Possible to copy automation data from one project to another?

Hi
I have done some automation editing to a region in a project, and I would like to copy it to an identical region in another project. Is this possible?

I have not tried this method I'm now going to describe, but 'logic' dictates it should work:
1. In your donor project, open the *Automation Event List* , ctrl-⌘-E, then open a new Arrange window, ⌘-1. The new arrange window will now contain regions that only hold automation.
2. Go to *Logic Pro>Preferences>Audio>Devices>Coreaudio* tab and UNtick the Enabled box. (If you don't, each audio file and instrument will have to be reloaded each time you switch from one to the other project. That would drive anyone absolutely nuts.)
3. Now open the other project, get an Automation arrange window there, like in 1.
Now you should be able to copy/paste automation regions between the two projects.
Hope this works... I think that you need to set the playhead at the right position before pasting, but you'll have to figure that out yourself...
regards, Erik.

Similar Messages

  • How to copy the data from one database to another database without DB link

    Good Day,
    I want to copy the data from one database to another database with out DB link but the structure is same in both.
    Thanks
    Nihar

    You could use SQL*Plus' COPY command
    http://technology.amis.nl/blog/432/little-gold-nugget-sqlplus-copy-command
    http://download.oracle.com/docs/cd/B19306_01/server.102/b14357/apb.htm#sthref3702
    Edited by: Alex Nuijten on Sep 16, 2009 8:13 AM

  • SEM:BCS - Copying Consolidated data from one version to another

    Hi,
    We have a situation where we do Consolidation of Forecast data. However this involves mixing Actuals data. For eg.
    1) Q3 forecast would contain Q1 and Q2 as Actuals and Q3 and Q4 as Forecast
    2) System has already done the consolidation for Q1 and Q2 lets say in version 0
    3) Forecast is a different version eg. F1.
    4) I want to be able to copy the Consolidated data of Q1 and Q2 from version 0 to version F1. Then load the data for Q3 and Q4 for forecast and perform consolidations for Q3 and Q4.
    What I have seen in the system is -
    a) You can copy only the non-consolidated data from one version to another and not for eg. Elimination entries etc.
    b) This means that I have to perform consolidations in version F1 for quarters Q1 and Q2 again even though its already been done in the Actuals version (0).
    c) Is there any way out of this. There is always the possibility that the consolidated data in Q1 and Q2 does not match between Actuals (version 0) and Forecast (F1)

    Hi,
    We had the same issue. In your solution you'll have to delete old (Q1 and Q2) forecast data and replace them by actuals. It's too problematic.
    And you are absolutely right about possible inconsistency between actual and forecast data.
    So, we've chosen another way.
    We make separate consolidation in actual, budget, plan and forecast versions.
    In plan and forecast we everything that is possible do periodically (including currency translation) -- to avoid the possible influence of historical data.
    In a BEx query (and Excel workbook) level we retrive: N months of fact, forecast data for N1 month and a plan data for N2 month. After summing up all figures we have predicted (name it as forecast) data for N+2 months.
    Of course, the actual, forcast and plan components are hidden in a report.
    This is possible because, in plan and forecast we use turnovers (not balances) only. Even a balance sheet is produced without problems, not talking about P&L and Cash Flow.
    Hope it helps.
    Eugene

  • --Any way to copy/paste clips from one project to another w/o LOSING TRANSITIONS...??

    I have CS5...
    I'm trying to speed up render/export time. I have multiple edited video's in about 15 different projects.
    I had a couple video's within one project and rendered the work area - consisting of 4 video's...then exported. It was much faster than just going to straight exporting so I wanted to do the same with all the other video's.
    Pull everything into one project - render first - and export from there but premiere doesn't copy transitions from one project to another. Is there any way to get it to copy/paste transitions??
    Thanks

    exported regularly and took 2hrs 50min's for each video....then rendered and exported - took prob around 2hrs total - including rendering/exporting.
    That seems unlikely.  If anything, the separate render/export should take slightly longer (though not that much) as you may also have to transcode the preview files (depending on your preview codec) during the render, as well as decode them for the export.  Besides adding an additional layer of compression, it also adds time.  Here's what I mean.
    Export only:
    1. Decode original media
    2. Render new frame based on sequence, effects, titles, etc.
    3. Transcode that new frame to the export codec of choice.
    Render (1-3) /Export (4-5)
    1. Decode original media.
    2. Render new frame based on sequence, effects, titles, etc.
    3. Transcode that new frame to the Preview codec (if anything less than Uncompressed, this adds time and potentially degrades quality)
    4.  Decode the rendered frame (if not Uncompressed, which adds time)
    5. Transcode that (decoded) render frame to the export codec of choice.
    So you see, the render first process has two extra steps which add time, one of which could also introduce additional artifacts (depending on your preview codec).

  • Copying directory data from one server to another

    Hi friends,
    I maintain two directory server (ver. 5.2) with same domain (xxx.com) and i have to copy the entire data from one server.
    I tried to export from a one server and import it on another server, but it didn't get copied and it is getting object class violation error,
    Please give me some tips to copy the entire data along with password encryption, so the users should be able to login to the new server.
    Regards,
    Iqbal

    Before you copy the data, make sure the new server has all user-defned schema (objectclass, attribute) which reside on the first server. What you can do is to copy the schema over first. Then you can copy the data over.

  • How to copy form data from one pdf to another?

    Hi,
    I have created a pdf, added form data to it. Saved the form data as a fdf file - all good.
    I've updated the document and saved as a new pdf and would like to load the fdf data into it.
    So I select tools - forms - more forms options, and press the "import" function  - it goes grey and nothing happens.
    If I re-open the document the import function remains greyed out.
    I can find no way to import this data.... any ideas?
    I've tried going into form edit mode - adding a new field.  The import option is no longer greyed out so I click it and can select the fdf file hit open and ... the dialogue disappears and nothing happens.
    Is my Acrobat XI 11.0.07 badly installed - or what?

    You need to learn about the different types of PDFs. PDF/ A is an archive format that does not allow changes. PDF/X is used for graphics exchange
    For forms I would use only the PDF with a target version. Do not use the Optimizer feature.
    Forms always become larger due to the need to include the font for the various form fields. You might have to review the type fonts used by the form fields and one standard font as much a possible.
    It is possible to use the FDF file to move field values from one PDF to another.
    If you are trying to replace the underlying content and keep the form fields, use the replace pages.

  • Copy historical data from one material to another

    I have added a new material in the planning hierarchy and need to copy historical data from an existing material to this new material.
    For achieving the same I carried out below steps:
    In the forecasting view of the new material I added the existing material as reference material: consumption, also added the reference plant, validity period and multiplier.
    But then too system is not copying the historical data of that material to the new material..I cannot see any data in MC94 or in the infostructure.
    Please let me know where am I going wrong or if I am missing any setting.....
    Thanks in advance.
    Regards,
    Sonal

    Dear ,
    System will not copy the Reference material consumption to new material consumption -Total Consuption tab .If  you maintain those filed like
    1.Reference material consumption
    2.Ref.Plant Consumptuion
    3.Date To
    4.Multipler
    5.Similar Period Indicator -M/W ( some time if you maintain the frist 4 option but not same period indicator , system will not consider the consumption ) .
    Based on the above set up  , when you execute the Forecast ( Indiviaully -MM02-Forcaste Tab or MP38 collectively or through SOP) , forcast programme will use the  historical values of Refe.Material and project  the  new material\s forcasted demand as per your forecast period ( 2 months or 3 motnhs etc )  in the forecasting view .
    System will not copy the Historical valu to total consumption tab of the new material ok .
    If you need to copy the  consumption of old material to new material , you have to use report RMDATIND, MVER_DI or BAPI_MATERIAL_MAINTAINDATA_RT .For more details please refer the OSS Note 200547 - Program: Direct input for consumption values
    More over why do you need to copy when u have facility to have refence in Forecasting view !
    Just chek the above points wht i have mentioned and execute forecast .Do not forget to keep same period indicaotor-M/W what ever .
    Test a sample and procced .
    Hope it is clear .
    Regards
    JH
    Edited by: Jiaul Haque on Jun 5, 2010 10:12 AM

  • Copy the data from one column to another column using @

    I have two columns here - A and B.
    Column A has a complicated formula that will generate results. I wanted the results in Column A to be reflected in Column B without pasting the A's formula in B. This will save me the trouble of editing formulas in more than 1 column if there is a need.
    I saw somewhere that you can use "@" in column B but I have no idea how to use it.
    Assumingly column A is the first column. I tried to insert '@1' in B's formula and change B's column properties' Data Format as "Treat Text as HTML". It does not work.
    Please advise how I can do that.

    So is there any way to copy the data in Column A into Column B without putting the same formula? something like in Excel where we put "=C1". Its not possible in BI as it comes in excel.....The only way is to create a duplicate column in RPD or Answers screen and incorporate the formula and giving different name to it.
    whats the problem if you duplicate the column with same formula?....Ok still if you dont want to see identical just write some pseudo logic say
    Duplicated column f(x) case when 1=0 then column_name else formula end.....so it appears different to see but it outputs same.
    UPDATED POST
    Dont create in RPD,you can create a dummy column in that report request and change the f(x) to the above case i mentioned by taking the column from columns button in edit formula screen so when ever you edit the actual column formula that would reflect in the dummy column also as it is replicating from original one.Try and see
    hope helps you.
    Cheers,
    KK
    Edited by: Kranthi.K on Jun 2, 2011 1:26 AM

  • Bundle to copy ntuser.dat from one profile to another

    I was wondering if it was possible to create a bundle to solve the following issue.
    It seems our windows 7 image contains an proxy setting in the default user profile so that every user logging on for the fist time (using DLU) gets this proxy set.
    Is there a way to create a bundle to copy say ntuser.dat from the Administrator profile to the default user's profile without having to enable the see system files etc view.
    Tom

    Originally Posted by Tom Cummings
    It seems our windows 7 image contains an proxy setting in the default user profile so that every user logging on for the fist time (using DLU) gets this proxy set.
    Hi Tom,
    I what you are looking for the clear out the IE proxy that has been set in the default user, as alternative to a copy you could also clear the setting in the default user hive.
    Here's one example:
    http://www.windows-noob.com/forums/i...-user-profile/
    Originally Posted by windows-noob.com
    @ECHO OFF
    REM ************************************************** ***
    REM Script configures the Default User Profile
    REM ************************************************** ***
    echo.
    echo. Load default profile HIVE and apply registry settings.
    echo.
    REM Load the default profile hive
    REG LOAD HKU\Default C:\Users\Default\NTUSER.DAT
    REM Configure the default user profile
    REM Customise Wallpaper Theme Screensaver etc.
    REG IMPORT HKDUser\HKU_ControlPanel_Desktop.reg
    REG IMPORT HKDUser\HKU_Themes.reg
    REG IMPORT HKDUser\HKU_Software_MSWin_DWM.reg
    REG IMPORT HKDUser\HKU_ControlPanel_Colors.reg
    REG IMPORT HKDUser\HKU_ControlPanel_Cursors.reg
    REM Unload the default profile hive
    REG UNLOAD HKU\Default
    exit
    Cheers,
    Willem

  • Can I Copy and Paste From One Project To Another?

    I have a scrolling title working very nicely in one project and wanted to "simply" copy and paste it into another project.  After doing the copy on project 1, when I get to project 2 to do the paste, there is nothing there to paste.  Is this something with Premiere Elements 12, or with my iMac for not keeping what I copied in the appropriate buffer?  I found something online that implied there was some software to do this but I can't believe that is the only solution. 
    I also created a "temporary" project for easier editing with pictures, transitions and sound added that I want to put into my "master" project.  I could create an avi and bring it over but I was hoping to have the finished project all in one source.  Any thoughts would be appreciated. Thanks.
    Rick

    Thanks for the info.  I'll keep that in mind if I ever want to do it again.  Unfortunately, I had already just re-done it in the master before I saw this.  Amazingly (to me, anyway), I couldn't even cut and paste the TEXT in the title to a Word doc just to save me from keying it in again.  (It was more than a title - it was like movie credits with names, songs, etc.)  I figured I could at least cut and paste the text.
    The bigger issue was I had done a "save as" of my main project, deleted all but the 55 pictures I had, then added transitions and music, burned it to a RW DVD so I could see how it looked, then figured if it looked good I would just copy and paste the info into my master.  Well I wound up redoing that as well once I figured out I couldn't do that.  In Pinnacle, whether it was a title or just the video track or audio or both it was a simple highlight of what I wanted, copy it, close that project, open another one, paste it in.  Done.
    I also had trouble editing today.  If I edited my pictures, maybe changed one or added one, it messed up my soundtrack.   In Pinnacle I would click a lock icon on the timeline and edit either the audio or video to my heart's content and not mess up the other track.  I could leave the audio in place but replace the video.  For my daughter's wedding, for example, I took video from 3 different cameras but used the audio from just one so it played smoothly but I could switch the video around for the best shots and it looked very good.
    Dare I ask how to lock just the audio or video track?  Don't spend a lot of time replying.  I already edited my music file by putting it way out in the timeline where there wasn't any video track.  Then I could split the audio clip, copy part of it, and paste it back in.  I needed the music to last a little longer while the pictures were displaying.  Then when I was done I moved it where I wanted, but even at that, I had to be careful because moving it sometimes messed up the video track if I didn't do it just right.
    The good news is I'm pretty much done with my video.

  • Isit possible to copy DRM version from one database to another?

    I want to copy a version from DRM (Development environment) to another instance (production environment) by copying one database to another database. In order to synch both the version. Is this possible? rather than exporting and reloading?
    It is possible, but I want to know the steps invloved for this
    Thanks in advance
    Edited by: Ramesh Janardanan on Jun 19, 2012 6:21 PM

    Hi Ramesh,
    You can use the DRM Configuration console for this purpose. Please follow the below steps:
    1. Open Repository Wizard
    2. Check - Copy/Upgrade
    3. Enter Source connection details and test connection
    4. Click Next on Analysis summary
    5. Enter Target connection details and test connection
    6. Confirm Copy by clicking Next
    It copies everything. Hope this helps!!
    Cheers, Vicky.

  • Copy a mapping from one project to another project in same reepository.

    Hi All,
    I am using OWB 10GR2. I have two projects in this repository called dev_project and test_project. after completion of mappings development in dev_project, i want to move the mapping from dev_project to test_project. I was able to copy the mapping from dev_project to test_project.
    However, when i open the mapping in test_project project, I was able to see all mapping operators like sources, targets and all other operators. But filter operators, join operators and aggregator operators doesn't have its properties( means there are no filter condidtion, join condition).
    Please help me how to take those filter and join conditions also from dev_project to test_project.
    Thanks,
    pv

    There is a OWB bug 8267898 described as:
    COPYING MAPPING BETWEEN PROJECTS IN OWB LOOSES ALL THE OPERATOR PROPERTIES
    Try to apply patch:
    Patch 8289030 - PSE FOR BASE BUG 8267898 ON TOP OF 10.2.0.4 FOR WINDOWS 32BIT (215)

  • Is it possible to copy page content from one book to another?

    Have 2 books in a single Aperture project.
    Need to copy one page content from book 1 to an empty page of book 2.
    Tried all my best, but couldn't manage.
    Anybody please advice.

    At the time the "copy content" only works between pages in the same book. Even if you drag the involved images to the new book, copying content between the two books don't work. This I believe could be a bug and do hope it is corrected soon.
    Regards
    Paul K

  • How to copy test cases from one project to another?

    Currently we have several projects withing the oracle test manager suite with test cases in each of them. I need to be able to copy some of the test cases to other projects or atleast select them to run under a new project instead of retyping them everytime. Is there a way to do this? I see that I can copy within a project and paste but have not be able to find way to do it outside of a project. Maybe there is a way to export and then import? Any ideas would be helpful?
    Thanks

    Hi
    You can always export a test Summary table Report in XLS and import it in the new project, however that will not give you results or test steps but at least is a start.
    Also there is something called Data Links have a look at the help file you may be able to use that when creating test cases, you could create the test case in CSV first and then upload it to multiple projects using the data link.
    Hope this helps
    Alex

  • How to copy game data from one device to another

    I downloaded Injustice: Gods Among Us onto an iPhone 5 and I wanted to have all of my save data copied onto the iPhone 5. The same iCloud account is used on both devices and I recently backed up my iPhone 4. I want to know how to copy (if there is a way) my game data onto the iPhone 5. Is there a way I can just copy the game data and nothing else to the iPhone 5?

    There is no way to just copy the game data. Game data is saved as part of the backup, and the only way to transfer it is to restore the new phone from a backup of the old phone. Just remember, anything that you have done on the new phone since the backup of the old phone will be deleted.

Maybe you are looking for

  • 3510 network interfaces and # of direct attached hosts

    Hi, I have 3510 array with Dual FC controllers and each controller has a network interface. I am trying to congiure both NICs with separate IPs but I only see one interface through console. How to set the 2nd interface up? And there are 8 FC host por

  • DBMS_METADATA.GET_DDL help needed

    Hello, I am using ORACLE 10G, the result of this query SELECT DBMS_METADATA.GET_DDL('TABLE', 'PMSSECURITY2') FROM DUAL Returned the below output CREATE TABLE "ASSETS"."PMSSECURITY2" ( "COMP_CODE" NUMBER(4,0) NOT NULL ENABLE, "BRANCH" NUMBER(4,0) NOT

  • Animate site won't load on iPads

    I've made a site using Edge Animate - http://nextonet.tv - though on iPads, the site can't load. It shows it for a split second then gives me the message "problem occurred with this webpage so it was reloaded", then reloads, then displays the message

  • Assign a SELECT item's list of values - APEX 2.2.0

    Hey, all, Is there a way to assign the list of values of a SELECT item programatically, besides the usual query-in-the-LOV? I am reusing a page 0 region and have a SELECT item that can take on a wide range of lists of values. Something like: AddOptio

  • Ethernet speed problem after OS 10.4 security update