We're currently in our upgrade project. I have a concern about our transport system after upgrading to ECC 5.0. Here is my scenario. We are currently upgrading from 4.6C to ECC 5.0.  All systems are central installations no app servers. Production server consist of PRD. Second server contains DEV and QA. The transport directory is shared between these server.
Upgrade landscape is on another server containing a Dev 5.0 and QA 5.0 system. Our go live plan is to upgrade PRD after testing on QA 5.0. I will manually add post upgrade transports to PRD and then import. My question is, will I run into any problems by manually adding the transports to PRD?
Yes, I know 6.0 is the better upgrade version but it's a long story.
Thank you in advance.

Hi Martin,
What do you mean by post upgrade transport if it is SPDD & SPAU fixes then for this you will get option during the upgrade to add a single transport request.
If you are talking @ the development happening into DEV & QA system during the production system upgrade the you just need to keep track of the transport sequance and need to import in a same sequance in the PRD after the upgrade
Hope this will help you, do revert if you need any more info.
Best Regards,
Sachin.

Similar Messages

  • BW 7.0 to 7.3 upgrade-Post upgrade activity and Transport the changes

    Hi Experts,
    We have upgraded our BW system from Release 7.0 to 7.3. As part of Security post upgrade activity I ran Migration steps,
    RSECADMIN-Extras->Migrations->Migration:Release 7.0 to Release 7.3. and later SU25 steps too.
    I fixed the Roles appeared in SU25 Step 2C and made below Characteristics as auth relevant,
    0TCAACTVT
    0TCAIPROV
    0TCAVALID
    But I have few doubts before Quality movement,
    1) Do I need to Run the Migration steps again in Quality and Production?
    RSECADMIN-Extras->Migrations->Migration:Release 7.0 to Release 7.3
    2) Do I need to transport only above Characteristics to Quality and Production or need to transport all the Characteristics and Analysis Authorization?
    3) How to transport Characteristics?
    Please provide your views.
    Regards
    Parag

    Hi,
    Technically its possible but it has its own consequences again based on the kind of object that you are going to Tranport.
    The above statement is applicable considering that you have 3.x flow in Bi7.0 system and with no DTP's or transformation etc...
    And if the BI7.0 is Unicode and 3.5 system is non-unicode then you will have lot of issues and most of the times you need Basis help to resolve the issues. So its bit risk to move the transport this way.
    So its better to develop the objects once again in 3.x system and then transport from D to Q and to P as a standard practice.
    Hope this helps.
    Murali

  • BW upgrade - pre and post upgrade reports

    Hi All
    Quick question please.
    We plan to upgrade our BW ABAP system from NW 731 SPS7 to NW 740 SPS6.
    I read the ASU toolbox note 1000009 and can see that there is no file for our scenario i..e from 73X to 740 so note 1734333 is the way to go here when prompted for ASU toolbox run. However within the note 1734333, it states "This note requires that all pre-requisites for the BW-related system copy automation are met according to note 1707321". When i read 1707321 it talks about installation procedure for PCA which is part of LVM, a licensed software. We don't have this license.  Hence I am wondering if note 1707321 is applicable for us at all or is it that this note would bring about changes in the system and sets up a staging area upon which the Z report from the other note(1734333) builds and then creates task list for pre and post upgrade. I am certain that we will have to implement Z report from note 1734333 however the reference to note 1707321 has created some confusion.
    Also once we implement the Z report from 1734333, the note says, the report needs not be transferred but the objects generated need to be. Would the author here referring to reports - SAP_BW_BEFORE UPGRADE and SAP_BW_AFTER UPGRADE and having them recorded into a transport.  Any thoughts here please.  If the author is indeed referring to these reports only, how do we know this will show up in quality systems via STC01 as input options.
    Regards
    Kalyan

    I re-read the note again, It says, If task manager content notes(1707321) are not applied, we will not see reports for stopping RDA Daemons and Process chains i...e report RS_SYSTEM_SHUTDOWN. However we are on NW 731 SP7 so we already have this report. This means we can go ahead with implementing the Z report from 1734333 and forget about the other note.  Have I comprehended it correctly
    Regards
    Kalyan

  • ASU-process POST Upgrade Step on SQL database

    Hi All,
    To check this message in the right format kindly click on reply first then click on quote original icon ("").
    I am performing an upgrade from R/3 4.7 to ERP 6.0 SR3, while doing upgrade sapup asking me To perform the manual application specific post upgrade step.
    This phase says to run ASU toolbox by using tx /n/asu/upgrade. when i run this tx is show the below list of steps to be performed with showing severity level of some as optional and many as obligatory.
    Task List                                                                                Severity     SAP R/3 release frm     SAP R/3 release to
    IS-OIL Application Test 600                                                 Optional          
    KP06xx: Termination SYNTAX_ERROR                                                 Obligatory     470                           500
    CGPL: Entries are blank after upgrade                                                Obligatory          
    Error handling of task group execution                                Optional          
    Mobile device cannot confirm TO after release upgrade     Obligatory     470                         600
    Mobile device doesn't find transfer orders after upgrade     Obligatory     470                          600
    Grantee Management - Upgrade from EA-PS 2.00 to ECC 600     Obligatory          
    Convert customizing for warehouse funds ctr scenarios     Optional          
    Various problems classification commitment items (class type     Obligatory          
    Unauthorized error messages udring fiscal year change/reassi     Obligatory          
    RFFMUDX1 migrates incomplete budgeting tables                          Obligatory          
    Non-7bit-ASCII character used for BCS key figures             Obligatory          
    Changes in TKEDR for /ISDFPS/RFFMDISTDERIVALE          Obligatory          
    BCS - Tool for Deleting Obsolete Derivation Strategies     Obligatory          
    BCS Syntax Error on Upgrade from EA-PS 2.00 to ECC 600     Obligatory          
    Migration to ERP 6.0 (EA-PS 6.00)                                         Obligatory          
    Migration EA-PS 2.00 to ERP 5.0 (EA-PS 5.00)                      Obligatory          
    Missing initialization of new fields in table ANLZ                  Obligatory     46C                       470
    Activating VMC for the Internet Pricing and Configurator     Obligatory          
    Customer specific BSEG-fields not transferred                  Optional          
    Conversion of report headers in drilldown-reporting            Optional                                   600
    IBase: Upgrade to Release 4.6C and higher                         Optional     46C                         600
    ZSAPRCKML_COGS: Upgrade to release 4.7 or higher     Optional     46C                      470
    Conversion of CO-Total-Tables                                              Obligatory     46C                      500
    Conversion of CO-line-item table COEP                                Obligatory     46C                       600
    New General Ledger, problems in CO-documents                 Obligatory                               500
    No receivers found in allocations                                          Obligatory     46C                        470
    Conversion Of New Process Parameter Long Texts For Search     Optional     110                       600
    Migration of process parameters in recipe management     Optional     110                        600
    FAQ new depreciation calculation                                        Optional                                600
    Upgrading to SAP R/3 47x200 and SAP ECC 500 with RMGMT     Obligatory     100                       500
    Reloading Table T512W                                                        Optional          
    Converting Short Texts                                                         Obligatory          
    Migrating Data                                                                         Optional     4.7     
    Activating SAP ECC Extensions                                          Optional          
    I am not sure about which steps I have to perform, I am a bit confused.. because some are optional and some are not relevant to my release (as target or source release is different from mine). and also few things are not applied in my envirnoment hence those steps are also not relevant.
    Please suggest me, how to proceed and what to do. please guide if i skip this step now and later  on I apply latest SP than still I need to do all this.
    Regards
    Vinay

    Hi All,
    I also faced a similar issue during upgrade. Some useful findings.
    1. Only super user can access this /n/ASU/START
    2. All the obligatory executable tasks are automatically performed by the system automatically during upgrade.      SAPADM. Only errors (if any) are to be corrected.
    3. Some of the tasks are only to go through some SAP notes as a precaution before upgrade.
    4.  Execute all the checks /n/ASU/UPGRADE
    5. This surely can be skipped, but not advisable.
    regards,
    Amit

  • Upgrade step ASU-process post upgrade step

    Hi All,
    To check this message in the right format kindly click on reply first then click on quote original icon ("").
    I am performing an upgrade from R/3 4.7 to ERP 6.0 SR3, while doing upgrade sapup asking me To perform the manual application specific post upgrade step.
    This phase says to run ASU toolbox by using tx /n/asu/upgrade. when i run this tx is show the below list of steps to be performed with showing severity level of some as optional and many as obligatory.
    Task List                                                                                Severity     SAP R/3 release frm     SAP R/3 release to
    IS-OIL Application Test 600                                                 Optional          
    KP06xx: Termination SYNTAX_ERROR                                                 Obligatory     470                           500
    CGPL: Entries are blank after upgrade                                                Obligatory          
    Error handling of task group execution                                Optional          
    Mobile device cannot confirm TO after release upgrade     Obligatory     470                         600
    Mobile device doesn't find transfer orders after upgrade     Obligatory     470                          600
    Grantee Management - Upgrade from EA-PS 2.00 to ECC 600     Obligatory          
    Convert customizing for warehouse funds ctr scenarios     Optional          
    Various problems classification commitment items (class type     Obligatory          
    Unauthorized error messages udring fiscal year change/reassi     Obligatory          
    RFFMUDX1 migrates incomplete budgeting tables                          Obligatory          
    Non-7bit-ASCII character used for BCS key figures             Obligatory          
    Changes in TKEDR for /ISDFPS/RFFMDISTDERIVALE          Obligatory          
    BCS - Tool for Deleting Obsolete Derivation Strategies     Obligatory          
    BCS Syntax Error on Upgrade from EA-PS 2.00 to ECC 600     Obligatory          
    Migration to ERP 6.0 (EA-PS 6.00)                                         Obligatory          
    Migration EA-PS 2.00 to ERP 5.0 (EA-PS 5.00)                      Obligatory          
    Missing initialization of new fields in table ANLZ                  Obligatory     46C                       470
    Activating VMC for the Internet Pricing and Configurator     Obligatory          
    Customer specific BSEG-fields not transferred                  Optional          
    Conversion of report headers in drilldown-reporting            Optional                                   600
    IBase: Upgrade to Release 4.6C and higher                         Optional     46C                         600
    ZSAPRCKML_COGS: Upgrade to release 4.7 or higher     Optional     46C                      470
    Conversion of CO-Total-Tables                                              Obligatory     46C                      500
    Conversion of CO-line-item table COEP                                Obligatory     46C                       600
    New General Ledger, problems in CO-documents                 Obligatory                               500
    No receivers found in allocations                                          Obligatory     46C                        470
    Conversion Of New Process Parameter Long Texts For Search     Optional     110                       600
    Migration of process parameters in recipe management     Optional     110                        600
    FAQ new depreciation calculation                                        Optional                                600
    Upgrading to SAP R/3 47x200 and SAP ECC 500 with RMGMT     Obligatory     100                       500
    Reloading Table T512W                                                        Optional          
    Converting Short Texts                                                         Obligatory          
    Migrating Data                                                                         Optional     4.7     
    Activating SAP ECC Extensions                                          Optional          
    I am not sure about which steps I have to perform, I am a bit confused.. because some are optional and some are not relevant to my release (as target or source release is different from mine). and also few things are not applied in my envirnoment hence those steps are also not relevant.
    Please suggest me, how to proceed and what to do. please guide if i skip this step now and later  on I apply latest SP than still I need to do all this.
    Regards
    Vinay
    Edited by: Vinay Paul on Sep 11, 2009 10:11 PM

    Hi All,
    I also faced a similar issue during upgrade. Some useful findings.
    1. Only super user can access this /n/ASU/START
    2. All the obligatory executable tasks are automatically performed by the system automatically during upgrade.      SAPADM. Only errors (if any) are to be corrected.
    3. Some of the tasks are only to go through some SAP notes as a precaution before upgrade.
    4.  Execute all the checks /n/ASU/UPGRADE
    5. This surely can be skipped, but not advisable.
    regards,
    Amit

  • EJB references post upgrade from 8.1 to 10.3

    Hi,
    I have an application.xml file in META-INF directory of the EAR file. It has the below reference:
    <module>
              <ejb>content.jar</ejb>
         </module>
         <module>
              <ejb>content_repo.jar</ejb>
         </module>
         <module>
              <ejb>netuix.jar</ejb>
         </module>
         <module>
              <ejb>p13n_ejb.jar</ejb>
         </module>
         <module>
              <ejb>prefs.jar</ejb>
         </module>
         <module>
              <ejb>wps.jar</ejb>
         </module>
    Post upgrade I accidentally packaged an EAR without above references in application.xml and without actual jars in the EAR file. The application seemed to be running fine, did not test it completely though. Do we really need these jar files? I had upgraded this application from 8.1 to 10.3 using upgrade tool in workshop. This is a portal based web application. Also, what is the purpose of these libraries? Could these be automatically added by the upgrade tool to the weblogic.xml.

    Hi Srini,
    it supports but you need to upgrade correctly.
    follow this link
    Beehive Applications
    after upgrade if you found some error like classnotfound error.
    If those are the errors you were also experiencing, then please follow one of these options to resolve this issue:OPTION
    1:Identify all the JARs that contain the beehive classes and explicitly add the jar files to the classpathOPTION
    2:When you created the domain (if you used the Config Wizard), do you make it a "Workshop" domain? If not, try that.That should deploy the Workshop framework (Beehive controls, NETUI, etc) libraries as shared libraries. Then these libraries should be referenced in your applications weblogic.xml and weblogic-application.xml.
    regards,
    Kal

  • Hi Post Upgrade Job Failing

    HI All,
    We have recently done the Upgrade from BW 3.1 to BI 7.0
    There is a issue regarding the POST Upgrade
    One Job is failing every day
    The name of the JOB is BI_WRITE_PROT_TO_APPLLOG
    And the Job log is
    06/18/2008 00:04:55 Job started                                                          00           516          S
    06/18/2008 00:04:55 Logon of user PALAPSJ in client 200 failed when starting a step      00           560          A
    06/18/2008 00:04:55 Job cancelled
                                                           00           518          A
    This Job is actually running the program
    RSBATCH_WRITE_PROT_TO_APPLLOG
    when i try to run this program with my user id its working
    but with the other user id which it is schedule its failing giving the messages as mentioned in the job log
    Kindly suggest me
    REgards
    janardhan K

    Maybe it's a dialog and no system or background user. so the job fails.
    Regards,
    Juergen

  • Post-upgrade tasks for OWB 10g Release 2

    Hi,
    we're planning to upgrade from OWB 10.1.0.2 to 10.2.x.
    Now, I'm trying to get a clear view on what will be the "post-upgrade" tasks, in terms of manual adaptations, corrections, etc. to get everything back up and running after the upgrade ...
    E.g. : by means of test al already exported a dimension, and imported it in the 10.2 repository ... Turned out that in the pre-10.2 version, there were no validation problems, but as from 10.2 (although the upgrade and import were successful), I got 19 warnings and 2 errors ... because each level needs to have a business or surrogate key ...
    It' s things like that I'm especially interested in, in order to determine the workload after the upgrade ...
    So, feel free to share your experiences ; I'm looking forward to read them!
    Thanks!
    Grtz.

    Here are some from my list. I stopped maintaining it a while ago, we have lots more where this came from. Some of it also apply to older versions of OWB.
    Key lookup     You are to choose input and output attributes BEFORE being able to choose loookup table, all in a time consuming wizard
    Expressions     Copy and paste into expression editor, validation fails for expressions using lowercase (such as "upper" or "substr")
    Renaming attributes     Not possible anymore, you need to open details
    Adding a table component     You must browse in a tree structure (time consuming), not search functionality anymore
    Import     Import converting from 9.2 hangs after 15% in about 10% of all imports
    Import     Some mappings are not possible to import, a total rewrite is necessary
    Deployment     You can only deploy about 5-10 times before you need to restart OWB
    Memory leak     If something goes wrong in OWB, memory is never cleared - JAWAW.exe needs to be removed manually from memory
    Import     Importing mappings one by one (as this is sometimes needed due to OWB), the last directory used is OF COURSE not default when importing the next time
    OWB GUI / mapping editor     When working with components in the mapping editor, an object hidden behind the object you are actually working with is selected prior to the object in visual focus to the user
    BUG!     Urgent: CASE - wrong generated Code
    ANSI JOINS     Remove ANSI-SQL from mapping configuration, otherwise (+) outer joins will not work
    Transformations     Not possible to enter a transformation such as "sysdate", you must find it in a huge tree structure list (no search available)

  • ITunes crashing when syncing with my iphone 3gs on a Vista machine post upgrade..have tried the netsch winsock reset but no luck...any ideas?

    Upgraded my iTunes to the latest version and upgraded my iPhone 3gs to IOS5. Unable to sync my iPhone with iTunes after upgrade and is getting stuck on Step1. I am running my iTunes on Windows Vista PC and have tried the solution of netsh winsock reset and still no luck.
    Also, I am not able to see any of my music on the phone post upgrade, but it shows on iTunes. Again not sure on how to make it appear on my phone. Any help would be much appreciated!!
    Cheers,
    Kishore

    my advice to you is to SWITCH TO SOMETHING BESIDES "VISTA"!!!!!!!!!!!!!

  • Audio Tracks on my iPhone stopped working post upgraded to iOS 5.

    Audio Tracks on my iPhone stopped working post upgraded to iOS 5.
    Quiet a lot of my tracks do not play on my iPhone 4 after I upgraded to iOS 5. The the seeker bar does not progress and it looks stuck.
    Could someone please help.
    Regards,
    S!d

    Hi !
    I am currently having the same problem, since I upgraded my iPhone 4 to iOS 5, many tracks don't work. They were working before. Some are working but half isn't.
    Tried to restore, remake playlist, delete every tracks et put them back. Same prob.
    Please help !
    Regards,
    Rom

  • 12.1.1 POST-upgrade ---verify concurrent process

    I have upgraded 11.5.10.to 12.1.1 successfully when I was running post upgrade
    Oracle® Applications
    Upgrade Guide
    Release 11i to 12.1.1
    Part No. E14010-01
    chapter 4
    Step 1: Verify completion of concurrent programs (recommended)
    The upgrade process creates numerous concurrent program requests. Once you bring
    up the application tier, these programs run automatically to complete tasks such as data
    cleanup and upgrades to historical data, among others. You can run these programs in
    the background, while your system is up and running and users are active, unless
    otherwise instructed in the product-specific sections of this book.
    Before you continue, be sure all the concurrent programs generated by the upgrade
    have run successfully. In the Required Post Upgrade Jobs section of E-Business Suite
    Release 12 Upgrade Sizing and Best Practices (Doc ID: 399362.1), you will find a list of the
    distinct concurrent programs included in the upgrade process. The Best Practices
    section includes a recommendation on how to isolate these programs (and all their
    executions) into a separate concurrent manager queue, which you can use for
    processing.
    post upgrade concurrent request were around 989 but
    by mistake I stopped the concurrent manager and I ran cmclean.sql --:(
    then after some time I shut abort the database
    please tell me what should I do now
    what impact will cmclean and shut abort will have ?
    how do i know which request are clean by cmclean
    and how can I ran them again??
    Immediate reply is appreciated
    AppsmastI
    SHaring Is CArinG

    post upgrade concurrent request were around 989 but
    by mistake I stopped the concurrent manager and I ran cmclean.sql --:(
    then after some time I shut abort the database
    please tell me what should I do now In the Required Post Upgrade Jobs section of E-Business Suite Release 12 Upgrade Sizing and Best Practices (Doc ID: 399362.1), you will find a list of the distinct concurrent programs included in the upgrade process.
    what impact will cmclean and shut abort will have ?cmclean.sql script should not have any impact on the concurrent programs, however shutdown abort will do the following http://docs.oracle.com/cd/E11882_01/server.112/e10595/start003.htm#i1006611
    how do i know which request are clean by cmclean In the same session you will find the list of table that are updated by cmclean.sql script along with the request ids.
    and how can I ran them again??See the doc referenced above.
    Thanks,
    Hussein

  • SLA Pre- upgrade programs and process and SLA Post upgrade

    Hi Guys
    Can anybody please let me know what are the SLA Pre- upgrade programs and process we have to run and SLA Post upgrade process and programs.
    Thanks
    Ajeesh

    Pl post details of OS and EBS versions. Pl see if MOS Doc 604893.1 (R12: FAQ for the SLA Upgrade: SLA Pre-Upgrade, Post-Upgrade, and Hot Patch) can help
    HTH
    Srini

  • Error on Oracle 11gR2 RAC database Post upgrade step

    [Upgrade the Oracle Clusterware Configuration|http://docs.oracle.com/cd/E11882_01/server.112/e23633/afterup.htm] Problem Description:
    O.S Version: HP-UX B.11.31 U ia64
    It is upgrading of Oracle RAC 2 node database from 11.1.0.7.0 to 11.2.0.3.0
    I receive following error while perfoming the post upgrade step
    indba1 racdb&gt; srvctl upgrade database -d racdb -o /app/oracle/product/11.2.0.3/db
    PRCD-1231 : Failed to upgrade configuration of database racdb to version 11.2.0.3.0 in new Oracle home /app/oracle/product/11.2.0.3/db
    PRKC-1136 : Unable to find version for database with name racdb
    Actually I am performing the step "Upgrade the Oracle Clusterware Configuration" whill getting the error.
    When I tried on below;
    indba1 racdbp> srvctl upgrade database -d racdb -o /app/oracle/product/11.2.0.3/db
    PRCD-1231 : Failed to upgrade configuration of database racdb to version 11.2.0.3.0 in new Oracle home /app/oracle/product/11.2.0.3/db
    PRKC-1136 : Unable to find version for database with name racdb

    Output from Oracle 11.1.0.7 Home:
    oracle@indba1:/app/oracle/product/11g/db_1 $ srvctl config database -d racdb
    PRKR-1001 : cluster database racdb does not exist
    PRKO-2005 : Application error: Failure in getting Cluster Database Configuration for: racdb
    Output from Oracle 11.2.0.3 Home:
    oracle@usfsdba1:/app/oracle/product/11.2.0.3/db $ srvctl config database -d racdb
    PRKR-1001 : cluster database racdb does not exist
    PRKO-2005 : Application error: Failure in getting Cluster Database Configuration for: racdb

  • Upgrading Oracle Text - Post upgrade step 10.2 to 11.2

    I already upgraded my 10.2.0.4 database to 11.2.0.1 and have to do post upgrade steps. In step 39 of Manual guideline (837570.1) is not clear for me. If some one can explain further would be appriciated. When i check my source ORACLE_HOME/ctx/admin/ctxf102.txt or ctxf102.sql
    Step 39
    Upgrading Oracle Text
    Copy the following files from the previous Oracle home to the new Oracle home:
    * Stemming user-dictionary files
    * User-modified KOREAN_MORPH_LEXER dictionary files
    * USER_FILTER executables
    To obtain a list of the above files, use:
    $ORACLE_HOME/ctx/admin/ctxf<version>.txt
    $ORACLE_HOME/ctx/admin/ctxf<version>.sql
    where version is 920,101,102
    For instance, if upgrading from 10.2.0
    *1. For dictionary files check*
    *$ORACLE_HOME/ctx/admin/ctxf102.txt*
    *2. Execute the script as database user SYS,SYSTEM, or CTXSYS*
    *$ORACLE_HOME/ctx/admin/ctxf102.sql*
    If your Oracle Text index uses KOREAN_LEXER which was deprecated in Oracle 9i and desupported in Oracle 10g Release 2, see below Note for further information on manual migration from KOREAN_LEXER to KOREAN_MORPH_LEXER.
    Note 300172.1 Obsolescence of KOREAN_LEXER Lexer Type

    Hi Srini
    Thank you very much. now i got it.
    Oracle asked me to identify the CTXCAT indexes with KOREAN_LEXER execute the following query as user CTXSYS: if nothing return then i can skip this step.
    SELECT idx_name
    FROM ctxsys.ctx_indexes
    WHERE idx_type = 'CTXCAT'
    AND idx_name IN
    (SELECT ixo_index_name
    FROM ctxsys.ctx_index_objects
    WHERE ixo_class = 'LEXER'
    AND ixo_object = 'KOREAN_MORPH_LEXER ');
    SELECT isl_index_owner,isl_index_name,isl_language
    FROM CTXSYS.ctx_index_sub_lexers
    WHERE isl_object = 'KOREAN_MORPH_LEXER';

  • Post upgrade step for EP

    HI Friends,
    I have upgraded my EP from 6.0 to 7.0 successful with all component. ALos i am getting login screen. SO what are post upgrade step for EP.
    Thanks,
    Regards,
    Sachin

    HI ,
    System restart
    run the SICK verify the installation check
    Check developer traces on the operating system. Log on to
    Check the installed license and profile configuration (RZ10 and PFCG)
    confirm the  operation modes
    Perform a client copy
    Check the status of the SAP Web AS Java and the user SAPJSF
    Check the rdisp/j2ee_start profile parameter
    Check the current state of SAP Web AS Java using transaction SMICM
    SAP Load Generator
    Start SAP Load Generator (SGEN)
    Regards,