Post upgrade check list

Hi,
We have a sandbox upgraded from XI 3.0 to PI 7.0.
Is there any check list to see if every thing is ok or not
thanks,

Hi Naveen,
      I think there is no such check list for post upgradation, but you can check these SAP artifacts which talks about the same:
<a href="https://www.sdn.sap.comhttp://www.sdn.sap.comhttp://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/b6974f99-0701-0010-9591-adf867dca09b">https://www.sdn.sap.comhttp://www.sdn.sap.comhttp://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/b6974f99-0701-0010-9591-adf867dca09b</a>
<a href="https://www.sdn.sap.comhttp://www.sdn.sap.comhttp://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/cefe0399-0701-0010-8d86-b6b31cc5a681">SAP Exchange Infrastructure in High Availability Environments</a>
<a href="https://www.sdn.sap.comhttp://www.sdn.sap.comhttp://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/8c72aca0-0501-0010-3d9e-e16fdb86fd15">Upgrade Master Guide 04</a>
<a href="https://www.sdn.sap.comhttp://www.sdn.sap.comhttp://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/a1a0eb43-0b01-0010-23aa-908cc4eaabcd">Upgrade Master Guide 04s</a>
Also check these two similar threads:
Upgrade check list
Regards,
Subhasha Ranjan

Similar Messages

  • Upgrade check list

    Hi All,
    We are planning to upgrade to SP12..I would like to if there is a post upgrade check list that needs to be checked for after the upgrade is done??
    -Teresa

    right now, i would not recommend to apply SP13. We've got some OSS open with SAP as it is really buggy. It is the buggiest XI patch ever seen since the feature pack....
    regarding post installation steps, i always do the following things:
    - check every page in RWB if it is still working, if necessary some services in SICF need reactivation
    - check for status of components in component monitoring
    - check for status of adapters in adapter monitoring
    - check logs and traces for anything unusual
    - check logon to IBD, IBC and SLD
    Best regards
    Christine

  • Post installation check list - SR1

    Hi all ,
    I have installed SR1 on windows and SQL as DB . Let me know anybody have a complete check list for the postinstallation verifications .
    Thanks In advance
    Aneez

    Hi Aneez Hameed how are you?
    I'm sorry I cannot replay to you, I'm looking for the same )
    Do you have a check list for WAS 640 SR1 post installation?
    (Please send me email to junior AT israel DOT net)
    Thanks
    Miki

  • ECC6 Upgradation check list?

    Dear SAPIENTS,
    I wish to get check list for upgradation from 4.7 to 6.0 related to functional modules. What are the new things i can do in Plant maintenance module?
    Regards,
    Kaushal Rai

    Hi,
    can you look at this
    [https://wiki.sdn.sap.com/wiki/display/ERP6/SAP%20ERP%206.0%20Upgrade]
    [http://help.sap.com/erp2005_ehp_03/helpdata/EN/60/d6ba7bceda11d1953a0000e82de14a/frameset.htm]
    Regards,
    Muralidhar

  • Post Refresh Check List

    Hello All,
    We are on EP and SRM 7.0, now the client is refreshing its SRM Dev system from SRM Production. system
    Earlier while refreshing its sandbox environment we had faced some issues in EP side regarding SSO, based on that experience I have put together a small list.
    I wanted a more exhaustive list of activities that needs to be taken care off from a EP perspective after refresh.
    Thanks and Regards
    Pradeep Bhojak

    Hi Pradeep,
    Check the "Follow Up Activities" section of the EP System Copy document which can be downloaded from service market place.
    http://service.sap.com/instguides
    Regards,
    Vinod

  • R12 Apps with 4 node RAC and 4 apps nodes - Post Install check list

    Hi All,
    We have a new Oracle Apps R12 instalaltion with 4 node RAC and 4 Apps nodes with load balancing and external web tier being done by an outside firm. We are assigned the responsibility of checking that everything has been configured properly both on the RAC side and Apps side. I haven't worked on RAC earlier. Please let me know what all need to be checked before approving the install done by the outside firm.
    Thank you!

    Please check below metalink notes
    RAC Assurance Support Team: RAC and Oracle Clusterware Starter Kit and Best Practices (Generic) [ID 810394.1]
    Using Oracle 10g Release 2 Real Application Clusters and Automatic Storage Management with Oracle E-Business Suite Release 12 [ID 388577.1]
    Using Oracle 11g Release 2 Real Application Clusters with Oracle E-Business Suite Release 12 [ID 823587.1]
    Oracle E-Business Suite and Oracle Real Application Clusters Documentation Roadmap [ID 745759.1]
    745759.1 Oracle E-Business Suite and Oracle Real Application Clusters Documentation Roadmap
    384248.1 Sharing The Application Tier file system in Oracle E-Business Suite Release 12
    387859.1 Using AutoConfig to Manage System Configurations with Oracle E-Business Suite Release 12
    406982.1 Cloning Oracle Applications Release 12 with Rapid Clone
    240575.1 RAC on Linux Best Practices
    265633.1 Automatic Storage Management Technical Best Practices
    Loadbalancer
    note 380489.1 Using Load-Balancers with Oracle E-Business Suite Release 12
    note 727171.1 Implementing Load Balancing On Oracle E-Business Suite - Documentation For Specific Load Balancer Hardware
    note 601694.1 How To Check Session Persistence On BigIP F5 And Cisco Ace Load Balancer Appliances
    note 603325.1 Using Cisco ACE Series Application Control Engine with Oracle E-Business Suite Release 12
    Installation R12
    note 761564.1 Oracle Applications Installation and Upgrade Notes Release 12 (12.1.1) for Linux x86
    note 402310.1 Oracle Applications Installation and Upgrade notes Release 12 (12.0) for Linux (32-bit)
    note 559518.1 Cloning Oracle E-Business Suite Release 12 RAC-Enabled Systems with Rapid Clone
    note 735276.1 Interoperability notes E-Business Suite R12 with Oracle Database 11gR1
    Shared Applications Confiugurations:
    note 380483.1 Oracle E-Business Suite Release 12 Additional Configuration and Deployment Options
    note 384248.1 Sharing The Application Tier File System in Oracle E-Business Suite Release 12
    Edited by: Amigo on Dec 20, 2010 9:58 AM

  • No upgrade check query for B1 8.8 in Note 1000846

    Hi Experts,
    I see that there is no upgrade check for B1 8.8 in SAP note 1000846 untul present. Is it difficult to develop it or just use existing one ? I am not sure if we can go on to upgrade without the query of upgrade check.
    Steve

    Dear Steve,
    In Business One 8.8 version Pre-Upgrade checks are a part of the Upgrade Wizard. SAP Note [1357462|https://websmp130.sap-ag.de/sap(bD1odSZjPTAwMQ==)/bc/bsp/spn/sapnotes/index2.htm?numm=1357462] encloses all the SAP Notes for pre-upgrade checks. Always refer to this collective SAP Note for the latest pre-upgrade check list and details.
    For more information regarding Pre-Upgrade Checks under 8.8 please refer to the "Upgrade Wizard Online Help" or to the "Administrator's Guide 8.8 SQL", which can be found on the Documentation Resource Centre on the Portal.   
    hope it helps,
    Regards,
    Ladislav Meszaros
    SAP Business One Forum Team

  • Check list for Upgrade

    Hi,
    Can some one provide me a check list of activities to be taken care of during the upgrade.
    Thanks in advance.
    Points assured for relevant answers.

    Hi Sriramachandra,
    a checklist of action you need to perform is :
    - find SAP notes
    - plan the upgrade
    - prepare the upgrade
    - upgrade the Sap system
    - perform the follow-up activities
    If you need further info let me know..
    if it helpful reward points are appreciated

  • Check List for closing posting period

    Hi everyone,
    What should be the complete check list (activity to be done) before closing the posting period in MM

    Hi,
    In fact when ever you complete the month you have to close the period for the previous month.This you can do at the T.code MMPV.
    1)before closing the period check wheather the Back posting is allowed at SPRO-logistics general -material master-basic settings-company code settings for the financial year.
    2)There will be peiod indicatotors.You have to check them.
    3)unless and untill you dont close the period your inventory management settings will not allow you to furthur stating a warning message that 'posting period is in previous month'.
    Regards,
    Raghu

  • Check List for Functional Upgrade from 4.7 to ECC 6.0

    Hi Gurus,
                      Cany anybody tell me what is the check list for SAP SD Functional Upgrade from 4.7 to ECC 6.0.?
    My Email :  [email protected]
    Points for sure for useful answer
    Venkat
    Edited by: Venkat Goteti on Feb 4, 2008 5:34 AM

    If it is possible can you send me file to [email protected]

  • Objects for RSRV Check Post Upgrade

    Hi,
    Could be a Trivial Question for some - Nevertheless.....
    What would be an Exhaustive list of various types of Objects to be tested for Consistency using RSRV post Upgrade ?
    Please throw some "Expert" Light ...
    Regards
    Shweta

    In our case we apply upgrades to Sand Box.
    We created few reports and prepared test script before and after upgrade.
    We prepared our own document.
    But this is what the guideline we did.
    Regards,
    Bashir Awan

  • ASU-process POST Upgrade Step on SQL database

    Hi All,
    To check this message in the right format kindly click on reply first then click on quote original icon ("").
    I am performing an upgrade from R/3 4.7 to ERP 6.0 SR3, while doing upgrade sapup asking me To perform the manual application specific post upgrade step.
    This phase says to run ASU toolbox by using tx /n/asu/upgrade. when i run this tx is show the below list of steps to be performed with showing severity level of some as optional and many as obligatory.
    Task List                                                                                Severity     SAP R/3 release frm     SAP R/3 release to
    IS-OIL Application Test 600                                                 Optional          
    KP06xx: Termination SYNTAX_ERROR                                                 Obligatory     470                           500
    CGPL: Entries are blank after upgrade                                                Obligatory          
    Error handling of task group execution                                Optional          
    Mobile device cannot confirm TO after release upgrade     Obligatory     470                         600
    Mobile device doesn't find transfer orders after upgrade     Obligatory     470                          600
    Grantee Management - Upgrade from EA-PS 2.00 to ECC 600     Obligatory          
    Convert customizing for warehouse funds ctr scenarios     Optional          
    Various problems classification commitment items (class type     Obligatory          
    Unauthorized error messages udring fiscal year change/reassi     Obligatory          
    RFFMUDX1 migrates incomplete budgeting tables                          Obligatory          
    Non-7bit-ASCII character used for BCS key figures             Obligatory          
    Changes in TKEDR for /ISDFPS/RFFMDISTDERIVALE          Obligatory          
    BCS - Tool for Deleting Obsolete Derivation Strategies     Obligatory          
    BCS Syntax Error on Upgrade from EA-PS 2.00 to ECC 600     Obligatory          
    Migration to ERP 6.0 (EA-PS 6.00)                                         Obligatory          
    Migration EA-PS 2.00 to ERP 5.0 (EA-PS 5.00)                      Obligatory          
    Missing initialization of new fields in table ANLZ                  Obligatory     46C                       470
    Activating VMC for the Internet Pricing and Configurator     Obligatory          
    Customer specific BSEG-fields not transferred                  Optional          
    Conversion of report headers in drilldown-reporting            Optional                                   600
    IBase: Upgrade to Release 4.6C and higher                         Optional     46C                         600
    ZSAPRCKML_COGS: Upgrade to release 4.7 or higher     Optional     46C                      470
    Conversion of CO-Total-Tables                                              Obligatory     46C                      500
    Conversion of CO-line-item table COEP                                Obligatory     46C                       600
    New General Ledger, problems in CO-documents                 Obligatory                               500
    No receivers found in allocations                                          Obligatory     46C                        470
    Conversion Of New Process Parameter Long Texts For Search     Optional     110                       600
    Migration of process parameters in recipe management     Optional     110                        600
    FAQ new depreciation calculation                                        Optional                                600
    Upgrading to SAP R/3 47x200 and SAP ECC 500 with RMGMT     Obligatory     100                       500
    Reloading Table T512W                                                        Optional          
    Converting Short Texts                                                         Obligatory          
    Migrating Data                                                                         Optional     4.7     
    Activating SAP ECC Extensions                                          Optional          
    I am not sure about which steps I have to perform, I am a bit confused.. because some are optional and some are not relevant to my release (as target or source release is different from mine). and also few things are not applied in my envirnoment hence those steps are also not relevant.
    Please suggest me, how to proceed and what to do. please guide if i skip this step now and later  on I apply latest SP than still I need to do all this.
    Regards
    Vinay

    Hi All,
    I also faced a similar issue during upgrade. Some useful findings.
    1. Only super user can access this /n/ASU/START
    2. All the obligatory executable tasks are automatically performed by the system automatically during upgrade.      SAPADM. Only errors (if any) are to be corrected.
    3. Some of the tasks are only to go through some SAP notes as a precaution before upgrade.
    4.  Execute all the checks /n/ASU/UPGRADE
    5. This surely can be skipped, but not advisable.
    regards,
    Amit

  • Upgrade step ASU-process post upgrade step

    Hi All,
    To check this message in the right format kindly click on reply first then click on quote original icon ("").
    I am performing an upgrade from R/3 4.7 to ERP 6.0 SR3, while doing upgrade sapup asking me To perform the manual application specific post upgrade step.
    This phase says to run ASU toolbox by using tx /n/asu/upgrade. when i run this tx is show the below list of steps to be performed with showing severity level of some as optional and many as obligatory.
    Task List                                                                                Severity     SAP R/3 release frm     SAP R/3 release to
    IS-OIL Application Test 600                                                 Optional          
    KP06xx: Termination SYNTAX_ERROR                                                 Obligatory     470                           500
    CGPL: Entries are blank after upgrade                                                Obligatory          
    Error handling of task group execution                                Optional          
    Mobile device cannot confirm TO after release upgrade     Obligatory     470                         600
    Mobile device doesn't find transfer orders after upgrade     Obligatory     470                          600
    Grantee Management - Upgrade from EA-PS 2.00 to ECC 600     Obligatory          
    Convert customizing for warehouse funds ctr scenarios     Optional          
    Various problems classification commitment items (class type     Obligatory          
    Unauthorized error messages udring fiscal year change/reassi     Obligatory          
    RFFMUDX1 migrates incomplete budgeting tables                          Obligatory          
    Non-7bit-ASCII character used for BCS key figures             Obligatory          
    Changes in TKEDR for /ISDFPS/RFFMDISTDERIVALE          Obligatory          
    BCS - Tool for Deleting Obsolete Derivation Strategies     Obligatory          
    BCS Syntax Error on Upgrade from EA-PS 2.00 to ECC 600     Obligatory          
    Migration to ERP 6.0 (EA-PS 6.00)                                         Obligatory          
    Migration EA-PS 2.00 to ERP 5.0 (EA-PS 5.00)                      Obligatory          
    Missing initialization of new fields in table ANLZ                  Obligatory     46C                       470
    Activating VMC for the Internet Pricing and Configurator     Obligatory          
    Customer specific BSEG-fields not transferred                  Optional          
    Conversion of report headers in drilldown-reporting            Optional                                   600
    IBase: Upgrade to Release 4.6C and higher                         Optional     46C                         600
    ZSAPRCKML_COGS: Upgrade to release 4.7 or higher     Optional     46C                      470
    Conversion of CO-Total-Tables                                              Obligatory     46C                      500
    Conversion of CO-line-item table COEP                                Obligatory     46C                       600
    New General Ledger, problems in CO-documents                 Obligatory                               500
    No receivers found in allocations                                          Obligatory     46C                        470
    Conversion Of New Process Parameter Long Texts For Search     Optional     110                       600
    Migration of process parameters in recipe management     Optional     110                        600
    FAQ new depreciation calculation                                        Optional                                600
    Upgrading to SAP R/3 47x200 and SAP ECC 500 with RMGMT     Obligatory     100                       500
    Reloading Table T512W                                                        Optional          
    Converting Short Texts                                                         Obligatory          
    Migrating Data                                                                         Optional     4.7     
    Activating SAP ECC Extensions                                          Optional          
    I am not sure about which steps I have to perform, I am a bit confused.. because some are optional and some are not relevant to my release (as target or source release is different from mine). and also few things are not applied in my envirnoment hence those steps are also not relevant.
    Please suggest me, how to proceed and what to do. please guide if i skip this step now and later  on I apply latest SP than still I need to do all this.
    Regards
    Vinay
    Edited by: Vinay Paul on Sep 11, 2009 10:11 PM

    Hi All,
    I also faced a similar issue during upgrade. Some useful findings.
    1. Only super user can access this /n/ASU/START
    2. All the obligatory executable tasks are automatically performed by the system automatically during upgrade.      SAPADM. Only errors (if any) are to be corrected.
    3. Some of the tasks are only to go through some SAP notes as a precaution before upgrade.
    4.  Execute all the checks /n/ASU/UPGRADE
    5. This surely can be skipped, but not advisable.
    regards,
    Amit

  • Upgrading Oracle Text - Post upgrade step 10.2 to 11.2

    I already upgraded my 10.2.0.4 database to 11.2.0.1 and have to do post upgrade steps. In step 39 of Manual guideline (837570.1) is not clear for me. If some one can explain further would be appriciated. When i check my source ORACLE_HOME/ctx/admin/ctxf102.txt or ctxf102.sql
    Step 39
    Upgrading Oracle Text
    Copy the following files from the previous Oracle home to the new Oracle home:
    * Stemming user-dictionary files
    * User-modified KOREAN_MORPH_LEXER dictionary files
    * USER_FILTER executables
    To obtain a list of the above files, use:
    $ORACLE_HOME/ctx/admin/ctxf<version>.txt
    $ORACLE_HOME/ctx/admin/ctxf<version>.sql
    where version is 920,101,102
    For instance, if upgrading from 10.2.0
    *1. For dictionary files check*
    *$ORACLE_HOME/ctx/admin/ctxf102.txt*
    *2. Execute the script as database user SYS,SYSTEM, or CTXSYS*
    *$ORACLE_HOME/ctx/admin/ctxf102.sql*
    If your Oracle Text index uses KOREAN_LEXER which was deprecated in Oracle 9i and desupported in Oracle 10g Release 2, see below Note for further information on manual migration from KOREAN_LEXER to KOREAN_MORPH_LEXER.
    Note 300172.1 Obsolescence of KOREAN_LEXER Lexer Type

    Hi Srini
    Thank you very much. now i got it.
    Oracle asked me to identify the CTXCAT indexes with KOREAN_LEXER execute the following query as user CTXSYS: if nothing return then i can skip this step.
    SELECT idx_name
    FROM ctxsys.ctx_indexes
    WHERE idx_type = 'CTXCAT'
    AND idx_name IN
    (SELECT ixo_index_name
    FROM ctxsys.ctx_index_objects
    WHERE ixo_class = 'LEXER'
    AND ixo_object = 'KOREAN_MORPH_LEXER ');
    SELECT isl_index_owner,isl_index_name,isl_language
    FROM CTXSYS.ctx_index_sub_lexers
    WHERE isl_object = 'KOREAN_MORPH_LEXER';

  • What are  Pre Database Copy and Post data base copy activity list, Pre Migration and Post Migration activity list from SAP BW 7.0 to SAP BW 7.4 SPS6.

    BW on HANA :  Pre Database Copy and Post data base copy activity list, Pre Migration and Post Migration activity list from SAP BW 7.0 to SAP BW 7.4 SPS6.
    We are trying to copy database from SAP BW7.0 to SAP BW on HANA 7.4 SPS6 so we are in search for list of steps or activities during database copy both pre and post steps.
    Along with the above we are in search of Pre and post migration steps ones database is transferred successfully from oracle to HANA on 7.4 SPS6.
    Kindly help us in getting the exact course of action as requested.
    Thanks and Regards,
    Lavina Joshi

    Hi Lavina,
    try this link for starters: Upgrade and Migration - BW on HANA | SAP HANA
    Points to remember are:
    Preparation:
         -- Hardware Sizing
         -- Preparation of Data Centres
         -- HANA Hardware preparation
         -- System Landscape Readiness (upgrade software downloads, system readiness checks, etc)
         -- House Keeping activities on BW system (data clean up, etc)
    Post Installation:
         -- Sanity checks / Preparation and License checks
         -- JAVA Configurations
         -- Infoprovider conversions 
    Overall Stages are described below:
    # Environmental setup (HANA box)
         -- Initial system checks and Building Activities (system copy, Appln server setups, etc)
    # System readiness
                   - ZBW_HANA_COCKPIT Tool
                   - ZBW_HANA_CHECKLIST Tool
                   - ZBW_ABAP_ANALYZER Tool
                   - ZBW_TRANSFORM_FINDER Tool
                   - SIZING Report
                   - System Clean up Activities
                   - Impact of 7.4 on source system checks
                   - Java Upgrade for portal
    # DMO Stages
                   - Preparation & Pre Migration checks
                   - Execution / Migration
                   - Post Migration Activities
    # Testing Phase
                   - Source system checks/Activities
                   - System and Integration Testing
                   - End to End Testing
                   - Performance testing
                   - Reports
                   - BO reports / Interfaces
    Do let me know if you require any further information.
    Regards,
    Naren

Maybe you are looking for