Post processing of defect records from automatic Goods movement

During the run of COGI transaction, we got the List of all goods movements with errors.The list of errors can be <b>saved at once</b> and the other option is <b>save for background</b> (when we choose option List-> Save-> Save at once or Save for Background).In save at once option it saves the error & save for background shows the message "goods movements were entered as a background job".
Now my question is 1)What is the use of Save for BAckground? 2)If there are are multiple errors for a single raw material (say 7 errors)associated with different Process orders in COGI output.When we choose two or more error(say five errors we selected check boxes) the exercised option <b>save for background</b> the displayed message is self explainatory & it should have created a background job.But when I checked the SM37 (Simple Job Selection) it did not show us the Background Job details.
3)When I exercised the option of <b>Save for Background</b> & processed five error records, how can I find  which I processed & where they gone?

This cannot happen that u dotn see in SM37
May be u r using wrong username there.Just recheck it with your username
or check for BACKFLUSH*  Jobs
Confirm if it resolves
Reward points if useful
Regards
Manish

Similar Messages

  • Automatic goods movement for serialized material

    We are confirming a material which have two components.
    Both the components are serial number managed. can we post automatic goods issue for those components while confirming the header material using backflush indicator or in any other way?

    Hi, I  believe standard SAP does not supports automatic goods movement for the serialized material.
    Regards
    Edited by: Sarvan on Mar 25, 2010 4:33 PM

  • BaDI:Automatic goods movements

    Hi gurus,
    Can anybody tell whether we can use the BaDI :Automatic goods movements (menu path: SPRO> Production>Shop floor control >system modifications>Business add ins--> BaDI :Automatic goods movements) for the following requirement.
    1)To check the quantity of components Backflushed  with respect to the Yield  during partial 
      confirmation through co11n transaction(against the Production order BOM ).
    Scenario:# We reserve components for the production order in batches.
    We save production order eventhough component qty is insufficient(don't want to stop 
                     production) to fulfil the whole order quantity.
    We reserve partial quantity of components through batch split in production order.Open qty
                     will be there in the  component overview screen without  batch
    Our problem : 1) System not backflushing components proportionate to yield qty (batch split 
                              component with insufficient component qty)
                          2) No check/error when we post higer goods yield with insufficient component(no error )
    OR
    can we use the following Enhancement to solve the above problem
    CONFPP04    PP order confirmation: Customer-specific input checks 2 (menu path: SPRO> Production>Shop floor control >system modifications>Enhancements for order confirmations--> customer specific input checks with changes)
    Thanks in advance
    Jan

    Hi Jan,
    For your queries, refer to the following link:
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/b1/c04d01439a11d189410000e829fbbd/frameset.htm
    Hope this will help you in some way........

  • Automatic goods movement in co07

    Hi,
    I am trying to process an order without material (rework order). But while confirming I am not able to do the automatic component backflushing since components are not reflected in the goods movement screen of the order confirmation. Do I need to do some additional settings or is it the system that does not allow an automatic goods movement in this case?
    Thanks in advance
    Snigdho

    Dear Snigdho,
    CO07 is used for some rework purpose or for a dismantling process,
    Moreoever it will be created without reference to a material,so how is the system picking the BOM, and
    the BOM components?
    IF you are making the system to pickup always few components,then you can make the setting
    mentioned by Mr.Brahamankar and go ahead.
    Check and revert back.
    Regards
    Mangalraj.S

  • Automatic goods movement

    Dear expert,
    I have one question regarding goods movement in PP. How to deactivate automatic goods movement on creation of production order.
    I have untick backflush on material master, work centre, routing. Then i have also untick "collective order with goods movement" in configuration of order type.
    What are missing?
    Point will be reward

    Hi.
    To deactivate  automatic Goods movement please check below points
    For Auto GI 1. Remove the backflush indicator  at material master , Work center, Routing , Production order.
    2. Deselect the "all Components" check Box at OPK4 for your order type and plant Combination.
    For Auto GR.
    1. Change Auto GR  Control Key assigned at Last Operation
    2. Change  Production scheduling Profile Assigned at work scheduling View.
    Pradeep

  • Why do we configure Record resaon for goods movement?

    Hi,
    I have seen the settings for "Record reason for goods movement" in customizing for different movement types. it can be optional , suppressed or required.
    Can somebody please let me know what is the effect of this setting? what it does at the front end or rather user level, what transaction does it effect?
    Thanks
    Regards

    Hi,
    We define Record reason for goods movement to input reason for material rejection to vendor or material srapped etc.
    By means of displaying the mtl doc anyone get idea why this mtl is rejected.
    Regards,
    Sandeep

  • Post processing after system copy from standalone to cluster enviornment

    Hi,
    I have done a system copy(Backup restore method) from a standalone quality BW (QBW) system to cluster environment (TBW).
    The steps I have followed as follows.
    . setup the machines in the cluster environment  ( Windows 2003 EE server,sql 2005 SP3)
    . Backup the current database in the source system
    . Given a different SID (TBW) during the System copy installation .its a dual stack installation.
    . Restore the database in the target system and select the back up restore method during the system copy database installation step.
    .The installation completed successfully and i m having some doubts regarding the post processing steps after this .
    We want to retain the same client in the target system ,for this i need to rename the  logical name .Kindly assist me for changing the logical name for the extraction of BW delta process from extraction server to BW system and also the other steps I have to follow after system copy.
    Thanks
    Arun Padikkal

    Hi Arun,
    You should probably post this question in a basis forum.
    Cheers,
    Diego

  • Automatic goods movement at the time of confirmation in IW42

    Hey gurus,
    In a maintenance order i ve reserved some materials to be issued from the stores. Now i am not issuing the reserved materials from the stores and going to iw42 for confirming the operations of the order. If i select the item overview of the operation line against which we have booked the material, in the goods movement section i can see my reserved material which hasn't been issued from the stores. Now when i'm saving the confirmation, goods movement of the unissued material is automatically taking place and the cost of the material is getting booked in the order. How do i stop this automatic posting of material?
    Regards,
    Abhishek

    Hi friend
               in spro
    Plant Maintenance and Customer Service-Maintenance and Service ProcessingMaintenance and Service OrdersCompletion ConfirmationsDefine Control Parameters for Completion Confirmations
    you can define the setting of goods movements
    jitender

  • Automatic Goods movement from CO11N for serialized materials

    Hello,
    I'm dealing with confirmation of discrete production orders. When I confirm last operation, the system has to post Good Receipt automatically but materials are serialized, so I know I cannot use flag "Automatic GR" in control key.
    My requirement is:
    soon after the confirmation, I want to call MIGO transaction (movement type 101) with order number, yield confirmed, material code coming from CO11N.
    Both CO11N and MIGO have to be on line transactions.
    I have activated enhancement CONFPP05 but the call transaction MIGO gives me the message "Order xxx is already being processed" because the confirmation isn't still saved .
    The BADI WORKORDER_CONFIRM has the same problem.
    I haven't found an exit after saving the confirmation.
    Have you any suggest?
    Regards
    Nue

    Hello
    You can try Background job for all confirmed order, ran MIGO background
    thanks
    bala

  • How can I stop my audio message recorder from automatically recording audio messages? I am not even pushing down the button.

    I am having trouble with my Messages app. Sometimes the keyboard messes up as I text and I also am having trouble with my audio message microphone. It is automatically recording messages without me doing anything. I won't even be typing, my hand is nowhere near the button and all of a sudden I look down, and thirty seconds of audio has been recorded. It doesn't usually send, but sometimes it sends on its own.
    Any insight would be greatly appreciated.

    Reset your iPhone: hold down the sleep and home buttons, wait for the Apple logo, let go of the buttons.

  • Marking "goods movement completed" automatically during iw41 in PM

    Hi all,
    I have a problem during iw41.
    I asign material/components in component tab in order, and use t-code IW41 for confirmation, in this I confirm operation then click on goods movement icon, "completed" field is getting ticked automatically in this goods movement screen.
    So when I change the amount of component to a lower quantity than planned quantity and come back and save, it is recorded as completed goods movement. But I don't want this goods movement with missing amount to be ticked as completed goods movement because it is recorded in tables as completed also.
    Please kindly let me know how can I avoid this ticked automatically.
    Thanks and Regards
    Damlasu

    As the component has been mentioned as Backflush in component tab of the order, Completed check box is selected in Goods movement screen.
    Implicit meaning is that as it has been mentioned as Backflush, no more qty is required. I guess, there is no config to change this. Only using user exit or manually, we need to remove the tick.

  • OPENSSO PRE/POST PROCESSING ATTRIBUTE FETCHING VIA POLICY AGENT

    Is it possible to apply filter or post processing when fetching attributes from open sso using a policy agent? If so, do you know if the process is documented and where or under what search criteria should I use to start my search?
    Assume the following attribute (keys) can store multiple values:
    Keys:
    A | 1 (key 1)
    B | 4 (key 2)
    A | 7 (key 3)
    Is there a way to only extract the key values of B | 4 instead of all of the key values (keys 1, 2 & 3) ?

    Is it possible to apply filter or post processing when fetching attributes from open sso using a policy agent? If so, do you know if the process is documented and where or under what search criteria should I use to start my search?
    Assume the following attribute (keys) can store multiple values:
    Keys:
    A | 1 (key 1)
    B | 4 (key 2)
    A | 7 (key 3)
    Is there a way to only extract the key values of B | 4 instead of all of the key values (keys 1, 2 & 3) ?

  • EDI message output for goods movements

    Dear experts,
    we configured NACE to send EDI messages, when goods movements are created. When we use partner type "VN" (Vendor) and leave the partner number empty, no message is created. Only if the partner number is filled, a message is created. This means, that the partner number is not extracted dynamically from the goods movement and we have to make one NACE entry for each partner. For other applications (e. g. outbound call offs), the partner number in NACE can be left empty and when a document is posted, the receiver partner number is determined dynamically.
    Is it possible to modify the processing, so that the partner number is extracted from the goods movement? How can this be done?
    Best regards,
    David Claes

    Hi,
    What is the application you selecting for creating ouput?
    I don't see output record condition with as combination.
    You should be using ME as application area.
    Thank you!
    Dipak

  • Batch Classification Screen for Goods Movements

    SAP Gurus,
    Very recently (24. April), we experience the following issue: (PP-PI Process Order)
    At the moment of process order confirmation, for any new batch assigned in the good movement overview, there's no pop-up of batch classification screen which allow our user to entry the classification data. And this functionality works fine in the past.
    Do you have an idea that how it happens? We checked the configuration OMCV and master data as well, the settings are all fine to me.
    Best regards,
    Vincent

    Dear Vincent,
    I think you talk about the 101 movement, don't you? In this case this is not possible at all, check SAP note  85310
    Because goods movements can be decoupled from confirmations and          
    processed in background, it was decided that this functionality would    
    not be implemented; therefore this is Standard R/3.                      
    Solution                                                                 
    As a work around for this you have the following options:                                                                               
    1.  Classify your batch manually through Batch Master Maintenance.                                                                               
    2.  Turn off automatic goods receipt and classify your batch through the 
        pop-up that is presented during MM goods receipt.                                                                               
    3.  Do not create your batch during Order Processing. Instead have the   
        system create it during confirmation and at this time you will be    
        able to classify your new batch from the Goods Movement screen       
        COMPONENT>BATCH MANAGEMENT>CREATE BATCH.                                                                               
    Note :                                                                   
    If you want that your batch is classified in the background you can set  
    in the transaction OMCV (classify batches within goods movement          
    overview) that the classification is to happen in the background. You    
    can then utilise the user exit EXIT_SAPMM07M_004 to valuate the          
    characteristics if it is valid for                                       
    your release.                                                            
    Regards,
    Sabine

  • Enable Goods Movement Error Handling on Inventory Management

    Hello gurus.
    The Production department uses transaction COGI (Automatic Goods Movement Error Handling) to track what automatic goods issues were not performed due to errors like stock deficit, etc.
    My question is; is it possible to use this same COGI transaction to store manual goods movements that also end up in an error?
    For example, if I go to MIGO and I perform a Goods Issue with Movement Type 201; if I don't have enough stock of the material, normally I get an error and I cannot continute; instead I want the movement to fail and go to transaction COGI, where I can deal with it later.
    The main goal is not to interrupt the capture of the Goods Issues, if there is not enough stock in the system, the person should not stop to correct the error. It's something that is desired to deal with later.
    Any possibilities that you see?

    Hi,
      COGI transaction is Goods movements error status while process order or production order level.
      If Goods are not avaiable in store/warehouse, how to post thru' 201 movement. In case stock is avaiable goods movements are only thru' 261 movement.
      regards,
      satish kumar

Maybe you are looking for

  • Report Layout

    Hi Gurus, I have a reporting scenario. I would like to have a report layout with the following.  In my columns, I would like to have 4 KFs of 1 Year and 4 KFs of prior Yr.  On top of the first 4 columns, I would like to have a title that says CurrYr

  • 24" iMac Video Card Burned

    I have the 24" aluminum iMac and all of the sudden when I tried starting it up, it wouldn't do anything. It is out of warranty because I didn't buy AppleCare for it (Stupid...I know) but when I opened it up, I immediately noticed that the graphics ca

  • My mac has recognized my iphone for 2 years now all of a sudden it doesn't even have "devices" listed when I bring up my itunes

    My iMac has always recognized my iPhone now, all of a sudden I go to sync it and nothing shows up. "Devices"doesn't even show up in the left hand side of my iTunes. Help?

  • MFBF Conformation

    Dear All. Here we use z programs for conformation of Rem activated Materials (ZMFBF). While Doing conformation for REM activated materials, the system allows me to do conformation only once for a planned order even though planned order is still Open.

  • Installing Oracle AS R2 (10.1.2.0) on RHES 4.0

    To run the Installer is necessary modifier the file /etc/redhat-release Red Hat Enterprise Linux ES release 4 (Nahant) to Red Hat Enterprise Linux ES release 3 (Nahant) and don't care inclusive mantain the other words, because if OUI finds e.g. digit