Population o batch manufacturing date automatically through process mesages

Hi gurus,
We sre using control recipe to download data into MES system and uploading data through process message to do the confirmation and goods receipt. We are using batch management and calculating shelf life expiration date at the time of confirmation using manufaturing date + shelf life. Now the issue is, through process message we are not able to populate batch manufacturing date automatically and getting confirmation error after sending the process message to SAP. In process messgae category we are using characterics PPPI_END_DATE,PPPI_EVENT_DATE, PPPI_START_DATE as a date field.
Can anybody suggest how can we populate batch manufacturing date automatically through process mesages.
With thanks
Rajib Pathak

thanks

Similar Messages

  • Process order release date as batch manufacturing date

    Hi All,
    We have automatic batch creation during the release of the process order. Now the requirement is that proess order release date should be updated as Batch manufacturing date in the corresponding Batch data (MSC3N). How this can be done.
    Regards
    Vinamrath

    Hi Vinamrath,
    Hope your proess order release date and the batch creation date are same.
    In such case go to txn CT04 (create Characteristic) and create a  Characteristic say  "Batch manufacturing date". Then in the tab Addnl data maintain the table name as "MCH1 or MCHA" and Field name as "ERSDA" (created on-this is the batch creation date).
    In case your  proess order release date and the batch creation date are not same, then there is a field called " HSDAT" -date of manufacture.you can maintain this field name in addnl data.
    Maintain this Characteristic in classification (CL02)
    Then this will get updated in the batch and same can be viewed in MSC3N
    Regards
    Hari
    Edited by: Harikris_83 on Sep 29, 2011 3:05 PM

  • Batch Manufacturing date

    Hi there,
    my customer controls the stock they manufacture with batch numbers.
    The customer wants the due date of the production order to be inserted in the manufacturing date field on the batches setup screen  when completing the production order.
    I have tried without any luck...can someone please help me with this...
    thank you
    Kind regards
    Ian

    Hi Ashis
    I am aware of the function of maintaining batches, but this happens after the production process has been completed.
    I need to populate the manufacturing date during the production process...
    e.g. Production has been completed, the user opens a receipt from production and selects the production order, when adding the receipt from production the batch setup screen appears and the user can complete the batch details for the item manufactured, on this screen they want the manufacturing date to be populated automatically from the Production order due date...
    I will try to use UDF's to see if it works...
    Thank you

  • Header batch manufacturing date to be update after 261 movt  of any compane

    Dear all ,
    we have one requirment in that ....suppose we have one Process order , we done companent batch determiantion
    now what happens whenever we do confirmation ..means 101 then Manufacturing date at Header bacth updates , ( the 101 date is set as Manufacturing date. ...Now when we do picking i.e goods issue of any companenet under order , that date shud
    be there as manufacturing date for that header batch .
    pls suggest.
    Regards,
    Prerna

    Hi Prena,
    Could you please post your solution how you acheived this? I have the similar requirement to populate batch manufacturibng date as process order confirmation date.
    Your help is appritiated.
    Thanks,
    Jyoti

  • Error in the Source system while data loding through Process Chain

    Hi,
    I am facing issue while data loading for certain extractors through Process chain. Load of 0BPM_WIHEAD, 0BP_LOGHIST, OBPM_OBJREL, 0BPM_DEADLINES(there are 2-3 more extractors) is getting failed daily with message Error occurred in the source system and if we repeat the same it is getting executed successfully.
    Regards,
    Javed

    Hi..
    It means that the extraction job is failing in the source system..
    Please check the Job log in the source system  --> Copy the request nimber --> In the source system go to SM37 --> Give * then the request number......execute --> Check the Job log..
    Look there may be multiple reasons behind this....
    1) Connection problem : Go to SM59 and test the connection, If you don't have the access in SM59...then go to RSA1 --> Source Systems --> Right click --> Connection Parameters --> Connection Test
    2) Or may be work processes are not available and due to which jobs are failing due to time out...
    In both the cases you can check with the Basis Team if they can suggest something....or you can change the process chain scheduling time if possible, and schedule it in such a time when less no of jobs are running..
    Regards,
    Debjani..

  • How to stop the data loads through process chains

    hi,
    I want to stop all the data loads to BI through Process chains where load happens periodic.
    kindly suggest how can I proceed.

    Hi,
    Goto RSPC find your PC and double click on START then change the timings, i.e. give starting date is 01.01.9999 like that Save and ACtivate the PC, it won't start till 01.01.9999.
    Thanks
    Reddy

  • How to load data targets through process chain

    hello gurus,
    i am new to bi7.0 environment,
    can anyone provide me step by step loading of data targets with the help of process chains.
    its very urgent
    thanks in advance
    bharath kumar

    Hi,
    After creating Start variant, select Data Targets in left side, find out which one you want to create PC. Drag and drop that Data Target ODS into right side, and select info package and ods activation.
    For Master data also the same you have select Attr Change run.
    Connect the links from Start variant to data targets.
    Check the below links:
    http://help.sap.com/saphelp_bw33/helpdata/en/d5/e80d3dbd82f72ce10000000a114084/frameset.htm
    http://help.sap.com/saphelp_bw33/helpdata/en/8f/c08b3baaa59649e10000000a11402f/frameset.htm
    http://help.sap.com/saphelp_nw70/helpdata/en/dc/c7e542de327276e10000000a1550b0/frameset.htm
    http://help.sap.com/saphelp_nw70/helpdata/en/87/13843b74f7be0fe10000000a114084/frameset.htm
    Business Intelligence Old Forum (Read Only Archive)
    Reg
    Pra

  • Processing the batches of data in parallel

    Hi friends,
    Can any one suggest me how to process the bathces of data in parallel.
    Please see the requirement below.
    •     A new version of ZREDISND1_OLD named ZREDISND1_EINVOICE with the possibility of processing the blocked invoices with parallel processing capability. The program will process the blocked invoices and will have the same results / outcome as the old program ZREDISND1_OLD had.
    •     A new version of Z_RECTHI01_60 named ZRECTHI01_EINVOICE with the possibility of charging the amounts with parallel processing capability. The program will have the same results / outcome as the old program Z_RECTHI01_60 had.
    •     An umbrella-program ZREDISND1_UMBRELLA will have de same capability as ZREDISND1_EINVOICE but will split the data automatically into batches, initial by supplier and additional by Business Partner followed by Contract Account. It will therefore act as an umbrella program for ZREDISND1_EINVOICE.
    •     An umbrella-program ZRECTHI01_UMBRELLA will have the same capability as ZRECTHI01_EINVOICE but will split the data automatically into batches by suppliers. It will therefore act as an umbrella program for ZRECTHI01_EINVOICE.
    •     For the realisation of the umbrella-programs a new table must be created. The table must contain all the service providers which are charged by E-Facturering. Also the indication if the blocked invoices belong to the service provider are processed indirect (the old method) or directly (the new method) must be stored. The table name will be ZEINVOICE.
    I have to develop the umbrella programs.
    Please suggest to me how implement this. Its an Urgent
    Thanks in advance.
    Vijay

    We have 8 "short-fat" tables to hold the source data uploaded from the source file via SQL*Loader (the SQL*Loader step is fast). The data consists simply of strings of characters, which we treat simply as VARCHAR2 for the most part.
    These tables consist essentially of a case key (composite key initially) plus up to 250 data columns. 8*250 = 2000, so we can handle up to 2000 of these variable values. The source data may have 100 any number of variable values in each record, but each record in a given file has the same structure. Each file-load event may have a different set of variables in different locations, so we have to map the short-fat columns COL001 etc to the corresponding variable definition (for validation etc) at runtime.
    CASE_ID VARCHAR2(13)
    COL001 VARCHAR2(10)
    COL250     VARCHAR2(10)
    We do a bit of initial validation in the short-fat tables, setting a surrogate key for each case etc (this is fast), then we pivot+validate this short-fat data column-by-column into a "long-thin" intermediate table, as this is the target format and we need to store the validation results anyway.
    The intermediate table looks similar to this:
    CASE_NUM_ID NUMBER(10) -- surrogate key to identify the parent case more easily
    VARIABLE_ID NUMBER(10) -- PK of variable definition used for validation and in target table
    VARIABLE_VALUE VARCHAR2(10) -- from COL001 etc
    STATUS VARCHAR2(10) -- set during the pivot+validate process above
    The target table looks very similar, but holds cumulative data for many weeks etc:
    CASE_NUM_ID NUMBER(10) -- surrogate key to identify the parent case more easily
    VARIABLE_ID NUMBER(10) -- PK of variable definition used for validation and in target table
    VARIABLE_VALUE VARCHAR2(10)
    We only ever load valid data into the target table.
    Chris

  • Automatically populating a Form from data stored in Access

    Hi,
    I need help automatically populating a form from data stored in Access. The form needs to have specific fields that are updated from an Access database. I want to be able to enter a site number and have the subsequent list of information (approximately 35 pieces of data) populate. I DO NOT want to update the Access database via the form. The form is for quick viewing and documentation only, not data entry. Currently I've been doing this with VB in Access which exported the data to a Word Document which was then saved as a PDF. It seems easier and less troublesome to go directly to the PDF form, but I can't figure out how!
    I have already connected my database to the form using OLEDB.
    I don't want a dropdown list and I don't want buttons to scroll through the sites (I've already found out how to do that through this forum).
    Any help would be very much appreciated!!

    Some more help to get started in this.. would be really appreciated..Are you trying to come up with the graphs yourself? IF so, are you familiar with MVC?

  • Manufacturing date entry control in MIGO for process order GR

    hi
    when i make process order GRN output entry ,i enter the manufacturing date for the batch.But it is now allowing me to enter,future date as well as any past date even before the RM issue date.please let me know wheter any control can be given so that while enterin manufacturing date , system should not allow a dae earlier than , RMissue date or Operation start date and any date future than the material recipt GR date for the output.The best practice is the manufacturing date is the date on which the first operation of the batch starts.
    unnikrishnan

    please write the user exit for the same

  • Incorrect data after activating the request through Process chain.

    Dear SDN chaps.
    Today morning. I encountered a strange issue in DSO..
    I have DSO which is updating from the AL11(application server) flat file.
    While i am loading it to PSA there were no issues and after loading it to the DSO there is no issue and its passing through the routine and the data is populating properly in NEW data Table .But after successful activation of  the request through process i am getting the wrong records in active data table.
    Then i deleted the request and reran it manually i mean triggered the DTP and ran the manual activation surprisingly accurate records are coming through manual process..
    I am just wondering why it is not working through process chain and why it is showing incorrect records through process chain execution and how it is showing accurate records through manual uploading process..'
    Could some one please help to come out from this..By the way mine is SAP BI 7 SP20 &SP05 for BW 7.01
    Thanks
    K M R
      

    Hi Pra
    Thanks for your response..
    We are doing PSA deletion and then we are uploading the data to PSA as well as DSO.
    Now the issue is not in the part of loading we are facing the issue in Actiation of request if i am executing the activation through process chain it is sucess but the values are incorrect. If i am doing the manual activation it sucess with correct data.
    Even i tried with a new chain but still i am facing the issue.
    Surprise thing is in new data table the data is perfect in both the ways like manual upate and Process chain update only during activation i am getting incorrect record in the active data table..
    Appreciate your help on this....
    Thanks
    K M R
    Edited by: K M R on Jul 9, 2010 11:09 AM

  • How to automate the process of loadind data from XML to BI.

    Hi,
    We have configured all settings that is required for web service portal(web application server).
    But, the problem is that when we go to the T-Code WSADMIN----> XMLA -->Test
    After entering the data manually i.e material,plant etc. it will be available for RSA7.
    Now, we want to automate these process i.e to load data thru files.
    We have gone thru the XML to BI document. Anyone who have worked on these scenario would be helpful.
    This is the HTML code for for uploading an XML file and sending this to the BW Web application server by using HTTP.
    <input type="text" name="filename" size=50 maxlength=80 value="c:\temp\">
    <P>BW SOAP service: </P>
    <input type="text" name="portname" size=50 maxlength=80 value="http://ds0056.wdf.sap-ag.de:1080/sap/bc/soap/rfc">
    We are using BI 7.0.
    Best Regards,
    SD

    any input...........

  • Data migration through IDoc processing in LSMW

    Hi all,
    I have an requirement wherein i need to transfer material master data through LSMW conversion process into R/3 database.The data is to be posted through ARTMAS04 inbound IDoc.
    The problem is to transfer the data simultaneousely through <b>multiple instances</b> of <b>E1BPE1MARAEXTRT</b> segment of <b>ARTMAS04 IDoc</b>.
    for example:
    I need to have an assignment  that should work like this:
    E1BPE1MARAEXTRT[]-FIELD1 = '00001'
    E1BPE1MARAEXTRT[]-FIELD1 = '76545'
    E1BPE1MARAEXTRT[]-FIELD1 = 'SAP'.
    Can anybody help me in acheiving this example scenario in LSMW.
    Thanks.

    HI everybody,
    i had solved the problem myself.
    Thanks all.

  • How to creat Process messages automatically through PI sheet saved?

    How to creat Process messages automatically through PI sheet to the Process message destinations.

    Hi Jessie,
    When you process instruction category PROD_3 in master recipe, the process message PI_PROD is created.
    After releasing process order, you have to create control recipe. Upon successful creation of control recipe, process instructions will get generated. Check the error log for control recipe creation for error if any. 
    Note that control recipe will be generated only with order status "Released".
    You have to sent this control recipe to process control (CO53).
    Hope it is helpful.
    Regards,
    Sachin

  • Copy manufacturing date to batch characteristics in REM confirmation

    Hi to everyone,
    I have a situation that when goods receipt occurs with movement 131 in MFBF, manufacturing date is not updated in batch. How can I copy the value as batch characteristics?
    please advice,
    best regards..

    Hi,
    If you want the value as batch characteristic you need to:
    1. Create the characteristic in trn. CT04, with reference to field MCHA-ERSDA (or MCH1-ERSDA if your batch management is cross-plant)
    2. Create a class in trn. CL02 and include the characteristic in it.
    3. Assign the class to your material in Material Master.
    Hope it helps.
    Regards,
    mr.

Maybe you are looking for

  • Multiple accounts with the same iTunes???

    I'm looking at getting my wife the iPod Nano. I have the iPod 20GB Color Display. If she has the iPod Nano does iTunes allow you to have two separate accounts within the same iTunes so you we have our own sets of music? Or would we have to have two s

  • Process over BPM with message split: strange behavior

    Hi everybody, introduction: We poll a file from a file-server and pass it to BPM. in BPM there is a multimapping. With each single message a WebService is called. Now we see that after a special amount of messages, each message is send (from BPM to W

  • Kann kein labview vi von ni vision assistant machen

    habe labview 7 base development inklusive application builder, und ni vision development module 7.0 installiert

  • DVD Studio Pro 4 Manual

    I have had studio pro suite since it's release and only now find myself needing a manual for DVDSP. Did a manual come with the suite? Thanks, Gary

  • What is "This page requires AC_RunActiveContent.js."

    I have gone through many of the posted fixes like reloads, resets, opening in safe mode, removing all cookies for this site, etc. and nothing is working to stop this. The main page of the website doesn't load all the links or linked pages. Is the pro