Populating Profit Centre Field while doing Transaction for Vendor/Customer
Dear Experts,
I have cheked in FSG of GL Code of Vendors/Customers where "Profit Centre " is a optional field.
I have cheked in OB41 also for posting key relating to vendors/customers "Profit Centre" field is set as optional field.
We need to make entry in the Profit Centre Field for both Vendors and Customers whicle doing manual posting.
How can we bring that field which is not populated while doing transaction with posting keys of vedors and customers.
Regards,
Alok
Dear Sayeed,
I am agree with u, but since in SAP Vendor /Customer Line Item takes automatically profit centre from the other line items.
Here is an example:-
We have different profit centre for plant(104001) and coprorate office(106001)
Customer billing is done at plant then the entry will be:-
Customer A/c Debit (by default it will take 104001 profit centre)
Sales A/c Credit with Profit Centre 104001
In Corporate Office We Receive the sales proceeds:-
In Coming Bank a/c Corporate Debit with Profit Centre 106001
Customer A/c Credit (It will take by default profit centre 106001)
By this If we genrate Profit Centre Wise Trial Balance then all Customers Debit will lying with Plant Trial
and Customer Credit Balance will lying in Corporate Treial Balance giving a mis information to the auditors.
For solving this we need to populate the Profit Centre field in Customer line item so that while doing the received entry we can selct the Plant Profit Centre (104001) in Customer line item so that the Customer balance become Nil in Plant Trial.
Hopw you understand our requirement.
Regards,
Alok
Similar Messages
-
Profit centre field not visible while using Posting Key 15
Hi,
While using Tcode F-28 and Posting Key 15 profit cente field is not visible. I have checked following configuration. In OBC4 for Reconciliation account - additional account assignment - here the profit centre field is optional. Likewise I have checked OB41 for Posting key 15 - Profit centre field is optional.
Is there any other configuration to be done inorder to make the profit centre field visible.
Many thanks in advance
Regards
NarayananDear,
SAP Standard System cannot provide PRCTR field for the screen for customer/vendor line
item although it is available if the line item is a G/L account. As a
general rule, the system assumes PRCTR to be filled by document split or
by running SAPF180 and AR/AP transfer depending on NewGL PCA or
classic PCA usage.
It was and still is not possible to enter PRCTR on vendor/
customer items.
One of the workarounds using the standard tools is to use field-to-
field substitution. You can enter the profit center in dummy field,
for example XREF1, and substitute the value entered in XREF1 into
PRCTR field.
I hope this can help You.
Mauri -
VBRP does't have the PROFIT CENTRE FIELD
Hi Gurus,
Hi Gurus
I am fetching the billing(commision, credit notes ) from vbrp, based on profit centre, controlling area and date.
but some where in vbrp profit centre field having no value.
Actually this report is FICO but commission ,credit notes and cover price(MEDIA MODULE) available in SD ONLY.
if any body knows give the sollution.
this is very urgent.
Regards,
Shashikumar.GHi ,
It is at the item level under Account Assignment tab of sales order transaction .VBAP-PCTRF and also the same is copied in VBRP-PRCTR .
and obtained from COBL.
Please reward if useful. -
Need Profit centre field as mandatory field in the sales order
Dear All,
Normally Profit center data maintained in the material master, same data will get coipied to the sales order while creating sales order in VA01 transaction.
My requirement is if profit center data is not maintained/available in the sales order system should give the error message
For this I need Profit center field as mandatory field in the sales order(VA01).
Can you please give possibilities ASAP.
Give the SHD0 maintenance step by step.
Regards,
Murali.Hi Murali
I beleive that you are talking about the Profit centre field not maintined in sales order hence not picked in delivery and billing and there is an FI posting error (GL account error) because of that
Profit centre is maintained in MMR and the same flows thro the sales cycle and i am quite sure if maintained in MMR it will be picked automatically and no need to make it mandatory in sales order( as the purpose is already solved)
But there is no standard option in SAP like (even if Account assignment category of the material is not maintained in MMR it can be given in VF02 and the document can be released for accounting) to give the Profit centre in the billing and release the same
Profit centre field field is picked from masters and flows in the entire flow and that field is greyed out (like no option of inserting it inbetween)
As told by others incompletion log in sales doc type will take care for future orders and for the already created orders the standard option is cancel billing, reverse delivery and open the sales order and give Profit centre field and process it (if only a few orders are there)
But if the already created orders are many then from the FI Area you need to go for development ( we also faced this issue as profit center not maintained in MMRs and hence accounting got hit and there were tons of billing docs and our FI consultant made some development to open it and solve it) FI consultant should be able to do this for already created orders
Instead of making Profit centre field as mandatory field in the sales order better make it a mandatory entry in MMR
Regards
Raja -
Error while doing MIGO for a sub-contracted item
Hello to Everybody,
I am facing below problem -
Error : Incorrect CCtr <Cost Center Code> with this account (CCtr category must=D) for
<Item Code> , while doing MIGO. (for receiving sub-contracted item from vendor).
May I request for possible solution to above error ?
regards,Dear Sanjay,
You can determine the cost object for the posting of the costs in the transaction OKB9.
Following thread should resolve this issue:
Re: cost of subcontracting
Regards,
Naveen. -
Display of Profit Center field while creating asset in AS01
Dear Experts,
I have a requirement of displaying profit center field while creating asset in AS01. Currently there is no option of profit center in AS01. My client uses the profit center reporting, so they want to assign a profit center at the time of creation of asset in AS01.
Is this possible to display profit center field in AS01, or else any other option to tackle this issue.
Regards,
JunedHi,
You can only have COST CENTER in asset master, but not profit center.
You have to maintain the respective PC in cost center master data only.
If Cost Cetner field is also not in AS01, then you need to activate it first.
SPRO->FA->AA->Integration with GL->Additional Account Assignment Objects->Activate Account Assignment Objects.
Here you need to activate COST CENTER field. Now you will be able to change the field status of cost center field in screen layout for asset master data as REQUIRED field. and SAVE
Then in AS01 you can enter COST CENTER
Regards,
Srinu -
Problem while doing bdc for fv60
Hi frends,
I got problem while doing BDC for fv60 tcode.i have given
header items:
vendor number
invoice date
posting date
amount
item data:
g/l acc no: 100000
amount 1000 whatever
these are all given in recording
in recording after all giving this data if we click on park it is telling "parking not possibe duiring batch input".
can any body tell me the process for recording shdb and after that in bdc how can we give multiple line items for fv60
thanks,
naveen.I don't think you can use FV60 in batch input. Your options are to use transaction FBV1 or bapi BAPI_INCOMINGINVOICE_PARK.
Rob -
Payment Budget Exceeded while doing transaction ABUMN, Message number:BP629
Dear All,
i got a problem while doing transaction ABUMN (Asset Transfer), **Error Message: BP629 Payment budget has exceeded"
Actually we have migrated our system from 4.7 to ECC 6.0 version, in 4.7 we are deactivated assets from FM-Budget checking that time it was working fine, but now after migration system giving this error message,
Can you please help me is there any setting need to do in Ecc- 6.0 to deacivate Assets from budget check.
Thanks .....SudheerThanks for your reply Aleksey,
At present we are using Format Budgeting, in my previous system we had a simple option to deactivate Asset transactions using Transaction type, but in in ECC 6 , i am not sure where such facility available.
I gone through whole FM menu but i didn't find any way to do this.
Can you please suggest where i can deactivate Asset transactions (either using transaction types or even Document type also fine).
Thanks ...Sudheer -
Error while doing GR for scheduling aggrement
Dear Experts,
We are facing error while doing GR for scheduling aggrement.
we have done the following steps.
1) Scheduling aggreement in ME31L
2) Released in ME35L
3) Mainatined Sch.Agmt Schdule in ME38 for todays and date 200 qty and other line is 800 qty.
When we are trying to do GR in MIGO system is giving the following message.
Document 5500000152 does not contain any selectable items
can I know what I have missed in the above steps.
Please guide me to resolve this.
Regards,
PrasadHi,
Please check Please check if Gr is already done against this document. Also please check whether you have attached SA in the source list with line items.
T-code:ME01
Enter Mat.code & Plant.
In the next screen pl.do the following:
Valid from - commencement date of the SA
Valid to - End date of the SA
Vendor - Vendor on whom the SA is released
POrg - Your purchase organisation
PPL - Leave it blank(This is only for interplant)
OUn - Ordering unit
Agreement - SA number
Item - 1
I hope this will resolve your issue. Thanking you -
I am getting error while doing MFBF for semifinisg good
Hi,
i am getting error while doing MFBF for semifinisg good
Existing standard cost estimate cannot be used
Message no. RM175
Diagnosis
This error appears under the following circumstances:
The existing standard cost estimate cannot be used for backflushing activities as the repetitive manufacturing profile was not maintained correctly when the standard cost estimate was carried out.
The standard cost estimate must come from product costing. Other cost estimates (such as base object controlling) are not possible.
Procedure
The repetitive manufacturing profile assigned to the material at the time of the planned cost estimate must be a profile for repetitive manufacturing with product cost collector.
Use product costing to create the standard cost estimate.I had already check REM profile repetitive mfg profile final backflush w. activities.
this particular material is semifinish material attached in BOM of finish material.
backflush of finish good is possible but now new requirement is to do production booking for the semifinish material.
i had assign production version , done routing and maintain REM profile,
created material cost with quantity structure ck11n then run the costing in ck40n.
still getting the error what else is to done to able to book this thru MFBF. -
Error while doing PGI for Outbound delivery using BAPI BAPI_GOODSMVT_CREATE
Hi All,
I am getting an below error while doing PGI for outbound delivery using the BAPI BAPI BAPI_GOODSMVT_CREATE:
Goods movement not possible with mvmt type 601
Can anyone suggest me what will be the solution for it?
Regards,
Raghuraman.kI tried with the above BAPI but it is not working.
In my case a delivery has one line item with batch split and other line item without batch split.
Below is my code :
DATA : gwa_header_data TYPE bapiobdlvhdrcon,
gwa_header_ctrl TYPE bapiobdlvhdrctrlcon,
lv_delivery TYPE bapiobdlvhdrcon-deliv_numb,
git_item_data TYPE STANDARD TABLE OF bapiobdlvitemcon,
gwa_item_data TYPE bapiobdlvitemcon,
git_item_ctrl TYPE STANDARD TABLE OF bapiobdlvitemctrlcon,
gwa_item_ctrl TYPE bapiobdlvitemctrlcon,
git_return TYPE STANDARD TABLE OF bapiret2,
gwa_return TYPE bapiret2.
*Header data
gwa_header_data-deliv_numb = '0808000002'.
*Header Control data
gwa_header_ctrl-deliv_numb = '0808000002'.
gwa_header_ctrl-post_gi_flg = 'X'.
*Delivery Number
lv_delivery = '0808000002'.
*Item data and its corresponding control data
gwa_item_data-deliv_numb = '0808000002'.
gwa_item_data-deliv_item = '900002'.
gwa_item_data-dlv_qty = 4.
gwa_item_data-dlv_qty_imunit = 4.
gwa_item_data-fact_unit_nom = 1.
gwa_item_data-fact_unit_denom = 1.
APPEND gwa_item_data TO git_item_data.
gwa_item_ctrl-deliv_numb = '0808000002'.
gwa_item_ctrl-deliv_item = '900002'.
gwa_item_ctrl-chg_delqty = 'X'.
APPEND gwa_item_ctrl TO git_item_ctrl.
gwa_item_data-deliv_numb = '0808000002'.
gwa_item_data-deliv_item = '900003'.
gwa_item_data-dlv_qty = 6.
gwa_item_data-dlv_qty_imunit = 6.
gwa_item_data-fact_unit_nom = 1.
gwa_item_data-fact_unit_denom = 1.
APPEND gwa_item_data TO git_item_data.
gwa_item_ctrl-deliv_numb = '0808000002'.
gwa_item_ctrl-deliv_item = '900003'.
gwa_item_ctrl-chg_delqty = 'X'.
APPEND gwa_item_ctrl TO git_item_ctrl.
gwa_item_data-deliv_numb = '0808000002'.
gwa_item_data-deliv_item = '000020'.
gwa_item_data-dlv_qty = 10.
gwa_item_data-dlv_qty_imunit = 10.
gwa_item_data-fact_unit_nom = 1.
gwa_item_data-fact_unit_denom = 1.
APPEND gwa_item_data TO git_item_data.
gwa_item_ctrl-deliv_numb = '0808000002'.
gwa_item_ctrl-deliv_item = '000020'.
gwa_item_ctrl-chg_delqty = 'X'.
APPEND gwa_item_ctrl TO git_item_ctrl.
BREAK-POINT.
CALL FUNCTION 'BAPI_OUTB_DELIVERY_CONFIRM_DEC'
EXPORTING
header_data = gwa_header_data
header_control = gwa_header_ctrl
delivery = lv_delivery
TABLES
item_data = git_item_data
item_control = git_item_ctrl
return = git_return.
BREAK-POINT.
IF git_return IS INITIAL.
CALL FUNCTION 'BAPI_TRANSACTION_COMMIT'.
ENDIF. -
Getting the error while doing PGI for depot delivery
Hi
I am getting the below error while doing PGI for Depot delivery. This error is happening only when I taking the materials from stock transfer order which has more than 10 line items. Same issue is not happening when I am taking one material in Stock transfer order in & same material in depot delivery. Please see the screen shots below attachment. I have already maintained no range for the object J_1IDEPINV for year 2014.
Regards
PKMoved from SAP ERP SD Sales to Internationalization and Unicode. Please post all your CIN related queries here. Also ensure that before posting, you made efforts in searching in SCN or Google. The reason for this indication is the issue you posted has already been discussed many times here and you will get some clue had you searched.
G. Lakshmipathi -
What are the main steps to be taken care while doing recording for LSMW
Hi,
I am facing problem in LSMW.
Can anybody suggest me that What are the main steps to be taken care while doing recording for LSMW for recording mm01 ?
thanks'
nareshHi,
Recording in LSMW is similar as SHDB.
in LSMW after you give Project-Subproject and Object.
1)Go to-> Maintain Object Attributes -> double click
2)Press Display/Change Button at top left to make editable mode.
3)Select radiobuton -> Batch Input -> Give Recording name say Z_mm01
4) Click the Recording Overview boton on right -> Give TCode which u want to record....
Rest refer the Document link attached.
Please find the links to various threads on the same.
Re: LSMW - Using a BAPI
BAPI, IDOC in LSMW
Upload the data in LSMW using BAPI
This one is the most complete document for the same
http://sapabap.iespana.es/sapabap/manuales/pdf/lsmw.pdf
http://service.sap.com/lsmw.
Regards
Kiran -
Error while doing IV for Service Delivery Payment
Dear Support,
There is Problem while doing Invoice for delivery Payment(Agent commission) in case of Service Order having without
account assingment.
While doing Invoice for that Delivery cost , system is giving a error message 'Enter a GL Account'.
Pls provide some solution regards .
Ragerds
MukeshHi,
if your service order is a service purchase order, please read the following:
Planned delivery costs are not supported for service orders.
There is no plan to change this in the near future.
Delivery costs are generally not supported in external services
management and in case of blanket purchase orders, item category D or B.
Instead of representing delivery costs via conditions, in case of
service documents, freight costs and other, SAP recommends to add in
additional service lines. (note 381030 )
For the future we recommend to use additional service line instead
of planned delivery costs condition. There is no problem to post
invoice for different vendor for particular SES created for service
line that constitutes delivery costs.
Regards,
Edit -
Reduction logic while doing PGI for Delevery
Hello all,
we have one requirement to make the consumption for MTO(Make to Orders) while MRP running through MD04. We have done some changes in enhancement spot to made the consumption forcifully for MTO's.
But while accessing MD63 for VSF(Planning with Final Assembly) MTO's we are not able to display the reduction quantity while doing PGI for particular Delivery.But this functionality is working fine for VSE(Planning without Final Assembly) MTO's as SAP standard.
Please help me out to achieve the same functionality for VSF(Planning with Final Assembly) MTO's .
Thanks and Regards,
Siva.Hello all,
we have one requirement to make the consumption for MTO(Make to Orders) while MRP running through MD04. We have done some changes in enhancement spot to made the consumption forcifully for MTO's.
But while accessing MD63 for VSF(Planning with Final Assembly) MTO's we are not able to display the reduction quantity while doing PGI for particular Delivery.But this functionality is working fine for VSE(Planning without Final Assembly) MTO's as SAP standard.
Please help me out to achieve the same functionality for VSF(Planning with Final Assembly) MTO's .
Thanks and Regards,
Siva.
Maybe you are looking for
-
I need to file a complaint. Fraud is happening and no one is assisting.
ello anyone at Verizon- I need to file a formal complaint about a huge issue that is going on in a local store as well as the customer service number. I have called over 5 times in the course of 2 months to have an issue a resolved and each time I ta
-
Including an link to an help file(*.chm) in dash board
hi, is it possible to place an *.chm file(help file) in the dash board . i tried but OBI is not opening it up in that format. can some one give me an solution to this. thanks
-
Accordion and master/detail datasets
Does anyone know of a working Accordion example that uses master and detail datasets, with master records as tabs and multiple detail records in the contents? Would like to be able to see XML data files, too. I keep getting an error message and in ot
-
Import from Server Tabular Project creating a new Tabular DB?
Hi, I have a Tabular database on a server want to make some changes to it, for that I have imported Tabular DB through BIDS and trying to makes changes, and what I see is every time I import the tabular DB its creating a New DB on the server with <DB
-
This has happened in other instances as well. My default browser is Firefox 8.0