Pooled Capacity in Scheduling

HI All,
I have created the independent capacity and activated as pooled capacity which is a group of labors,
Now I have the Work Center which is a machine work center, this group of labors are used in diff work centers, so I assigned them to these work centers in capacity Tab of WC.
I have capacity formulas assigned to Machine capacity and pooled capacity is assigned to labor capacity  which is created in WC, 
Do in need to assign this pooled capacity in Scheduling tab, using Capacity category as Person ?
OR it is sufficient to assign pooled capacity in capacity tab page?
In my scheduling, part I wanted to have scheduling on the maximum time consumed in operation. But in planned order scheduling tab, I cud see both machine and labor.
Where am I getting wrong.
Please suggest
Regards
raghu
Edited by: raghu m on Nov 26, 2009 12:04 PM
Edited by: raghu m on Nov 26, 2009 4:11 PM

Hello Mr. Bramhnakar,
Thanks for your reply,
Yes i have tried the settings you mentioned.
My doubts are :
Should the Pooled capacity be getting calculated in Scheduling.
Since I gave capacity formulas, for both capacities in Work Center,
and scheduling formula in scheduling tab.
In routing i gave 12 Hr machine and 16 Hr in Labor (Pooled),
In Planned order, I can see the Both Taming, But after converting it to Prod Order, In Operation details tab->dates, i cansee the scheduling on the Machine Time, for which i gave formula in WC--Scheduling tab. This is confusing for me since in Planned order i cud find both but in Production order i found One,
In Routing i have activated Req. Overlapping.
One more query sir,
Is their any problem if i use Splitting indicator with count of available capacity in WC,
I did this bse  the all order were followin in diff dates.
Regards
Raghu

Similar Messages

  • Pooled Capacity

    Hello all,
    At a client site am using Pooled capacity at Work centers(SAP resources) to help capacity planning with some pooled resources. So during planned order scheduling or in production(process) order the time required to complete the operation is higher than the Recipe(Route) time.
    Eg: - Recipe time for operation at a Pooled Resource =10 min
    Planned order or Production order time at that operation shows as 15 min
    So the question is how does SAP read 10 min Recipe processing time & calculate 15 min as actual required time in Production( Process ) order.
    I could not find any relevant SAP writeup on the pooled capacity concept & detailed sheduling being done.
    So if anyone has been able to find more explanation from SAP on this will be appreciated.
    Also please share your experience on scheduling using pooled capacity.
    Thanks,
    Ram

    HI,
    Assigning Pooled Capacities
    Prerequisites
    You can assign a pooled capacity to a work center
    Pooled capacities can only be created independently from the work center in capacity maintenance. If you want to make a work center independent capacity a pooled capacity, set the Pooled capacity indicator in the General data section of the screen and then choose Enter
    Procedure
    Enter in the required capacity category in the capacity overview of the work center the name of the pooled capacity.
    If the default capacity of a work station does not intend pooled capacities to be assigned, you can do this nonetheless:
    Delete the capacity category by choosing Edit ® Delete.
    Create a new capacity category by choosing Edit ® New entries.
    Maintaining Scheduling Data
    From any work center screen choose Goto ® Scheduling.
    The Scheduling screen appears.
    Enter the capacity with its capacity category whose execution time you want to use for scheduling. This can be either a work center capacity or a pooled capacity.
    The capacity data must have already been entered in the work center.
    Maintain formulas for operation segments (for production orders) or for internal processing time (for networks and maintenance orders).
    If you do not enter a formula for an operation segment, the execution time of this segment is set to zero.
    If you do not enter a formula for internal processing time, the duration in the network or maintenance order is used.
    Via Extras ® Formula you can assign a formula constant a value and an unit, display a formula and test formulas
    Maintain queue times and if necessary the dimension and units of measure for work in internal processing operations.
    Hope this helps.
    Regards,
    Tejas

  • Sequence dependent setup (setuo matrix) with pooled capacity

    Hi all,
    We are facing a problem in the sequence dependent setup. We have a pooled capacity in ECC on which we want sequence dependent setup happening in APO. In APO orders are required to be scheduled on this resource and this resource is the primary resource. When I am trying to do the Detailed scheduling the time from the matrix is the one in which there is no predecessor.
    Is sequence dependent setup not possible with pooled resource.  Is it the standard system behaviour or am I missing something here.
    Thanx for the help.

    Insted of making pooled capacity you better try with alternate sequence.
    system is behaving properly.

  • Capacity in scheduling agreement

    Hi,
    The documentation says we can assign transportation capacity and vendor capacity in scheduling agreements in ECC. Can you tell me which field in scheduling agreements are related to  transportation capacity and vendor capacity?
    I am new to scheduling agreements so please be a little elaborate.
    Thanks.

    Hi,
    For all of your queries;
    ME01 - Maintain Source List for the materials
    Here maintain, Vendor, Plant, Purchase Org, most important input Scheduling Agreement No  in Agreement column and  in "MRP" column, use "2" i.e. Record relevant to MRP. Sched. lines generated automatically
    Now run MRP and observe the result, it will consider Scheduling Agreement in MRP.

  • Pooled capacity in SAP PS

    Hi,
    I would like to know, is it possible to use pooled capacity in SAP PS and how it really works.
    Pls advise.
    Regards
    Raju

    Hi Narayan........
    Yes it is possible to use pooled Capacity in PS.........pooled capacity means the capacity which can be shared by several work centers at the same time. Whenecr you are creating a capacity in PS, just click on Pooled Capacity so that it will become pooled capacity. For your help.........go through this link also..........
    http://help.sap.com/erp2005_ehp_02/helpdata/en/89/a41d15461e11d182b50000e829fbfe/frameset.htm
    Regards..............

  • Remaining capacity requirements scheduled for operation in Planned Order

    Hi all,
    I'm workig with planned orders, and I need the "Remaining capacity requirements scheduled for operation" data to list it in a Z Report, but I don't know how to get it.
    You can see the info in the "Detail Scheduling" of the planned order in MD13.
    Anyone knows how to get the info? Any table or any FM to get it?
    Points will be given for helping
    Thanks in advance!

    Did you ever find out where the planned order capacity information lives?  I can find the production capacity information in table KBEZ, but it appears that there is no planned order info there.
    Thanks,
    Matthew Bruckner

  • Creation of pooled capacity

    Hi all,
    I would like to create a new pooled capacity for resource X.
    Please help me how to proceed?
    Is there any place in customizing where we need to maintain it? Or do we need to configure it?Please provide me the steps.
    Thanks in advance
    Regards
    Avinash

    Hi,
    You need to create the Pooled Capacity in T. Code : CR11.
    Here enter your capacity category and Capacity.
    Here you check the Pooled Capacity.
    Now Create/Change Work ceter - Capacity Tab page:
    If your default work center/default capacity does not allaow the Pooled Capcity then goto Edit and Delete the Capacity.
    Now again Edit--> New Entrie, Enter the Capacity Category and Pooled Capacity just now creatd.
    In the Capacity Over view you will get the Pooled Capacity Checked and new capacity for you.
    Hope this helps to create the pooled capacity.
    Revert for further discussion.
    Regards,
    Siva

  • CRP on Pooled Capacity

    I have successfully been able to create and assign a pooled capacity to a work center. I am wondering, however, how to review requirements against that pooled capacity. (similar to CM50 with work centers) Is there a way to review pooled capacity requirements which are loaded from multiple work centers, or must you review a specific work center and then check capacity by the capacity category? Any help would be much appreciated. thanks

    Hi,
    you'll check with the transaction CM03-POOL, CM25-CAPACITY LEVELING and CM25-CAPACITY EVAULATION.
    your problem will match & resolve your problem to these tcodes.
    regards,
    Mohan R

  • Pooled Capacity Not updating in Work center

    Hi All, I want to update pooled capacity in Work center. But when i delete the existing capacity it is giving error that " Capacity still being used". Can any one suggest,how to tackle this problem? I want to give solution to Client. Thanks in Advance..!

    HI,
    Capacity Utilisation rate = Actual Capacity / Theoritical Capacity
    Theoritical Capacity= Shift period * No. of machines available
                                 = 8 hrs * 2 = 16 hrs
    Actual Capacity value depends on how the company decides it. Say if the break 30 mins has to be considered, then the actual capacity will be 15 hrs for 2 capacities and hence,
    Capacity Utilisation rate = 15 / 16 = 93.8%
    So, decide the utilisation rate based on the Company's requiremnt.
    Hope the above gives you an idea.
    -Thaila Shree

  • Pooled capacity greyed out

    Dear PP gurus,
                           I am trying to activate pooled capacity.
    I have created a capacity in cr11 with pooled capacity ticked and capacity category person
    but when i try to create a work center in cr01, in the capacity tab capacity pool is greyed out
    I gave capacity category , then also it is greyed out .
    Do I have to do some configuration setting?
    (I have got a tab called HRMS in the capacity tab - does that affect pooled capacity?)

    Dear,
    Create the pooled capacity using transaction CR11, and in the capacity header, "Pooled Capacity" check box is to be activated.
    and then assigned to the work-center capacity tab - Pooled Capacity field.
    Now Create/Change Work center - Capacity Tab page:
    If your default work center/default capacity does not allow the Pooled Capacity then go to Edit and Delete the Capacity.
    Now again Edit--> New Entries, Enter the Capacity Category and Pooled Capacity just now created.
    In the Capacity Over view you will get the Pooled Capacity Checked and new capacity for you.
    Hope this helps to create the pooled capacity.
    You can assign this pooled capacity in the work center creation in CR01,under capacity overview ,just below to the capacity category.
    Please refer my reply from this thread,
    Re: Available capacity
    Regards,
    R.Brahmankar

  • Pooled capacity, machine work center can have labour?

    Dear All,
    1) We have eg. a common pool of welders for Location A and Location B welding work centers.  How do we setup the pooled capacity and assign to them?
    2) We have eg. 2 CNC machining work centers (Vert and Horiz) but we have labour support to do machine setup, labour related jobs etc.  If we need to perform labour capacity planning in this machine-based work center, is this done by maintaining a separate work center for this labour support and assigned to the same Cost Center?  Or for machine-based work center, labour capacity planning is not required?
    Thank you for contributing.

    Dear
    We have eg. a common pool of welders for Location A and Location B welding work centers. How do we setup the pooled capacity and assign to them?
    There is no differnce between pooled capacity and available caapcity .Only thing is you can utilised this capacity pool for various work centre level.
    To do that , Goto - SPRO-Production -BAsic Data-Work center-Capacity Planning-Define Capacity categories -Create Capacity Categoery for common pool of welders  , Create Capacity in CR11 and assing them into Work cetre Capaicty tab-Pooled Capacity Catogeries and maintian No of indivuial caapcity in Capacity Header -Standard Available caapcity-Indivual Capacity ( Total Number of welders with working timing , utilisation ) .
    Quest2 : To address this issue  , you can select Setup , Labour and Machine in Defalut tab of  same Work centre with proper Standard Value Key .Now , as they are all part of the Production activity , so you can keep the same Cost Centre ( Production Cost Centre )  in the Work centre tab with Formula Key of Labour ,Machine and setup .Goto CR02-Default Tab and Costing tab .
    Hope this is clear
    regards
    JH

  • BEA-000627  issue.. reached max pool capacity

    I got this reached max pool capacity error msg shown below..
    What is confusing to me is , how does the increment level become -ve... Shoudnt it be zero instead of -11 ?
    <BEA-000627> <Reached maximum capacity of pool "aPool", making "-11" new resource instances instead of "5".>
    Then a stack trace follows this error message saying
    negativeArraySizeException, which is understandable becoz it is trying to increase the pool by -11.. The stack trace is shown below...
    Has anyone seem anything like this ? Any thoughts ?
    java.sql.SQLException: java.lang.NegativeArraySizeException
    at weblogic.jdbc.common.internal.JDBCUtil.wrapAndThrowResourceException(JDBCUtil.java:209)
    at weblogic.jdbc.common.internal.RmiDataSource.getPoolConnection(RmiDataSource.java:316)
    at weblogic.jdbc.common.internal.RmiDataSource.getConnection(RmiDataSource.java:333)

    pc cp wrote:
    I got this reached max pool capacity error msg shown below..
    What is confusing to me is , how does the increment level become -ve... Shoudnt it be zero instead of -11 ?
    <BEA-000627> <Reached maximum capacity of pool "aPool", making "-11" new resource instances instead of "5".>
    Then a stack trace follows this error message saying
    negativeArraySizeException, which is understandable becoz it is trying to increase the pool by -11.. The stack trace is shown below...
    Has anyone seem anything like this ? Any thoughts ?
    java.sql.SQLException: java.lang.NegativeArraySizeException
    at weblogic.jdbc.common.internal.JDBCUtil.wrapAndThrowResourceException(JDBCUtil.java:209)
    at weblogic.jdbc.common.internal.RmiDataSource.getPoolConnection(RmiDataSource.java:316)
    at weblogic.jdbc.common.internal.RmiDataSource.getConnection(RmiDataSource.java:333)Certainly it's a bug, and likely already fixed. What version of weblogic is this?
    Joe

  • Why different Overall requirements value between labor and pool capacity

    Hi all,
    I create a PM Order with using a PP work center and this PP work has 3 Capacity category: machine, labor, pool.
    after I check the PM Order with CM35
    and i find out, that Overall requirements value are different between labor and pool capacity. Is this normal?
    In my opinion,labor and pool should have same amount requirements of capacities.
    thanks&regards

    Hello,
    Please refer the Link [http://help.sap.com/saphelp_47x200/helpdata/en/b1/c03662439a11d189410000e829fbbd/frameset.htm]
    Regards,
    Rakesh
    Edited by: RAKESH ASHOK MANE on Aug 17, 2010 9:42 AM

  • Why ist Pool Capacity from PP work center automatically involved

    Hi, All
    i use PP work center to create a PM Order.
    this PP work center has machine-, labor- and pool capacity. and I add "SAP008" into field "other fomula" for labor capacity in Tab capacities.
    now after I create a PM Order, when I check CM50, I can see for this PP Work center also  Pool Capacity involved.
    Question:
    1. where comes this Pool capacity, even though I didnot set  any formula in field "other formula" for pool capacity in Tab capacities?
    2. for creating PM Order, do I also need add "SAP008" into field "other fomula" for machine capacity in Tab capacities?
    thanks&regards

    Hi Shrithar,
    Do you means the time Profile in CM50.
    when I check this time Profile, I see differant time interval, -Database read period
                                                                                    -Evalution period
                                                                                    -plannung period
                                                                                    -Dispatching of backlog
    is it also influencing work center capacities?
    thanks&regards

  • Capacity Vs Scheduling

    Gurus,
    A very basic one.
    In Work Centres, both the capacity view & scheduling view have similar formulae (such as setup & process time etc.)
    Pl. let me know application wise, what is the difference between both the views(Capacity & Sheduling).Is there a need for both of them simultaneously?
    regards,
    K.Kumar.

    Hi Kumaran,
    capacityview:
    Normally here we will give the available capacity of work center for ex: say Lathe. Here in this view initially we will give the formulae to calculate the cap requirements , then system will ask about the availbale cap of that perticular work center i.e., its cap utilisation, no of ind capacities, time....etc. During production order creation , due to the help of these formulae that u specified in cap view of work center , system will calculate cap requirements. This u can see in T-Code CM01.
    Scheduling view:
    Normally here we will give formulae to calculate operation start time and operation finish time for routings.
    This view is used only for scheduling of operations.
    Hence we will give respective formulae in above two view for cap req calculation and scheduling of operations.
    Hope clear to u.
    Regards,
    Imran

Maybe you are looking for

  • The iPod can not be synced. The disk could not be read from or written to.

    I try several time to send my song list from libraly to iPod. But it's show me that " The iPod can not be synced. The disk could not be read from or written to. " About this problem i try to do manythings follow some reply for advice me. but i still

  • What  should I do to update my OSX 10.6.8 or later

    Help Plese dont know what to do

  • Z61t - Sound not working

    Hi, I am new to this forum. Had purchased the z61t about 1.5 yrs back. Was working fine. I am very satisfied. However, recently, when the laptop was on standby, the battery drained completely. After I recharged the battery and brought up the laptop,

  • Ipod can't open...

    hi everyone, My ipod app on iphone doesnt open, when i click on the icon, i've got a white screen, then 30 seconds later, desappears and nothing else... I just updated my device, but no change... Any solution? Thanks, .:m0r0r@69:.

  • How To Activate GPRS connection programmatically?

    guys i need help with activating a GPRS or opening a GPRS connection... im creating a GMAIL client for mobile phones... and i still dont know how to activate GPRS to connect to pop.gmail.com... do u have references or ebooks that could help? thanks i