can check the issue.
    Also, please check if the issue comes up only after Publishing or you are able to see the issue when previewed in a Browser via Muse?
    Regards,
    Sachin

  • Save changes when there are no changes

    Why is it that when I open a subvi and close it making absolutely no changes, I'm prompted to 'save changes'?

    Hi wb2nvy,
    "Why would anyone NOT want to include the subvis when the main vi is recompiled to a newer version?"
    Maybe you have linked to subVIs also used with the older LV version and so don't want to save subVIs automatically?
    As said before: no other IDE I know of automatically saves referenced files to a newer version...
    And:
    You should get asked to save subVIs before closing the mainVI. You always have the option to save them. You always are presented with reason why LV wants to save. You always have to decide between saving or not saving... You always have the mass compile option.
    It's your duty to decide when to upgrade VIs - LV will and cannot take that decision!
    Message Edited by GerdW on 06-02-2010 04:37 PM
    Best regards,
    GerdW
    CLAD, using 2009SP1 + LV2011SP1 + LV2014SP1 on WinXP+Win7+cRIO
    Kudos are welcome

  • Project Server 2013 Site Owner not changed when Project owner is changed

    It seems when a project is created the project site "owner" is set to be the person that created the project. If the project owner is changed then site "Owner" is not updated.  This is a problem on several fronts and I am almost
    hoping it is an issue with my install.(We are running Project permissions mode)
    Use Case 1: A project manager leaves the company and the New PM is added as the new project owner. After addition and publish the site owner remains the same as the original. this means the new pm can't share the site (to a stakeholder who is not in the
    ERP) by adding them to the general "Contribute" group or otherwise.
    Use Case 2: a planner creates a portfolio project and gets it through the workflow and all. the PM is assigned but can't add other stakeholders without going back to the planner and having them add them to the project site as an owner. 
    Question: Is this a feature or a bug? Is there a script to do this? 
    Seems kind of cumbersome and has already produced numerous issues for us. 
    Tasks

    Bob,
    Unfortunately, you are seeing the behavior as designed. The Project Site Owner will always be the person, who created the project site (i.e. Project). This is because, after the initial creation, the only groups that are synced are:
    <Site Name> Project Managers (Project Web App Synchronized)
    <Site Name> Team Members (Project Web App Synchronized)
     <Site Name> Web Administrators (Project Web App Synchronized)
    The idea here is that, all 'sharing' of the project site will happen via the project schedule/Project Server. Anybody who is part of the Project team, will be given Team member access, and anybody with rights to save that project will be given project manager
    acess on the Project site,
    This is also good in a way, because, this prevents any license violations, (users who access project sites also should have PWA CAL), that could happen via direct sharing.
    Having said that, you have couple of options:
    1) Make it part of your process that when a owner changes, the admin (or workflow) manually adds the new owner to the Site Owners group.
    2) Disable Project Site Sync, and manage it via the AD Groups (depending upon on your security model).
    Cheers,
    Prasanna Adavi, Project MVP
    Blog:
      Podcast:
       Twitter:   
    LinkedIn:
      

  • Event times changed when daylight savings time changed - that's just wrong!

    My events that were scheduled for certain times all were changed one hour back, when DST changed. Why should that happen? An event that is scheduled for 8:15 should still be 8:15, however, it automatically got moved to 7:15, as did all my other scheduled events.
    Is this happening to anyone else?

    Well if you are syncing they should both be set the same way. Try turning it on on the Mac and see if the events go back to their correct times.
    AK

  • Every time I try to add album art work to some albums nothing happens, it's the same for the metadata. Nothing changes when I try to change artwork/genre/artist etc. Any help?

    I can't change any of the metadata for some of my albums and see blank artwork really bugs me, I'm a little OCD about it.

    That is the highest you will be able to go with 3g. You need 3gs or 4 to go any higher (multi processors and more memory needed).  Version 4.2.1 marks the end of your updates for that device.

  • Does inserted swf reflect changes when Cap movie is changed?

    I have several swfs in my Presenter presentation. If I make changes to the Captivate movies (the source file for the swf), then republish them, will the inserted swf update automatically? If not, can they be updated without having to delete them then insert them again?

    Unfortunately Leeann, an updated Captivate file will not automatically replace or update the swf you imported in the PowerPoint environment using the Presenter feature.  And simply replacing one swf for another gets pretty dicey with Captivate, especially earlier versions of Captivate because of multiple files that are created as a result of Captivate's publishing process.
    However, if you've published your Presenter content locally to your computer, then you might be able to try the following:
    Open your project folder where you've published your content to your computer.  From there open up the data folder; nested within that should be the resources folder.  Once inside the resources folder, you should see all the swfs you imported earlier.
    Run each swf by double-clicking so that you can see what swf corresponds to your Captivate material, and make note of the file name.  The idea here is to use the same file name for the existing swfs in the resources directory and use that information on the updated files that you republished from Captivate.
    Of course your individual results may vary, so I'd tread very lightly here...but you can give that a shot and see if it helps any.
    Regards,
    Rob
    www.robrode.com/yabb/

  • Error in GR when delivery qty PO quantity

    Hello!
    we create NB type POs for inter company transactions. If the PO qty is 10 and we actually deliver 11 (goods issue = 11), we are unable to do the GI against the delivery with the error message that the PU quantity exceeds by 1 unit.
    I have checked the vendor master for the supplying plant but unable to find any setting that would enable us to do the Goods receipt in the receiving plant for the actual qty shipped i.e. 11 units. Can someone tell me where this setting is so we don't et this error and can receive the goods against the delivery w/o modifying the PO? We don't want to receive against the PO because that causes imbalance in the quantity and the remaining would remain in MB5T.
    Many thanks.

    Hi,
    This error is due to the fact that the GI qty and the PO qty differance.When you try the delivery at VL10G, or VL10B sytem creates the delivery for the PO qty.and when you try to change the pick qty and do the PGI this error will come.Please check the qty at MMBE for the supplying plant.I do not know why the GI should be more if the PO qty 10.
    If you post transactions other than the PO qty delivery completion issues will exists so that the indicator can not be taken.
    How ever you post 10qty GI and let the receiving plant receive 11 and change the PO qty to11 and do a delivery for the excess and PGI it.
    Regards,

  • Exception setting SOAP address to $CHANGE-WHEN-DEPLOY$:

    Am trying to call the Credit Rating Service using the 10.1.2 version of BPEL engine using the JDeveloper Designer. Have no problems calling the Credit Rating Service through the console tester but when my BPEL process called SynchBPELProcess2 calls the credit rating service I get the following error:
    Your test request generated the following exception/fault:
    com.oracle.bpel.client.BPELFault: faultName: {{http://schemas.oracle.com/bpel/extension}bindingFault}
    messageType: {{http://schemas.oracle.com/bpel/extension}RuntimeFaultMessage}
    parts: {{summary=exception setting SOAP address to $CHANGE-WHEN-DEPLOY$: no protocol: $CHANGE-WHEN-DEPLOY$; nested exception is:
         java.net.MalformedURLException: no protocol: $CHANGE-WHEN-DEPLOY$}}
    Is there some additional configuration that needs to be done to get around this or am I missing a step somewhere. Ran into this while going step by step with the Order booking tutorial and so decided to try with a separate project.
    BPEL File Attached below:
    <!--
    // Oracle JDeveloper BPEL Designer
    // Created: Tue Apr 12 18:57:43 GMT+05:30 2005
    // Author: 121401
    // Purpose: Synchronous BPEL Process
    -->
    <process name="SynchBPELProcess2" targetNamespace="http://xmlns.oracle.com/SynchBPELProcess2" xmlns="http://schemas.xmlsoap.org/ws/2003/03/business-process/" xmlns:bpws="http://schemas.xmlsoap.org/ws/2003/03/business-process/" xmlns:xp20="http://www.oracle.com/XSL/Transform/java/oracle.tip.pc.services.functions.Xpath20" xmlns:ns1="http://services.otn.com" xmlns:ldap="http://schemas.oracle.com/xpath/extension/ldap" xmlns:xsd="http://www.w3.org/2001/XMLSchema" xmlns:bpelx="http://schemas.oracle.com/bpel/extension" xmlns:client="http://xmlns.oracle.com/SynchBPELProcess2" xmlns:ora="http://schemas.oracle.com/xpath/extension" xmlns:orcl="http://www.oracle.com/XSL/Transform/java/oracle.tip.pc.services.functions.ExtFunc"><!-- ================================================================= --><!-- PARTNERLINKS --><!-- List of services participating in this BPEL process --><!-- ================================================================= -->
    <partnerLinks><!--
    The 'client' role represents the requester of this service. It is
    used for callback. The location and correlation information associated
    with the client role are automatically set using WS-Addressing.
    -->
    <partnerLink name="client" partnerLinkType="client:SynchBPELProcess2" myRole="SynchBPELProcess2Provider"/>
    <partnerLink name="CreditRatingService" partnerLinkType="ns1:CreditRatingService" partnerRole="CreditRatingServiceProvider"/>
    </partnerLinks><!-- ================================================================= --><!-- VARIABLES --><!-- List of messages and XML documents used within this BPEL process --><!-- ================================================================= -->
    <variables><!-- Reference to the message passed as input during initiation -->
    <variable name="inputVariable" messageType="client:SynchBPELProcess2RequestMessage"/><!--
    Reference to the message that will be returned to the requester
    -->
    <variable name="outputVariable" messageType="client:SynchBPELProcess2ResponseMessage"/>
    <variable name="invokeCR_process_InputVariable" messageType="ns1:CreditRatingServiceRequestMessage"/>
    <variable name="invokeCR_process_OutputVariable" messageType="ns1:CreditRatingServiceResponseMessage"/>
    </variables><!-- ================================================================= --><!-- ORCHESTRATION LOGIC --><!-- Set of activities coordinating the flow of messages across the --><!-- services integrated within this business process --><!-- ================================================================= -->
    <sequence name="main"><!-- Receive input from requestor.
    Note: This maps to operation defined in SynchBPELProcess2.wsdl
    -->
    <receive name="receiveInput" partnerLink="client" portType="client:SynchBPELProcess2" operation="process" variable="inputVariable" createInstance="yes"/><!-- Generate reply to synchronous request -->
    <assign name="Assign_1">
    <copy>
    <from variable="inputVariable" part="payload" query="/client:SynchBPELProcess2ProcessRequest/client:input"/>
    <to variable="invokeCR_process_InputVariable" part="payload" query="/ns1:ssn"/>
    </copy>
    </assign>
    <invoke name="invokeCR" partnerLink="CreditRatingService" portType="ns1:CreditRatingService" operation="process" inputVariable="invokeCR_process_InputVariable" outputVariable="invokeCR_process_OutputVariable"/>
    <reply name="replyOutput" partnerLink="client" portType="client:SynchBPELProcess2" operation="process" variable="outputVariable"/>
    <assign name="Assign_2">
    <copy>
    <from variable="invokeCR_process_OutputVariable" part="payload" query="/ns1:rating"/>
    <to variable="outputVariable" part="payload" query="/client:SynchBPELProcess2ProcessResponse/client:result"/>
    </copy>
    </assign>
    </sequence>
    </process>
    WSDL Attached below :
    <?xml version="1.0" encoding="UTF-8"?>
    <definitions name="SynchBPELProcess2"
    targetNamespace="http://xmlns.oracle.com/SynchBPELProcess2"
    xmlns="http://schemas.xmlsoap.org/wsdl/"
    xmlns:client="http://xmlns.oracle.com/SynchBPELProcess2"
    xmlns:plnk="http://schemas.xmlsoap.org/ws/2003/05/partner-link/">
         <!-- ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
         TYPE DEFINITION - List of services participating in this BPEL process
         The default output of the BPEL designer uses strings as input and
         output to the BPEL Process. But you can define or import any XML
         Schema type and us them as part of the message types.
         ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ -->
         <types>
              <schema attributeFormDefault="qualified"
                   elementFormDefault="qualified"
                   targetNamespace="http://xmlns.oracle.com/SynchBPELProcess2"
                   xmlns="http://www.w3.org/2001/XMLSchema">
                   <element name="SynchBPELProcess2ProcessRequest">
                        <complexType>
                             <sequence>
                                  <element name="input" type="string"/>
                             </sequence>
                        </complexType>
                   </element>
                   <element name="SynchBPELProcess2ProcessResponse">
                        <complexType>
                             <sequence>
                                  <element name="result" type="string"/>
                             </sequence>
                        </complexType>
                   </element>
              </schema>
         </types>
         <!-- ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
         MESSAGE TYPE DEFINITION - Definition of the message types used as
         part of the port type defintions
         ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ -->
         <message name="SynchBPELProcess2RequestMessage">
              <part name="payload" element="client:SynchBPELProcess2ProcessRequest"/>
         </message>
         <message name="SynchBPELProcess2ResponseMessage">
              <part name="payload" element="client:SynchBPELProcess2ProcessResponse"/>
         </message>
         <!-- ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
         PORT TYPE DEFINITION - A port type groups a set of operations into
         a logical service unit.
         ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ -->
         <!-- portType implemented by the SynchBPELProcess2 BPEL process -->
         <portType name="SynchBPELProcess2">
              <operation name="process">
                   <input message="client:SynchBPELProcess2RequestMessage" />
                   <output message="client:SynchBPELProcess2ResponseMessage"/>
              </operation>
         </portType>
         <!-- ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
         PARTNER LINK TYPE DEFINITION
         ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ -->
         <plnk:partnerLinkType name="SynchBPELProcess2">
              <plnk:role name="SynchBPELProcess2Provider">
                   <plnk:portType name="client:SynchBPELProcess2"/>
              </plnk:role>
         </plnk:partnerLinkType>
    </definitions>

    Lasts monday I downloaded a version (10.1.2 release, not preview/beta 3) which has the same filename and file size of the 10.1.2 GA release which is available right now.
    I don't think the problem is in the PM, because i can run bpelc/obant to build my processes. however when i build them with the Eclipse plugin, it won't change the location of the wsdl (keep saying $CHANGE_WHEN_DEPLOY$).

Maybe you are looking for

  • Investment grant on asset

    Hi all, I would like to know how it could be possible to integrate investment grant on a legacy asset. I have two kind of assets : asset capitalized on a previous fiscal year asset capitalized on the current fiscal year Integrating investment grant f

  • Changing refresh rate blanks screen indefinitely

    Hi all, I'm new to the mac world and I was exploring OSX upon bringing my new Mac Pro home. I have an old 17" Benq LCD monitor (upgrading soon) that I had hooked up using the analog to DVI adapter. I've heard that LCD's usually always are set at 60Hz

  • I am trying to add a video to my Keynote presentation on my iPad. Since I am 2 hours away from my computer to use iTunes. Is there a way to move videos to the camera roll so I can use them?

    I am trying to add a video to my Keynote presentation on my iPad. Ideally I would like to be able to play the video in the presenation sream rather than switch between apps. Since I am 2 hours away from my computer to use iTunes syncing to move them

  • Using ASP with Dreamweaver

    I'm sorry, I'm a n00b at this... as soon as I get the link, I will have access to my website files from the host. From there I want to update the website. The tech at the host says I need to be knowledgable with ASP, which I'm not.... I've read a lit

  • Telephone number

    When I purchased my 16gig WiFi 3G iPad last December, I went to Telus Mobility (here in Canada) and got my iPad setup for 3G.  Because 3G is like my data plan that I have for my Blackberry, I learnt that my iPad has a telephone number assigned to it.