Positive time management through interface or without interface

Hi Gurus,
I am working on positive time management and i have few queries:
1. As a consultant I have to suggest my client whether they should for interface between sap and eternal recording system or not... What you guys suggest which one is better.
2. I came to know that there is a standard interface(HR PDC) in sap to interact with ecternal recording system. I want to know how this Sap interact with external recording system i.e. online or offline using this interface.
Please reply to my queries soon..
Points will be awarded for the inputs.
Hope to hear soon from u guys...

1. As a consultant I have to suggest my client whether they should go for interface between sap and eternal recording system or not... What you guys suggest which one is better.
If your client wish to go for postive time management it is must for you create interface either you willing to say or not.
Without that interface you can't do time positive time management
2. I came to know that there is a standard interface(HR PDC) in sap to interact with ecternal recording system. I want to know how this Sap interact with external recording system i.e. online or offline using this interface.
I belive this needs some third party tool to intract with PDC. then you have use time evaluation status TMSTA 1 according to  PDC
I belive it bit differnt from what you are looking for.
please tell me what kind of time terminal your client is using at the moment?
Best Regards

Similar Messages

  • Photo Management through Dropbox and without iPhoto

    Good evening,
    I have finally made the jump back from iPhone to BB and i'm loving it. Go Blackberry!!!
    The ability to port some apps from android has bridged most of the gaps from the store. 
    My biggest show stopper right now is getting dropbox to sync my photos and for blackberry link not to use iPhoto to sync photos with my computer. I would like to select a folder of pictures that i want synced and select a folder where i want the new camera to be synced.
    Does anyone have any tricks that i could use to facilitate my photo management through dropbox and BBLink? If these are features being worked on I'd appreciate to get an idea how long it will take to get it.
    Thank you very much and happy holidays.
    Mathieu

    1. As a consultant I have to suggest my client whether they should go for interface between sap and eternal recording system or not... What you guys suggest which one is better.
    If your client wish to go for postive time management it is must for you create interface either you willing to say or not.
    Without that interface you can't do time positive time management
    2. I came to know that there is a standard interface(HR PDC) in sap to interact with ecternal recording system. I want to know how this Sap interact with external recording system i.e. online or offline using this interface.
    I belive this needs some third party tool to intract with PDC. then you have use time evaluation status TMSTA 1 according to  PDC
    I belive it bit differnt from what you are looking for.
    please tell me what kind of time terminal your client is using at the moment?
    Best Regards

  • What are the major challenges for the end-user in using Positive Time Management

    Hi Seniors,
    Can anybody please provide me some data on the same.
    Thanks.

    Hi,
    Positive time management is slightly difficult to implement compared to negative time management.
    In negative time management, you use planned working times + deviations in time evaluation.
    In positive time management, you record actual times through time recording system. You have to bring these times to SAP through an interface and then evaluate the actual times against the planned times and accordingly pay them out. You would need to pay attention regarding the integration between SAP R/3 and time recording system.
    Building rules for positive time management is slightly more challenging compared to negative time management.
    Kindly go through the below documents on positive time management which will give you more idea about the same.
    Integration of Time Recording Terminals with SAP R/3
    Determination of First Clock In & Last Clock Out in Positive Time Evaluation
    Late Coming, Early Going and Unauthorized absence
    Prorated Grant of Absence Quota for Contract Period in Time Evaluation
    Splitting of Overtime Hours after X Hours in Time Evaluation
    Rounding off Overtime Hours Generated via T510S table in Time Evaluation
    Public Holiday Calendar and Work Schedule Rules
    I hope these are helpful to you.
    Thanks and regards,
    Vivek Barnwal

  • Document on Positive Time Management & Integration with payroll

    Hi,
    Can any one suggest me any link from where I will get the IMG steps of Positive time management implemetation, time evaluation, time wagetype detail as well as the steps of integration with payroll..
    Thanks in advance.
    Ajay

    Hi Chandrashekar,
    Can you please advise how actually the transfer of clock times from time recording terminals to SAP R/3 will work?
    I read from help.sap.com that there is a SAP certified CC1 interface (BAPI based) which can be used for this purpose. However, in such a case, the time recording terminals should be SAP CC1 certified.
    If the time recording terminals are not SAP CC1 certified, then what is the method to be used? Will we write a custom BDC program in this scenario and what all should be considered in functional specification of such a BDC program.
    Please advise.
    Thanks and warm regards,
    Vianshu

  • Key difference between Negative & Positive Time Managment

    Dear Consultants,
    Please provide the information regarding the key differences between Negative Time Management & Positive Time Management.
    Under what circumstances, we shouldn't recommend for Positive Time Management?
    What are the major challenges for the client/end-user in using Positive Time Management?
    What would be the duration required to implement Negative TM?
    What would be the duration required to implement Positive TM?
    What are the limitations of Negative TM?
    Can a client opt for both Positive & Negative TM?
    Regards,

    See the re
    Please provide the information regarding the key differences between Negative Time Management & Positive Time Management.
    Time Management can be bifurcated types:
    1. Positive Time (+ve Time) ? Positive time is plays the total role of workflow. All the processes related to time are automatically gets executed in the background. E.g., in our case it is done only partially to validate the attendance as per punches and other documents with shift timing and generate absence automatically in case of any discrepancy. 
    2. Negative Time (-ve Time) ? Where the all time related activities like validation of the attendance, posting of absence for wage deduction etc are done manually. It has less level of integration among the different components of time management.
    Negative Time Recording:
    1. Records time deviations to Planned Working Time
    2. Valid deviations include: Absences, Special Absences, On Call Duty, Overtime, Substitutions, Time off in lieu
    3. Deviations are manually entered according to type & duration.
    Positive Time Recording:
    1. Records the attendance time of the employee
    2. Records the deviation times of the employee
    3. Valid attendances include: Training, Business Trips, Seminars, Overtime.
    4. Attendances & deviations can be entered either:
    - Front end system
    - Manually.
    Positive Time Management we have two types of recordings:
    1. With Clock times - Complete time recording is captured
    2. With out Clock times - Only Number of hourse worked is captured
    Negetive time Management:
    1. No clock times and assumed employee is working unless and until his or her absences are entered.
    How is the process of getting data from time recording system to SAP how can we connect time recording system to SAP? How do we interface for positive time management?
    To simplify:
    We can consider two independent systems:
    1. SAP System which contains Planned Working time
    2. Time recorder system which contains the actual timings
    Now as Time recorder system will contain all Clock in & Clock outs, the data needs to be uploaded to SAP system either as Scheduled job at back end or online in critical cases.
    Based on our Time pair and other IMG settings in SAP System and comparison of IT2011 with IT2000, it generates values of OT,Absences etc etc.
    This job can be effectively done in proper coordination with Basis, ABAPers and Time Consultants.
    Under what circumstances, we shouldn't recommend for Positive Time Management?
    >>>If the company has only salaried employees /exempt empls, where you dont record their OT, DT, etc..
    >>>If Company has already another system which records time and can provide just total hours to be paid off in Regular / OT/ DT and also could update quotas
    What are the major challenges for the client/end-user in using Positive Time Management?
    >>>Integration between 3rd party system and SAP - Interface, logics
    >>> Accruals and Quota
    What would be the duration required to implement Negative TM?
    >>> Few months *
    What would be the duration required to implement Positive TM?
    >>> Depends on volume diversity you have in time recording. May be between few months to a year.
    What are the limitations of Negative TM?
    >>> Detailed reporting may not be available in SAP and Posting Timesheets to CO/Billing would out of scope
    >>> Also refer to SAP documents and presentation by clients in market place for more details
    Can a client opt for both Positive & Negative TM?
    >>> Yes you can

  • Negative time management to positive time management

    Hi Experts
    our client is following negative time management now. They would
    like to implement positive time management from now onwards.
    please suggest how i'll do this for my client.
    Thanks

    Hi,
    Firstly, your client has to decide how the entry exit timings of the employees are going to be captured, and then load them into SAP. The timevents will be updated in IT2011.
    One way is to have a third party capture all the events from recording terminals located on the site, have a RFC to get these events to SAP. The time events can then be uploaded into the infotype table TEVEN (IT2011). These programs shud also be scheduled in the backgrnd to run either daily or after sum intervals of time.
    In config,
    You will have to change the groupings of PS & EE for time recording,
    Change the time management status for these employees,
    change the feature TMSTA to default the same status for new employees to be hired.
    Maintain IT0050 for all employees. (necessary for +ve time)
    Change the grouping for Attendance / Absence types
    Have to check whether system reactions for time pair formations in system are as per clients requirements
    Modify the time mangement schema (with clock times) according to the requirement.
    Schedule a background job so that time evaluation is run for all employees once a day. (usually scheduled during the night)
    These are some of the changes that I can think about right now hope this is helpful.
    Regards,
    Shreyasi.

  • Query on Positive time management in SAP HR

    Dear Experts
    While checking the RPTIME00, I get the following in log -
    Select time wage types
    GWT
    Input -  TIP
    Processing - No pairs exist for processing type
    Output
    DZL - No entry in table
    What could be the possible reasons?
    Can anyone please tell me as to which output tables(such  as ZES, SALDO, ZML etc) needs to filled up after time evaluation for overtime?
    Thanks,
    Rupesh Mhatre
    Edited by: rumhat on Feb 24, 2011 2:08 PM

    Hi
    http://help.sap.com/saphelp_47x200/helpdata/en/8a/9868bc46c411d189470000e829fbbd/frameset.htm
    Regards

  • Positive & Negative Time Management

    Dear Seniors,
    What is positive & negative time management? Which time management status do we use for these?
    What r time pairs & where can these be configured?
    Thx & Regards
    WARNED-> No more basic questions please.

    Hi,
    Positive time is plays the total role of workflow. All the processes related to time are automatically gets executed in the background. E.g., in our case it is done only partially to validate the attendance as per punches and other documents with shift timing and generate absence automatically in case of any discrepancy.
    .Negative Time (-ve Time) ? Where the all time related activities like validation of the attendance, posting of absence for wage deduction etc are done manually. It has less level of integration among the different components of time management.
    Positive Time Management we have two types of recordings:
    1. With Clock times - Complete time recording is captured
    2. With out Clock times - Only Number of hourse worked is captured
    Negative time Management:
    1. No clock times and assumed employee is working unless and until his or her absences are entered.
    Regards,
    Tarun

  • Difference between a positive time and negative time management.Explain with screenshots.

    Hi gurus!
    I would like to know the difference between Positive time management and negative time management.
    thx & regards,
    raju

    Hi Nagaraju,
    I am adding more information..
    Whether or not an employee is on positive or negative time is determined by the time management status on IT0007. Status 1 or 2 = positive time; status 9 = negative time.
    In a standard system, positive time recording means the employee is required to record time (absence or attendance) for any day on which he is scheduled to work according to his generated work schedule. Negative time recording means an employee does not need to record time unless he has an exception to his normal working time; so absences are typically recorded as well as overtime or time work on days for which the employee is not scheduled to work.
    Schema TM00 is used to process positive time employees for whom clock times are entered; that is, every record has a start and end time.
    Schema TM04 processes both positive and negative time employees. The key distinction between TM00 and TM04 is TM04 does not require start and end times on every entry. Records with start and end times cna be processed in TM04. However, the records do not require these entries.
    In TM04 you will see code using IF, ELSE, ENDIF statements during the import process to separate the import of time data for positive and negative time employees.
    Positive time employees use the following data import statements in the schema:
    P2011 Import IT2011 records to TIP; regardless of whether the EE has IT2011, load the work schedule to TZP. If no IT2011 record exists, TIP is empty.
    P2001 Load absences
    P2002 Load attendances
    Negative time employees use the following data import statements:
    P2000 This is the critical difference between positive and negative employees. P2000 loads the daily work schedule to the TIP table as if the employee workede; that is, if the employee is scheduled to work from 8:00 to 17:00, this record will now appear on TIP. The work schedule details are also added to TZP.
    P2001 Load absences -- to pick up exceptions to planned working time
    P2002 Load attendances -- again to pick up exceptions, special costing information, overtime, alternate payments, premiums or any other variation from normal schedule work.
    So if you want to determine if you are using positive or negative time, check the time management status on the employees.
    Regards
    Siva

  • UNABLE TO GET SALARY BASED ON HOURS ( POSITVE TIME MANAGMENT )

    Hi Vivek,
                    Your document was great.
           I am implementing positive time management and at present i am entering the clock in and clock-out in IT-2011 manually for testing and when i run PT60 using TM00 schema it was not showing any errors but data in 'ZL' it was showing as no entries.
    And to cross check i have executed  'PC00_M40_CALC' but the payroll was caluclated based on no. of days( negative tm).
    I am new to TM concept please help me out.
    Thanks,
    Saikrishna.

    Hi,
    Here are some answers/comments to your question above.
    1. You should not make any changes in schema TM00 (Standard SAP Schema) - copy this to a custom schema (ZM00) in transaction PE01 and add logic/make changes in this custom schema.
    2. Entries will not automatically be created in the ZL table just because you have IT2011 (Table TEVEN) entries. ZL entries are created either through PCR logic, or via table T510S (Wage type generation) entries. These are both very complex Time Management concepts that require a lot of studying and understanding in order to take raw data and generate the appropriate wage types at the appropriate time. This is important because based upon raw clock in and clock out's alone the system does not know if it should generate regular hours, overtime, double time, holiday pay etc - you have to do the configuration to tell the system what to generate and when to generate it.
    3. As far as your issue within the payroll driver (Basic Salary being created on the basis of number of date) - I believe this could be based upon either wage type setup or your Pay Scale configuration and this associate's Infotype 8. You probably have him setup like a salaried associate. Check the following area in the IMG Personnel Management --> Personnel Administration --> Payroll Data --> Basic Pay
    Good luck on your journey to learning SAP Time Management/SAP Payroll.
    Thanks,
    Imran

  • Attendance type for training in negative time management

    Hi,
    We are using negative time management. Attendance Type T-Training is created. I have specified in the integration switch PLOGI-TIME 1 and specified the attendance type in SEMIN-APART. But even when I firmly book a business event, the attendance type is not stored in the attendances of the employees who are booked to the training event.
    Is the attendance stored automatically when the business event is firmly booked in negative time management? Or this is applicable only to the Positive Time Management?
    Please help.
    Regards,
    Sasi.

    Hi Dear,
    In  "Specify Attendance Types" node under Integration with Time mgmt in TEM node in SPRO. Kindly check the following points:
    PLOGI,,TIME,,1,,Integration switch: Training and Event Mgmt/ Time
    SEMIN     AINST     "value as maintained in Time Managment" for Attendance type for instructor in T554S
    SEMIN     APART   "value as maintained in Time Managment" for Attendance type for instructor in T554S
    SEMIN     TIMEP    According to your requirement
    kindly check the value for the above two field under
    Time Management --> Time Data recording and Administration --> Attendance/Actual Working Time --> Define Attendance Type
    and check the value maintained Trainee Attendance and Trainer Attendance. Following is maintained as default.
    01     0420     Trainee Attendance
    01     0425     Trainer Attendance
    let me know if you have any issues.
    Thanks and Best Regards
    Puneet

  • HR-PDC , Time Management Interface Question

    Hi,
    I am involved in a project that links Kronos Time Management system with SAP 4.6C . Since Kronos is certified for standard interface HR-PDC, we can use it for integration without patch-work.
    For more information, go to <a href="https://www.sdn.sap.comhttp://www.sdn.sap.comhttp://www.sdn.sap.com/irj/sdn/developerareas/sdnservices/icc">this link</a> and on the right hand side, select Human Resources from Integration Scenarios -> Business Application Integration. Select HR-PDC from the list of interfaces available for HR.
    There are a few concerns though, the most important being related to transfer of HR mini-master data. It is mentioned in the interface documentation that SAP always sends complete master data for all employees and that deltas are not supported.
    Now, the customer has around 50,000 employees and sending data for each one of them every night doesn't seem to be a workable solution, especially when only 30-50 records change in a day. I understand that sending deltas can be accomplished through some tweaking, I am wondering why the standard interface won't support them, knowing the fact that all historical (delta) information is available from cluster PCL4.
    Although I understand that SAP themselves are in a better position to answer the question of why the interface is like that, I am asking if anyone experienced any short-comings with sending delta information. For example, perhaps the number of scenarios for which delta was to be transferred were too many and sending complete information was more suitable. So if anyone has had previous experience of working on HR-PDC, please shed some light on their experience.
    Secondly, is there a standard interface to record and send changes in Organization and Staffing (create, modifiy, delete) to a sub-system? I am talking in relation to t. code PPOME. Is HR-OCI the right interface for that???
    Thanks and regards
    Message was edited by: Shehryar Khan

    Hi,
    Thanks for the reply. It was quite helpful.
    It is fine to download time balances but downloading whole employee (mini)master data each day is a bit difficult to explain to stakeholders. Perhaps I may need to create my own driver program that populates data for modified employees only. Thoughts??? Is this the correct approach???
    As far as the second one is concerned, I am interested in downloading new/modified OM records like departments, jobs, positions, etc. It seems the same can be catered for by using HR-PDC through business object RCVPEVTREC, method receivePObject. I perhaps overlooked the interface specs.
    Thanks again and I may get back with more questions.
    Regards

  • Time Management Interface

    Hi,
    I am involved in a project that links Kronos Time Management system with SAP 4.6C . Since Kronos is certified for standard interface HR-PDC, we can use it for integration without patch-work.
    For more information, go to <a href="https://www.sdn.sap.comhttp://www.sdn.sap.comhttp://www.sdn.sap.com/irj/sdn/developerareas/sdnservices/icc">this link</a> and on the right hand side, select Human Resources from Integration Scenarios -> Business Application Integration. Select HR-PDC from the list of interfaces available for HR.
    There are a few concerns though, the most important being related to transfer of HR mini-master data. It is mentioned in the interface documentation that SAP always sends complete master data for all employees and that deltas are not supported.
    Now, the customer has around 50,000 employees and sending data for each one of them every night doesn't seem to be a workable solution, especially when only 30-50 records change in a day. I understand that sending deltas can be accomplished through some tweaking, I am wondering why the standard interface won't support them, knowing the fact that all historical (delta) information is available from cluster PCL4.
    So if anyone has had previous experience of working on HR-PDC, please shed some light on their experience.
    Regards

    Although I understand that SAP themselves are in a better position to answer the question of why the interface is like that, I am asking if anyone experienced any short-comings with sending delta information. For example, perhaps the number of scenarios for which delta was to be transferred were too many and sending complete information was more suitable. Any previous experiences...
    Regards

  • Attachment through interface table (OE_HEADERS_IFACE_ALL)

    Dear,
    i have make customization in Order Management Module
    currently i am loading data through interface tables i.e
    OE_HEADERS_IFACE_ALL
    OE_LINES_IFACE_ALL
    now, a new requirement is generated by the management to make the attachment in the customized application. User will write the long text in the text field and after the interface table has been processed through ORDER IMPORT request. text will be saved in the attachment tables i.e
    fnd_documents_short_text
    fnd_documents_tl
    fnd_documents
    fnd_attached_documents
    Kindly Guide,
    Regards

    See Add Attachement to Sales Order
    Sandeep Gandhi

  • Employees Salary without Time Management sub-module?

    Dear Consultants,
    Where to record employees attendance/absences (time related information) inorder to pay the salary through SAP-HR Payroll? We are implementing PA and Payroll (International). Time Management is not in the scope of the project.
    Could you please let me know, how can we handle this without Time Management. What would be the limitations without Time Management sub-module.
    Thank you all for your efforts.
    Edited by: Business Analyst - HCM on May 20, 2009 2:20 PM

    You have to create atleast the work schedule which will consist of DWS and PSW and then work scheedule rule. Also I think you will require to configure feature SCHKZ to default work schedule rule in IT0007.
    After doing this configuration you can create wagetypes related to ur time and you can pay these wage types through IT2010 ee remuneration info
    if the wt will have rate then that rate you can maintain in T510 and may be to meet the complete requirement you need to write little bit code in CATS exit.
    otherwise you will be able to pay through 2010 and you can enter the data thru CAT2 tcode. Just you need to create a profile and set the view for entering the data like single entry or mass entry.
    SPRO->IMG->Cross-Application Components->Time Sheet->Specific Settings for CATS Regular->CATS Regular->Record Working Time
    hope this will help
    guds

Maybe you are looking for

  • Acrobat Error - need help! - Acrobat 9 Pro

    When I try to open an acrobat files my it trys to Open EVERY acrobat file on my computer and does so until I get the following message "There was an error opening this document.  The maximum number of files are already open.  No other files can be op

  • IVI specific drivers usage in Teststand

    Hi, I am using Teststand 2.0.1 and i want to use some of the IVI specific drivers in my application. Can somebody guide me how to do that. Another clarification, if we use the IVI drivers which fall into any of the classes how do we achieve the inter

  • START_BROADCASTER and LAUNCH_BROADCASTER gives diffrent o/p screen

    Hello All, I am trying to identify why the broadcaster functions differently if I use LAUNCH_BROADCASTER than START_BROADCASTER. In case of START command, with Start_Wizard='X', the broadcaster starts with step 1 as a new wizard but after completing

  • Converting 2 large .movs for quality DVD play

    I need specific advice for converting a 3.6 GB (created from Final Cut Pro) .mov and a 1.2 GB .mov (created from AVID) to a somewhat smaller file that contains good quality and can be viewed from most consumer computers. Because the .mov files are so

  • Imaq string to image

    Hi guys i am facing problem in converting an imaq string into image. i am transmitting an imaq image via datasocket by flattening into string. now at the receiver how do i convert this string back into image.