Post GR without stock in STO

Hi,
This is with respect to STO.
we have removed the movement reference in delivery (in config) and hence no PGI document is created. we have only the confirmation.
Now there is a necessity to do the GR in receiving plant.  But the system says, there are no selectable items. 
Let us know if there is a way to accomplish this.
Thanks
sivakumar

Try following options
Option 1
Reverse PGI by VL09 with the old config settings.
Then apply new config settings.
Prepare PGI again
Option 2
Check MB5B Stock in-transit. Whether stock is displaying there.
Try Goods Receipt (MIGO) at Receiving plant
Regards,
Chintan

Similar Messages

  • Goods receipt without stock

    How to do goods receipt without stock for a stock material? Is there a way to create a material document without stock posting?

    in case you do a goods receipt to a third party order, it is just statistical and does not update your stock figures.

  • Posting to QM stock while goods receipt

    Hi
    What are all the options we have to post the goods to Quality stock category at the time of goods receipt?
    I know off
    A. In material master, purchasing view - post to inspection stock is active
    B. If QM control key is active
    What are the other possibilities?
    Thanks
    RJS

    Hi,
    In Material master we need to maintain "Post to inspection" and respective inspection types say for example 01 inspection type for Purchase order.
    Maintain Quality inspection plan using QP01 for the respective material.
    When a PO is created for the material having QM activated , in delivery tab Stock type will be automatically set as "Quality inspection". If you want to post to Quality stock without quality management activated for a material , then while doing MIGO select the stock type as "Quality inspection" in the where tab.

  • Posting of FG stock into blocked status

    Dear Experts,
    Plz advise is there is any way through which we can directly post the FG stock into blocked stock ( at the time of Order Confirmation). Without using quality.
    Thanks
    Sumit Kalyan

    HI
    In production order header, you can see the goods recipt tab, in that tab you see in control data. there you need to select the stock type Blocked stock.
    or at time of GR i.e MIGO you can select the stock type Blocked stock.
    -ashok

  • T code QA11, quantity can not be posted to blocked stock

    For Inspection lot with system status is   INSP RREC SPRQ, when user tries to perform QA 11 to post stock to blocked stock the system does not allow as "to blocked stock field" is greyed out and also can not chnage the storage location on that screen.
    I have checked the material already exists in the WH/storage location also inspection charachterstics are corrct not sure what else to check.please advise.

    Does not seem like authorisation restriction since user is able to process other QA11 for the same plant/WH and storage location. Does not seem like customisation either since all " Quantity to be posted "options and storage location are greyed out under inspection lot stock Tab
    After Accept atleast system should allow posting to "unrestricted stock " but thats not available either.
    For the same material/plant/WH, I am able to sucessfully post stock when system status is -REL  CALC SPRQ but in this case the status is -INSP RREC SPRQ, what does this signify.Please help

  • Restricting for creating the Billing Document without PGI in STO Process

    We want to restrict creating the Billing Document  without PGI in STO Process
    Delivery Type:NL
    Item cataogory:NLN
    Billing Type: JEX Profroma Invoice
    I have check in VTFL
    At Header Level, Routine - 003.  for normal sales process LF-F2
    At Item Level , Routine  - 004
    in VTFL-- NL-JEX
    At Header Level, Routine - 009. 
    At Item Level , Routine  - 010. here when i changed to 003 and 004 for NL and JEX
    i am getting error after PGI when i am doing vf01 error is coming " document is not relevant for Billing"

    Hi
    Kindly do the belwo
    1. goto the t code VOV7 item category determination and select the item category and put  the billing relevance as "A"
    2. once the step 1 is completed then it will show the billing relevant status AS "A"in the delivery documnt at the item level
    The above configuration  will be applicable in the new documents only
    Regards
    Damu

  • Error while posting batch managed stock in 107 movement type?

    Hi All,
    Error while posting batch managed stock in 107 movement type in MIGO, like 'Goods movement not possible with mvmt type 107'
    and here in batch tab batch number is not displaying only valuation type is displaying, kindly let me know can it be done by doing any change in field selection with respect to 107 movement type
    regards,
    Sanjana

    Hi,
    spro-inventory management-setting for enjoy transaction-setting for goods mvt--field selection per mvt type
    107     SGTXT
    107     WEMPF
    Check here 107 mvt type there or not if not then put.
    101     CUSTNAME
    101     GRUND
    101     SGTXT
    101     WEMPF
    102     SGTXT
    102     WEMPF
    103     SGTXT
    103     WEMPF
    104     SGTXT
    104     WEMPF
    105     SGTXT
    105     WEMPF
    106     SGTXT
    106     WEMPF
    107     SGTXT
    107     WEMPF
    108     SGTXT
    108     WEMPF
    109     SGTXT
    109     WEMPF
    110     SGTXT
    110     WEMPF
    Regards
    Rakesh

  • Material  stock to be  posted to restricted stock( urgent please)

    Hi genius,
                     This is below my scenario, Please let me the solution .
    1.  Material to be received thro’ GR ( MIGO ) and which has to be posted to unrestricted stock.
    2.  Material will be reserved by the users as on when required thro’ MB21 T.Code.
    3. Reservation does not allow the reservation qty over the quantity available present in unrestricted stock.
    4.  New Reservation should not allow to create more than available qty. which is taken into the account of already reserved.
    5. Consumption should be blocked on actual objective.
    6.  Plant control/Indented items should be put to restriction on issuance only to indented department.
    7.Less impact on account inventory qty and value reconciliation.
    Please find anyother solution , Let me know, I am eagarly waiting for your valuable reply,
    Regards
    Jeya

    Hi
    1. Through movement type 101, stock will be posted as unrestricted stock.
    2. Reservation is created via MB21 only
    3 You are defeating the logic of reservation if in you scenario reservation should not exceed the quantity available in stock. If you are running MRP, it will take the reservation into a/c and if any deficit in stock in there it will draw an PR for the same.
    4 Same answer as point 3
    5 You can restrict consumption against reservation.
    6 You can control this thru reservation.
    7 Its matter od discipline.

  • Transfer posting of subcontracting stock with mvt type 541 from project stk

    Hi,
    we run project MRP and the requirement is raised for subcontracting item also ,after converting the PR into PO when I try to transfer post material in MB1B using 541 ,system shows Error Purchase order does not contain any item even I have  material in my project stock,what may be the reason?
    Regards
    Kantha

    Hello Kantha,
    The components which you provide for a vendor are manged in a vendor-related special stock, O. This stock is updated at plant level, becuase material is actually not in your plant. If you want to provide stock to vendor the avialble stock types in subcontracting are from un restricted use and in quality inspection.
    When you provide componets to vendor via transfer posting this needs to go from only unrestricted use stock to the stock of material provide to vendor movement type is 541.
    So to execute the transfer posting for the stock of material provided to the vendor, you have to specify special indicator O, if not the transfer posting will not differ from normal transfer posting.
    Also T-code MBLB will help you in evaluating the stock of material provided. So you need to transfer the stock from project stock to unrestricted stock to carry out the transfer.
    Br,
    Tushar

  • Stock posting in block stock after grn for source inspection

    Hi All,
    I have following scenario
    I am doing source inspection at vendor site i have maintained control key 0005 in material master & necessary certificate with certificate check required at GRN & UD stage
    i am creating a source inspection lot for a release po through t.code qi07 & then processing that lot before GRN
    Now when i am doing GRN for same PO it is giving me the following message  stage
    <b>A category ZC01(user sp. category) inspected certificate is required</b>
    Message no. QA312
    Diagnosis
    An inspected certificate must exist at the first goods receipt for a purchase order item.
    Procedure
    Check whether a suitable certificate exists for the purchase order and delivery, and create a certificate record with the status "Certificate checked and stored".
    If there is no certificate or no suitable certificate, this does not comply with the requirements in the material master record. If there is no inspection lot for this goods movement, the system posts the quantity to blocked stock or does not post the goods receipt.
    If you have created an inspection lot, the system marks the certificate check with the status "In lot". You must confirm the availability of an inspected certificate by the time you make the usage decision.
    after doing the GRN stock is being posted to block stock
    if i do not process the source inspection lot then the stock is posted to quality stock but this does fulfill the requirement of source inspection
    plz suggest soultion
    It's urgent
    Regards
    Ashutosh Shende
    9860681314

    Hello Ashutosh,
    In the material master you have defined certificate type with the customizing setting indicator for  'Enhanced Certificate Processing' active.
    If you set this indicator, extended certificate processing is active for
    this certificate type. You can then manage the inbox for quality        
    certificates independent of the goods receipt.                          
    The electronic inbox of certificates for the purchase order is only     
    possible if this indicator is set.                                                                               
    This means you have to create a certificate in QM (Transaction QC51),   
    before you can update your PO with cert. enclosed.  
    If you do not want the enhanced certificate processing you have change  
    the indicator into inactive.    
    Another problem known here is if you have activated the 05 Inspection type in the material master, that it is not activated in all plants relevant although QM in Procurement is set in all plants.                                        
    I hope that this resolves the described issue.
    Regards,
    Isabelle

  • How to get the stock of STO Report with suppling Plant/receiving Plant/open

    How to get the stock of STO Report with suppling Plant/receiving Plant/open/close qty.

    MB5T gives you Details of STO which have stok in transit.
    ME2W gives you supplying plant wise STO details.  Also in ME2W , in the ALV report output, if you select  the "delivery Schedule line" icon , you will get details such as , STO qty, Issued qty , undelivered qty etc.

  • How to update profit center in posted document without profit center ?

    HI,
    I want to know,
    How to update profit center in posted document without profit center ?
    So that i can get my profit center accouting report proper.
    Thanks
    Nilesh

    There is a long story about profit center accounting. I assume you are using Classic PCA, this means you can see the PCA documents.  And the solutions is below:
         For P/L account, even you don't maintain cost element for it, if you maintain the profit center in the application (Frontend transaction), then PCA line items will be generated for this account.
        For B/S account,  if you maintain the default Profit Center with transaction 3KEH/3KEI, the PCA line items will generated for this account also.
      Hints, don't maintain default profit center for AR/AP accounts, these accounts to be treated in periodic processing.
      First, calculate the distribution/adjust by F.5D, then transfer it by 1KEK. for others account rather than AR/AP, use F.5E
    For you case, if this account is P/L account, but you don't maintain profit center in the transaction, you can maintain default profit center as B/S account in 3KEH and 3KEI, then transfer it subsequently by transaction 1KE8.
    Good Lucky!
    Flex Yang

  • Hi. I clicked some snaps from my iphone and post that without copying it i restored the iphone with all apps etc available from the backup taken. How do i get back the photos which were clicked earlier. Is there a way to get it back?? Please help

    Hi. I clicked some snaps from my iphone and post that without copying it i restored the iphone with all apps etc available from the backup taken. How do i get back the photos which were clicked earlier. Is there a way to get it back?? Please help

    Yes i had not taken back up before restoring it. However i was just going through some links on the net and there is a software available for MAC to retrieve such lost data. But the point is will the said software work on iphone as the OS is not MAC..
    Will have to give a try to this. If successful will share it with all. Anyone else has any idea about this please so share.

  • Goods reception without stock

    Hi ,
    Is any solution for to do PO goods reception but without stock put in  , is that possible ?

    Hi ,
    It is a specific request in our industry , before to do production order goods reception ,we need to print out the sample instruction and label , if sample qc check is pass then we can contiune with put into stock.
    now all sample instruction and label printing is upon production order goods reception.
    so we want to do dummy goods reception but without stock in order to print out the instruction and label

  • Posting logic for stock shortage

    Hi there,
    I m workiing in SAP R/3 ECC 6.0 version CO module.
    We are trying to find a solution for posting logic for stock shortage. Regarding this SAP Note 362037 have also been referred.
    We have purchased vide PO a certain item say ferro alloy 100 kgs. @ 5000 INR each (Clearing & Forwarding charges Rs.50000 credited) at which GR was made. Now at the time of bill passing of clearing & forwarding at a later date the amount passed was Rs. 20000 when the stock quantity of ferro alloy was only 40 kgs. The system adjusted the entire Rs. 30000 with the balance inventory available reducing the inventory cost instead of transferring to Price difference account the required proportionate amount.
    Whether this can be rectified in the system.
    Regards,
    Divraj Agarwal
    Edited by: Divraj Agarwal on Feb 22, 2010 12:32 PM

    Hi,
    Create a Formula variable with Replacement Path for Batch, and replace with Attribute and attribute is Date OF Manufacturing, so using this you get Date Of manufacture. And next create a Formula variable with Custome Exit and select Dimenstion ID = Date.
    And write the following code to get Current day.
    WHEN 'ZVCURDAY'.
          CLEAR: l_s_range.
          l_s_range-low = sy-datum.
          l_s_range-sign = 'I'.
          l_s_range-opt = 'EQ'.
          APPEND l_s_range TO e_t_range.
    so by using you get current date. So create Formula and do Substraction, i.e. Curday-Dateof Manufacture (above Replcement variable), so you get number of days from Manufacturing.
    Then you csan create conditions, i.e. <30 days, <60 days like that.
    Thanks
    Reddy

Maybe you are looking for

  • How to cancel payment run?

    Hi, Is there a way to cancel a complete payment run? I know how to cancel individual payments (and clearing) but how to do it for a run which includes e.g. +1000 payments? Thanks! Regards, Aki

  • Gif is animated in Sent folder but not received by others as animated

    I've always used Entourage but would like to use Mail if only because it will send animated gifs. I sent one to myself at another (not .mac) address and received it in Entourage but it's quite different from what I sent. gif isn't animated and format

  • Take very long time in phase DEPLOY_ONLINE_DEPL when install EHP1

    Dear all,<br><br> I need help for anyone that read my thread. I get trouble when install SAP EHP1 for SAP NetWeaver 7.1 at our client server, in phase DEPLOY_ONLINE_DEPL(Downtime Step). The phase take very long time. It has been more than 5 hours, bu

  • 7.1: Why do we need Hierarchy Groups?

    Hi, dear experts! Could you please explain why do we need Hierarchy Groups? As I see we can only use it to group devices, profiles and so on one screen. But can we use hierarchy groups to search for devices, mobile components or mass perform any acti

  • ABUM tcode

    Hi, We have a custom program that uses BDC for tcode ABUM to transfer an asset. It gives an error message 'Retirement/transfer on asset 20000001 0 takes place with no values'. The help says Diagnosis