Portions in schedule master data

What is the difference between
End bill period
Schedule bill date &
Allocate Bill date

Dear Shilpa,
I think this will help you, A detail about  Portions,
1. When you create a portion, you can transfer existing values from another portion and use these as a template.
2. Dynamic Scheduling
When you create a portion, you must decide whether you want the portion and the corresponding meter reading units to be used for dynamic scheduling. Set this indicator if you want the portion to be used for dynamic scheduling.
3. End Bill. Per. (End of Billing Period)
Here you can determine the date when the portion is billed for the first time. This date is used as the base date for calculating the end of the billing periods or floating backbilling periods.
This date cannot come before the end of the meter reading period or the scheduled meter reading date of all allocated meter reading units.
4. All Date Billg (Billing Allocation Date)
This date enables you to statistically allocate billing. It is used during cross-contract billing to allocate billing orders and documents. The date is also copied to the billing order.
This date cannot come after the end of the billing period. The end of the billing period cannot come before the end of the meter reading period or the scheduled meter reading date of all allocated meter reading units.
If you use budget billing procedure 3 (payment plan) in your system and a payment plan has already been created for this portion, you can no longer change the allocation date.
5. Sch. Bill. Date (Scheduled Billing Date)
This date specifies the day the system starts billing contracts that belong to a portion. The factory calendar is used for this.
This date displays the point in time when a billing period is prepared. Billing orders that have the status billableafter this date are not processed. The date, therefore, acts as the selection date for determining billable billing orders during mass and single billing.
6. Billing Class / Division Category
You can restrict how the portion is used by entering a billing class and a division category. You have the following options for this:
Restricted portion
In the meter reading unit, you can only use the constellations of billing class and division category that are entered in the portion. You can also not make any restrictions.
Portion not restricted
The meter reading unit can be restricted or unrestricted.
Regards
Rehan K.

Similar Messages

  • Automatic Creation of Scheduled Master Record for Scheduled Master Data

    Hi experts,
    We know that MRU and Portion are Scheduled master data but Scheduled master record is transactional data. So it is obvious that we have to generate scheduled master record in every server wher we transport the master data manually. And we can generate records for a particular time span and after that time we have to generate the records again.
    All I want to know that whether it is possible to get all the records generated automatically after certain period.
    Thanks,
    Arghya

    Hi,
    Scheduled records do NOT get created automatically , altleast not by any sort of configuration, in case you are looking for it.
    Your can always create custom program to do so, but it isn't worth the effort.
    You can create records for upto 7yrs ( do need to check but definitely for a period long enough)
    Hope that helps!!!

  • 62: Scheduling: Master data inconsistent in MD04

    Dear all experts,
    I am new in PP. After i run MRP and i go to MD04 . Noticed that, 1 message is shown as below
    62: Scheduling: Master data inconsistent
    I have checked Routing and BOM and they are correct.
    I am using ECC 6
    Any solution on this issue?
    Thank you.

    Dear cijelew,
    I dont think there is problem with configuration setting,but it's with
    1. BOM validity date,BOM status.
    2.Check if any change numbers are used with release key and ensure the release key is set.
    3.Routing status,usage,validity and also
    check if BOM selection method is value 2 or 3(production version--->so check whether production version has been created
    properly,lot size,validity date,check where you have assigned the routing group and group counter whether is it against
    detailed planning,rate based planning or rough cut planning).This routing assignment should be against the correct planning
    level as per the configuraion setting made in OPU5,for the selection ID.
    Check and revert.
    Regards
    Mangalraj.S

  • Exception message 62 - Master Data Inconsistant

    I'm getting the referenced exception message when generating an MRP run with scheduling value of "lead time scheduling and capacity planning".  I've done consistency checks on all master records - routings, work centers, etc - and all have come back clean.  Anyone have any idea why this may be happening?
    Thanks!
    Bob

    Hi,
        62 Scheduling: Master data inconsistent Check master data !
    Remove "In House Processing Time" from the Material Master MRP2
    view. Ensure that the Production Version & Routing are correct. Run
    MPS/MRP manually once corrected.
    Regards
    Sunil

  • Master data load gives dump with exception CX_RSR_X_MESSAGE

    Hi all,
    I scheduled master data load for 0MATERIAL in our BI 7.0 Quality server. The load ended in dump with the exception CX_RSR_X_MESSAGE. The data has loaded into PSA( 37257 from 37257 records) but the technical status is red and has not updated the master data object.
    I have seen note 615389 which talks about number range but the check is successful. The data load was successful in development server. This error has occured only in Quality.
    We are on SP 12 in BI 7.0.
    We are moving to production soon, so this is an urgent issue. I would appreciate if anyone responds soon. Points will be rewarded.
    with regards,
    Ashish

    Hi,
    The log of the dump is given below.
    Error analysis
    An exception occurred which is explained in detail below.
    The exception, which is assigned to class 'CX_RSR_X_MESSAGE', was not caught
    and
    therefore caused a runtime error.
    The reason for the exception is:
    No text available for this exception
    Information on where terminated
    Termination occurred in the ABAP program "SAPLRRMS" - in "RRMS_X_MESSAGE".
    The main program was "SAPMSSY1 ".
    In the source code you have the termination point in line 78
    of the (Include) program "LRRMSU13".
    Source Code Extract
    Line
    SourceCde
    48
    *... Nachricht an den Message-Handler schicken
    49
    50
    *... S-Meldung wenn kein Handler initialisiert
    51
    DATA: l_type  TYPE smesg-msgty,
    52
    l_zeile TYPE rrx_mesg-zeile.
    53
    CALL FUNCTION 'MESSAGES_ACTIVE'
    54
    IMPORTING
    55
    zeile      = l_zeile
    56
    EXCEPTIONS
    57
    not_active = 1.
    58
    IF sy-subrc NE 0.
    59
    l_type = 'S'.
    60
    ELSE.
    61
    l_type = 'W'.
    62
    ENDIF.
    63
    64
    CALL FUNCTION 'RRMS_MESSAGE_HANDLING'
    65
    EXPORTING
    66
    i_class  = 'BRAIN'
    67
    i_type   = l_type
    68
    i_number = '299'
    69
    i_msgv1  = i_program
    70
    i_msgv2  = i_text.
    71
    ELSE.
    72
    DATA: l_text  TYPE string,
    73
    l_repid TYPE syrepid.
    74
    75
    l_repid = i_program.
    76
    l_text  = i_text.
    77
    >>>>>
    RAISE EXCEPTION TYPE cx_rsr_x_message
    79
    EXPORTING text = l_text
    80
    program = l_repid.
    81
    ENDIF.
    82
    83
    ENDFUNCTION.
    I went to SM21 and went through the system log.  There was a log with the following text  ORA-20000: Insufficient privileges#ORA-06512: at
    "SYS.DBMS_STATS", line 2150#ORA-06512: at "SYS.DBMS_STATS.
    I found a note 963760 for this error. After the changes said in this note were done I reloaded the data and it worked fine. Data load for another data source which gave dump now worked.
    I am not sure if the note did the trick. So i am keeping this post open in case someone finds another solution or can confirm the solution which worked for me.
    Thanks Oliver and Oscar, for replying.
    regards,
    Ashish

  • Possibility of combining exception broadcasting with master data bursting

    Hi Experts,
    We have a scenario where it is required to combine exception broadcasting with master data bursting.
    As per my understanding if you choose broadcast method as 'exception broadcasting', there is no option for choosing 'master data bursting'.
    Am I missing something or Is there a workaround or some method to achieve the same.
    Thanks
    Rajeev

    Hi,
        62 Scheduling: Master data inconsistent Check master data !
    Remove "In House Processing Time" from the Material Master MRP2
    view. Ensure that the Production Version & Routing are correct. Run
    MPS/MRP manually once corrected.
    Regards
    Sunil

  • Master Data loading is very slow.

    Hi Experts,
    I have scheduled Master Data Attribute Process Chain daily. 0employee_attr, infoObject is having only 487315 & it is taking more than 12 hrs. There are number of infoobjects are much bigger is taking 10 minutes only. 0Employee attr in increasing 5-10 records daily only. Earlier it was taking 4-5 hours.
    Regards,
    Anand Mehrotra.

    Hi,
    You must have the following profiles to BWREMOTE or ALEREMOTE users.So add it. Bcoz either of these two users will use in background to get extract teh data from ECC, so add tehse profiels in BW.
    S_BI-WHM_RFC, S_BI-WHM_SPC, S_BI-WX_RFC
    And also check the following things.
    1.Connections from BW to ECC and ECC to BW in SM59
    2.Check Port,Partner Profiles,and Message Types in WE20 in ECC & BW.
    3.Check Dumps in ST22, and SM21.
    4.If Idocs are stuck i.e see the OLTP Idoc numbers in RSMO Screen in (BW) detials tab see in bottom, you can see OLTP Idoc number and take the Idoc numbers and then goto to ECC see the status in WE05 or WE02, if error then check the log else goto to BD87 in ECC and give the Idoc numbers and execute manually and see in RSMO and refresh.
    5.Check the LUWs struck in SM58,User Name = * (star) and run it and see Strucked LUWs and select our LUW and execute manually and see in RSMO in BW.
    See in SDN
    Re: Loading error in the production  system
    Thanks
    Reddy

  • Error when scheduling the infopackage for loading Master data attributes

    Hi,
    Iam getting the following error message when scheduling this Master data Attributes ZIP_0PLANT_ATTR_FULL..( Flexible update of Master data info objects)..
    In Data load monitor error i got this following error message.
    Error message when processing in the Business Warehouse
    Diagnosis
    An error occurred in the SAP BW when processing the data. The error is documented in an error message.
    System response
    A caller 01, 02 or equal to or greater than 20 contains an error meesage.
    Further analysis:
    The error message(s) was (were) sent by:
    Update rules
    Thanks

    HI,
    A caller 01, 02 or equal to or greater than 20 contains an error meesage This is an Idoc error. Please check the Idocs :
    1) SM37 job log (In source system if load is from R/3 or in BW if its a datamart load) (give request name) and it should give you the details about the request. If its active make sure that the job log is getting updated at frequent intervals.
    Also see if there is any 'sysfail' for any datapacket in SM37.
    2) SM66 get the job details (server name PID etc from SM37) and see in SM66 if the job is running or not. (In source system if load is from R/3 or in BW if its a datamart load). See if its accessing/updating some tables or is not doing anything at all.
    3) RSMO see what is available in details tab. It may be in update rules.
    4) ST22 check if any short dump has occured.(In source system if load is from R/3 or in BW if its a datamart load)
    5) Check in SM58 and BD87 for pending tRFCs and IDOCS.
    Once you identify you can rectify the error.
    If all the records are in PSA you can pull it from the PSA to target. Else you may have to pull it again from source infoprovider.
    If its running and if you are able to see it active in SM66 you can wait for some time to let it finish. You can also try SM50 / SM51 to see what is happening in the system level like reading/inserting tables etc.
    If you feel its active and running you can verify by checking if the number of records has increased in the data tables.
    SM21 - System log can also be helpful.
    Thanks,....
    Shambhu

  • Work Schedule in HR Master Data Feeding Work Center!

    Hi,
    I have several questions on how work schedule in HR master data relates to the work center for capacity planning.
    1. How do we assign the employee to a work center? is that in the HR master data or work center or some other transaction?
    2. If we can assign an employee to a work center, how the work schedule in the HR master data feeds the work center capacity? Is there any button that I can control whether I want to feed the work center capactiy from HR master data work schedule or from manual input directly to work center?
    3. If I can feed the HR master data work schedule to work center, what do I need to do to reflect the vacation time or sick time which is not in the work schedule in the HR master data to the work center?
    Thanks,
    Ting

    Hi,
    For starters, please take a look at the following discussion:
    Logistics Work Center and HR Work center.
    Credits: SDN members
    Hope this helps.
    Donnie

  • Loading of master data through input schedule

    Hi guys!
    Is any solution for loading/updating of master data through input schedule?

    Hi Maxim,
    In addition to all above, Input Schedules are used to enter and send data for whatever dimension members you have maintained in BI or BPC.
    The master data can be maintained in BI, then you need ot load data from BI and it will be reflected in BPC.
    If you want to make changes in master data in BPC, then you need to goto Admin, select whatever properties you want to display and then Maintain Dimension Members for the same.
    However, you can also import master data from BI using DM packages in BPC Excel.
    Hope this clarifies.
    Rgds,
    Poonam

  • Master data for Delivery Schedules for Scheduling agreements

    At the link below, under the scheduling agreements with delivery schedules section, the integration section indicates that data comes in from 3 sources, one of which is master data.  Does this mean that the delivery schedule can be maintained in master data somewhere?  If so, where do you maintain it?  Getting the delivery schedule from EDI, or entering it manually, is not an option for our business requirements.
    http://help.sap.com/saphelp_47x200/helpdata/en/78/2085347860ea35e10000009b38f83b/frameset.htm
    All help would be appreciated.  Thank you.

    hi,
    the data you need from master data are:
    customer: KNVV-EIKTO, supplier account at customer
    customer inforecord: correspondance between customer material and your material number
    Roberto

  • Load master data using input schedules

    Hi all,
    Does there exist a way to load and modify master data using input schedules?
    Regards,
    Nithya

    Hi Nithyapriya,
    Chiming in here to 2nd Joost's statement above.  As of BPC 5.1 version, it is not possible to update master data from an Input schedule.
    Whether that's possible in other products or with BPC 7.0 NW (currently in Ramp-up), is another story.  For now, the general answer is that it's not possible.
    This is a known area for improvement with BPC at this time, and we're sure to hear more about either integration with NetWeaver or some other methods of making things more dynamic, or with SSIS packages, etc.. in the future.
    Edited by: garrett tedeman on Sep 2, 2008 7:20 PM

  • About delta loading for master data attribute

    Hi all,
    We have a master data attribute loading failed which is a delta loading. I have to fix this problem but I have two questions:
    1. how can I find the those delta requests because I need to delete all these failed requests first, am I right ? Master data is not like cube or ods that we can find the requests in Manage, for master data how can we find them ?
    2. Could you please let me know the detailed procedures to perform this delta loading again ?
    Thanks a lot

    Hi...
    1. how can I find the those delta requests because I need to delete all these failed requests first, am I right ? Master data is not like cube or ods that we can find the requests in Manage, for master data how can we find them ?
    Look.....for master data.....no need to delete request from the target..........just make the status red.......and repeat the load.....But problem is that master data sometimes does'nt support Repeat delta..........if u repeat......then load will again fail with Update mode R.........in that case u hav to do re-init.......
    1) delete the init flag.......(In the IP scheduler >> in the top Scheduler tab >> Initialization option for source system)
    2) Init with data transfer(if failed load picks some records)..........otherwise .....init without data transfer.....if the last delta failed picking 0 records.......
    3) then Delta.......
    2. Could you please let me know the detailed procedures to perform this delta loading again ?
    1) Make the QM status red.........to set back the init pointer.......
    2) Repeat the load.....
    After that.........if again load failed with Update mode R.....
    1) delete the init flag.......
    2) Init with data transfer(if failed load picks some records)..........otherwise init without data transfer.....
    3) then Delta.......
    Regards,
    Debjani.....

  • Periodic Transfer of Master Data

    Hello,
    I need assistance understanding the underlying config related to master data updates in R/3 and the resulting entries in GTS.
    Our setup:
    GTS (7.2) is a plug-in to CRM
    CRM & R/3 in same logical system group (GTS)
    EWM in unique logical system group (FEEDSYS) - based on SAP config guide and direction, we split feeder logical systems from GTS logical systems. all logical systems had resided in a single logical system group (GTS)
    EWM > system for warehouse functions
    R/3 > feeder system for material master
    R/3 > GTS Plug-In activated (per SAP direction)
    R/3 > Configure Control Settings for Document Transfer > MMOA mapped to our purchase order doc type at logical system and logical system group level
    R/3 > Configure Control Settings for Document Transfer > MMOB mapped to our inbound delivery doc type (EL) at logical system and logical system group level for DTAVI
    R/3 > Configure Control Settings for Document Transfer > MMOC mapped to our movement types 101 and 601, in addition to others
    I mention the PO and Inbound delivery setup because we do see changes to material qty in R/3 after creating PO's and the subsequent IB deliveries.
    We are trying to implement GTS as a bonded warehouse - storing material as duty-unpaid only.  We are not concerned with duty-paid status for this implementation.
    There has been an initial transfer of material to GTS from R/3 via /SAPSLL/MENU_LEGALR3.  We have GTS master data marked as BondedWH.  Although T-Code MMBE shows qty's for the material, it does not match the qty being displayed in GTS stock overview. 
    The SAP GTS Config guide states, page 40, to create a job for RBDMIDOC, with a variant and have it scheduled.  We still need to do this part and it is my understanding this is to synce data.  With this, I am also trying to understand the use of change pointers in R/3, in addition to enhancement project SLLLEG04 for the User Exits for Material Masters.  I don't know if we need to worry about the SLLLEG04 enhancement or not.
    I know there is more information I can provide on our current setup, but what major things are there to consider to get the stock overview qty's of GTS to actually reflect what's in MMBE, AND, be displayed as duty-unpaid, rather than duty-paid via the initial transfer function?
    Any advise or experience getting R/3 to communicate correctly with GTS, especially in light of a bonded warehouse is greatly appreciated.
    Regards,
    Brian

    Hello Uwe,
    Our intent for GTS is the use of bonded warehouse functionality.
    As a part of preparation for go-live activities, we will stock the warehouse with material, this is a distribution center of service parts (replacement parts).  The stocking activitiy will be through STO's.  As a result, we expect all the material showing up in GTS to be duty-unpaid.  We will continue to receive material into the warehouse via STO's as no base-receipts are required at this time. 
    When we process orders through the warehouse system (EWM) we expect the qty's in GTS to reflect what has been shipped (exports).  As such, we will be able to reconcile any stock discrepancies with the authoriities.
    My questions about intial transfer is my attempt to get some inventory showing in GTS, so that after I process the inbound deliveries based on PO's (STO) I see the inventory building in GTS.
    The use of initial stock transfer may not be correct as I described my activities above, but with very little documentation specifying the actual process of establishing a bonded warehouse, especially in our landscape, I am working through this on a trial-and-error basis.
    I hope this provides clarity on our goals.  I will continue to research the change pointers as I am still not sure of the relevance.
    Regards,
    Brian

  • Extraction of certain master data not working

    Hi, we are on BI7 and some of the BC masterdata extractions are not working correctly.  Some masterdata working fine, consequently communication between systems working, but some master data fields e.g. 0co_area, 0chrt_accts and more are not working fine.  Get this on 3.x and new datasources.
    The data does get pulled through but the upload just never goes green, and keeps running.  If one look at the batch jobs (SM37) in the appropriate source system, it keeps on going until it is manually stopped. 
    I am only experiencing this problem with data pulled through from the production system - I am pulling it through to my testing and production box, but fails in both, where all other ECC systems are fine.
    In the monitor there is a warning and the following is the details of the monitor: 
    Overall status: Missing Messages or warnings
       Requests (messages):  Everything OK  (green)       Data request arranged  (green)
           Confirmed with:  OK (green)
       Extraction (messages): Missing messages (yellow)
           Data request received (green)
           Data selection scheduled (green)
           Missing message:  Number of sent records (yellow)
           Missing message: Selection completed (yellow)
       Transfer (IDocs and TRFC): Missing messages or warnings (yellow)
           Request IDoc: Application document posted (green)
           Info IDoc 1 : Application document posted (green)
           Data Package 1 : arrived in BW ; Processing : Selected number does not agree with transferred n (yellow)
           Info IDoc 2 : Application document posted (green)
       Processing (data packet) : Everyting OK (green)
           Inboun Processing (32 records) : No errors (green)
           Update PSA (32 records posted) : No errors (green)
           Processing end : No errors (green)

    Thanks, for the responses.  The appropriate Idocs work fine with transaction BD87. I looked in SM58 earlier during the course of the day and there was no error, just checked again (8PM) and found some entries with error texts for BW background user - 6 errors within 10 seconds.  Something to do with 'ERROR REQU... PG# IN 1' - do not have authorisation at this moment to check the specific requests, but not sure if the master data extractions would have caused these.
    In the job log for the problematic jobs, only 1 IDoc get created, unlike the other succesful ones that have 3 IDocs (not sure if this means anything)

Maybe you are looking for

  • [SOLVED]/tmp fills up when building packages

    When I try to install Red Eclipse with: yaourt redeclipse I get a BUNCH of write failed errors then: redeclipse/bin/reserver_freebsd_64: Write failed redeclipse/bin/reclient_freebsd_32: Write failed redeclipse/bin/reserver_linux_32: Write failed rede

  • Frequent Apache crashes on win nt 4.0 server

    Hi, In our production environment we use Portal 3.0.9.8.0 and the 9iAS is on a win nt 4.0 server and the 8.1.7.0.0 rdbms is on another win nt server (3-tier). Other products on the 9iAS are Discoverer and Web Forms and Reports. The apache webserver i

  • TS4006 Find my Phone

    I have lost my iPhone and when I try to find it through ICloud it is showing as offline.  What does this mean and how can I locate it on a map.  I have sent 3 messages to the phone but no luck in finding it so far.  Please help,

  • E-mailing large files

    my brother is making a website for me. i need to send him images of my artwork via e-mail. i don't want to send them one at a time... that would take forever. i think what i need to do is make a zip file. i figured out how to do that..... i just don'

  • J ai oublié mon code de verrouillage du tel comment le debloquer marci

    j 'ai oublié mon code de verrouillage du tel comment faire comment le debloquer merci